A10. J1_SF1442 & Terms_12970224R0036, 07162024.pdf

PDF 1 MB Posted

Attached to
San Francisquito Fire Station & Barracks Construction Federal contract opportunity
Solicitation number
12970224R0036
Issued by
Department of Agriculture Forest Service

About this file

This document is a solicitation for a firm fixed-price construction contract to build a new fire station and potentially a new barracks on an existing administrative site in the Angeles National Forest in California. The project includes multiple optional items that may or may not be awarded.

The new fire station will be approximately 7,000 square feet with space for up to four fire engines and 15 employees. The optional new barracks will be approximately 3,500 square feet and house 2 engine crews with 8 bedrooms for 15 residents. The contract also includes constructing a new waterline, potential new well and water distribution system, and drought-tolerant landscaping.

The anticipated contract performance period is 540 calendar days from the notice to proceed, with the base and optional items potentially delivered concurrently. The anticipated contract award date is around September 13, 2024 and the estimated contract value is over $10,000,000. This is a total small business set-aside solicitation, and bonding is required. Proposals are due by August 23, 2024, and a pre-proposal conference/site visit is scheduled for July 23-24, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to San Francisquito Fire Station & Barracks Construction, newest first.
File Type Posted
A11. 5-Q&A v3 ROUND 4-12970224R0036.pdf PDF
A11. 4-J1-SF30_12970224R0036-0004F.pdf PDF
A11. 4-J2_SOI 12970224R0036-00004 v3.xlsx XLSX spreadsheet
A11. 4-J1- Sol. Terms B-M, 12970224R0036-0004, 09022024F.pdf PDF
A11. 3-J1- Sol. Terms B-M, 12970224R0036-0003, 09022024F.pdf PDF
A11. 3-Q&A v2 ROUND 3-12970224R0036F.pdf PDF
A11. 3-J1-SF30_12970224R0036-0003F.pdf PDF
A11. 3-J5_DRAWINGS 12970224R0036 v2.0, 09022024.pdf PDF
A11. 3-J2_SOI 12970224R0036-00003 v2.xlsx XLSX spreadsheet
A11. 2-J1-SF30_12970224R0036-0002.pdf PDF
A11. 2-J16_Reps&Certs_12970224R0036, v1.docx DOCX document
A11. 2-J1- Sol. Terms B-M, 12970224R0036-0002, 08212024.pdf PDF
A11. 2-J15_Experience & PastPerf Questionnaire, v1.docx DOCX document
A11. 2-J2_SOI 12970224R0036-00002 v1.xlsx XLSX spreadsheet
A11. 2-J5_DRAWINGS 12970224R0036 v1.pdf PDF
A11. 2-Q&A v1 ROUND 2-12970224R0036, 08212024.pdf PDF
A11. 1-J9_Fire Plan, v1, 07312024.pdf PDF
A11. 1-J17_Geotechnical Report.pdf PDF
A11. 1-J1-SF30_12970224R0036-0001.pdf PDF
A11. 1-J1- Sol. Terms B-M, 12970224R0036-0001, 08052024.pdf PDF
A11. 1-SiteVistiMtgMins-Q&A v1-12970224R0036, 08052024.pdf PDF
A10. J1_SF1442 & Terms_12970224R0036, 07162024.pdf PDF
A10. J2_SOI - 12970224R0036.xlsx XLSX spreadsheet
A10. J7_Design Measures_SanFrancisquitoFireStation.pdf PDF
A10. J10_WD CA20240022, v7, 05242024.pdf PDF
A10. J14_ProgressSched (FS 6300-7).rtf RTF text file
A10. J15_Experience & PastPerf Questionnaire.docx DOCX document
A10. J3_SPECIFICATIONS.pdf PDF
A10. J4_Supp SPECS - Opt 1003_Well Syst.pdf PDF
A10. J6_Decision Memo_SanFrancisquitoFireStn&Barcks.pdf PDF
A10. J13_BiobasedStatementLetter.docx DOCX document
A10. J16_Reps&Certs_12970224R0036.docx DOCX document
A10. J8_MAP, 12970224R0036.pdf PDF
A10. J11_SF1413, Statement & Acknowledgement.pdf PDF
A10. J12_DesignationofKTRKeyPersonnel-Reps.doc DOC document
A10. J5_DRAWINGS, 12970224R0036.pdf PDF
A10. J9_Fire Plan, 03012024.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1122644

USDA FOREST SERVICE

SPOC SOUTHWEST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

USDA Forest Service, SPOC Southwest Branch

Klenise Wallace, Contracting Officer Email: klenise.wallace@usda.gov

KLENISE WALLACE 970-217-6804

1x 07/16/2024

12970224R0036

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Solicitatoin No.: 12970224R0036

Project Title: San Francisquito Fire Station & Barracks Construction

Forest: Angeles National Forest

Project Description: The United States Department of Agriculture (USDA) Forest

Service (USFS) Angeles National Forest San Francisquito Fire Station & Barracks

Construction project is a requirement to build a new fire station (and potentially a new barracks) on an existing administrative site.

Project Location: This project is located in the Angeles National Forest on the Los

Angeles Gateway Ranger District near Santa Clarita in Los Angeles County, CA.

Reference the project map provided in Section J.

Latitude: 34°35'31.00"N

Longitude: 118°27'7.43"W

Pre-Bid/Site Visit: The Government anticipates hosting a pre-proposal

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

3 540 calendar days and complete it within ________________ ________________ calendar days after receiving

08/23/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

SPOC SOUTHWEST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

KLENISE S. WALLACE

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

Company Name:

Address:

UEI SAM No.:

POC Name:

POC Email:

POC Phone:

klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight klenisewallace Highlight

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12970224R0036 conference/site visits on 23 July 2024 and 24

July 2024. Reference Section L.3 for details.

Wage Determination: WD CA20240022, Revision 7, Dated 05/24/2024 for buildings.

Forest Service Contacts:

Contracting Officer Representative (COR): Ricardo

Lopez, ricardo.lopez2@usda.gov

Contracting Officer (CO): Klenise Wallace, klenise.wallace@usda.gov

Delivery Location Code: 91T5

USDA FOREST SERVICE

ANGELES NATIONAL FOREST

SUPERVISOR OFFICE

701 N SANTA ANITA AVE

ARCADIA CA 91006 US

Period of Performance: 09/16/2024 to 04/24/2026

0001 Base 1 - FIRE STATION BLDG

Product/Service Code: Y1JZ

Product/Service Description: CONSTRUCTION OF

MISCELLANEOUS BUILDINGS

Delivery: 360 Days After Notice to Proceed

0002 Base 2 - FIRE PUMP HOUSE

Product/Service Code: Y1JZ

Product/Service Description: CONSTRUCTION OF

MISCELLANEOUS BUILDINGS

Delivery: 360 Days After Notice to Proceed

0003 Base 3 - NEW WATERLINE

Product/Service Code: Y1JZ

Product/Service Description: CONSTRUCTION OF

MISCELLANEOUS BUILDINGS

Delivery: 360 Days After Notice to Proceed

0004 Base 4 - CIVIL WORK & SUPPORTING FACILITIES

Product/Service Code: Y1JZ

Product/Service Description: CONSTRUCTION OF

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12970224R0036

MISCELLANEOUS BUILDINGS

Delivery: 360 Days After Notice to Proceed

0005 Option 1 - BARRACKS BLDG

(Option Line Item)

Product/Service Code: Y1JZ

Product/Service Description: CONSTRUCTION OF

MISCELLANEOUS BUILDINGS

Delivery: 180 Days After Notice to Proceed

Period of Performance: 10/26/2025 to 04/24/2026

0006 Option 2 - LANDSCAPING & IRRIGATION

(Option Line Item)

Product/Service Code: Y1JZ

Product/Service Description: CONSTRUCTION OF

MISCELLANEOUS BUILDINGS

Delivery: 90 Days After Notice to Proceed

Period of Performance: 01/26/2026 to 04/26/2024

0007 Option 3 - NEW WELL & WATERLINE EXTENSION

(Option Line Item)

Product/Service Code: Y1NE

Product/Service Description: CONSTRUCTION OF

WATER SUPPLY FACILITIES

Delivery: 120 Days After Notice to Proceed

Period of Performance: 12/27/2025 to 04/26/2026

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice

Processing Platform (IPP), https://www.ipp.gov.

If the contractor lacks an IPP account, USDA will automatically initiate the enrollment process with Treasury using the contractor's SAM.gov

Accounts Receivable POC as the IPP account holder. Once the enrollment process is complete, the IPP account holder will receive notification and can being invoicing. More information about

IPP can be found at: https://www.ipp.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No. 12970224R0036 San Francisquito Fire Station & Barracks Construction Angeles National Forest Page 5 of 53

Continuation of SF 1442

Block 27: The full text of a clause or provision may be accessed electronically at https://www.acquisition.gov/browse/index/far.

This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, are reasonably priced. Where available, these products should first be acquired from among qualified products that fall under the umbrella of items designated through the Federal Biobased Products Preferred Procurement Program (FB4P). For more information on biobased program and biobased products, refer to the links under Section C.

Important Solicitation 12970224R0036 Information:

PSC: Y1JZ - Construction of Miscellaneous Buildings NAICS: 236220 – Commercial and Institutional Building Construction

Issue Date: TBD Last Date for Questions: 9 August 2024 by 1300 PT.

Proposal Due Date: 23 August 2024 NLT 2359 PT.

Pre-Proposal / Site Visit: The Government anticipates hosting a pre-proposal conference/site visits on 23 July 2024 and 24 July 2024. Interested offerors should reference the venue in section L and RSVP to ricardo.lopez2@usda.gov within 2 business days prior to the date. Contractors unable to attend the site visit may access the project site without restrictions during normal business hours (0800 to 1700 PT).

All questions must be submitted in writing to klenise.wallace@usda.gov AND ricardo.lopez2@usda.gov to avoid response delays.

To be responsive, return all items identified in Section L.1 to klenise.wallace@usda.gov only. Offeror is responsible for verifying receipt.

Evaluations and award may be conducted without discussion. Results of the solicitation will be provided on SAM.gov.

https://www.acquisition.gov/browse/index/far mailto:ricardo.lopez2@usda.gov mailto:klenise.wallace@usda.gov mailto:ricardo.lopez2@usda.gov mailto:klenise.wallace@usda.gov

Angeles National Forest Page 6 of 53

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION D--PACKAGING AND MARKING

SECTION E--INSPECTION AND ACCEPTANCE

SECTION F--DELIVERIES OR PERFORMANCE

SECTION G--CONTRACT ADMINISTRATION DATA

SECTION H--SPECIAL CONTRACT REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

SECTION M--EVALUATION FACTORS FOR AWARD

Angeles National Forest Page 7 of 53

This Page Intentionally Left Blank

Angeles National Forest Page 8 of 53

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

**FOR SOLICITATION PURPOSES, CONTRACTOR SHALL COMPLETE THE SCHEDULE

OF ITEMS IN SECTION J, ATTACHMENTS. **

B.2 SCHEDULE NOTES

1. Offeror must fill in the UNIT price (highlighted in yellow) and offeror info ONLY. Spreadsheet is formatted to auto populate all pricing totals. Do NOT edit any other fields. Please return the schedule of items in Microsoft Excel.

2. A bid bond is required for this contract. The Successful awardee that receives the contract shall provide the bid bond as part of the proposal response package. The digitally signed payment and performance bonds are due within 10 calendar days post contract award.

3. Responses for quantities less than those listed in the numbered items or missing (without) prices for each item and/sub-item may be rejected.

4. Mobilization. No additional payment will be made to the contractor for any travel incurred while being on the site for the duration of the project. This includes pre-proposal and pre-work construction meetings and field observations as planned throughout the timeline of the project.

5. Bonding. Provide the anticipated reimbursable cost for bonding. The schedule reflects bonding cost should the Government only award base items or base + option items. The base and option bonding line items represent the range the flat rate for reimbursable bonding costs is not anticipated to exceed in the performance of this work with the exception of modifications for differing site conditions.

6. Base Items 0002-0005. Reference items in the Drawings (Sheet G-002) specified as “BASE” and Corresponding Specifications. The work in the base items include all work related to the construction of the fire station building including all structural, mechanical, electrical, plumbing, and utilities as specified on the drawings. Site work will include all excavation, over-excavation, retaining walls, sidewalks, as well as utilities as stated in the “Base” items. Work will also include the waterline base items, water tank, fire pumphouse, parking lots, utilities for the fire station, and sewer pits. A critical element of this project will be the coordination of utility service from Los Angeles Department of Water and Power (LADWP) for temporary water source and temporary power and Southern California Edison (SCE) for permanent power. The contractor will be responsible for obtaining temporary utilities for construction purposes with coordination by the Forest Service, LADWP, and SCE.

7. Option 1001. Reference items in the Drawings (Sheet G-002) specified as “OPTION 1” and corresponding Specifications. The work in this option line item includes all incidental work related to the BARRACKS building including all structural, mechanical, electrical, plumbing, and utilities as specified on the drawings. Site work including all excavation and over-excavation, retaining wall, as well as utilities as stated in the “Base” items including those in the vicinity of the barracks building are still included in the base proposal.

8. Option 1002. Reference items in the Drawings (Sheet G-002) specified as “OPTION 2” and corresponding Specifications. The work in this option line item includes all work specified in the L sheets including landscaping, planting and irrigation as specified in the drawings and specifications.

Angeles National Forest Page 9 of 53

9. Option 1003. Reference items in the Drawings (Sheet G-002) specified as “OPTION 3” and corresponding Specifications and Supplemental Specifications for the new well system. The work in this option line item includes all incidental work related to a new vertical well and extension of the waterline construction north of the Bouquet Aqueduct and as shown on the drawings. Contractor will construct a vertical groundwater well near the new fire station and barracks administrative site. This option item will determine the availability and quality of groundwater for drinking at the new fire station and barracks location. The work will include test drilling, construction of individual drilled water wells, completion of water analysis, well logs, and test pump reports, capping successful wells and abandoning wells that do not meet production and quality requirements. A hydrogeologic assessment report will be conducted and made available to the Contractor upon its completion which will identify a primary and secondary well site. With this option, there will no longer be a need to connect to any LADWP infrastructure as is indicated in the base proposal.

9.1 Test Drilling Primary Site / Secondary Site. This option line item includes all labor, equipment, and materials associated with drilling a new groundwater well to a depth of 200 feet. The option line item also includes installing the new casing and sanitary seal; capping successful wells; and properly abandoning wells that do not meet production or water quality requirements. Water quality will meet all state of California and Los Angeles County requirements. Production requirements will be a minimum of 10 gallons per minute. The new groundwater well work will be performed by a well driller licensed by the State of California. The Contractor will obtain all required California and Los Angeles County permits for the new well; pay all fees; and provide a copy of this documentation to the Contracting Officer. The Contractor will submit to the Contracting Officer a copy of all documents submitted to the state of California and Los Angeles County; well logs; and as- constructed documents. The new well will be drilled as near as possible to locations recommended in the hydrogeologic assessment report.

Upon completion the new wells will be used to supply drinking water to the proposed fire station. The work area will be delineated and secured with signage and caution tape. The design of the wells will be the same, as specified in the following:

• The bore holes for the wells will be 8.5 inches in diameter, in accordance with the contract specifications.

• The well casing will be constructed using 6-inch, with thickness and perforations in accordance with the contract specifications.

• The upper 50 feet of the well borings will be widened to 12.75 inches to provide for a 3- inch, Class II Type II, cement annular seal, in accordance with the contract specifications. The well design parameters are graphically depicted on Figure 1. To protect water quality, the well will be capped after well drilling is complete until the pump is in place and the well head is secured.

9.2 Additional Drilling Primary or Secondary Site. This option line item includes all labor, equipment, and materials associated with drilling the new well beyond 200 feet. Work beyond the 200-foot depth will only be done if no water is encountered. Price will be per linear foot of additional depth. No well will be drilled more than 400 feet deep. California and Los Angeles County requirements will also apply to the additional well drilling.

9.3 Drill Cuttings Pit BMPs Primary or Secondary Sites. This option line item pertains to cuttings (native rock, sediment, and mud) from the well drilling process. Cuttings will remain on-site contained in a shallow pit. The pit will be no more than 3 feet deep with sloped sides. The location of the pit will be flagged prior to construction activities and accepted by the Contracting Officer. After well drilling and testing is complete, the pit will be covered with native materials that were removed to make the pit.

Standard BMPs will be installed to prevent pollutants from being discharged into the environment.

9.4 Well Development Primary or Secondary Sites. This option line item includes all labor, equipment, and materials associated with developing and test pumping the new well and water analysis.

The Contractor will submit a copy of test pump reports and water analysis. Well development, test

Angeles National Forest Page 10 of 53 pumping, and water analysis will be done according to California state and Los Angeles County requirements.

9.5 Extend Water Distribution Line 1500 linear feet. This option line item relates to the base 3 item to connect the well site to the alignment in the drawings. Work will include saw-cutting existing pavement on San Francisquito Canyon Road which will require coordination with Los Angeles County Public Works (LACPW). The contractor will be responsible for ensuring traffic control, flagging and one-lane access is provided for this construction with coordination by the Forest Service and LACPW.

9.6 Development of Well Building or Enclosure

The new well system will include an enclosure for safeguarding and to maintain operability at all times of the wellhead, valves, pump, water meter, gauges, switches and other equipment needed to provide continuous operation of the well system. The well building will also have a meter with dedicated power coming from SCE or a solar option to be mounted in a secure location away from commuters and the public.

END OF SECTION B

Angeles National Forest Page 11 of 53

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 DESCRIPTION OF WORK

The USDA Forest Service Region 5 Angeles National Forest has a requirement to build a new fire station (and potentially a new barracks) on an existing administrative site. The project includes multiple option items that may or may not be awarded in FY24.

C.1.1. Optional Items. Optional items are those that are not required and may not be included with the base award items. If exercised, optional items may be awarded at the time of award of the base contract or at another time specified during the contract period of performance, subject to the availability of funds. During the solicitation period, optional items are evaluated with the base items in accordance with the solicitation evaluation procedures identified in Section M. Optional items not awarded with the base award items must be exercised via written contract modification and a Notice to Proceed (NTP) for this contract. The Contractor must guarantee pricing throughout the duration of the contract period of performance.

C.1.2. Background. During the past 30 years, there have been numerous fire-starts in proximity to the proposed site. The ANF needs safe, efficient fire response facilities to effectively respond to wildland fire incidents. The purpose of this project is to construct a new fire station and barracks on an existing administrative site within the ANF to protect resources and ANF assets by consolidating two deficient fire stations into one centrally located fire administration site that would effectively support wildland fire response and suppression efforts.

There are two fire stations in the vicinity: San Francisquito Station and Green Valley Station. San Francisquito Station is downslope of an extremely unstable hillside that cannot be economically stabilized. During severe weather events, employees and equipment have been forced to evacuate to avoid the landslide hazard. The Green Valley Station’s foundation is failing and beyond feasible repair. The combined size of the two existing stations is approximately 7,215 square feet.

Given the changed conditions in the wake of the Powerhouse fire that burned through the area and burned more than 30,000 acres in 2013, there is a critical need to replace the two fire station structures at risk of becoming uninhabitable due to these safety hazards. A safe and efficient fire station with barracks is needed to house fire personnel in a facility that meets current safety codes and standards.

The new proposed fire station is located approximately two miles up the road from the Los Angeles Department of Water and Power (LADWP) hydroelectric Power Plant 1 in Santa Clarita. The proposed site had a residential building and a detached garage owned by the LADWP that were both demolished in 2022, prior to starting the new construction. The demolition included testing for lead and asbestos which came back negative for any hazardous materials.

The design for this contract was completed by the United States Army Corps of Engineers (USACE) through a separate action. All design deliverables are furnished as attachments through this solicitation, including 100% plans, specifications, and compiled design analysis. Upon award of the contract, additional documents will be provided.

C.2 SCOPE OF CONTRACT

The new fire station is a single-story building of approximately 7,000 square feet and includes bay space for up to four fire engines and 15 full time employees. The new barracks will be a single-story building of approximately 3,500 square feet and will provide housing to 2 engine crews, including 8 bedrooms for 15 residents. The proposed landscaping would use drought-tolerant plants and recycled water to assist with irrigation.

A new waterline would be installed below ground to provide potable water to the administrative site. The

Angeles National Forest Page 12 of 53 location of the waterline would follow along Runner Road and continue along the shoulder of the south side of San Francisquito Canyon Road to where it would connect to the LADWP Aqueduct. See drawings. An optional line item would add a new vertical well and extend the waterline beyond the point of connection from the wet-tapped location near the aqueduct. The location of the new well will be provided upon completion of a hydrological assessment through a separate action, to be performed by others and completed and furnished upon contract award.

C.2.1. Contractor and Subcontractor Requirements.

The contractor shall:

- Be licensed and possess the necessary permits issued by the State of California, as applicable to the work performed. (e.g. The new groundwater well work in Option 3 will be performed by a well driller licensed by the State of California.)

- Ensure that all subcontractors performing work under this contract are licensed and possess the necessary permits issued by the State of California, as applicable to the work performed.

- Be certified in SAM.gov under the NAICS specific to this project.

- Document and provide all submittals for review and approval in accordance with the technical specifications in Section J, Attachments.

- Participate in a weekly progress meeting with the Government.

C.3 TECHNICAL SPECIFICATIONS

The contractor shall adhere to the technical specifications and shop drawings provided as attachments in Section J of this contract. Carefully review all tasks in the Specifications, Drawings and Schedule of Items (SOI) under Section J of this solicitation.

452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced herein.

452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.4 PROJECT LOCATION

This project is located in the Angeles National Forest on the Los Angeles Gateway Ranger District near Santa Clarita in Los Angeles County, CA. Reference the project map provided in Section J.

Latitude: 34°35'31.00"N Longitude: 118°27'7.43"W

C.4.1. Driving Directions from Santa Clarita (I-5 & CA-14 Interchange). Proceed on I-5 North for approximately 6.5 miles and exit on Valencia Blvd. Turn right onto Valencia Blvd and proceed for approximately 1 mile. Turn left on McBean Parkway and proceed for approximately 3.5 miles. Turn right on Copper Hill Drive (merging quickly to the left lane) and proceed for approximately 0.5 miles. Turn left at San Francisquito Canyon Drive and proceed for approximately 6 miles. Turn right at Stop sign (intersection with residential road) and proceed for approximately 6.5 miles. Turn right onto Runner Road (at penstocks) and proceed to Site 1, immediately following the first residential structure on the right.

Angeles National Forest Page 13 of 53

Google Maps Link:

https://www.google.com/maps/dir/34.3343102,-118.5086563/34.5895968,-118.45174/@34.3914762,- 118.6069153,12z/am=t/data=!4m2!4m1!3e0

C.4.2. Driving Directions from Lancaster/Palmdale (CA-14 Intersection at Palmdale Blvd). Take CA-14 exit 35 toward CA-138/Palmdale Blvd. Proceed west on Palmdale Blvd for approximately 0.8 mile. Continue on Elizabeth Lake Road for approximately 14.5 miles. Turn left onto San Francisquito Canyon Road and proceed for approximately 6.5 miles. Turn left onto Runner Road (just before penstocks) and proceed to Site 1, immediately following the first residential structure on the right.

Google Maps Link:

https://www.google.com/maps/dir/34.5864176,-118.1339807/34.5896663,-118.4518262/@34.6156592,- 118.3651574,12z/am=t/data=!3m1!4b1!4m2!4m1!3e0

C.5 CONTRACT TIME

The anticipated performance period is approximately 540 calendar days from the Notice to Proceed (NTP) effective date for base and options items as follows:

Base Items: 360 calendar days Option Item 1: 180 calendar days Option Item 2: 90 calendar days Option Item 3: 120 calendar days

The Government’s intent is for all items to be accomplished concurrently (as much as possible), to not exceed 540 calendar days, provided the optional work can be awarded under the base award of the contract. The contract period may be flexible if this is determined to be in the best interest of the https://www.google.com/maps/dir/34.3343102,-118.5086563/34.5895968,-118.45174/@34.3914762,-118.6069153,12z/am=t/data=!4m2!4m1!3e0 https://www.google.com/maps/dir/34.3343102,-118.5086563/34.5895968,-118.45174/@34.3914762,-118.6069153,12z/am=t/data=!4m2!4m1!3e0 https://www.google.com/maps/dir/34.5864176,-118.1339807/34.5896663,-118.4518262/@34.6156592,-118.3651574,12z/am=t/data=!3m1!4b1!4m2!4m1!3e0 https://www.google.com/maps/dir/34.5864176,-118.1339807/34.5896663,-118.4518262/@34.6156592,-118.3651574,12z/am=t/data=!3m1!4b1!4m2!4m1!3e0

Angeles National Forest Page 14 of 53

Government. The base items work is expected to begin within 10 calendar days of the NTP effective date, anticipated 16 September 2024. This contract performance period includes delays for weather, locating and transporting supplies and materials, mobilization, and final site cleanup. All work for the base and exercised option items must be completed by 24 April 2026, unless otherwise approved by the Government.

C.5.1. Work Hours. Work hours are from 7:30 am to 6:00 pm local time, Monday through Friday.

Both the contractor and subcontractor(s) are required to adhere to a work schedule during these standard hours of operation to mitigate the effects of construction noise on adjacent residents on Runner Road.

Weekend equipment work is not allowed at any time during this contract unless agreed to by the COR and approved in writing by the CO.

C.5.2. Operating Period. Record breaking temperatures and various environmental changes could cause accessibility issues affecting the project period. Contractor is encouraged to visit the project site and discuss any concerns with the project Contracting Officer Representative (COR). Implementation is expected to begin as soon as possible.

C.6 MAGNITUDE OF CONSTRUCTION PROJECT

It is anticipated that the range price of this contract will be (FAR 36.204):

More than $10,000,000.00.

C.6.1. Bonding Requirements. Bonding is required for this project. See Section G herein for more details.

C.7 BIO-BASED / SUSTAINABLE PRODUCTS PROGRAM

The contractor must comply with the Agriculture Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 9FSRIA), 7 U.S.C.

8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance”, dated October 2, 2009; EO 13423, “Strengthening Federal Environmental, Energy and Transportation Management”, dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products. All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.

In the performance of this contract, the Contractor shall make maximum use of biobased oils and lubricants that are designated by the United States Department of Agriculture unless the product cannot be acquired: (1) Competitively within a time frame providing for compliance with the contract performance schedule; (2) meeting contract performance requirements; or (3) at a reasonable price.

Information about these products is available at http://sftool.gov/green-products/1/construction-materials

The Federal Acquisition Regulation (FAR) requires Contractors to report the purchase of biobased products under service and construction contracts during the previous Government fiscal year (October 1 thru September 30) and to submit this report no later than October 31 of each year during contract performance and at the end of contract performance (as applicable). Information about this requirement is available at https://biopreferred.gov/BioPreferred/faces/pages/FARReporting.xhtml

C.8 GOVERNMENT FURNISHED PROPERTY

Except for the materials specifically stated within the awarded contract, the contractor shall be expected http://sftool.gov/green-products/1/construction-materials https://biopreferred.gov/BioPreferred/faces/pages/FARReporting.xhtml

Angeles National Forest Page 15 of 53 to provide all the tools, equipment, and materials necessary to carry out this work in accordance with Sections C.1-3 herein, and any associated attachments. There is currently no Government furnished property, supplies or materials anticipated for the performance of this contract. Any anticipated Government furnished information will be discussed in the Specifications provided in Section J, Attachments.

C.9 SUBMITTALS

Submittals required under this contract are identified in the Specifications and Supplements provided in Section J, Attachments and Section H herein. All submittals for this project shall meet Section 508 compliance requirements. See Section H.

C.10 DELIVERABLES

All deliverables for this contract pertain to the anticipated objectives of the statement of work, specifications, schedule of items and drawings associated with this work.

All deliverables for this project shall meet Section 508 compliance requirements. See Section H.

END OF SECTION C

Angeles National Forest Page 16 of 53

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

END OF SECTION D

Angeles National Forest Page 17 of 53

SECTION E--INSPECTION AND ACCEPTANCE

E.1 GENERAL

All work shall be conducted under the general direction of the Contracting Officer or designated representative(s) and is subject to Government inspection and testing at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

E.2 FINAL INSPECTION

A walk-thru inspection shall be scheduled PRIOR to the final inspection so major discrepancies found can be corrected prior to the scheduled completion date. The Contractor shall schedule the final inspection by contacting the COR or designated representative in advance of the contract completion date.

E.3 CLAUSES

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)

END OF SECTION E

Angeles National Forest Page 18 of 53

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 540 calendar days after the notice to proceed effective date.

The time stated for completion stated herein and under section C.5 shall include final cleanup of the premises.

52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.242-14 Suspension of Work (APR 1984)

END OF SECTION F

Angeles National Forest Page 19 of 53

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 GOVRERNMENT REPRESENTATIVES

The Contracting Officer (CO) for this contract is Klenise Wallace. The Contracting Officer has full warrant authority and will be the signatory as well as point of contact for all further communication for administrative matters during the solicitation and post contract award until otherwise stated.

The contract technical point of contact/Contracting Officer Representative (COR) is Ricardo Lopez. The COR delegated authority, responsibilities and contact information will be defined on a delegation letter issued after contract award.

G.2 INVOICES

All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. Payments will be made from the Contractor’s invoice(s).

All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.

This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.

Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).

G.2.1. Itemized Invoices. If the itemized invoice has not been reviewed and approved by the COR, the IPP payment request will be rejected. Please follow the minimum requirements to ensure a successful payment process.

IPP Invoice shall have the following areas completed at a minimum:

Invoice Number Invoice Date Bill Period Start Date Bill Period End Date Supplier Contact Name Supplier Contact Phone Contract Number

Itemized invoice shall include at a minimum:

Contractor Name & Address Contract number Invoice Number Description of Services or work completed.

Date of services or completion.

G.2.2. Certified Payrolls. Certified payrolls for Construction: certified payrolls must also be uploaded as an attachment. Contractor and all subcontractors, through the contractor, shall furnish all certified payrolls covering payments to laborers and mechanics for on-site work.

G.2.3. Final Payment. Following completion and acceptance of the work (including return of Government-furnished property and site cleanup), Final payment will made within 30 calendar days after presentation of a properly executed invoice and if required by the contract, a release of all claims against the Government, other than claims arising under this contracted, in stated amounts, which the Contractor specifically accepts from the operation of the release.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

Angeles National Forest Page 20 of 53

G.3 BONDING

The bid bond shall be submitted for 20% of the overall project costs.

Performance and payment bonds are required for 100% of the project costs, which includes base and option items. Reference Section I for the applicable FAR Clauses identifying the amounts and percentages applicable for these bonds.

G.4 LABOR INTERVIEWS

The Government (via the Contracting Officer (CO), Contracts Specialist (CS) or Contracting Officer Representative (COR)) will conduct periodic interviews with workers on the job using the Stand Form (SF) 1445, Labor Standards Interview, which may be validated against submitted payroll data.

G.5 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

Contractor Performance Information and Contractor Performance Assessment Reporting System (CPARS) will be used by the Forest Service for evaluating contractor performance. CPARS is the single USDA-wide system used to collect, maintain, and disseminate contractor performance evaluations to the Past Performance Information Retrieval System (PPIRS). Past performance reporting is required by FAR

42.1502 and 42.1503. The contractor will be notified by email to review evaluation information submitted by the Agency. The contractor will have 60 days to submit comments, rebutting statements, or additional information to the Assessing Official before any evaluation is considered final.

G.6 DEFINITIONS AND CONTRACT ADMINISTRATION DATA

Administrative Contracting Officer (ACO) - The ACO is a warranted Contracting Officer that has authority for the administration of the contract and may handle matters beyond the authority of the COR in the absence of the Contracting Officer (CO)). Generally, this includes the day-to-day administration of the contract, to include changes in contract price and time.

Changes (Modifications) The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

Contract Award A written award or acceptance of offer mailed or otherwise furnished to the Contractor shall result in a binding contract without further action by either party.

Contracting Officer (CO) Has full authority for the administration of the contract and will personally handle all matters beyond the authority of the CS and COR. Contracting Officers are agents of the Government and are the only officials authorized to enter into any contract or agreement that binds the Government. If you are asked to perform additional work, or make changes not specified in the contract, DO NOT perform the work but immediately notify the Contracting Officer. A Contracting Officer holds a legal warrant, which is a designation of authority to bind the Government.

Contracting Officer’s Representative (COR) The Contracting Officer’s Representative (COR) is the person most responsible for technical advice. The COR is also responsible for maintaining property records, outlining work, material approvals, inspecting work in progress, estimating completed work for partial or progress payments, and conducting pre-final and final inspections. In addition, the COR

Angeles National Forest Page 21 of 53 oversees administrative matters (e.g., submittals, etc.). Also ensures elements of contract requirements are met in accordance with terms and conditions. The COR is NOT authorized to direct changes or bind the Government to any contractual agreement. NOTE: The COR Designation form outlines functions the COR can and cannot perform.

Contract Specialist (CS) - The CS has delegated authority from the Contracting Officer for the administration of the contract and will handle all matters beyond the authority of the COR. Generally, this includes the day-to-day administration of the contract, except for matters pertaining to changes in contract price and time. Any contractual documents that bind the Government must have Contracting Officer approval and signature.

Designation of Authorized Representative of the Contractor The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.

Designation of Contracting Officer’s Representative (COR) Designation will be made upon contract issuance and a copy of the designation letters will be furnished to the Contractor. Limits of authority are described in each designation letter.

Government Technical Monitor (GTM) A Government Employee may be designated in writing to assists the CO and/or COR as a technical advisor/inspector to monitor contractor performance and answer basic contract questions. This person exists only to shadow or advise the COR in his/her area of expertise.

A GTM has no contractual authority.

Inspector(s) An Inspector may be assigned to the contract by the CO in writing authorized to inspect the progress and certify completion of work on behalf of the COR. The inspector is the most likely person to coordinate with on matters involving conduct of work within the scope of the contract. If a disagreement or dispute arises, the contracting officer must be notified immediately for resolution of such issues. The Contractor will receive a copy of the inspection designation (form R6-6320-32, or equivalent).

Notice to Proceed (NTP) The Contractor shall commence work upon receipt of a properly executed Notice to Proceed.

Unauthorized Instructions from Government or Other Personnel The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.

G.7 CLAUSES

452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled after the date of contract award. The conference will be held at a date/time to be determined post award and coordinated with the Contracting Officer Representative and Contracting Officer.

END OF SECTION G

Angeles National Forest Page 22 of 53

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 KEY PERSONNEL

(a) The Contractor shall assign to this contract the following key personnel: Contract Representative, Foreman/Forewoman, and Inspector. The personnel listed may fulfill multiple roles in the performance of this work. At minimum, all personnel named as key personnel must be able to read, write and speak English fluently.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.1.1. Additional Key Personnel Requirements. Contractor Key Personnel must be able to meet the following requirements throughout the performance of this contract, regardless of role:

a. Possess the experience, technical knowledge, and skill to support the requirements of this contract.

b. Possess any applicable credentials and/or certifications required for the performance of specialty work for every role he/she/they fulfill in the performance of the work on this contract.

c. Possess the capacity to participate in required meetings and provide technical inputs as needed throughout the duration of this contract.

H.2 WAGE DETERMINATION

The applicable Davis Bacon Wage Determination for this project is WD CA20240022, Revision 7, Dated 05/24/2024.

H.3 SAFETY

H.3.1. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety (protection of the lives and health of contractor employees and prevention of property, materials, supplies and equipment damage) of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private to avoid work interruptions. The Contractor shall submit a project safety plan to the CO and COR for review prior to commencement of Work.

H.3.1.1. OSHA Standards. The Contractor is responsible for all hazardous conditions arising under this contract. Occupational Safety and Health Administration (OSHA) regulations, as well as this contract, impose the responsibility upon you to ensure that the working conditions are not unsanitary, hazardous, or dangerous to your employees’ health and safety. Forest Service employees will not inspect or accept the work under conditions that are hazards or unsanitary, that has not been mitigated to the extent required by

Angeles National Forest Page 23 of 53

OSHA. Any subcontract entered into pursuant to this contract shall similarly provide a work environment that is sanitary and not hazardous. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .