Q_A Responses for W9124C25R0003 CO2 Gas Services.pdf

PDF 35 KB Posted

Attached to
CO2 Gas Services & Tank Rental
Solicitation number
A028438
Issued by

About this file

This is a Q&A document for RFI W9124C-25-R-0003 addressing questions about CO2 gas and tank rental services at Fort Jackson, SC. The document contains four questions and answers clarifying contract details. Key points include: the contract will use monthly invoicing under a Keep Full Program rather than specifying pounds of CO2; historical usage data is provided in the PWS; the contractor must confirm proper setup and functioning of solenoid equipment connecting pools to tanks; and tanks will remain in their current storage locations. The Q&A provides technical clarifications for potential bidders but does not modify the core requirements of providing CO2 gas services and tank rentals for treating pool water.

View the file

Other files

File Type Posted
Pre-Proposal Site Visit_Sign-in_20250204.pdf PDF
ADDENDUM 52.237-1 (Site Visit).docx DOCX document
CO2 Gas PWS 31 Dec 24.pdf PDF
52.217-8 Option to Extend Services.docx DOCX document
ADDENDUM 52.228-5 (Insurance).pdf PDF
ADDENDUM 52.212-1 (Instructions).docx DOCX document
Wage Determination No. 2015 4429.pdf PDF
ADDENDUM 52.212-2 (Evaluation).docx DOCX document
Solicitation - W9124C25RA003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Q&A Responses W9124C-25-R-0003

CO2 Gas & Tank Rental

1. Please clarify the number of pounds per year that are estimated and change CLIN 0001, 1001, 2001, 3001, and 4001 to reflect this information? CO2 cannot be priced at a per month charge.

A1. This contract will be structured for monthly invoicing and will not specifically state pounds. This requirement is for a Keep Full Program.

2. Wanted to point out that there is no CLIN for product in lbs. Can you advise usage amounts for each site?

A2. Please see response to A1. In addition, the PWS includes a historical data chart.

3. Has the solenoid equipment already been set up to establish the line of communication from the pool to the tanks?

A3. The contractor shall confirm the solenoid equipment is properly set up and all necessary connections and configurations are in place and functioning as intended.

4. Are the tanks going to be stored in the same area where the pools are?

A4. The tanks will be stored in their current existing location.