About this file

This document is a proposed progress schedule for the San Francisquito Fire Station & Barracks Construction project, a federal contract opportunity issued by the USDA Forest Service Region 5 Angeles National Forest.

The project involves the construction of a new single-story fire station building of approximately 7,000 square feet with bay space for up to four fire engines and 15 full-time employees, as well as a new single-story barracks building of approximately 3,500 square feet that will provide housing for 2 engine crews. The contract also includes optional bid items such as a new vertical well, landscaping using drought-tolerant plants, and a new waterline. The anticipated performance period is approximately 540 calendar days from the Notice to Proceed (NTP) effective date. The solicitation period is proposed to be from July 16, 2024 to August 23, 2024, with a pre-proposal conference/site visit on July 23-24, 2024. The anticipated contract award date is on or about September 13, 2024, with a contract value expected to be more than $10 million. The contract will be a single award Firm Fixed Price (FFP) and is set aside for small businesses.

Text of this file

USDA Forest Service R2-FS-6300-7 (Rev 2/81)) MS Word 2000

PROPOSED PROGRESS SCHEDULE

PROJECT

San Francisquito Fire Station & Barracks Construction

UNIT

Angeles National Forest

CONTRACT NO.

CONTRACT TIME

Compute Time Per Square as follows:

Total Time ( ) days = ( ) days per square Item of Work

% Completion Days Contract Time

INSTRUCTIONS

SUBMITTED BY:

REVIEWED AND APPROVED:

CONTRACTOR

1 Complete CONTRACT TIM block above to determine days per square

2 Insert contract days in brackets at 20%, 40%, etc.

3 Show line through each square for work planned. Please do not block in solid.

4. Submit ONE copy to C.O.R.

Contractor Contracting Officer’s Representative

Date C.O.R.

REVIEWED

1 Approve schedule or submit to C.O. with comments

2 Chart actual progress against proposed progress

3 Advise C.O. when progress falls behind By

4 Distribute as follows: Original to C.O. copies to Contractor, C.O.R. Forest

Date Contracting Officer

Date

GPO 830-257

Other files for this federal contract opportunity

Other files attached to San Francisquito Fire Station & Barracks Construction, newest first.
File Type Posted
A11. 5-Q&A v3 ROUND 4-12970224R0036.pdf PDF
A11. 4-J2_SOI 12970224R0036-00004 v3.xlsx XLSX spreadsheet
A11. 4-J1- Sol. Terms B-M, 12970224R0036-0004, 09022024F.pdf PDF
A11. 4-J1-SF30_12970224R0036-0004F.pdf PDF
A11. 3-Q&A v2 ROUND 3-12970224R0036F.pdf PDF
A11. 3-J1-SF30_12970224R0036-0003F.pdf PDF
A11. 3-J5_DRAWINGS 12970224R0036 v2.0, 09022024.pdf PDF
A11. 3-J2_SOI 12970224R0036-00003 v2.xlsx XLSX spreadsheet
A11. 3-J1- Sol. Terms B-M, 12970224R0036-0003, 09022024F.pdf PDF
A11. 2-J2_SOI 12970224R0036-00002 v1.xlsx XLSX spreadsheet
A11. 2-J5_DRAWINGS 12970224R0036 v1.pdf PDF
A11. 2-Q&A v1 ROUND 2-12970224R0036, 08212024.pdf PDF
A11. 2-J1-SF30_12970224R0036-0002.pdf PDF
A11. 2-J16_Reps&Certs_12970224R0036, v1.docx DOCX document
A11. 2-J1- Sol. Terms B-M, 12970224R0036-0002, 08212024.pdf PDF
A11. 2-J15_Experience & PastPerf Questionnaire, v1.docx DOCX document
A11. 1-J1-SF30_12970224R0036-0001.pdf PDF
A11. 1-J1- Sol. Terms B-M, 12970224R0036-0001, 08052024.pdf PDF
A11. 1-SiteVistiMtgMins-Q&A v1-12970224R0036, 08052024.pdf PDF
A10. J1_SF1442 & Terms_12970224R0036, 07162024.pdf PDF
A11. 1-J9_Fire Plan, v1, 07312024.pdf PDF
A11. 1-J17_Geotechnical Report.pdf PDF
A10. J8_MAP, 12970224R0036.pdf PDF
A10. J11_SF1413, Statement & Acknowledgement.pdf PDF
A10. J12_DesignationofKTRKeyPersonnel-Reps.doc DOC document
A10. J1_SF1442 & Terms_12970224R0036, 07162024.pdf PDF
A10. J5_DRAWINGS, 12970224R0036.pdf PDF
A10. J9_Fire Plan, 03012024.pdf PDF
A10. J2_SOI - 12970224R0036.xlsx XLSX spreadsheet
A10. J7_Design Measures_SanFrancisquitoFireStation.pdf PDF
A10. J10_WD CA20240022, v7, 05242024.pdf PDF
A10. J15_Experience & PastPerf Questionnaire.docx DOCX document
A10. J3_SPECIFICATIONS.pdf PDF
A10. J4_Supp SPECS - Opt 1003_Well Syst.pdf PDF
A10. J6_Decision Memo_SanFrancisquitoFireStn&Barcks.pdf PDF
A10. J13_BiobasedStatementLetter.docx DOCX document
A10. J16_Reps&Certs_12970224R0036.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .