A3 S-63500-00011754 Elk River Hatchery New Rearing Ponds .pdf
PDF 1 MB Posted
- Attached to
- Elk River Hatchery New Rearing Ponds
- Solicitation number
- S-63500-00011754
- Issued by
- Crook County, Oregon
About this file
This is Addendum #3 from the Oregon Department of Fish and Wildlife for ITB S-63500-00011754, Engineering Project No. 23-037 for the Elk River Hatchery New Rearing Ponds project. The addendum modifies Attachment C to update pump model information and correct flow information, specifically replacing Sheet P4 (dated November 18, 2024) and Sheet P2 with revised versions dated December 2, 2024. The bid submittal deadline remains December 12, 2024 at 2:00 pm, with questions or protests regarding this addendum due by close of business on December 4, 2024.
The revised engineering drawings show detailed piping plans for the new pump house and rearing ponds, including specifications for HDPE pipes, concrete cylinder pipes, valves, and various fittings. The drawings indicate flow rates, pressure specifications, and detailed measurements for the installation of the pumping and piping systems. This addendum constitutes a material change to the solicitation and must be acknowledged by bidders per Form A-1, Item 12 of the ITB.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 3 ITB S-63500-00011754
Date: December 3, 2024
Oregon Department of Fish and Wildlife
ADDENDUM #3
ITB S-63500-00011754
Engineering Project No.: 23-037
Elk River Hatchery New Rearing Ponds
This addendum modifies the solicitation document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original solicitation document and shall become part of the work required.
Deleted language is shown as strike through within [brackets]. New language is show in Bold and Underlined. New Attachments or Sections deleted in their entirety and replaced will not show [brackets] or Bold and Underlined, they will be labeled, “REVISED”.
ADDENDUM
1. ATTACHMENT C ELK RIVER HATCHERY NEW REARING PONDS PLANS AND DRAWINGS
shall be modified to update the pump model information and correct flow information.
a. Sheet P4 Revised November 18, 2024 shall be removed and replaced with the Sheet P4 Revised December 2, 2024, attached to this addendum.
b. Sheet P2 shall be removed and replaced with Sheet P2 Revised December 2, 2024, attached to this addendum.
ITB DATES REMAIN UNCHANGED:
Deadline for Bid Submittal December 12, 2024 at 2:00 pm
Prospective Bidders have until Close of Business on December 4, 2024 to submit written questions or protests regarding this Addendum.
This addendum constitutes a MATERIAL CHANGE to the solicitation. Its receipt by the Bidder is to be acknowledged per Form A-1, Item 12 of the ITB.
Addendum prepared by:
Julie L. Cone julie.l.cone@odfw.oregon.gov
End of Addendum #3 mattesch 2024 Digital Stamp mattesch 2024 Digital Stamp
| A3 ITB S-63500-00011754 Elk River Hatchery New Rearing Pondsfinal.pdf |
| 1. ATTACHMENT C ELK RIVER HATCHERY NEW REARING PONDS PLANS AND DRAWINGS shall be modified to update the pump model information and correct flow information. |
| a. Sheet P4 Revised November 18, 2024 shall be removed and replaced with the Sheet P4 Revised December 2, 2024, attached to this addendum. |
| b. Sheet P2 shall be removed and replaced with Sheet P2 Revised December 2, 2024, attached to this addendum. |
| Prospective Bidders have until Close of Business on December 4, 2024 to submit written questions or protests regarding this Addendum. |
| Elk River New Ponds P2 Piping Plan REV 12-2-24.pdf |
| Elk River New Ponds P4 Pump House Piping Plan REV 12-2-24.pdf |