Sol_12445524R0003_Amd_0002.pdf
PDF 110 KB Posted
- Solicitation number
- 12445524R0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This document provides details for a solicitation to renovate the Iargo Springs Interpretive Site. The project consists of replacing vault toilets and an information kiosk with new signage, removing and replacing an existing wood stair and portions of the boardwalk, and constructing new elevated boardwalk loops. The period of performance is through August 1, 2025. All tree clearing and ground disturbance activities must be completed by April 30, 2025. The site will be closed to the public starting October 1, 2024 to allow contractor mobilization and construction in upper areas, pending clearance for endangered wildlife. As of November 1, 2024, work can begin on slopes and the full site. The solicitation number is 12445524R0003 and is issued by the Department of Agriculture Forest Service for renovations at the Iargo Springs location in Iosco County, Michigan.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12445524R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
540B
OSCODA MI 48750-1595
5761 N SKEEL
HURON SHORES RANGER STATION
USDA FOREST SERVICE
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 13
02/22/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to change the performance period as well as incorporate additional restrictions to beginning ground work. This solicitation is hereby extended through 3/7/2024 at 1400 eastern.
The current proposed schedule for Iargo construction is as follows:
October 1st, 2024 ¿ The site closed to the general public. The contractor can mobilize to the site and construction work on the upper flat level ground area can begin after assessing for any signs of eastern massasauga rattlesnake (EMR). If any signs of EMR is found work in that area will be delayed until area cleared by a FS biologist.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DEBRA K. BRINN
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12445524R0003/0002
November 1st, 2024¿ Work can begin on the entire site including the slopes down to the river. All tree cutting must be completed by 4/15 2025.
All new ground disturbance activities must be completed by 4/30/2025. Construction activities that do not included new ground disturbance can continue until project completion.
August 1st, 2025 ¿ Proposed construction completion
These are the only changes as a result to this solicitation. All other terms and conditions remain the same.
FOB: Destination
Period of Performance: 11/01/2024 to 08/01/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Notice to Contractors bidding on Iargo Springs project
October 1st – The site will be closed to the general public. The contractor can mobilize to the site and construction work on the upper flat level ground area can begin after a FS assessment for any signs of endangered wildlife. If any signs of endangered wildlife are found work in that area will be delayed until area cleared by a FS biologist.
November 1st – Work can begin on the entire site including the slopes down to the river. All tree cutting must be completed by 4/15/2025. All new ground disturbance activities must be completed by 4/30/2025. Construction activities that do not included new ground disturbance can continue until project completion.
File details come from the government source that posted it. Updated .