A04_Tulsa_HQ_HVAC_Plan_-_First_Floor_-_M-1_Optimized.pdf

PDF 820 KB Posted

Attached to
TULSA HQ MECHANICAL PREVENTIVE MAINTENANCE
Solicitation number
89503625QSW000168
Issued by

About this file

This document is a detailed HVAC floor plan drawing (sheet M-1) for the first floor of the Madrona Office Building HVAC replacement project at the U.S. Department of Energy's Southwestern Power Administration facility in Tulsa, OK. The drawing, prepared by Lee & Browne Consulting Engineers, shows the layout of HVAC systems including ductwork, equipment locations, and mechanical rooms across the first floor of the building.

The plan includes technical notes regarding new and existing items, connection requirements for terminal units and ductwork, fan powered VAV boxes, and temperature sensors. It appears to be part of a larger set of mechanical drawings for an HVAC system replacement project, with specific details about equipment placement, ductwork routing, and mechanical specifications. The drawing is dated 6/23 and includes a north arrow orientation, scale bar, and professional engineer's stamp.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sward Rectangle sward Line sward Rectangle sward Line sward Rectangle sward Line sward Rectangle sward Line sward Rectangle sward Line sward Rectangle sward Line sward Rectangle sward Line sward Rectangle sward Line

File details come from the government source that posted it. Updated .