This document is a One-Line Diagram for electrical infrastructure prepared for the NIFC RFIMS Infrastructure Demo project dated February 11, 2026. The diagram illustrates the existing electrical service configuration and required modifications, with an existing 277/480V, three-phase, 500kVA pad-mount transformer serving as the primary power source, featuring a maximum symmetrical RMS fault current of 37,590 amps at the transformer and 20,366 amps at the service entrance (DISC1).

The contractor is required to furnish and install a 30kVA, 480V single-phase to 120/240V single-phase transformer (T1) with downstream distribution via two 100-amp, 120/240V service entrance disconnects (DISC1 and DISC2) rated with 80-amp and 100-amp fuses respectively. Specific installation requirements include: providing 3/4-inch conduit with one CAT6 cable to the main building; installing a meter in a NEMA 3R enclosure; and providing a 100-amp 120/240V receptacle. All conduit and copper conductors must be sized per National Electrical Code requirements, with calculations provided for the service, panel, and equipment feeders. Contractors may substitute compressed aluminum conductors if corresponding adjustments to conduit and conductor sizes and arc-flash calculations are made. Additional requirements include engraved labels on all electrical equipment displaying available fault current values, and a coordination study with performance testing of the ground fault protection system per NEC 230.95 standards.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ONE-LINE DIAGRAM

NTS

N

EXISTING 277/480V, 3Ø,

500KVA PAD MOUNT

TRANSFORMER

37,590

MAXIMUM SYMMETRICAL RMS

FAULT CURRENT

(TYPICAL OF SYMBOL)

20,366

EXISTING UNDERGROUND

PRIMARY BY IDAHO POWER

T1

30KVA

480V,1Ø - 120/240V, 1Ø

1. PROVIDE 3/4" CONDUIT WITH (1) CAT6 CABLE TO MAIN BUILDING.

2. PROVIDE METER IN NEMA 3R ENCLOSURE.

3. 100 AMP 120/240V RECEPTACLE

A. CONDUIT, CONDUCTORS AND AIC CALCULATIONS FOR ALL

SERVICE, PANEL AND EQUIPMENT FEEDERS INDICATED ON THE

ONE-LINE HAVE BEEN SIZED BASED ON COPPER. THE

CONTRACTOR MAY USE COMPRESSED ALUMINUM

CONDUCTORS FOR THESE FEEDERS PROVIDING THE CONDUIT,

CONDUCTOR SIZES AND AIC CALCULATIONS ARE ADJUSTED AS

REQUIRED TO MEET ALL NATIONAL ELECTRICAL CODE

REQUIREMENTS.

B. FURNISH AND INSTALL ENGRAVED LABEL ON THE FRONT OF

ALL ELECTRICAL EQUIPMENT NOTING THE AVAILABLE FAULT

CURRENT VALUE SHOWN.

C. A COORDINATION STUDY SHALL BE PERFORMED ON THE

GROUND FAULT PROTECTION SYSTEM AND THE GROUND FAULT

PROTECTION SYSTEM SHALL BE PERFORMANCE TESTED TO

VERIFY PROPER OPERATION AS REQUIRED BY NEC 230.95 AT A

MINIMUM. REFER TO SPECIFICATIONS FOR ADDITIONAL STUDY

AND TESTING REQUIREMENTS.

GROUND

PER NEC

GENERAL NOTES:

KEYED NOTES:

DISC1

100/2/3R

SERVICE ENTRANCE RATED

W/ 80AMP FUSES

# SYMBOL USED FOR NOTE CALLOUT.

GROUND

PER NEC

1"C-3#3Cu

F

1-1/2"C-3#1Cu, 1#6Cu

F 14,628

DISC2

100/2/3R

W/ 100AMP FUSES

1-1/2"C-3#1Cu,1#6Cu

1-1/2"C-3#1Cu,1#6Cu

1 2

1-1/2"C-3#1Cu,1#6Cu

PRIMARY

15,736

Shelby Stuart Typewritten Text NIFC RFIMS Infrastructure Demo ATT-4 - Existing One Line Diagram February 11, 2026