This is a Request for Quotation (RFQ) for infrastructure demolition and removal services at the National Interagency Fire Center (NIFC) in Boise, Idaho. The Department of Interior's Bureau of Land Management is seeking a single-award, firm fixed-price construction contract for the NIFC RFIMS (Rangeland Fire Information Management System) Infrastructure Removal project. The work involves salvage-demolition of structures and facilities (excluding buildings) and must be completed within a 45-day construction period from the award date, with a delivery date of June 30, 2026. The contract is classified as a Total Small Business Set-Aside under NAICS Code 238910 with a $19 million size standard.
Quotes are due by June 26, 2026 at 10:00 AM Mountain Time, with questions due by June 18, 2026 at 10:00 AM MT. Award will be made based on technical acceptability and fair and reasonable pricing. Respondents must be registered in the System for Award Management (SAM), provide a short cover letter with company information and responses to standard business questions, sign Standard Form 18, acknowledge any amendments, submit a completed pricing worksheet, and provide a technical response limited to 10 pages. Construction wage rate requirements apply per prevailing wage determination ID20260104. The contractor must maintain liability insurance with minimum coverage of $100,000 workers' compensation, $500,000 general liability, and $200,000-$500,000 automobile liability. Payment will be processed through the Invoice Processing Platform (IPP), and work hours are limited to 8:00 AM to 4:30 PM Monday through Friday, excluding federal holidays, unless prior approval is obtained. All construction materials must be domestic origin per Buy American requirements unless exceptions are approved.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6/1995)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NUMBER
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
c. CITY
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
3833 S DEVELOPMENT AVE
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
3833 S. DEVELOPMENT AVE.
BOISE ID 83705
0044039400140L3726R0007
Matthew Steele
387-5130
BLM-FA NATIONAL INTERAGENCY FIRE CE
83705
06/12/2026
06/26/2026 1000 MD
06/30/2026
BOISE
ID
In accordance with the terms and conditions set forth in this solicitation and the following attachments provide a quote for review by the due date specified:
NIFC RFIMS Removal Work Statement
NIFC RFIMS Removal Att 1 Campus Map
NIFC RFIMS Removal Att 2 Infrastructure
Plan
NIFC RFIMS Infrastructure Removal Att 3
Existing Concrete Pad Details
NIFC RFIMS Infrastructure Removal Att 4
Existing One-Line
Contract period of performance and
Continued...
1 14
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L3726R0007 construction period will be 45 days calculated from date of award for the stated construction days taking into account any site restrictions stated in the solicitation. (Period of
Performance shown on solicitation is system generated and will be adjusted on award).
Ensure the bid/pricing schedule is completed with submission.
00010 NIFC RFIMS infrastructure demo & removal
Product/Service Code: P500
Product/Service Description: SALVAGE-
DEMOLITION
OF STRUCTURES/FACILITIES (OTHER THAN
BUILDINGS)
Delivery: 06/30/2026
Period of Performance: 05/15/2026 to
06/30/2026
Request for Quotation: 140L3726R0007
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 3 of 14
US WILDLAND FIRE SERVICE
National Interagency Fire Center (NIFC)
Request for Quotation
Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract Place of Performance: Boise, Idaho. Ada County Type of Construction: Building
NAICS: 238910 SIZE STD: $19M SET-ASIDE: Total Small Business
Quote Submittal Information:
Questions Due Date: June 18, 2026 at 10 AM MT.
Quote Due Date: June 26, 2026 at 10 AM MT.
Award Selection Process: Award will be made when technical/schedule, fair and reasonable pricing is determined.
Technical Representative Contracting Officer (CO)
TBD Matt Steele
TBD matthew_steele@ios.doi.gov
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 4 of 14
GENERAL
(a) The Department of Interior (DOI) is seeking a quotation for construction services as attached in the accompanying specifications. The DOI intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13. A single contract award will be made when technical and fair and reasonable pricing can be determined. The offeror’s submission must demonstrate the ability to satisfy all technical requirements set forth in this RFQ.
(b) The Government will not award any contract if the resulting contract would not represent a "best value" to the Government.
(c) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award. It is the responsibility of offerors to ensure their quote is received by the recipient and by the due date and time.
(d) Offerors are cautioned to submit adequate information to enable the Government to fully ascertain each offeror’s capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ).
(e) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale by the question deadline specified on the cover page of this document.
(f) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government.
(g) Quotation must be valid for a minimum of 60 days.
(h) Respondents must complete registration utilizing the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/. The Government will obtain respondent representations and certifications through this system.
(i) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate.
(j) All questions should be emailed directly to the Contracting Officer by the posted due date. Only written RFI’s will be considered and responded to by the Government. DOI responses to RFIs will be posted as an amendment to the solicitation. Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer.
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 5 of 14
CONTRACT CLAUSES
CLAUSES INCORPORATED BY REFERENCE
Clause Title Date
52.204-9 Personal Identity Verification of Contractor Personnel January 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards June 2020
52.204-13 System for Award Management Maintenance October 2018
52.204-19 Incorporation by Reference of Representations and Certifications December 2014
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015
52.213-4 Terms and Conditions – Simplified Acquisitions (Noncommercial) March 2026
DEV FEB 2025
52.219-6 Notice of Total Small Business Set Aside November 2020
52.219-28 Post-Award Small Business Program Representation January 2025
52.222-3 Convict Labor June 2003
52.222-6 Construction Wage Requirements August 2018
DEV FEB 2025
52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records July 2021 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014
DEV FEB 2025
52.222-12 Contract Termination-Debarment May 2014
52.222-13 Compliance with Construction Wage Rate Requirements and Related Act Regulations May 2014
52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-90 Addressing DEI Discrimination by Federal Contractors April 2026
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts May 2024
52.223-3 Hazardous Material Identification and Material Safety Data February 2021
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving May 2024
52.227-4 Patent Indemnity – Construction Contracts December 2007
52.232-5 Payments under Fixed-Price Construction Contracts May 2014
52.232-23 Assignment of Claims May 2014
52.232-27 Prompt Payment for Construction Contracts January 2017
52.232-33 Payment by Electronic Funds Transfer-System for Award Management October 2028
52.233-1, Alt 1 Disputes May 2014 December 1991
52.233-3 Protest after Award August 1996
52.233-4 Applicable Law for Breach of Contract Claim October 2004
52.236-2 Differing Site Conditions April 1984
52.236-3 Site Investigation and Conditions Affecting the Work April 1984
52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984
52.236-7 Permits and Responsibilities November 1991
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 6 of 14
52.236-8 Other Contracts April 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. April 1984
52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984
52.236-12 Cleaning up April 1984
52.236-13 Accident Prevention November 1991
52.236-14 Availability and Use of Utility Services April 1984
52.236-15 Schedules for Construction Contracts April 1984
52.236-17 Layout of Work April 1984 52.236-21, Alt I Specifications and Drawings for Construction February 1997
April 1984
52.242-14 Suspension of Work April 1984
52.243-5 Changes and Changed Conditions April 1984
52.244-6 Subcontracts for Commercial Products and Commercial Services October 2025
DEV MAR 2025
52.245-1 Government Property September 2021
52.245-9 Use and Charges April 2012
52.246-21 Warranty of Construction March 1994
DIAR 1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior July 1996
CLAUSES INCORPORATED BY FULL TEXT
52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS (October 2022) a)Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation
(FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S.
supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency.
The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 7 of 14
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b)Domestic preference. (1)This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components. (1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii)The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or (iii)The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 8 of 14 commercial quantities of a satisfactory quality.
(c)Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction Material Description
Unit of Measure Quantity Price (dollars)*
Item1:
Foreign construction material Domestic construction material
Item2:
Foreign construction material Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]
52.252-2 CLAUSES INCORPORATED BY REFERENCE (February 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): http://acquisition.gov/far/index.html.
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (November 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any FAR clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 9 of 14
DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (September 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
DIARS 1452.228-70 LIABILITY INSURANCE - DEPARTMENT OF THE INTERIOR (July 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
Workers’ Compensation and Employer’s Liability - $100,000 General Liability - $500,000 Automobile Liability:
$200,000 per person $500,000 per occurrence for bodily injury $20,000 per occurrence property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 10 of 14
SPECIAL CLAUSE 1 - ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING
PLATFORM (IPP)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System
(IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice date and Government Contract Number
2. Billing period specified with beginning and ending dates. The beginning date must not be later than the completion date or within any previous billing dates.
3. The accounting must follow the approved schedule of values as described in the specification attachment.
4. Total amount due for the billing period
5. Certification of Progress Payment
6. Payrolls (Mail weekly)
7. Substantiation of Subcontractor Payment
8. 52.223-9 Certification with final payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
SPECIAL CLAUSE 2 - LOCAL INTERNET PAYMENT PLATFORM (IPP) HOTLINE
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contracting Officer with the day and time you contacted the Payment Hotline.
SPECIAL CONTRACT REQUIREMENTS
WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours between 8:00am and 4:30pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection. In addition to holidays declared by Executive Order, the following federal legal holidays are observed:
New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Juneteenth Day Independence Day Labor Day Columbus Day Veterans’ Day Thanksgiving Day Christmas Day
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 11 of 14
DRAWINGS
(a) Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b) Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full-size drawings may contact the Contracting Officer identified in the solicitation.
PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
(a) The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
(b) If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
(c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d) The Contractor will be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
STAGING AREA
A lay-down, staging, and contractor-provided portable toilet area in the parking lot will be designated for the project. The physical size of the area required will be coordinated with the government upon award. Contractor shall provide sanitary facilities during the construction period for their employees and subcontractors.
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 12 of 14
LIST OF ATTACHMENTS
Number Description Number of Pages
1 NIFC RFIMS Removal Work Statement 3
2 NIFC RFIMS Removal Att 1 Campus Map 1
3 NIFC RFIMS Removal Att 2 Infrastructure Plan 1
4 NIFC RFIMS Infrastructure Removal Att 3 Existing Concrete Pad Details 1
5 NIFC RFIMS Infrastructure Removal Att 4 Existing One-Line 1
6 Bid Schedule 1
7 Wage Determination ID20260104 05/18/2026 4
Construction wage rate requirements are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are included in this Section. Applicable wage rates can be found at sam.gov.
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 13 of 14
SOLICITATION PROVISIONS
PROVISIONS INCORPORATED BY REFERENCE
Clause Title Date
52.203-2 Certificate of Independent Price Determination April 1985
52.204-7 System for Award Management November 2024
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations—Representation November 2015
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
February 2016
52.223-1 Biobased Product Certification May 2024
52.225-10 Notice of Buy American Requirement-Construction Materials May 2014
52.240-90 Security Prohibitions and Exclusions Representations and Certifications DEV MAR 2026
PROVISIONS INCORPORATED BY FULL TEXT
52.222-5 Construction Wage Rate Requirements – Secondary Site of The Work (May 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: http://acquisition.gov/far/index.html.
QUOTATION SUBMITTAL
Quotes must be in accordance with and in the order detailed in this section. Quotes are due by the date and time specified on the cover page of this document to the Contracting Officer’s email address.
REQUIRED DOCUMENTATION
Respondent shall submit the following information in response to this RFQ:
1) Short Cover Letter:
a. Offeror’s (company) name, address, SAM Unique Entity Identifier (UEI) number and phone number
b. Point of contact for individuals within the company
c. A statement that the quote is valid for the time period set in General Requirements paragraph (g).
d. A response to the following questions:
i. Judgments, Claims, and Lawsuits: Are there any judgments, claims, and/or lawsuits pending or outstanding against or involving entity or partners comprising your entity?
No ___, Yes ___. If “Yes,” submit details of all judgments or claims against either parent office or division/branch that will be responsible for the accomplishment of this project on a separate sheet.
PROJECT DESCRIPTION: NIFC RFIMS Infrastructure Removal Page 14 of 14
ii. Is your entity or partners comprising your entity under suspension or debarment by any Federal, state or local agency, or been terminated on any past projects (Federal or others)?
No ___, Yes ___. If “Yes,” submit details on a separate sheet.
e. IAW FAR 52.209-7(b), the offeror [ ] has [ ] does not have current active federal contracts and grants with a total value greater than $10,000,000.
2) Sign Standard Form (SF) 18, Request for Quotation. Please insert total price quote in block 11 and complete blocks 13 and
14. An official having the authority to contractually bind the Offeror's company must sign the SF 18 in accordance with the procedures prescribed in the Federal Acquisition Regulation Subpart 4.207.
3) Acknowledgement of Amendments: Acknowledge all request for quote amendments by signing and returning with your SF18 any SF30s issued (if applicable).
4) Complete and submit Attachment 6, Pricing Worksheet with your quote.
5) A brief response to the technical factors outlined below. The technical response is limited to 10 pages. The page size shall be
8.5 x 11 inches with a minimum margin size of one-half inch on all sides. Fonts shall be readable and a minimum size of 10-point font is recommended for use.
BASIS FOR CONTRACT AWARD
1) This acquisition is a Total Small Business Set-Aside award under the North American Industry Classification System (NAICS)
Code 238910 with a small business size standard of $19M.
2) The Government intends to make award based upon evaluation of quote provided. Award will be made when quote conforms to all solicitation requirements, such as terms and conditions, representations and certifications, technical requirements, and also provides fair and reasonable pricing.
3) The Government will evaluate technical acceptability in accordance with the following non-price factors:
# FACTOR ACCEPTABLE UNACCEPTABLE
X Technical/Schedule Quote description identifies the important steps to complete the project and demonstrates the necessary understanding to complete the project within the required timeframe.
No information provided or information provided does not demonstrate the quoter’s understanding of what is required to complete the project within the required timeframe.
X Price Quote documentation demonstrates fair and reasonable pricing when bid schedule factors are evaluated.
No information or only partial or incomplete information provided. Fair and Reasonable pricing cannot be determined
| Request for quotations |
| Request number |
| Date issued |
| Requisition/purchase request number |
| CERT. FOR NAT. DEF. UNDER BDSA REG. 2 AND/OR DMS REG. 1 |
| Issued by |
| For information call |
| Name |
| Telephone number |
| Area code |
| number |
| Deliver by (date) |
| Delivery |
| To: |
| Name |
| Company |
| Street address |
| City |
| State |
| Zip code |
| Destination |
| Name of consignee |
| Street address |
| City |
| State |
| Zip code |
| Please furnish quotations to the issuing office in block 5a on or before close of business |
| Schedule |
| Discount for prompt payment |
| 10 calendar days (%) |
| 20 calendar days (%) |
| 30 calendar days (%) |
| Calendar days |
| Number |
| Percentage |
| Name and address of quoter |
| Name of quoter |
| Street address |
| County |
| City |
| State |
| Zip code |
| Signature of person authorized to sign quotation |
| Date of quotation |
| Signer |
| Name |
| Telephone |
| Area code |
| Number |
Title
| AUTHORIZED FOR LOCAL REPRODUCTION Previous edition not usable |
| Standard form 18 (Rev. 6/1995) |