This document is a set of reference plans related to a federal contract opportunity for the repair and upgrading of six existing exterior aluminum storefront doors at the BLM WY Casper National Historic Trails Interpretive Center (NHTIC). The plans provide detailed information on the work required, including replacing existing pneumatic door operators with new electric operators, connecting existing push plates to the new operators, and other related modifications. The associated federal contract opportunity, Solicitation Number 140L6224Q0049, is for design and construction services necessary for this door upgrade project. The contract period of performance is from 9/3/24 to 11/30/2024. The opportunity is being competed under FAR Part 12 - Commercial Items Provisions and Clauses and FAR Part 13 - Simplified Acquisition Procedures. Offers must meet or exceed the stated specifications, and the evaluation criteria are provided in FAR clause 52.212-2.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_Addressed_0004.docx | DOCX document | |
| Sol_140L6224Q0049_Amd_0004.pdf | ||
| Sol_140L6224Q0049_Amd_0003.pdf | ||
| Sol_140L6224Q0049_Amd_0002.pdf | ||
| Sol_140L6224Q0049_Amd_0001.pdf | ||
| A06_3_Attachment_C_-_BLM_Codes_and_Standards.pdf | ||
| A06_2_Attachment_B_-_C40_Doors_and_Hardware.pdf | ||
| A04_Casper_NHTIC_-_Door_Upgrade_SOW_-_080924.pdf | ||
| B03_Wage_Determination.pdf | ||
| Sol_140L6224Q0049.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
PATIO DOOR - SEE SHEET A102 FOR MORE INFORMATION
INC. (2) PUSH PLATE
ELECTRICAL PANEL
(2) COMPRESSORS
TO BE REMOVED
(4) MAIN ENTRY DOORS - SEE SHEET A102 FOR MORE INFORMATION
INC. (4) PUSH PLATES
NOTE: FLOOR PLAN IS FOR REFERENCE ONLY. PLAN IS NOT TO BE SCALED.
MAIN ENTRY
PATIO
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r Bu re au o f L an d
M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
NOT FOR CONSTRUCTION4/
/2
1:
:4
PM
A101
REFERENCE FLOOR
PLAN
C
AS
PE
R
N H
TI
C
D
O O
R R
EN
O
VA
TI
O N
CASPER NHTIC -
DOOR
RENOVATION
April 10, 2023
N P op la r S t.
C as pe r, W yo m in g
JAL
N/A
1/32" = 1'-0"1 REFERENCE FLOOR PLAN
0 64 9632
Graphic Scale (Feet)
CONNECT EXISTING PUSH PLATE
TO NEW ELECTRIC OPERATOR
NOTE: FLOOR PLAN IS FOR REFERENCE ONLY. PLAN IS NOT TO BE SCALED.
PATIO
REPLACE EXISTING (2)
PNEUMATIC OPERATORS W/ (2)
NEW ELECTRIC OPERATORS
CONNECT EXISTING PUSH PLATE
TO NEW ELECTRIC OPERATORINTERIOR
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r Bu re au o f L an d
M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
NOT FOR CONSTRUCTION4/
/2
1:
:4
PM
A102
ENLARGED PATIO
REFERENCE PLAN
C
AS
PE
R
N H
TI
C
D
O O
R R
EN
O
VA
TI
O N
CASPER NHTIC -
DOOR
RENOVATION
April 10, 2023
N P op la r S t.
C as pe r, W yo m in g
N/A
N/A
1/4" = 1'-0"1 ENLARGED PATIO REFERENCE PLAN
0 8 124
CONNECT EXISTING PUSH PLATE
TO NEW ELECTRIC OPERATOR
NOTE: FLOOR PLAN IS FOR REFERENCE ONLY. PLAN IS NOT TO BE SCALED.
VESTIBULE
REPLACE EXISTING (2)
PNEUMATIC OPERATORS W/ (2)
NEW ELECTRIC OPERATORS
CONNECT EXISTING PUSH PLATE
TO NEW ELECTRIC OPERATOR
EXTERIORINTERIOR
REPLACE EXISTING (2)
PNEUMATIC OPERATORS W/ (2)
NEW ELECTRIC OPERATORS
NEW PUSH PLATE -
CONNECT TO BOTH DOORS
NEW PUSH PLATE -
CONNECT TO BOTH
DOORS
CONNECT EXISTING
PUSH PLATE TO NEW
ELECTRIC OPERATOR
REPLACE EXISTING (2)
PNEUMATIC OPERATORS W/ (2)
NEW ELECTRIC OPERATORS
CONNECT EXISTING
PUSH PLATE TO NEW
ELECTRIC OPERATOR
REPLACE EXISTING (2)
PNEUMATIC OPERATORS W/
(2) NEW ELECTRIC
OPERATORS
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r Bu re au o f L an d
M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
NOT FOR CONSTRUCTION4/
/2
1:
:4
PM
A103
ENL. MAIN ENTRY
REFERENCE PLAN
C
AS
PE
R
N H
TI
C
D
O O
R R
EN
O
VA
TI
O N
CASPER NHTIC -
DOOR
RENOVATION
April 10, 2023
N P op la r S t.
C as pe r, W yo m in g
N/A
N/A
1/4" = 1'-0"1 ENL. MAIN ENTRY REFERENCE PLAN
0 8 124
| Sheets |
| A101 - REFERENCE FLOOR PLAN |
| A102 - ENLARGED PATIO REFERENCE PLAN |
| A103 - ENL. MAIN ENTRY REFERENCE PLAN |
File details come from the government source that posted it. Updated .