This file shows mechanical schedules (MS-1) for the Madron/A Office Building HVAC replacement project for the Department of Energy's Southeastern Power Administration. The document contains four detailed technical schedules: a Single Duct Terminal Unit with Electric Heat Schedule, a Fan Powered Terminal Unit with Electric Heat Schedule, an Air Handling Unit Schedule, and a Coil Schedule.
The schedules provide specific technical specifications and requirements for HVAC equipment. The Fan Powered Terminal Unit schedule lists multiple units (FPTU-1 through FPTU-14) with detailed specifications for each, including dimensions, CFM ratings, and heating capabilities. The Air Handling Unit Schedule covers units AC-1 through AC-3, showing fan static pressures, capacities, and coil specifications. The Coil Schedule details three coils (CC-1 through CC-3) made of copper with aluminum fins. These mechanical schedules were prepared by Lee & Browne Consulting Engineers, Inc. for the U.S. Department of Energy facility in Tulsa, Oklahoma.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MS - 1 Lee Browne
File details come from the government source that posted it. Updated .