A02 PWS Attachment A - Required Maintenance.xls

XLS spreadsheet 101 KB Posted

Attached to
JBMHH Stormwater Management Facility Maintenance and Repair Services
Solicitation number
W91QV127PA997
Issued by

About this file

This is a Performance Work Statement (PWS) attachment detailing required maintenance for stormwater management facilities (SMFs) at Fort Myer and Fort McNair. The document provides a comprehensive inventory of 58 stormwater management facilities across both installations, including bioretention areas, permeable pavement systems, sand filters, detention basins, and specialized filtration units such as Filterra systems and BaySaver Technologies BaySeparator Systems.

The required maintenance encompasses both routine and inspection-based activities tailored to each facility type. Routine maintenance for bioretention and rain garden facilities includes removing debris, dead vegetation, sediment, and obstructions; replanting vegetation per design specifications; re-mulching annually; mowing and removing weeds; and notifying Environmental Management Division (EMD) of any contamination signs. Permeable pavement systems require vacuuming during dry weather, pea gravel replacement, sediment removal, and structural repair. Sand filters and underground detention facilities require cleaning, pumping, sediment removal, filter media replacement, and debris removal. Specific required maintenance items noted from inspections include replacing filter cartridges at the Radnor Heights retention vault, replanting vegetation at Memorial Chapel rain gardens and bioretention areas per original design specifications, removing sediment and dredging from several detention basins, replacing inlet grates, and planting replacement trees at Henderson Hall. The contractor must provide a proposed maintenance schedule prior to project start, notify the Activity Point of Contact 48 hours before beginning work on each facility, provide weekly oversight with at least one day per week on-site, inspect all 58 SMFs throughout the contract period, and obtain Government approval upon completion of each facility's maintenance before the work is considered complete.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ft Myer All

Stormwater BMP NameStormwater Management Facility TypeSMF IDLatitudeLongitudeApprox. Impervious Acreage TreatedApprox. Pervious Acreage TreatedApprox. Total Acreage TreatedRunoff Treated (Acre-Feet)Approx. Date BuiltDescriptionCapacity/Storage Volume/SizeRequired Maintenance
Filterra units behind Radnor Heights SubstationBioretention/filtrationJBM-HH_B138.885795-77.0829120.6800.680.0576/30/11Two Filterra® stormwater bioretention/filtration systems to treat runoff from paved roadway.
Two grates for two plants, but one large vault underneath. Vault is 13’ x 7’2”UnknownRoutine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Bioretention area behind Radnor Heights SubstationBioretentionJBM-HH_B1038.885714-77.0820420.190.130.320.0166/30/06Approx. 10 ft x 20 ft basins with three channels directing runoff from parking area. Currently contains flowering plants.UnknownRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Jogging Path Permeable Pavement along McNair RoadPermeable PavementJBM-HH_B1138.88523-77.076440.2000.200.015836/1/20C soils with no underdrain. Designed to meet Level 1 criteria per VA DEQ Storm water Design Specification No. 7.Routine maintenance: Vacuum during dry weather; replace or repair affected areas; remove any observed sediment and repair structural damage; ensure observation well is capped.
Old Post Chapel Lot Permeable PaversPermeable PavementJBM-HH_B1238.880384-77.0793470.2600.260.020586/1/20C soils with underdrain. Designed to meet Level 1 criteria per VA DEQ Storm water Design Specification No. 7.Routine maintenance: Vacuum during dry weather; replace pea gravel; replace or repair affected areas; remove any observed sediment and repair structural damage; ensure observation well is capped.

Specific Required Maintenance based on Inspections: Replace pea gravel.

Jogging Path Permeable Pavement along ANC WallPermeable PavementJBM-HH_B1338.87998-77.079020.2600.260.020586/1/20C soils with no underdrain. Designed to meet Level 1 criteria per VA DEQ Storm water Design Specification No. 7.Routine maintenance: Vacuum during dry weather; replace or repair affected areas; remove any observed sediment and repair structural damage; ensure observation well is capped.
Hatfield Gate Vehicle Inspection loop Filterra systemsMicro-bioretentionJBM-HH_B238.871819-77.0788473.030.753.780.2536/30/05Five Filterra® stormwater bioretention/filtration systems to treat runoff from paved vehicle inpection loop road
Five units each with a separate vault. Each vault is 4.5’ x 6’.UnknownRoutine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Memorial Chapel Rain GardensRain gardens (2)JBM-HH_B338.874019-77.0783350.2500.250.0216/30/12Two rain gardens that provide infiltration for stormwater from pavement surfaces in front of the ChapelUnknownRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Replace existing flowers with the following species: Rudbeckia hirta (balck-eyed susan), Monarda fistulosa (wild bergamot), Eupatorium coelestiunum (blue mistflower), Liatris spicata (blazing star), Heliopsis helianthoides (ox eye sunflower).

Biorention Area East of Building 411 Bioretention JBM-HH_B4 38.878002 -77.079534 0.77 0.27 1.04 0.063 5/30/18 Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Remove woody vegetation that is not included in the original design plans (to be provided).

Permeable Pavement East of Building 411Permeable PavementJBM-HH_B538.877827-77.0794910.330.010.340.0285/30/18Routine maintenance: Vacuum during dry weather; replace or repair affected areas; remove any observed sediment and repair structural damage; ensure observation well is capped.
East Lot Biorention Area (northeast of Building 407)BioretentionJBM-HH_B638.877477-77.0793750.1100.110.0094/30/19Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Remove woody vegetation.

Sheridan Avenue Bioswale (AAFMAA) Bioretention JBM-HH_B7 38.872978 -77.080705 0.31 0.07 0.38 0.026 4/30/19 Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: replace the broken stormwater inlet grate at the bottom of the swale Bioswales in Fitness Center Parking Lot Bioretention JBM-HH_B8 38.874987 -77.082009 0.3 0 0.3 0.025 4/30/19 Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Find cleanouts if buried and raise vertically to avoid being buried in the future.

Three bioswales - Henderson Hall Parking Lot Bioretention JBM-HH_B9 38.869252 -77.073915 1.022 0.48 1.50 0.09 12/1/19 Three dry swales located in the center of the Henderson Hall Parking Lot. Underground piping provides additional stormwater retention capacity. They were designed to meet level 2 criteria per VA DEQ storm water design specification No. 10 8,240 cubic feet (2,747 cubic feet per swale) Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

NOTE: Woody vegetation included in design should not be removed. Design plans to be provided.

Specific Required Maintenance based on Inspections: Replace trees that were removed frrom the northeastern portion of the bioswale along Northeast Road. Approximately five trees need to be planted.

Basin at Wright Gate Vehicle Inspection StationMicro-bioretentionJBM-HH_F138.887462-77.0726360.520.290.810.0436/30/05Small dry detention basin on SE side of Wright Gate Vehicle Inspection StationUnknownRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Sheridan Ave UEPHFiltering Practices (Sand filter)JBM-HH_F238.878176-77.0812411.810.11.910.156/1/113-chambered concrete sand filter vault (completed June 2011)UnknownRoutine maintenance: clean and pump out underground sand filters; fill cracks in concrete; repair inlets, outlets and overflow devices; repair chambers; remove water; replace filter media; remove blockages; remove excess sediment; remove trash and debris; pick-up trash and debris.
TOG Maintenance Facility (Building 314) Sand FilterSand filterJBM-HH_I138.88695-77.0750880.3040.10.4046/30/0410-ft wide x 57.5 ft x 13-ft deep precast concrete sandfilter vaultVolume = 7,475 cubic feetRoutine maintenance: clean and pump out underground sand filters; fill cracks in concrete; repair inlets, outlets and overflow devices; repair chambers; remove water; replace filter media; remove blockages; remove excess sediment; remove trash and debris; pick-up trash and debris.
Pershing Drive Permeable Pavement LotPermeable PavementJBM-HH_M438.874226-77.0799970.1600.160.0134/30/19Routine maintenance: Vacuum during dry weather; replace pea gravel; replace or repair affected areas; remove any observed sediment and repair structural damage; ensure observation well is capped.

Specific Required Maintenance based on Inspections: Vacuum and replace pea gravel.

Long Branch Detention BasinWet pondJBM-HH_P138.868772-77.07714431.311.69332.616/30/95Large open detention basin west of Building 423Quantity storage volume = ~155,350 cf
Quality storage volume = ~ 38, 365Routine maintenance: remove excessive vegetation and algae growth, remove woody vegetation, remove obstructions and repair any damage, repair and replant eroded areas, remove sediment and restore wet pond to original design, excavate excess sediment, mow and remove weeds, pick-up trash.

Specific Required Maintenance based on Inspections: remove excessive vegetation, sediment, and algae growth from the bottom of the basin and along the wetern embankment.

Basin #2 – North of Building 325 Dry extended detention pond JBM-HH_P3 38.886322 -77.073823 18.8 10.13 28.93 1.567 6/30/05 Partial underground detention basin 7,049 cubic feet (as designed) Routine maintenance: remove blockages to infiltration; remove excess/woody vegetation; remove obstructions; repair and replant or re-seed areas; mow and remove weeds; remove sediment to restore detention basin to original design; pick-up trash.

Specific Required Maintenance based on Inspections: Remove woody vegetation growing at culvert openings.

Basin #1 - Building 330 (TMP) Fueling Station Wet pond JBM-HH_P4 38.884914 -77.075289 3.4 0.34 3.74 0.283 6/30/05 Aboveground retention basin 5,859 cubic feet (as designed) Routine maintenance: remove excessive vegetation and algae growth, remove woody vegetation, remove obstructions and repair any damage, repair and replant eroded areas, remove sediment and restore wet pond to original design, excavate excess sediment, mow and remove weeds, pick-up trash.

Specific Required Maintenance based on Inspections: Remove phragmites and woody vegetation. Dredge sediment from the bottom of the basin to the level of the inflow pipes at the bottom of the riser.

Building 205 Stormwater Basin Dry extended detention pond JBM-HH_P7 38.885838 -77.082061 18.4 3.25 21.65 1.53 6/30/05 Partial underground detention basin Unknown Routine maintenance: remove blockages to infiltration; remove excess/woody vegetation; remove obstructions; repair and replant or re-seed areas; mow and remove weeds; remove sediment to restore detention basin to original design; pick-up trash. Issues with the condition of the structure (i.e. cracks in the concrete) must be addressed on an as-needed basis.

Specific Required Maintenance based on Inspections: Dredge and remove sediment down to the riser structure's inlet pipe, then restabilize and establish vegetation at the corrected elevation. Fix deterioration of concrete in the center culvert to restabilize.

Millenium Stormwater Interceptor BasinUnderground extended detention basinJBM-HH_U138.885886-77.0765617.02815.020.5856/30/07Large underground detention facility. Cast‐in‐place concrete structure with two parallel chambers separated by a 1’‐4” thick structural concrete wall. The interior of each chamber is 186’‐0” long by 18’‐4” wide by 16’‐0” tall. The two chambers are interconnected by two 3’‐0” by 3’‐0” openings at the bottom of the shared center wall.Two chambers - capacity at ~54,560 cubic feet, 109,120 CF total.
= 816,274 gallonsRoutine maintenance: remove blockages to inlet and outlet structures; remove sediment and debris from storage chambers; remove floating debris and petroleum products (if present); trace sources of contamination and implement controls as-needed.

Specific Required Maintenance based on Inspections: Remove trash and debris accumulated in the basin. Replace missing ladder rung within riser of manhole DB8.

Henderson Hall underground detentionUnderground pipe detentionJBMHH_U238.869416-77.0729130.870.21.070.0736/30/05Underground pipe detenionUnknownRoutine maintenance: remove blockages to inlet and outlet structures; remove sediment and debris from storage chambers; remove floating debris and petroleum products (if present); trace sources of contamination and implement controls as-needed.
Buildings 419 and 421 Underground Detention (Barracks A and B)Underground pipe detentionJBM-HH_U338.877901-77.0811520.130.30.430.0116/30/10Underground stormwater detention (located under basketball court)UnknownNote: Main issues to be addresed through FY22 contract, including removal of sediment. Unlikely to need maintenance through FY23 contract.

Typical maintenance procedures: remove blockages to inlet and outlet structures; remove sediment and debris from storage chambers; remove floating debris and petroleum products (if present); trace sources of contamination and implement controls as-needed.

TOG Maintenance Facility (Building 314) Underground Stormwater BasinUnderground extended detention/infiltration facilityJBM-HH_U438.886841-77.0749090.3040.10.4040.0256/30/0424-ft x 72-ft x 6-ft deep underground detention facility~10,000 cubic feetRoutine maintenance: remove blockages to inlet and outlet structures; remove sediment and debris from storage chambers; remove floating debris and petroleum products (if present); trace sources of contamination and implement controls as-needed.
Stormwater retention vault and associated storm filter north of Radnor Heights SubstationUnderground detention basinJBM-HH_U538.886114-77.0826260.2400.710.026/30/1164 ft x 8 ft retention vault and Contech storm filter1,300 cubic ftRoutine maintenance: remove water, remove excess sediment, remove trash and debris. If needed, fill cracks in concrete, repair inlets, outlets and manhole and remove obstructions. Replace filter cartridges in StormFilter® System.

Specific Required Maintenance based on Inspections: Replace filter cartridges (Eight 27", 7.50 GPM, ZPG Cartridges)

&CJBM-HH MS4 Stormwater Management Facility Inventory

Ft McNair

Stormwater BMP NameStormwater Management Facility TypeSMF IDLatitudeLongitudeApprox. Pervious Acreage TreatedApprox. Impervious Acreage TreatedApprox. Acreage TreatedRunoff Treated (acre-feet)Approx. Date BuiltLocation DescriptionDescriptionCapacity - Storage VolumeRequired Maintenance
Physical Fitness Center Bioretention - Parking lotBioretentionFMN_F138.87018-77.014121.431.312.7412006NE corner of Fitness CenterVegetated bioretention area to treat parking lot and roof runoff3,503.5 ft3Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

NOTE: Woody vegetation included in design to remain. Design plans to be provided.

Phyical Fitness Center Building MicrobioretentionMicrobioretentionFMN_F238.87008-77.014770.090.680.770.52006Three microbioretention boxes on west side of Fitness Center to treat roof runofffVegetated buffer adjacent to fitness centerRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Bioretention area east of USATA GarageBioretentionFMN_F338.870978-77.01494400.140.261.28/1/17609.84 cubic feetRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Install energy dissapator/larger stone just downhill from the curbcut to address erosion. Repalce missing cleanout pipe cap.

NDU Marshall Hall Microbioretention (SE of B62) Microbioretention FMN_F4 38.86557 -77.014073 0.25 2.75 1.65 2012 NDU Marshall Hall South Plaza Bioswale with engineered soil and underdrain; no direct outlet to storm drain system Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Replant bioswale plantings per the original design plan (to be provided). Includes a mix of common rush, big bluestem, swamp milkweed, blue liriope, and more.

Bioretention area west of USATA GarageBioretentionFMN_F538.870728-77.01543200.050.131.28/1/17217.8 cubic feetRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
BaySaver Technologies BaySeparator SystemHydrodynamic structure38.8668-77.0140401.51.52007East of the SE corner of B64Dual manhole filtration system
BaySaver Technologies BaySeparator SystemHydrodynamic structure38.86863-77.0152901.51.52007West of the parking lot between B69 and B64Dual manhole filtration system
BaySaver Technologies BaySeparator SystemHydrodynamic structure38.86693-77.016601.451.452007East of B20Dual manhole filtration system
BaySaver Technologies BaySeparator SystemHydrodynamic structure38.86342-77.0173101.451.452007N of B61Dual manhole filtration system
Underground pipe detentionExtended Detention38.86656-77.016760.252.7531/1/06E of tennis courtsUnderground pipe detention
Bioswale adjacent to the SeawallBioswaleFMN_F638.863182-77.0184261.490.371.861.22017Open channel dry swale constructed for for the Seawall Repairs project. 1,100 feet long (based on as-builts)5764 cubic feetRoutine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
USATA Garage GreenroofGreenroofFMN_GR138.870756-77.01519800.250.251.28/1/171,089 cubic feetRoutine maintenance: conduct spot weeding and replace any plants, as-needed. Water plants as-needed during periods of extended drought. Vegetation replanted must be in accordance with the design specifications of the green roof.
Grass swaleGrass swaleFMN_GS138.86863187-77.015290750.252.7530.51/1/06West of the parking lot between B69 and B64Grass swale surrounding fitness center parking lotRoutine maintenance: remove sediment and debris from in and around the swale. Mow swale and remove weeds or invasive plants. Mow no shorter than 2 1/2 to 3 inches. Repair eroded areas, reseed, and water on an as-needed basis.
BaySaver Technologies BaySeparator System (SW Corner of Parking Lot between B69 and B64)Hydrodynamic structureFMN_M138.8683-77.0151801.451.451.22006Southwest corner of the parking lot between B69 and B64Dual manhole filtration systemRoutine maintenance: Use a vacuum truck to clean out all water, debris, oil, and sediment from the storage manhole. Use a submersible pump to pump the bulk of the water from the primary manhole into the clean storage manhole. Clean the manhole of remaining sediment and debris using a hose, then vacuum out rinse water.
BaySaver Technologies BaySeparator System (NW Corner of B64)Hydrodynamic structureFMN_M238.868-77.015190.591.52.090.52006Northwest corner of B64Dual manhole filtration systemRoutine maintenance: Use a vacuum truck to clean out all water, debris, oil, and sediment from the storage manhole. Use a submersible pump to pump the bulk of the water from the primary manhole into the clean storage manhole. Clean the manhole of remaining sediment and debris using a hose, then vacuum out rinse water.
BaySaver Technologies BaySeparator System (NE Corner of B64)Hydrodynamic structureFMN_M338.86811-77.014301.51.50.52006Northeast corner of B64Dual manhole filtration systemRoutine maintenance: Use a vacuum truck to clean out all water, debris, oil, and sediment from the storage manhole. Use a submersible pump to pump the bulk of the water from the primary manhole into the clean storage manhole. Clean the manhole of remaining sediment and debris using a hose, then vacuum out rinse water.
BaySaver Technologies BaySeparator System (NW Corner of B62)Hydrodynamic structureFMN_M438.86651-77.0152401.451.450.52006Northewest corner of B62Dual manhole filtration systemRoutine maintenance: Use a vacuum truck to clean out all water, debris, oil, and sediment from the storage manhole. Use a submersible pump to pump the bulk of the water from the primary manhole into the clean storage manhole. Clean the manhole of remaining sediment and debris using a hose, then vacuum out rinse water.
BaySaver Technologies BaySeparator System (2nd St. Gate Parking Area)Hydrodynamic structureFMN_M538.8706124962-77.0140190306Adjacent to Police Station (B65) at McNair entrance along 2nd StreetRoutine maintenance: Use a vacuum truck to clean out all water, debris, oil, and sediment from the storage manhole. Use a submersible pump to pump the bulk of the water from the primary manhole into the clean storage manhole. Clean the manhole of remaining sediment and debris using a hose, then vacuum out rinse water.
Bioretention Area between 4th Avenue and 5th Avenue, S of residencesBioretentionFMN_P138.867613-77.0156570.250.50.7512012Between 4th and 5th Avenue (former swimming pool)Vegetated bioretention area to treat parking lot runoff37,019 cubic feet

276919 gallons

0.276918 million gallons Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

Specific Required Maintenance based on Inspections: Replant bioretention plantings per the original design plan (to be provided). Includes a mix of trees, shrubs, and grasses.

Does not exist

&CJBM-HH MS4 Stormwater Management Facility Inventory

OY1 & 2 Additional SMFs

InstallationStormwater BMP NameStormwater Management Facility TypeUSACE IDLatitudeLongitudeApprox. Impervious Acreage TreatedApprox. Pervious Acreage TreatedApprox. Total Acreage TreatedRunoff Treated (Acre-Feet)Approx. Date BuiltDescriptionCapacity/Storage Volume/SizeRequired Maintenance
Fort Myer-Henderson HallFilerra Unit 542 - Building 416 Parking LotTree box filter unitTBD38.876317-77.0820060.140.110.25TBDSpring 2024Model # - FT0610
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the South of Building 416.6' x 10'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 545 - Building 416 Parking LotTree box filter unitTBD38.876281-77.0822950.120.090.21TBDSpring 2024Model # - FT0610
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the South of Building 416.6' x 10'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 700 - Commissary Parking LotTree box filter unitTBD38.870403-77.0770710.400.240.64TBDSpring 2024Model # - FT1808
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary18' x 8'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 701 - Commissary Parking LotTree box filter unitTBD38.870313-77.0775320.270.070.34TBDSpring 2024Model # - FTIBC0713-C
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary7' x 13'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 702 - Commissary Parking LotTree box filter unitTBD38.870383-77.0776460.430.100.53TBDSpring 2024Model # - FT1608
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary16' x 8'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 703 - Commissary Parking LotTree box filter unitTBD38.869999-77.0771340.190.070.26TBDSpring 2024Model # - FTIBC1006-C
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary10' x 6'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 704 - Commissary Parking LotTree box filter unitTBD38.869757-77.0768950.310.070.38TBDSpring 2024Model # - FTIBC1208-C
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary12' x 8'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 706 - Commissary Parking LotTree box filter unitTBD38.869583-77.0778080.250.080.33TBDSpring 2024Model # - FT1805
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary18' x 5'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 707A - Commissary Parking LotTree box filter unitTBD38.869709-77.0779530.270.060.33TBDSpring 2024Model # - FT1805
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary18' x 5'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 707B - Commissary Parking LotTree box filter unitTBD38.86987-77.0781410.210.050.26TBDSpring 2024Model # - FT1307
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary13' x 7'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 708A - Commissary Parking LotTree box filter unitTBD38.870177-77.0783150.280.400.68TBDSpring 2024Model # - FT0814
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary8' x 14'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 708B - Commissary Parking LotTree box filter unitTBD38.87013-77.0782610.280.400.68TBDSpring 2024Model # - FTIBC1408-C
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northwest of the Commissary14' x 8'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 746 - Rader Clinic Parking LotTree box filter unitTBD38.869232-77.0757170.240.090.33TBDSpring 2024Model # - FT1107
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northeast of the Rader Clinic.11' x 7'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort Myer-Henderson HallFilterra Unit 747 - Rader Clinic Parking LotTree box filter unitTBD38.869359-77.0755080.260.070.33TBDSpring 2024Model # - FTIBC1208-C
Filterra® stormwater bioretention/filtration system to treat runoff from the parking lot to the Northeast of the Rader Clinic.12' x 8'Routine maintenance: remove debris, trash and silt from filter; replace the surface mulch layer; evaluate plant health and replace as necessary; dispose of all refuse items; and clean the area surrounding each Filterra® system. Pruning and fertilizing must not be conducted on these units. If replanting is required, vegetation replanted must be in accordance with the design specifications of the Filterra® system.
Fort McNairQuarters 24 BioretentionBioretention AreaFMN_F738.8696605556-77.01554510650.060.100.170.00619/5/23444 ft3
73'x7'Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Fort McNairQuarters 25 BioretentionBioretention AreaFMN_F838.8694559017-77.0155397420.060.130.190.0159/5/231205 ft3
72'x7' + 16'x20'Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Fort McNairQuarters 26 BioretentionBioretention AreaFMN_F938.8692220108-77.01552901320.030.090.120.0109/5/23901 ft3
85'x3' + 20'x2'Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Fort McNairQuarters 27 BioretentionBioretention AreaFMN_F1038.8689922957-77.01555047090.070.100.170.0139/5/23958 ft3
68'x8' + 20'x7'Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).
Fort McNairBuilding 59 Bioretention AreaBioretention AreaTBD38.8622634037-77.01546464020.740.100.840.044Summer 20242864 ft3
70'x31'Routine maintenance: remove blockages to infiltration, remove dead/diseased vegetation, replant vegetation, re-seed, re-mulch annually, remove excess sediment and clear obstructions, mow and remove weeds, remove woody vegetation unless part of the original design of the SMF, pick-up trash. If replanting or reseeding is required, vegetation/seeding replanted must be in accordance with the design specifications of the bioretention area. EMD must be notified if signs of contamination are observed during the annual maintenance activities (i.e. dark staining that could signify oil).

File details come from the government source that posted it. Updated .