A102 OVERALL SECOND FLOOR PLAN.pdf

PDF 1 MB Posted

Attached to
N063--Physical Access Control System (PACS) 671-23-1-5554-0012 (VA-23-00037147)
Solicitation number
36C25723Q0317
Issued by

About this file

This market research notice seeks sources for a turnkey physical access control system (PACS) to replace the existing C-Cure 9000 system at the South Texas Veterans Healthcare System facilities. Interested vendors should respond by January 25, 2023 with business information, applicable GSA schedule contracts, and estimated pricing. The notice will be used to determine the procurement strategy such as a small business set-aside for the future solicitation. The requirement includes installation at multiple facilities as detailed in the attached statement of work and facility drawings. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is the issuing agency.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

1 2 3 4 5 6 7 9 10 11 12 13 14 15

K

J

I

H

G

F

E

D

C

B

A

A2.11

F9

A2.11 C9

A2.11A9

A2.11

E9

2A106

WAITING

2G207

CONSULT

2G208

CONSULT

2G209

CONSULT

2G210

CONSULT

2G211

CONSULT

2G212

CONSULT

2G213

CONSULT

2G214

CONSULT

2G215

CONSULT

2G216

CONSULT

2G205

GROUP THERAPY

2G185

GROUP THERAPY

2G140

GROUP THERAPY

2G118

GROUP THERAPY

2G174

CUBICLE

2G105

OFFICE, CHIEF

2G106

OFFICE, CHIEF

2G154

GENERAL STORAGE

2G131

LOCKER

2G152

S TLT

2G130

S TLT

2G195

CONFERENCE

2G102

SPEC SYSTEMS

2D147

DIET / OFFICE

2D146

DIET / OFFICE

2D148

DIET / EXAM

2B146

EXAM

2B117

EXAM

2B147

EXAM

2B118

EXAM

2B148

EXAM

2B119

EXAM

2B128

GROUP ROOM

2D155

EXAM, MH

2D150

EXAM, PH

2B116

PROCEDURE

2B145

PROCEDURE

2D149

SW / EXAM

2B145.1

P TLT

2B116.1

P TLT

2B129

GROUP ROOM

2D151

EXAM, PH

E

O

IT

D A

T A

2D152

EXAM, PH

2D153

EXAM, MH

2D154

EXAM, MH

2G206

CONSULT

2G151

CONSULT

2G142

P TOILET

2G145

EXAM

2G146

CONSULT

2G147

CONSULT

2G148

CONSULT

2G149

CONSULT

2G150

CONSULT

2F102

P TLT

2B122

EXAM

2B121

EXAM

2G129

LOUNGE

E

O F

F

IC

E S

U P

E R

V

IS

O R

E

O F

F

IC

E

A O

2E165

SEDATION

2E171

SOILED SPD CART

HOLDING

2E175

OFFICE ASSISTANT CHIEF

2E167

SEDATION

2E166

SEDATION

2E163

TREATMENT, TH

2E162

TREATMENT, TH

2E161

TREATMENT, TH

2E146

TREATMENT

2E147

TREATMENT

2E153

TREATMENT, BAR

E

T L

T

2E145

TREATMENT

2E154

TREATMENT

2E157

TREATMENT

2E158

TREATMENT

2E155

TREATMENT

2E149

TREATMENT, BAR

2E148

TREATMENT

2E159

TREATMENT

2E156

TREATMENT

2E144

TREATMENT

2E143

TREATMENT

2E142

TREATMENT

2E132

TREATMENT

2E133

TREATMENT

2E137

TREATMENT, BAR

2E138

TREATMENT

2E140

TREATMENT

2E135

TREATMENT, BAR

2E134

TREATMENT

2E139

TREATMENT

2E109

TREATMENT

2E114

TREATMENT

2E115

TREATMENT

2E119

TREATMENT, BAR

2E126

TREATMENT

2E113

TREATMENT

2E120

TREATMENT

2E123

TREATMENT

2E124

TREATMENT

2E121

TREATMENT

2E117

TREATMENT, BAR

2E116

TREATMENT

2E160

TREATMENT

2E125

TREATMENT

2E122

TREATMENT

2E112

TREATMENT

2E111

TREATMENT

2E110

TREATMENT

2E100

RECEPTION

2E102

BARIATRIC TREATMENT

2E103

TREATMENT

2E104

TREATMENT

E

O F

F

IC

E

C H

IE

F

2E164

PANO SCAN

2B109

OFFICE, ADMIN

2G155

CONSULT

2G161

EXAM

2G160

CONSULT

2G159

CONSULT

2G158

CONSULT

2G157

CONSULT

2G156

CONSULT

2G128

HOLDING

2G120

EXAM

2G121

CONSULT

2G122

CONSULT

2G123

CONSULT

2G124

CONSULT

2G125

CONSULT

2G126

CONSULT

2G127

CONSULT

2G107

HOLDING

2G115

EXAM

2G114

CONSULT

2G113

CONSULT

2G112

CONSULT

2G111

CONSULT

2G110

CONSULT

2G109

CONSULT

2G108

CONSULT

2G196

BIO-FEEDBACK CONSULT

2G186

GROUP THERAPY

2G202

EXAM

2G201

CONSULT

2G200

CONSULT

2G199

CONSULT

2G198

CONSULT

G

C O

N S

U L

T

2F111

C&P EXAM

2F107

C&P EXAM

2F108

C&P EXAM

2F109

C&P EXAM

2F110

C&P EXAM

2F103

C&P EXAM

2F104

C&P EXAM

2F105

C&P EXAM

2F106

C&P EXAM

2F101

RECEPTION

2E131

CLEAN UTILITY

2E177

LOCKER

2E141

CLN LINEN

E

S O

IL

E

D U

T Y

2A101

WAITING

2B125

SCREEN

2B127

GROUP ROOM

2B154

SCREEN

2B149

EXAM

2B150

EXAM

2B153

OB/GYN

2B153.1

GYN TLT

2B123.2

S TLT

2B134

SUPPORT PROVIDER

2B126

P TLT

E

A E

D G

D E

N T

A L

A S

S

IS

T S

U P

2E173

MULTI-PURPOSE ROOM

E

A E

D G

D

IR

D

T L

T

E

H A

C

2D130

CLEAN LINEN

2D132

LOCKER2C142

MEDICAL EQUIPMENT

D

W A

S T

E S

T O

R A

G E

2D158

TRASH

2C116

BREAKROOM

2D156

MED EQUIP.

2B142

SOILED UTY

D

T L

T

2B143

CLN LINEN

2G153

MEDICATION

2B123.1

P TLT

2B124

EXAM

2B152

EXAM

2C115

CLEAN UTILITY

2B140

OIT DATA

2D129

SOILED UTY

B

E L

E C

E

O F

F

IC

E S

U P

E R

V

IS

O R

2E130

MED. RM.

2G104

ELEC

2B107

EXAM

2B104

SW / EXAM

2B106

SW / EXAM

2B103

SW / EXAM

2B105

SW / EXAM

2B108

EXAM

2B113

CONFERENCE

2B110

OFFICE, ADMIN

2B111

OFFICE, ADMIN

2B112

OFFICE, ADMIN 2B138

TEAM WKRM

2B139

TEAM WKRM

2B131

TEAM WKRM

2B137

TEAM WKRM

2B130

TELEHEALTH

2B136

STORAGE

2B115

MEDICATION

2B135

SUPPLIES

2B132

TEAM WKRM

2B120

EXAM

2B151

ISO EXAM

E

E L

E C

2G194

OIT DATA

2A103

INFORMATION DESK

2E151

NURSE OFFICE

E

N U

R S

E R

O O

M

2E172.2

CAD CAM ROOM

E

.3

P O

R C

E L

A

IN

R O

O M

2G101

OFFICE, SECRETARY

2G175

ELEC

2C137

EXAM

2C110

EXAM

2C138

EXAM

2C111

EXAM

2C139

EXAM

2C112

EXAM

2C113

PROCEDURE

2C140

PROCEDURE

2C140.1

P TLT

2C113.1

P TLT

2C103

SCREEN

C

S C

R E

E N

2C136

EXAM

2C135

EXAM

2C132

OB/GYN

2C132.1

GYN TLT

2C106.2

S TLT

2C122

SUPPORT PROVIDER

2C104

TLT

2C106.1

P TLT

2C105

EXAM

2C133

EXAM

2C118

TEAM WKRM

2C119

TEAM WKRM

2C125

TEAM WKRM

2C117

TEAM WKRM

2C126

TELEHEALTH

2C121

STORAGE

2C114

MEDICATION

2C120

SUPPLIES

2C124

TEAM WKRM

2C109

EXAM

2C134

ISO EXAM

2D136

EXAM

2D105

EXAM

2D137

EXAM2D106

EXAM

2D138

EXAM

2D107

EXAM

2D104

PROCEDURE

2D135

ISOLATION /

OBSERVATION

2D135.1

P TLT

2D104.1

P TLT

D

S C

R E

E N

D

S C

R E

E N

2D139

EXAM

2D140

EXAM

2D143

OB/GYN

2D143.1

GYN TLT

D

.2

S T

L T

2D123

SUPPORT PROVIDER

2D114

TLT

D

.1

P T

L T

2D112

EXAM

2D142

EXAM

2D127

TEAM WKRM

2D128

TEAM WKRM

2D120

TEAM WKRM

2D126

TEAM WKRM

2D119

TELEHEALTH

2D125

STORAGE

2D103

MEDICATION

2D124

SUPPLIES

2D121

TEAM WKRM

2D108

EXAM

2D141

ISO EXAM

2D109

EXAM

2D110

EXAM

2C107

EXAM

2C108

EXAM

2C100.1

CORRIDOR2B102

SW / EXAM

2B155

GROUP ROOM

ROOF BELOW

F9 / A1.22B

F A

.2

B

F9 / A1.22D

F A

.2

D

F A

.2

C

F9 / A1.22C

F9 / A1.14A

F A

.1

A

A2.14 D8

A2.14

D5

F8

A2.12 F4

A2.12

D8

A2.12 F8

A2.12

B8

A2.13F8

A2.13C8

A2.13

E5

A2.13E8

A2.14

F6

2E172

PROSTHETIC LAB

2D101

TLT

2D102

HAC

2G187

EXAM

2G188

CONSULT

2G189

CONSULT

2G190

CONSULT

2G191

CONSULT

G

C O

N S

U L

T

2G193

BIO-FEEDBACK CONSULT

2G167

EXAM

2G183

EXAM

2G182

CONSULT

2G168

CONSULT

2G169

CONSULT

2G170

CONSULT

2G171

CONSULT

2G172

CONSULT

2G173

CONSULT

2G177

CONSULT

2G178

CONSULT

2G179

CONSULT

2G180

CONSULT

2G181

CONSULT

2G117

GROUP THERAPY

2G139

CONSULT

2G138

CONSULT

2G135

CONSULT

2G134

CONSULT

2G133

CONSULT

2G132

HYPNOSIS

2G217

CONSULT

2G218

CONSULT

2B144

MEDICATION

2C141

MEDICATION

2D134

MEDICATION

2B133

PROSTHETIC

2C123

PROSTHETIC

2D122

PROSTHETIC

2G143

GROUP THERAPY

2G203

P TLT

2G166

GROUP THERAPY

2G144

P TOILET

2G204

P TLT

2G119

SCREEN

2G165

SCREEN

2G184

SCREEN

2G162

REGISTRATION

2E101

BARIATRIC TREATMENT

2G136

CONSULT

2E108

TREATMENT

2E107

TREATMENT

2E106

PANO SCAN

2E105

CRASH CART

2G163

CHECK OUT

2F100

CORRIDOR

2G116

SCREEN

2D118

GROUP ROOM

D

G R

O U

P R

O O

M

2E136

AEDG WORK ROOM

2E118

WAITING

2G176

SPEC SYSTEMS

2G100.10

CORRIDOR

2G100.9

CORRIDOR

2G100.8

CORRIDOR

2G100.7

CORRIDOR

2G100.6

CORRIDOR

G

.2

C O

R R

ID

O

R

G

.5

C O

R R

ID

O

R

G

.4

C O

R R

ID

O

R

G

.3

C O

R R

ID

O

R

G

.1

C

O R

R

ID

O R

G

.1

C

O R

R

ID

O R

G

.1

C

O R

R

ID

O R

G

.1

C

O R

R

ID

O R

G

.1

C

O R

R

ID

O R

E

.1

C

O R

R

ID

O R

E

.8

C O

R R

ID

O

R

E

.4

C O

R R

ID

O

R

E

.2

C O

R R

ID

O

R2 D

.5

C O

R R

ID

O

R

D

.6

C O

R R

ID

O

R

D

.7

C O

R R

ID

O

R

D

.1

C O

R R

ID

O

R

C

.6

C O

R R

ID

O

R

C

.7

C O

R R

ID

O

R

C

.2

C O

R R

ID

O

R

C

.4

C O

R R

ID

O

R

B

.7

C O

R R

ID

O

R

D

.2

C O

R R

ID

O

R

D

.4

C O

R R

ID

O

R

2C100.5

CORRIDOR

2C100.3

CORRIDOR

2D100.3

CORRIDOR

2E100.7

CORRIDOR

2E100.12

CORRIDOR

E4

ELEVATOR 4

2G103

OIT DATA

2E100.5

CORRIDOR

2E168

SEDATION

E

.1

C

O R

R

ID

O R

2E100.9

CORRIDOR

2E100.6

CORRIDOR

2E100.3

CORRIDOR

2A100.2

CORRIDOR

2A100.1

CORRIDOR

2B100.3

CORRIDOR

B

.1

C O

R R

ID

O

R

B

.4

C O

R R

ID

O

R

B

.2

C O

R R

ID

O

R

B

.6

C O

R R

ID

O

R

B

.5

C O

R R

ID

O

R

B

S P

E C

S Y

S T

E M

S

S3

STAIR 3

E

S P

E C

S Y

S T

E M

S

13.513.7

C.8

D.5

E.4

F.4

J.5

K.3

S1

STAIR 1

8.78.3 8.5

AA

BB

4.5

A.4

A2

AA

0.5

E.6

DD

CC

A4

A3

A1

2E172.1

LAB SUPERVISOR

S2

STAIR 2

F.1

C1

C2

C3

C4

2E170

CLEAN UTILITY

2C127

CHECK-IN

2C128

RECEPTION

2C102

FLEX

2C101

FLEX

2C129

WOMEN

2C130

MEN 2D115

STORAGE 2D145

PEER SUPPORT

2A104

MHV KIOSK

2A109

HAC

E1

ELEVATOR 1

E2

ELEVATOR 2

E3

ELEVATOR 3

2A100

LOBBY

2G100.16

CORRIDOR

2G164

COPY

2E136.1

S TLT

A.6

13.1

D.3

C A

N O

P Y

R O

O F

B

E L O

W

CANOPY

ROOF

BELOW

15' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10" 31' - 10"

384' - 0"

FOS

1' - 0"

15' - 11" 15' - 11" 3' - 7" 8' - 11" 4' - 10"

FOS

1' - 0"

10' - 8" 5' - 0"

2' - 0"

5' - 10" 1' - 6"

5' - 8"10" 11' - 10"11' - 10" 10' - 0"15' - 0" 7' - 2"

5"

5' - 0"5' - 10" 8' - 0"7' - 10"

F.V. w/ STUCCO STRIPES

F.V. w/ STUCCO

STRIPES

F.V. w/ STUCCO

STRIPES

F.V. w/ STUCCO

STRIPES

F.V. w/ STUCCO

STRIPES

F.V. w/ STUCCO

STRIPES

F O

S

F .V w

S

T U

C C

O S

T R

IP

E

S

F .V w

S

T U

C C

S T

R

IP

E S

F .V w

S

T U

C

R

IP

E S

F .V w

S

T U

C

R

IP

E S

F O

S

F O

S

F O

S

1' - 0" FOS

16' - 10"

REFER TO SHEET G2.11 IN

PACKAGE 1 FOR THE

WORK POINT LOCATIONS

F O

S

F O

S

FOS

2' - 4 1/2"

FOS

1' - 4"

16' - 6" 127' - 8"

FOS

1' - 0"

FOS

1' - 0"1' - 0 1/2"

LOW CANOPY

ROOF BELOW

DROP-OFF

CANOPY ROOF

A7.12

F5

A7.12

D4

CG

A2.13 F4F3

A2.13 F2F1

A2.12F1 3

SS2

SS1

A4.14

F1

A3.61

B1

2E100.1

CHECK OUT

GENERAL NOTES - FLOOR PLANS:

1. RE: SHEET G0.01 FOR ADDITIONAL GENERAL NOTES

THAT ARE APPLICABLE.

2. ARCHITECTURAL ELEVATION 100'-0" = CIVIL

ELEVATION 873.00

3. DIMENSIONS SHOWN ON THE FLOOR PLAN ARE TO

THE FACE OF GYP. BOARD/ WALL (FOG), FACE OF

MASONRY (FOM), FACE OF CONCRETE WALLS (FOC),

AND COLUMN GRID LINES, UNLESS NOTED OR SHOWN

OTHERWISE.

4. NOT USED

5. DOOR OPENINGS NOT LOCATED BY DIMENSION SHALL

BE CENTERED IN WALL SHOWN OR LOCATED 4

INCHES FROM FINISH WALL TO HINGE SIDE OF THE

DOOR, ALWAYS ALLOWING A MINIMUM OF 18" FROM

THE PULL SIDE (STRIKE SIDE) OF THE DOOR TO THE

INTERSECTING WALL, OR OTHER PROTRUDING

OBJECTS.

6. ALL CLOSETS AND ALCOVES WITHOUT A SPACE

IDENTIFICATION NUMBER SHALL HAVE THE SAME

FINISHES AS THE ADJOINING SPACES.

7. ALL PUBLIC SPACES: THE WALLS WILL BE FINISHED

WITH 5/8" GYP. BD. TO A LEVEL 4 FINISH AND PAINTED,

UNLESS NOTED OR SPECIFIED OTHERWISE.

8. RE: FINISH LEGEND, FINISH SCHEDULE AND

SPECIFICATIONS FOR DOOR AND DOOR FRAME

FINISHES.

9. ALL WALL TYPES TO BE P3.45 UNLESS NOTED

OTHERWISE

10. FLOOR SLAB UL-ASSEMBLY PER D902 (RE: G-SHEETS

AND STRUCTURE FOR ADDT'L INFO)

11. REFER TO DOOR SCHEDULE FOR LOCATION OF COAT

HOOKS (JSN A5145) ON BACK OF DOORS

A B

C

DMAIN

ENTRY

AMBULANCE ENTRY

LOADING

DOCK

STAIR 3

ELEVATOR

STAIR 1

LOBBY STAIR

STAIR 2

ELEVATOR

STAIR 4

PROFESSIONAL SEAL

C O

P Y

R

IG

H

B

Y H

O E

F E

R W

Y S

O C

K I

A R

C H

IT

E

C T

S L

L C

Drawn:Checked:

Location:

Date:

Project Title:

Dwg. of

Drawing Number:

Project Number:

Building Number:

Approved: Project Director

Drawing Title:

ARCHITECT/ENGINEERS:CONSULTANTS:

A

B

C

D

E

F

986543 7 o n e a n d o n e h al f in c h e s o n e f o o t th re e i n ch e s o n e f o o t

A

B o n e i n ch o n e f o o t

C o n e h a lf i n c h o n e f o o t

E

D th re e q u a rt e rs i n ch o n e f o o t o n e q u ar te r in c h o n e f o o t

F

VA FORM 08-6231

o n e e ig h th i n ch o n e f o o t th re e e ig h th s in ch o n e f o o t

Office of

Construction and Facilities

Management

Project Status:

/1

/2

:3

:5

P

M

OVERALL SECOND FLOOR PLAN CBOC - SAN ANTONIO

October 14, 2019

164251

9939 STATE HWY 151

SAN ANTONIO, TEXAS

CORRECTED FINAL A1.02

1/16" = 1'-0"F9 OVERALL SECOND FLOOR PLAN

NORTH

KEYPLAN

NORTH

MATERIAL KEYNOTES

NO. Description Date

File details come from the government source that posted it. Updated .