A02 PWS Attachment C - McNair BMPs Map.pdf
PDF 339 KB Posted
- Solicitation number
- W91QV127PA997
About this file
This document is a stormwater infrastructure map for Fort McNair dated April 2, 2021. The map illustrates the stormwater management system across the installation, which spans approximately 1,000 feet in total area and borders the Washington Channel and Anacostia River to the east. The installation includes 80 numbered buildings and structures positioned throughout the facility.
The stormwater infrastructure depicted includes multiple best management practices (BMPs) and conveyance systems strategically placed across the installation. Key components identified on the map include stormwater pumps, outfalls, and manholes (marked with specific symbols), stormwater inlets, and grassed swales. Additionally, the map shows bioswale/bioretention areas, BaySeparator™ systems, green roofs, and future BMP locations. Notable projects include a bioretention area associated with Building 59 renovation. The stormwater system is accessed via a Main Gate (ceremonial) and 2nd Street Gate, with critical infrastructure labeled with designation codes (FMN_M1 through FMN_M5 for monitoring points, FMN_P1 for pump, FMN_F1 through FMN_F10 for various filtration/flow features, FMN_GS1 for grassed swale, and FMN_GR1 for green roof). The comprehensive stormwater management network demonstrates an integrated approach to managing runoff and environmental compliance across the Fort McNair installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
g
6 7 8 9 10 11 12 13 14 15 60
23 24 25
40 46
26 28
1 2 3 4 5
67 66
WASH
4th Ave
2nd Ave
WASHINGTON CHANNEL
Legend
Building
InstallationBoundary
2ndStreet Gate
MainGate (ceremonial)
Date: 4/2/2021
0 125 250 500 750 1,000 Feet
Stormwater Pump
Stormwater Outfall
Stormwater Manhole
Stormwater Inlet
Grassed Swale
Bioswale/Bioretention Area
BaySeparatorTM System
FMN_M1
FMN_M2
FMN_M3
FMN_M4
FMN_M5
FMN_P1
FMN_F1
FMN_F4
FMN_F2
FMN_GS1
FMN_F5
FMN_GR1
Green Roof
FMN_F8
Future BMP
FMN_F3
Building 59
Reno Project
Bioretention
Area
FMN_F7
FMN_F8 FMN_F9 FMN_F10
Smith, Stephen Polygon
Smith, Stephen Polygon
Smith, Stephen Polygon
Smith, Stephen Polygon
Slide 1
File details come from the government source that posted it. Updated .