This document is a Schedule of Items (SOI) for a federal contract opportunity related to the construction of a new fire station and potential barracks on the Angeles National Forest in California. The key details are:

The project includes a base bid for construction of a 6,467 SF fire station building, a 390 SF fire pump house, a 2,700 LF new waterline, and associated civil/site work. There are also optional bid items for a 3,695 SF barracks building, landscaping and irrigation, and a new well/waterline extension. The contract is anticipated to be a single-award firm-fixed-price contract with a performance period of approximately 540 calendar days. The solicitation will be issued on or around July 16, 2024, with proposals due by August 23, 2024. The contract award is expected on or about September 13, 2024, with a total estimated value of over $10 million. The opportunity is set aside for small businesses, and bonding is required. The contracting agency is the USDA Forest Service.

View the file

Other files

File Type Posted
A11. 5-Q&A v3 ROUND 4-12970224R0036.pdf PDF
A11. 4-J1-SF30_12970224R0036-0004F.pdf PDF
A11. 4-J1- Sol. Terms B-M, 12970224R0036-0004, 09022024F.pdf PDF
A11. 3-J5_DRAWINGS 12970224R0036 v2.0, 09022024.pdf PDF
A11. 3-J1-SF30_12970224R0036-0003F.pdf PDF
A11. 3-Q&A v2 ROUND 3-12970224R0036F.pdf PDF
A11. 3-J1- Sol. Terms B-M, 12970224R0036-0003, 09022024F.pdf PDF
A11. 3-J2_SOI 12970224R0036-00003 v2.xlsx XLSX spreadsheet
A11. 2-Q&A v1 ROUND 2-12970224R0036, 08212024.pdf PDF
A11. 2-J1- Sol. Terms B-M, 12970224R0036-0002, 08212024.pdf PDF
A11. 2-J5_DRAWINGS 12970224R0036 v1.pdf PDF
A11. 2-J1-SF30_12970224R0036-0002.pdf PDF
A11. 2-J16_Reps&Certs_12970224R0036, v1.docx DOCX document
A11. 2-J15_Experience & PastPerf Questionnaire, v1.docx DOCX document
A11. 2-J2_SOI 12970224R0036-00002 v1.xlsx XLSX spreadsheet
A11. 1-SiteVistiMtgMins-Q&A v1-12970224R0036, 08052024.pdf PDF
A11. 1-J9_Fire Plan, v1, 07312024.pdf PDF
A11. 1-J1-SF30_12970224R0036-0001.pdf PDF
A10. J1_SF1442 & Terms_12970224R0036, 07162024.pdf PDF
A11. 1-J17_Geotechnical Report.pdf PDF
A11. 1-J1- Sol. Terms B-M, 12970224R0036-0001, 08052024.pdf PDF
A10. J13_BiobasedStatementLetter.docx DOCX document
A10. J4_Supp SPECS - Opt 1003_Well Syst.pdf PDF
A10. J11_SF1413, Statement & Acknowledgement.pdf PDF
A10. J8_MAP, 12970224R0036.pdf PDF
A10. J6_Decision Memo_SanFrancisquitoFireStn&Barcks.pdf PDF
A10. J3_SPECIFICATIONS.pdf PDF
A10. J7_Design Measures_SanFrancisquitoFireStation.pdf PDF
A10. J2_SOI - 12970224R0036.xlsx XLSX spreadsheet
A10. J15_Experience & PastPerf Questionnaire.docx DOCX document
A10. J14_ProgressSched (FS 6300-7).rtf RTF text file
A10. J10_WD CA20240022, v7, 05242024.pdf PDF
A10. J12_DesignationofKTRKeyPersonnel-Reps.doc DOC document
A10. J16_Reps&Certs_12970224R0036.docx DOCX document
A10. J1_SF1442 & Terms_12970224R0036, 07162024.pdf PDF
A10. J9_Fire Plan, 03012024.pdf PDF
A10. J5_DRAWINGS, 12970224R0036.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

CONTINUATION OF SF 1442 - SECTION B
SCHEDULE OF ITEMS
PROJECT TITLESan Francisquito Fire Station & Barracks Construction
UNITAngeles National Forest
SOL #12970224R0036-0004
Issuing OfficeSpecialized Project Operations Center (SPOC) Southwest Branch
BASE ITEMS
ITEM NO.SUPPLIES/SERVICESQUANTITYUNITUNIT PRICEAMOUNT
0001MOBILIZATION - All Base Items1LS$0.00$0.00
0002FIRE STATION BUILDING6,467SF$0.00
Substructuer Foundations1LS$0.00$0.00
Shell - Superstructure1LS$0.00$0.00
Interiors1LS$0.00$0.00
0003FIRE PUMP HOUSE390SF$0.00
Substructuer Foundations1LS$0.00$0.00
Shell - Superstructure1LS$0.00$0.00
Interiors1LS$0.00$0.00
0004NEW WATERLINE2,700LF$0.00
Sitework: Site Prep, excavation/Trench water supply1LS$0.00$0.00
Civil/Mechanical Utilities1LS$0.00$0.00
Water Supply1LS$0.00$0.00
0005CIVIL WORK & SUPPORTING FACILITIES1LS$0.00
Building Site Work (including all earthwork and rough grading) for all buildings (See Note 10)1LS$0.00$0.00
Fire Station roadways, parking lots, retaining walls, sidewalks

tc={7C303BEE-E574-40F8-A814-E4862B7A4448}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Left of Match Line1LS$0.00$0.00
Fire Station Utilities (Includes electrical, gas, telecomm, lighting, sewer, water, fire water, water storage tank1LS$0.00$0.00
SUBTOTAL - Base Only$0.00
0006BONDING - Base Only1LS$0.00$0.00
SUBTOTAL - Base with Base Bonding$0.00
OPTIONAL ITEMS
ITEM NO.SUPPLIES/SERVICESQUANTITYUNITUNIT PRICEAMOUNT
1001BARRACKS BUILDING3,695SF$0.00
Mobilization -Barracks Building1LS$0.00$0.00
Substructure Foundations1LS$0.00$0.00
Shell - Superstructure1LS$0.00$0.00
Interiors1LS$0.00$0.00
Barracks roadways, parking lots, sidewalks

tc={B296C185-141F-4359-94CD-A8D5A14ED977}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Right of Match Line tc={7C303BEE-E574-40F8-A814-E4862B7A4448}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Left of Match Line1LS$0.00$0.00
Barracks Utilities (Includes electrical, gas, telecomm, lighting, sewer in building, water, fire water)1LS$0.00$0.00
Barracks landscaping (includes planting per plans)1LS$0.00
Barracks building irrigation per plans1LS$0.00
1002LANDSCAPING & IRRIGATIONLS$0.00
Firestation landscaping (includes planting per plans)1LS$0.00$0.00
Fire station irrigation per plans1LS$0.00$0.00
1003NEW WELL & WATERLINE EXTENSION$0.00
Test drilling Primary Site1LS$0.00$0.00
Test drilling Secondary Site1LS$0.00$0.00
Additional Drilling Primary or Secondary Site200LF$0.00$0.00
Drill Cuttings Pit BMPs Primary or Secondary Site1LS$0.00$0.00
Well Development Primary or Secondary Site1LS$0.00$0.00
Extend water distribution line1,500LF$0.00$0.00
Development of Well Building1LS$0.00$0.00
Mobilization - Well & Waterline Extension1LS$0.00$0.00
SUBTOTAL - ALL Options$0.00
SUBTOTAL (Base + Option 1)$0.00
SUBTOTAL (Base + Option 2)$0.00
SUBTOTAL (Base + Option 3)$0.00
SUBTOTAL (Base + ALL OPTIONS)$0.00
1004BONDING (Base + ALL Options)1LS$0.00$0.00
TOTAL CONTRACT VALUE (Base + ALL Options+Bonding)$0.00
ALTERNATIVE CONTRACT VALUE (Base + ALL Options + Bonding ($3M Cap)) (See Note 2)$3,000,000.00
B.2 SCHEDULE NOTES
1. Offeror must fill in the UNIT price and offeror info ONLY (highlighted in yellow). Spreadsheet is formatted to auto populate all pricing totals. Do NOT edit any other fields. Please return the schedule of items in Microsoft Excel.
2. A bid bond is required for this contract. The Successful awardee that receives the contract shall provide the bid bond as part of the proposal response package. The spreadsheet is already formatted to input the amount. Should the amount the spreadsheet produces in item 1004 exceed $3M, the offerors bid guarantee to be submitted with the proposal shall be $3M. The total amount offerors shall use for Total Contract Value on the SF 1442, Block 17 (Amounts) will match TOTAL CONTRACT VALUE (row 59 in excel) -OR- the ALTERNATIVE CONTRACT VALUE (row 60 in excel). The digitally signed payment and performance bonds are due within 10 calendar days post contract award.
3. Responses for quantities less than those listed in the numbered items or missing (without) prices for each item and/sub-item may be rejected.
4. Mobilization. No additional payment will be made to the contractor for any travel incurred while being on the site for the duration of the project. This includes pre-bid and pre-construction meetings and field observations as planned throughout the timeline of the project.
5. Bonding. Provide the anticipated reimbursable cost for bonding. The schedule reflects bonding cost should the Government only award base items or base + option items. The base and option bonding line items represent the range the flat rate for reimbursable bonding costs is not anticipated to exceed in the performance of this work with the exception of modifications for differing site conditions.
6. Base Items 0002-0005. Reference items in the Drawings (Sheet G-002) specified as “BASE” and Corresponding Specifications. The work in the base bid items include all work related to the construction of the fire station building including all structural, mechanical, electrical, plumbing, and utilities as specified on the drawings. Site work will include all excavation, over-excavation, retaining walls, sidewalks, as well as utilities as stated in the “Base” items. Work will also include the waterline base items, water tank, fire pumphouse, parking lots, utilities for the fire station, and sewer pits. A critical element of this project will be the coordination of utility service from Los Angeles Department of Water and Power (DWP) for temporary water source and Southern California Edison (SCE) for temporary and permanent power.
7. Option 1001. Reference items in the Drawings (Sheet G-002) specified as “OPTION 1” and corresponding Specifications. The work in this option bid item includes all incidental work related to the BARRACKS building including all structural, mechanical, electrical, plumbing, and utilities as specified on the drawings. Site work including all excavation and over-excavation, retaining wall, as well as utilities as stated in the “Base” items including those in the vicinity of the barracks building are still included in the Base bid.
8. Option 1002. Reference items in the Drawings (Sheet G-002) specified as “OPTION 2” and corresponding Specifications. The work in this option bid item includes all work specified in the L sheets including landscaping, planting and irrigation as specified in the drawings and specifications.
9. Option 1003. Reference items in the Drawings (Sheet G-002) specified as “OPTION 3” and corresponding Specifications and Supplemental Specifications for the new well system. The work in this option bid item includes all incidental work related to a new vertical well and extension of the waterline construction north of the Bouquet Aqueduct and as shown on the drawings. Contractor will construct a vertical groundwater well near the new fire station and barracks administrative site. This option item will determine the availability and quality of groundwater for drinking at the new fire station and barracks location. The work will include test drilling, construction of individual drilled water wells, completion of water analysis, well logs, and test pump reports, capping successful wells and abandoning wells that do not meet production and quality requirements. A hydrogeologic assessment report will be conducted and made available to the Contractor upon its completion which will identify a primary and secondary well site.
10. Base item 0006 includes site work and earthwork for the entire site to include all over-excavation required for the fire station building, the barracks building, and the water tank. The work also includes general eartwork and rough grading for all the buildings regardless of what is awarded to ensure that excavation and embankment (cut and fill) are balanced so that there is no need to import or haul soil material, other than the removal of any deleterious material. The base bid item 6 will also include all fine grading for the constructed features around the fire station and all earthwork related to the trenching, compaction, and backfill of buried utilities in the Base bid (Utilities).