A02.12 PWS Attachment 2 - Training Session Parameters dated 2026.06.29.pdf
PDF 80 KB Posted
- Attached to
- USACE Construction Management System User Training Federal contract opportunity
- Solicitation number
- W912HQ26RA010
About this file
This is an attachment document specifying training session parameters for a USACE system implementation across multiple user categories and delivery methods.
The document outlines ten distinct training program types with varying durations and instructor-to-student ratios. Leadership training is a 2-hour virtual session with a 1:20 instructor-to-student ratio designed for USACE leadership to learn basic system operation. Construction training comprises three variants: in-person CONUS (24 hours, 1:15 ratio), virtual CONUS (24 hours, 1:15 ratio), and in-person OCONUS (24 hours, 1:15 ratio), plus a virtual OCONUS option (24 hours, 1:15 ratio). All construction courses are continuous 3-day programs focused on in-depth system utilization for USACE Construction users. Project Manager (PM) training is a 4-hour virtual session with a 1:20 ratio for USACE project managers, while Engineering (ENGR) training is an 8-hour virtual program with a 1:20 ratio for USACE engineering users. Familiarization training for general USACE end users is a 2-hour virtual session (1:20 ratio), and Familiarization plus Design Review training is a 4-hour virtual program (1:20 ratio) for USACE and external personnel performing system reviews. External Construction Contractor training is an 8-hour virtual session with a 1:20 instructor-to-student ratio. All training delivery methods except in-person construction courses are conducted virtually, with maximum class sizes determined by the specified instructor-to-student ratios.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02.12 PWS Attachment 1 - End User Training Schedule revised 2026.08.18.pdf | ||
| B08.02 Instructions to Offerors - W912HQ26RA010 dated 2026.08.18.docx | DOCX document | |
| A02.12 PWS CMS User Training draft dated 2026.08.18.docx | DOCX document | |
| B08.03 Answers to Questions - W912HQ26RA010 - draft answers 2026.08.14.docx | DOCX document | |
| A02.12 PWS CMS User Training draft dated 2026.08.10.docx | DOCX document | |
| B08.02 W912HQ26RA010 Attachment 4 Small Business Participation Plan.docx | DOCX document | |
| B08.02 Instructions to Offerors - W912HQ26RA010 dated 2026.08.10.docx | DOCX document | |
| B08.02 W912HQ26RA010 Attachment 3 USACE PPQ.pdf | ||
| B08.02 W912HQ26RA010 Attachment 5 Small Business Subcontracting Plan Template.docx | DOCX document | |
| B08.02 Solicitation - W912HQ26RA010 dated 2026.08.10.pdf | ||
| A02.12 PWS Attachment 1 - End User Training Schedule dated 2026.06.29.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 - Training Session Parameters
Leadership Construction
(CONUS)
Construction Virtual
(CONUS)
Construction
(OCONUS)
Construction
(OCONUS
virtual) PM ENGR Familia rization
Familiari zation +
DR
External Construction
Contractor Delivery Method Virtual In-person Virtual In-person Virtual Virtual Virtual Virtual Virtual Virtual
Session Duration (hours)
2 24 24 24 24 4 8 2 4 8
Instructor/ student ratio (max)
1:20 1:15 1:15 1:15 1:15 1:20 1:20 1:20 1:20 1:20
Notes
1. "Leadership" training is for USACE leadership to become familiar with basic system operation and leader-level tools
2. "Construction" training is a continuous 3-day course focused on in-depth system utilization for USACE Construction users
3. "PM" training is for USACE project managers
4. "ENGR" training is for USACE engineering users
5. "Familiarization" training is for general USACE end users that do not fit into a different training category
6. "Familiarization + Design Review" training is for USACE and external personnel that perform reviews in the system
7. "External Construction Contractor" training is for external construction contractors
Construction
PWS Attachment 2
File details come from the government source that posted it. Updated .