A23 Attach 5 Accounting System Checklist.doc
DOC document 237 KB Posted
- Solicitation number
- HQ003420R0089
- Issued by
-
DOD Washington Headquarters Service
About this file
This document contains an accounting system checklist attachment and details for a solicitation seeking analytic and technical support services. The solicitation is for multiple-award IDIQ contracts from the Washington Headquarters Services Acquisition Directorate to provide support mainly to the Under Secretary of Defense Acquisition and Sustainment and other DoD Fourth Estate agencies. Requirements include administrative management, general management consulting, and professional scientific and technical services. The primary place of performance is the National Capital Region including the Pentagon, Mark Center and other offsite locations as specified in individual task orders. Offerors must complete the accounting system checklist in the attachment demonstrating their system can support cost reimbursement contracts and be ready for a DCAA audit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A23 Attach 12 RFP QA Amendment 3.pdf | ||
| A23 RFP HQ003420R0089 Amend 3.pdf | ||
| A23 Attach 11 RFP QA Amendment 2.pdf | ||
| A23 RFP HQ003420R0089 Amend 2.pdf | ||
| A23 Attach 6 Past Performance Questionnaire Amd 1.doc | DOC document | |
| A23 Attach 1 Small Business Participation Commitment Document Amd 1.docx | DOCX document | |
| A23 Attach 4 Subcontracting Plan Amd 1.docx | DOCX document | |
| A23 RFP HQ003420R0089 Amend 1.pdf | ||
| A23 Attach 10 RFP QA.pdf | ||
| A23 Attach 7 OCI Analysis and Disclosure Form.docx | DOCX document | |
| A23 Attach 8 ATSS Historical Environment Document.pdf | ||
| A23 Attach 4 Subcontracting Plan.docx | DOCX document | |
| A23 Attach 3 FP and TM-LH Labor Category Pricing Worksheet.xls | XLS spreadsheet | |
| A23 Attach 1 Small Business Participation Commitment Document.docx | DOCX document | |
| A23 RFP HQ003420R0089.pdf | ||
| A23 Attach 6 Past Performance Questionnaire.doc | DOC document | |
| A23 Attach 2 FP Labor Category Pricing Worksheet.xls | XLS spreadsheet | |
| A23 Attach 9 QA from Draft RFP.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #1 HQ003420R0089 - Accounting System Checklist
In order to understand the requirements of the SF1408 (Preaward (prior to Cost-Reimbursement Task Orders) Survey of Prospective Contractor’s Accounting System) and ensure your firm is ready for DCAA to perform an audit, offerors are required to fill out the following checklist and include it in Factor A of your proposal:
Instructions:
1. Mark “X” in the appropriate column.
2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary
Contractor Name:
Point of Contact (Name/Ph #/Email):
CAGE Code:
READY FOR AUDIT (YES) / (NO):
Yes No N/A Note
1. Is the accounting system in accord with generally accepted accounting principles?
2. ACCOUNTING SYSTEM PROVIDES FOR:
a. Proper segregation of direct costs from indirect costs.
b. Identification and accumulation of direct costs by contract.
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)
d. Accumulation of costs under general ledger control.
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.
g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.
j. Segregation of preproduction costs from production costs.
3. Accounting system provides financial information:
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).
b. Required to support requests for progress payments.
4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?
5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)
Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.
Note Narrative
>PLEASE ANSWER ALL QUESTIONS BELOW:
>ARE YOU PLANNING ON BIDDING ON COST TYPE CONTRACTS? (YES/NO)
>ARE YOU READY FOR A DCAA AUDIT? (YES/NO)
>HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO)
>HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's >WEBSITE (http://www.dcaa.mil/)? (YES/NO)
>PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR COMPANY - >(Found on DCAA's website (http://www.dcaa.mil/) >PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT (Name/ph #/ eMail)
If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report
>>[Insert name and title of individual responsible for design of the accounting system] Name: Title: Contractor:
Signature: Date:
File details come from the government source that posted it. Updated .