- 613163 LYNNFIELD FAP No. STP-0034(033)X Rail Trail Construction, from Ford Avenue to the Peabody
- Solicitation number
- BD-27-1030-0H100-0H002-131771
- Issued by
- Essex County, Massachusetts
About this file
This document package contains Army Corps of Engineers General Permit correspondence and comprehensive construction plans for the Lynnfield Rail Trail Phase 1 project in Massachusetts, involving the Massachusetts Department of Transportation (MassDOT) Highway Division, the U.S. Army Corps of Engineers New England District, and the towns of Lynnfield and Peabody. The project encompasses construction of a shared-use rail trail extending 1.841 miles (9,718.21 feet) from Ford Avenue to Nichols Lane, including a separate middle school connection. The trail will feature a 12-foot hot mix asphalt surface with 2-foot shoulders, limestone loam seeding, wood rail fencing, and trail amenities including granite seat walls, bicycle racks, interpretive kiosks, and mile markers. The project includes construction of a 3,092-square-foot wetland replication area to offset 4,086 square feet of permanent impacts to isolated K-series, T-series, U-series, and V-series wetlands. The Self-Verification application for the Army Corps of Engineers General Permits for Massachusetts was assigned file number NAE-2020-02900 as of May 30, 2025, with revised plans submitted on May 27, 2025, addressing jurisdictional wetland determinations and Corps terminology requirements. Construction plans comprise 37 sheets including typical sections, profiles, resource area impacts, construction details, and trail amenities.
The project involves substantial earthwork, pavement construction, utility coordination, tree protection and selective clearing operations, sediment control measures, and environmental restoration within wetland resource areas and 100-foot buffer zones. Elevation changes range from approximately 77 feet to 114 feet along the trail alignment, with multiple drainage structures including stone box culverts and corrugated metal pipe installations. The design accommodates existing railroad infrastructure, including ties with the MBTA for lease agreements, and coordinates around numerous utilities including water mains, gas pipelines, and electrical systems. Planting specifications include deciduous trees (red maple, river birch, arborvitae) and shrubs (highbush blueberry, arrowwood, swamp azalea, spicebush) for both trail amenity areas and wetland replication zones. The project involves preparation of suitably accepted soils, hydro-seeding, erosion control blankets, tree protection fencing, and final grading to meet natural grade conditions, with construction supervision by a project wetland specialist for all wetland-related activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LYNNFIELD-613163-135786-A-1.pdf | ||
| A00802-613163.pdf | ||
| BIDS OPENED - Tuesday - August 25-2026~4.pdf | ||
| A00855-613163.pdf | ||
| LYNNFIELD-613163-135786-A-2.pdf | ||
| A00875-613163.pdf | ||
| 613163 - Bid Tabulations.pdf | ||
| A00856-613163.pdf | ||
| A00830-613163.pdf | ||
| 613163 - Notice to Contractors.pdf | ||
| Link to Bid Opening 8-25-2026~5.pdf | ||
| 613163 - Plan Holders List 8-24-2026.pdf | ||
| A00860-613163.pdf | ||
| A00805-613163.pdf | ||
| A00820-613163.pdf | ||
| A00813-613163.pdf | ||
| A00812-613163.pdf | ||
| A00806-613163.pdf | ||
| 613163 - Plan Holders List 8-11-2026.pdf | ||
| A00870-613163.pdf | ||
| 613163 Bid Items List.txt | TXT text file | |
| A00801-613163.pdf | ||
| A00807-613163.pdf | ||
| A00861-613163.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 613163-135786
A00831 - 1
DOCUMENT A00831
ARMY CORPS OF ENGINEERS
GENERAL PERMIT
Massachusetts Department Of Transportation Highway Division Proposal No. 613163-135786
A00831 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
CAUTION: This email originated from a sender outside of the Commonwealth of Massachusetts mail system. Do not click on links or open attachments unless you recognize the sender and know the content is safe.
From: Newton, Kevin M CIV USARMY CENAE (USA) To: Collins, Lily R. (DOT) Cc: Davis, Heidi (DEP); scennaj@lcwd.us; dwells@lecenvironmental.com; Larner, Erica N. (DOT) Subject: NAE-2020-02900, MassDOT / Lynnfield Rail Trail Date: Friday, May 30, 2025 7:45:32 AM
Good morning, We received your Self-Verification (SV) application for the General Permits for Massachusetts (GPs for MA) indicating that you plan to conduct work in our jurisdiction. We have logged this into our database and assigned it file number NAE-2020-02900. Please reference this number in any future correspondence with us.
This confirmation that we have received the SV notification form does not confirm that the work is authorized under the GPs for MA. By submitting the SV application, you are self-verifying that your project is authorized under and meets the terms and conditions of the applicable GPs with no review by the Corps of Engineers. Activities that do not qualify for SV require a PCN to the Corps.
Please let me know if you have any questions.
Thanks, Kevin Newton Biologist/Project Manager U.S. Army Corps of Engineers New England District, Regulatory Division 696 Virginia Road Concord, MA 01742
(978) 318-8044
Proposal No. 613163-135786
A00831 - 3 mailto:Kevin.M.Newton@usace.army.mil mailto:lily.r.collins@dot.state.ma.us mailto:heidi.davis@mass.gov mailto:scennaj@lcwd.us mailto:dwells@lecenvironmental.com mailto:erica.n.larner@dot.state.ma.us
CAUTION: This email originated from a sender outside of the Commonwealth of Massachusetts mail system. Do not click on links or open attachments unless you recognize the sender and know the content is safe.
From: Collins, Lily R. (DOT) To: Newton, Kevin M CIV USARMY CENAE (USA) Cc: Vasconcelos, Daniel B CIV USARMY CENAE (USA) Subject: RE: DoD ShareFile Link for Large Files, Lynnfield Rail Trail, Phase 1 Date: Wednesday, May 28, 2025 1:38:00 PM Attachments: 2025-05-27 - 613163 ACOE SVN Plans.pdf
Hi Kevin, As promised, here is a revised copy of the plans for Phase 1 of the Lynnfield Rail Trail. I believe all of your comments were addressed, but if anything was missed, please let me know.
Thank you!
Best, Lily Collins Wetlands and Water Resources Co-Op MassDOT – Highway Division 10 Park Plaza, Boston MA, 02116 857-275-7182 | lily.r.collins@dot.state.ma.us
From: Newton, Kevin M CIV USARMY CENAE (USA) <Kevin.M.Newton@usace.army.mil> Sent: Tuesday, May 13, 2025 9:06 AM To: Collins, Lily R. (DOT) <lily.r.collins@dot.state.ma.us> Cc: Vasconcelos, Daniel B CIV USARMY CENAE (USA) <Daniel.B.Vasconcelos@usace.army.mil> Subject: RE: DoD ShareFile Link for Large Files, Lynnfield Rail Trail, Phase 1
Hi Lily, Do you know if this is related to USACE file NAE-2020-02900, which previously had a pre-application meeting with discussions on a proposed rail trail on an existing abandoned rail bed through Reedy Meadow in Lynnfield? The notes I can see in the file mention discussions about a pile supported section of boardwalk, invasive species control efforts, and mitigation. Is this a phase connected to that project?
I briefly reviewed the plans, and it appears portions of impacts are not included on the plan sheets.
Sheet 11 and 13 of 37 depicts areas of “non-jurisdictional isolated vegetated wetland” but does not seem to include the impacts as discharges of fill in the impact tables on the sheets (although it seems to be accounted for on the SVN form). Without an approved jurisdictional determination, these wetlands are considered WOTUS and will need to be included in the total impact calculations.
All plans should be revised to represent Corps jurisdiction terminology (i.e ordinary high-water mark, Proposal No. 613163-135786
A00831 - 4 mailto:lily.r.collins@dot.state.ma.us mailto:Kevin.M.Newton@usace.army.mil mailto:Daniel.B.Vasconcelos@usace.army.mil mailto:lily.r.collins@dot.state.ma.us
INTERSTATE
INTERSTATE
PROJECT BEGIN
STA 133+57.92
N3019857.0969
E777133.1521
PROJECT END
STA 230+87.54
N3020591.2343
E786484.7034
MASSDOT
PROJECT
NO. 613163
MASSDOT
PROJECT
NO. 607329
LYNNFIELD
RAIL TRAIL
PHASE 1
LENGTH OF PROJECT = 9,718.21 FEET = 1.841 MILES
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION
IN THE TOWN & CITY OF
HIGHWAY DIVISION
PLAN AND PROFILE OF
1,500
SCALE: 1" = 1,500'
0 3,000 4,500 6,000
N
ESSEX COUNTY
LYNNFIELD RAIL TRAIL
LYNNFIELD & PEABODY
FED. AID PROJ. NO. SHEET
NO.
TOTAL
SHEETS
RAIL TRAIL CONSTRUCTION
STATE
MA
PROJECT FILE NO.
613163
_H
D (T
IT
LE
SV
.D
W G
-M ay -2
:1
PM
Pl ot te d on
CONSTRUCTION - PHASE 1
INDEX
SHEET NO. DESCRIPTION
1 TITLE SHEET & INDEX
2 LEGEND & ABBREVIATIONS
3 GENERAL NOTES
4 - 5 KEY PLANS
6 - 7 TYPICAL SECTIONS
8 - 17 CONSTRUCTION PLANS
18 - 27 PROFILES
28 - 30 TRAIL AMENITY PLANS
31 - 32 TRAIL AMENITY DETAILS
33 WETLAND REPLICATION AREA
34 - 37 CONSTRUCTION DETAILS
DATE
APPROVED
CHIEF ENGINEER
DATE DESCRIPTION REV #
2025-02-28 0
45 BLUE SKY DRIVE | THIRD FLOOR |BURLINGTON, MA 01803
DRAFT ACOE SVN PLANS
ACOE SVN
TITLE SHEET & INDEX
NOT FOR CONSTRUCTION
MAY 27, 2025
SELF-VERIFICATION
NOTIFICATION PLANS
2025-03-11 0REVISED ACOE SVN PLANS
2025-04-21 0REVISED ACOE SVN PLANS
2025-05-27 1REVISED ACOE SVN PLANS
LEGEND & ABBREVIATIONS
GENERAL SYMBOLS
EXISTING PROPOSED DESCRIPTION
JERSEY BARRIER
CATCH BASIN
CATCH BASIN CURB INLET
FLAG POLE
GAS PUMP
MAIL BOX
POST SQUARE
POST CIRCULAR
WELL
ELECTRIC HANDHOLE
FENCE GATE POST
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
HYDRANT
LIGHT POLE
COUNTY BOUND
GPS POINT
CABLE MANHOLE
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
MISC MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
WATER MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MONUMENT
STONE BOUND
TOWN OR CITY BOUND
TRAVERSE OR TRIANGULATION STATION
TROLLEY POLE OR GUY POLE
TRANSMISSION POLE
UTILITY POLE W/ FIREBOX
UTILITY POLE WITH DOUBLE LIGHT
UTILITY POLE W / 1 LIGHT
UTILITY POLE
BUSH
TREE
STUMP
SWAMP / MARSH
WATER GATE
PARKING METER
OVERHEAD CABLE/WIRE
CURBING
CONTOURS (ON-THE-GROUND SURVEY DATA)
CONTOURS (PHOTOGRAMMETRIC DATA)
UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)
BALANCED STONE WALL
GUARD RAIL - STEEL POSTS
GUARD RAIL - WOOD POSTS
GUARD RAIL - DOUBLE FACE - STEEL POSTS
GUARD RAIL - DOUBLE FACE - WOOD POSTS
CHAIN LINK OR METAL FENCE
WOOD FENCE
SEDIMENT CONTROL BARRIER
TREE LINE
SAWCUT LINE
TOP OR BOTTOM OF SLOPE
LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY
BANK OF RIVER OR STREAM
BORDER OF WETLAND
100 FT WETLAND BUFFER
200 FT RIVERFRONT BUFFER
STATE HIGHWAY LAYOUT
TOWN OR CITY LAYOUT
COUNTY LAYOUT
RAILROAD SIDELINE
TOWN OR CITY BOUNDARY LINE
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
EASEMENT
TRAFFIC SYMBOLS
CONTROLLER PHASE ACTUATED
TRAFFIC SIGNAL HEAD (SIZE AS NOTED)
WIRE LOOP DETECTOR (6' x 6' TYP UNLESS OTHERWISE SPECIFIED)
VIDEO DETECTION CAMERA
MICROWAVE DETECTOR
PEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW AS SHOWN) AND SADDLE
EMERGENCY PREEMPTION CONFIRMATION STROBE LIGHT
VEHICULAR SIGNAL HEAD
VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED
FLASHING BEACON
PEDESTRIAN SIGNAL HEAD, (TYPE AS NOTED OR AS SPECIFIED)
RAILROAD SIGNAL
SIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED)
MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED)
HIGH MAST POLE OR TOWER
SIGN AND POST
SIGN AND POST (2 POSTS)
MAST ARM WITH LUMINAIRE
OPTICAL PRE-EMPTION DETECTOR
CONTROL CABINET, GROUND MOUNTED
CONTROL CABINET, POLE MOUNTED
FLASHING BEACON CONTROL AND METER PEDESTAL
LOAD CENTER ASSEMBLY
PULL BOX 12"x12" (OR AS NOTED)
ELECTRIC HANDHOLE 12"x24" (OR AS NOTED)
TRAFFIC SIGNAL CONDUIT
PAVEMENT MARKINGS SYMBOLS
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
STOP LINE
CROSSWALK
SOLID WHITE LINE
SOLID YELLOW LINE
BROKEN WHITE LINE
BROKEN YELLOW LINE
DOTTED WHITE LINE
DOTTED YELLOW LINE
DOTTED WHITE LINE EXTENSION
DOTTED YELLOW LINE EXTENSION
DOUBLE WHITE LINE
DOUBLE YELLOW LINE
ABBREVIATIONS
GENERAL
AADT ANNUAL AVERAGE DAILY TRAFFIC
ABAN ABANDON
ADJ ADJUST
APPROX. APPROXIMATE
A.C. ASPHALT CONCRETE
ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE
BIT. BITUMINOUS
BC BOTTOM OF CURB
BD. BOUND
BL BASELINE
BLDG BUILDING
BM BENCHMARK
BO BY OTHERS
BOS BOTTOM OF SLOPE
BR. BRIDGE
CB CATCH BASIN
CBCI CATCH BASIN WITH CURB INLET
CC CEMENT CONCRETE
CCM CEMENT CONCRETE MASONRY
CEM CEMENT
CI CURB INLET
CIP CAST IRON PIPE
CLF CHAIN LINK FENCE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CSP CORRUGATED STEEL PIPE
CO. COUNTY
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CR GR CROWN GRADE
DHV DESIGN HOURLY VOLUME
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DW STEADY DON'T WALK - PORTLAND ORANGE
DWY DRIVEWAY
ELEV (or EL.) ELEVATION
EMB EMBANKMENT
EOP EDGE OF PAVEMENT
EXIST (or EX) EXISTING
EXC EXCAVATION
F&C FRAME AND COVER
F&G FRAME AND GRATE
FDN. FOUNDATION
FLDSTN FIELDSTONE
GAR GARAGE
GD GROUND
GG GAS GATE
GI GUTTER INLET
GIP GALVANIZED IRON PIPE
GRAN GRANITE
GRAV GRAVEL
GRD GUARD
HDW HEADWALL
HMA HOT MIX ASPHALT
HOR HORIZONTAL
HYD HYDRANT
INV INVERT
JCT JUNCTION
L LENGTH OF CURVE
LB LEACH BASIN
LP LIGHT POLE
LT LEFT
MAX MAXIMUM
MB MAILBOX
MH MANHOLE
MHB MASSACHUSETTS HIGHWAY BOUND
MIN MINIMUM
NIC NOT IN CONTRACT
NO. NUMBER
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
P.G.L. PROFILE GRADE LINE
PI POINT OF INTERSECTION
POC POINT ON CURVE
POT POINT ON TANGENT
PRC POINT OF REVERSE CURVATURE
PROJ PROJECT
PROP PROPOSED
PSB PLANTABLE SOIL BORROW
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
PVMT PAVEMENT
PWW PAVED WATER WAY
ABBREVIATIONS (cont.)
GENERAL
R RADIUS OF CURVATURE
R&D REMOVE AND DISPOSE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RDWY ROADWAY
REM REMOVE
RET RETAIN
RET WALL RETAINING WALL
ROW RIGHT OF WAY
RR RAILROAD
R&R REMOVE AND RESET
R&S REMOVE AND STACK
RT RIGHT
SB STONE BOUND
SHLD SHOULDER
SMH SEWER MANHOLE
ST STREET
STA STATION
SSD STOPPING SIGHT DISTANCE
SHLO STATE HIGHWAY LAYOUT LINE
SW SIDEWALK
T TANGENT DISTANCE OF CURVE/TRUCK %
TAN TANGENT
TEMP TEMPORARY
TC TOP OF CURB
TOS TOP OF SLOPE
TYP TYPICAL
UP UTILITY POLE
VAR VARIES
VERT VERTICAL
VC VERTICAL CURVE
WCR WHEEL CHAIR RAMP
WG WATER GATE
WIP WROUGHT IRON PIPE
WM WATER METER/WATER MAIN
X-SECT CROSS SECTION
TRAFFIC SIGNAL ABBREVIATIONS
CAB CABINET
CCVE CLOSED CIRCUIT VIDEO EQUIPMENT
DW STEADY UPRAISED HAND
FDW FLASHING UPRAISED HAND
FR FLASHING CIRCULAR RED
FRL FLASHING RED LEFT ARROW
FRR FLASHING RED RIGHT ARROW
FY FLASHING CIRCULAR YELLOW
FYL FLASHING YELLOW LEFT ARROW
FYR FLASHING YELLOW RIGHT ARROW
G STEADY CIRCULAR GREEN
GL STEADY GREEN LEFT ARROW
GR STEADY GREEN RIGHT ARROW
GSL STEADY GREEN SLASH LEFT ARROW
GSR STEADY GREEN SLASH RIGHT ARROW
GV STEADY GREEN VERTICAL ARROW
OL OVERLAP
PED PEDESTRIAN
PTZ PAN, TILT, ZOOM
R STEADY CIRCULAR RED
RL STEADY RED LEFT ARROW
RR STEADY RED RIGHT ARROW
TR SIG TRAFFIC SIGNAL
TSC TRAFFIC SIGNAL CONDUIT
W STEADY WALKING PERSON
Y STEADY CIRCULAR YELLOW
YL STEADY YELLOW LEFT ARROW
20'
20'
M
RRSG
DBYL
DBWL
BWL
SWL
CW
ONLY
SL
DYLEx
DWLEx
DYL
BYL
DWL
SYL
JB
CB
FP
GP
MB
WELL
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UPL
WG
GENERAL NOTES
SURVEY NOTES
1. COORDINATES, IN U.S. SURVEY FEET, ARE IN THE
MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (MCS),
MAINLAND ZONE, REFERENCED TO THE NORTH AMERICAN DATUM
OF 1983, (NAD 83/2011, EPOCH 2010.00), BASED ON THE KeyNetGPS
VIRTUAL REFERENCE SYSTEM (VRS).
2. ELEVATIONS, IN U.S. SURVEY FEET, ARE REFERENCED TO THE
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) BASED ON
THE KeyNetGPS VIRTUAL REFERENCE SYSTEM (VRS)
3. SUBSURFACE UTILITY LINES AND FEATURES, AS SHOWN HEREIN,
WERE COMPILED FROM FIELD EVIDENCE AND/OR AVAILABLE
RECORD INFORMATION (SEE REFERENCES), AND THEIR
LOCATIONS ARE ONLY APPROXIMATE. ACTUAL LOCATIONS MUST
BE DETERMINED IN THE FIELD.
DAWOOD ASSUMES NO RESPONSIBILITY FOR DAMAGES
INCURRED AS A RESULT OF UTILITIES OMITTED OR
INACCURATELY SHOWN.
BEFORE DESIGNING FUTURE CONNECTIONS, THE APPROPRIATE
UTILITIES MUST BE CONSULTED.
BEFORE CONSTRUCTION, ALL UTILITIES, PUBLIC AND PRIVATE,
MUST BE NOTIFIED (SEE MASSACHUSETTS GENERAL LAWS,
CHAPTER 82 SECTION 40).
CALL "DIG SAFE" 1-888-DIG-SAFE. (888-344-7233).
GENERAL NOTES
1. EXISTING GROUND SURFACES SHOWN ON PLANS, PROFILES AND
CROSS SECTIONS ARE BASED UPON DATA OBTAINED BY FIELD
SURVEYS.
2. THE LOCATIONS OF EXISTING SUBSURFACE STRUCTURES, SUCH
AS SEWERS, WATER MAINS, DRAINS AND OTHER UTILITIES ARE
APPROXIMATE ONLY AND THE ENGINEER DOES NOT GUARANTEE
THEIR NUMBER OR LOCATIONS. THE CONTRACTOR SHALL VERIFY
THE LOCATION OF ALL UNDERGROUND UTILITIES BEFORE
EXCAVATING.
3. ALL GAS GATES, ELECTRIC MANHOLES, AND TELEPHONE
MANHOLES WITHIN THE LIMITS OF WORK SHALL BE ADJUSTED BY
THE OWNING AGENCY. ALL GAS, ELECTRIC, TELEPHONE AND CATV
WORK SHALL BE DONE BY THE OWNING AGENCY. THE
CONTRACTOR SHALL NOTIFY THE OWNING AGENCIES TO ADJUST
AND/OR RELOCATE THESE STRUCTURES TO AVOID IMPACTING THE
CONTRACTOR'S SCHEDULE OF OPERATIONS.
4. ANY CLEANING OF CATCH BASINS OR DRAIN PIPES NECESSARY
FOR THE PROPOSED WORK SHALL BE COMPLETED BY THE
RESPECTIVE MUNICIPALITY INVOLVED.
5. ANY DRAINAGE / SEWER / WATER CASTINGS BROKEN THROUGH NO
FAULT OF THE CONTRACTOR SHALL BE SUPPLIED BY THE
RESPECTIVE MUNICIPALITY FOR ADJUSTMENT UNDER THE
CONTRACT ITEMS.
6. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE
UTILITY COMPANIES DOING WORK IN THE SAME AREA. THE
CONTRACTOR SHALL ALLOW THE UTILITY COMPANIES AND THEIR
REPRESENTATIVES TO ADJUST AND/OR INSTALL THEIR SYSTEMS
WITHIN CITY/ STATE OWNED STREETS AND EASEMENTS.
7. CURB SHALL BE FURNISHED AND SET AT LOCATIONS SHOWN ON
THE PLANS AND/OR AS REQUIRED BY THE ENGINEER.
8. CONSTRUCT DRIVEWAYS AND WALKS AS SHOWN ON THE PLANS
AND/OR AS REQUIRED BY THE ENGINEER.
9. EXISTING GRANITE CURB AND EDGING SUITABLE FOR REUSE
WITHIN THE PROJECT SITE SHALL BE REMOVED AND RESET IN
ACCORDANCE WITH THE PLANS AND/OR AS REQUIRED BY THE
ENGINEER.
10. SAWCUT EXISTING ASPHALT ROADWAYS, CEMENT CONCRETE
SIDEWALKS, AND ASPHALT DRIVEWAYS AS SHOWN ON THE PLANS
AND AT THE PROPOSED MATCH LINE.
11. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE
PROPOSED WORK, THE LOCATION, ELEVATION AND SIZE OF THE
UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY
THE CONTRACTOR, AND THE INFORMATION FURNISHED TO THE
ENGINEER FOR RESOLUTION OF THE CONFLICT.
12. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY
THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE
CONTRACTOR TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL
COST TO THE OWNER.
13. ALL ACCESSIBLE ROUTES, WALKWAYS, CURB CUTS, RAMPS,
SIDEWALKS, DRIVEWAY OPENINGS, CLEARANCES AND SLOPE
TOLERANCES SHALL CONFORM WITH THE ARCHITECTURAL
ACCESS BOARD (AAB), 521 CMR AND MASSDOT CONSTRUCTION
AND TRAFFIC STANDARD DRAWINGS.
14. ITEMS LABELED "REM" SHALL BE REMOVED AND DISCARDED BY
CONTRACTOR.
15. THE CONTRACTOR SHALL PROTECT EXISTING SURVEY
MONUMENTS AND SHALL RESET ANY MONUMENTATION DISTURBED
BY THEIR OPERATIONS.
16. THE CONTRACTOR SHALL INSTALL OTHER NECESSARY
TEMPORARY REGULATORY AND WARNING SIGNS DURING
CONSTRUCTION AS REQUIRED BY THE ENGINEER FOR OTHER
INCIDENTAL CONSTRUCTION ACTIVITIES. ALL SIGNAGE AND
TRAFFIC CONTROL DEVICES USED MUST CONFORM TO THE LATEST
"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD)
17. THE CONTRACTOR SHALL PERFORM HIS WORK IN A MANNER
ACCEPTABLE TO THE ENGINEER SO THAT INTERFERENCE WITH
AND INCONVENIENCE TO BUSINESS CONCERNS AND ABUTTERS, ON
ACCOUNT OF THE CONSTRUCTION WORK, IS KEPT TO A MINIMUM.
18. THE CONTRACTOR SHALL NOT BE ALLOWED TO PARK EQUIPMENT
OR STOCKPILE EQUIPMENT OR MATERIAL ON THE TRAVELED WAYS
OVERNIGHT OR WHEN NOT IN USE.
19. THE CONTRACTOR SHALL MAINTAIN SAFE AND REASONABLE
ACCESS TO AND FROM ABUTTING PROPERTY, PRIVATE WAYS,
DRIVEWAYS AND ALL ALLEYS DURING THE CONSTRUCTION PERIOD.
20. ALL DETECTABLE WARNING PANELS SHALL BE MOUNTED IN
CEMENT CONCRETE AND INSTALLED IN ACCORDANCE WITH
MASSDOT CONSTRUCTION STANDARD DETAIL E107.6.5.
MIL
E 1.3
E 1.4
MILE1.5
MILE
1.6
1.7
SU
ER
STR
EET
FORD AVENUE
PE
R
Y
A
VE
U
E
PARSONS AVENUE
WESTOVER DRIVE
10+00
11+58.57
20+00
22+25
154+08.32 LYNNFIELD RAIL TRAIL - PHASE 1=
20+76.52 SUMMER STREET
136+92.84 LYNNFIELD RAIL TRAIL - PHASE 1=
11+58.57 MIDDLE SCHOOL CONNECTION
0.9
1.1
1.2
1.3
1.4
7 8 9 10
165 170 175 180
SUMMER STREET
WESTOVER DRIVE21
20+00
22+25
154+08.32 LYNNFIELD RAIL TRAIL - PHASE 1=
20+76.52 SUMMER STREET
(K
EY
P
LA
:3
SHEET REFERENCE:
Drawing Title:
Construction Plans
1 2 3 4 5 6 7
Sheet Number:
8 9 10
8 9 10 11
C O
TI
ED
B
EL
SH
EE
T
. 5
SCALE: 1" = 100'
0 200 300 400
KEY PLANS
PART 1 OF 2
9 10 11 12 12 13
Trail Amenity Plan
Wetland Replication Area
28 - - - 29 - - - 30 -
- - - - 33 - - - - -
PROP K-SERIES
WETLAND (ISOLATED)
REPLICATION AREA
PERMANENT K-SERIES
WETLAND (ISOLATED) IMPACT
PERMANENT K-SERIES WETLAND (ISOLATED) IMPACT
PERMANENT T-SERIES WETLAND (ISOLATED) IMPACT
PERMANENT U-SERIES WETLAND (ISOLATED) IMPACT
PROP V-SERIES IVW IMPACT
RESOURCE AREA IMPACTS
RESOURCE AREA SHEET
NO. TYPE LEGEND LOCATION IMPACT
AREA (SF)
REPLICA-
TION
K-SERIES WETLAND
(ISOLATED) 10 - 11 PERMANENT STA 155+64, RT TO
STA 160+60, RT 3,079 SF -
(ISOLATED) REPLICATION 10 REPLICATION STA 154+77, RT TO
STA 155+77, RT - 3,092 SF
T-SERIES WETLAND
(ISOLATED) 11 PERMANENT STA 158+54, LT TO
STA 158+95, LT 137 SF -
U-SERIES WETLAND
(ISOLATED) 11 PERMANENT STA 159+30, LT TO
STA 161+12, LT 715 SF -
V-SERIES WETLAND
(ISOLATED) 13 PERMANENT STA 184+15, LT TO
STA 184+25, LT 155 SF -
TOTAL: 4,086 SF 3,092 SF
PERMANENT T-SERIES
PERMANENT U-SERIES
0.5
0.4
0.6
0.7
0.8
10 11 12 13 14 15
180 185 190 195 200 205 210
PILLIN
S PO
WILDEWOOD DRIVE
0.1
0.2
0.3
NIC
HOLS
LN
(K
EY
. 3
SCALE: 1" = 100'
0 200 300 400
KEY PLANS
PART 2 OF 2
SHEET REFERENCE:
Drawing Title:
Construction Plans
9 10 11 12 13 14 15
Sheet Number:
16 17 18
12 13 14 1513 14 15 16 16 17
PERMANENT V-SERIES
NO. TYPE LEGEND LOCATION IMPACT
PAVEMENT NOTES
PROPOSED FULL DEPTH TRAIL PAVEMENT SECTIONS
SURFACE: 1-1/2" SUPERPAVE SURFACE COURSE 9.5 (SSC-9.5)
INTERMEDIATE: 2-1/2" SUPERPAVE INTERMEDIATE COURSE 19.0 (SIC-19.0)
BASE: 8" GRAVEL BORROW, TYPE b
PROPOSED FULL DEPTH ROADWAY PAVEMENT SECTIONS
(SUMMER STREET PARKING AREA)
SURFACE: 2" SUPERPAVE SURFACE COURSE 12.5 (SSC-12.5)
INTERMEDIATE: 2-1/2" SUPERPAVE INTERMEDIATE COURSE 19.0 (SIC-19.0)
BASE: 4" SUPERPAVE BASE COURSE 37.5 (SBC-37.5)
4" DENSE GRADED CRUSHED STONE FOR SUBBASE
8" GRAVEL BORROW, TYPE b
PROPOSED FULL DEPTH STABILIZED STONEDUST SECTIONS
SURFACE: 4" STABILIZED STONEDUST
PROPOSED FULL DEPTH CEMENT CONCRETE SIDEWALK SECTIONS
SURFACE: 4" CEMENT CONCRETE
(4,000 PSI, 3/4", 610 LBS. AIR ENTRAINED)
PROPOSED FULL DEPTH CEMENT CONCRETE PEDESTRIAN CURB RAMP SECTIONS
PROPOSED FULL DEPTH CEMENT CONCRETE DRIVEWAY SECTIONS
SURFACE: 6" CEMENT CONCRETE
(4,000 PSI, 3/4", 610 LBS. AIR ENTRAINED)
PROPOSED FULL DEPTH CURB SETTING PAVEMENT SECTIONS
SEE METHOD OF SETTING GRANITE CURB
(AGAINST EXISTING PAVEMENT)
SURFACE: 1-1/2" HOT MIX ASPHALT FOR PATCHING
INTERMEDIATE: 3" HOT MIX ASPHALT FOR PATCHING
BASE: 7.5"± CEMENT CONCRETE
6" (MIN) GRAVEL BORROW, TYPE b
TACK COAT SHALL BE APPLIED BETWEEN ALL PAVEMENT COURSES IN ACCORDANCE WITH SUBSECTION
450.43G2 AND NOTES BELOW.
TACK COAT NOTE:
ASPHALT EMULSION FOR TACK COAT SHALL BE GRADE RS-1H, PER THE SPECIFICATIONS. TACK COAT
SHALL BE SPRAY APPLIED AT THE RATE OF:
· 0.06 TO 0.08 GAL/SY OVER NEW HMA SURFACES, NOT OPENED TO TRAFFIC
· 0.06 TO 0.08 GAL/SY OVER EXISTING TIGHT SMOOTH PAVEMENT
· 0.07 TO 0.09 GAL/SY OVER MILLED SURFACES
· 0.06 TO 0.09 GAL/SY OVER NEW HMA PATCHES
ANCILLARY WORK NOTE:
PREPARATION OF UNDERLYING SURFACE, ASPHALT EMULSION FOR TACK COAT, HMA FOR PATCHING, AND HMA JOINT SEALANT SHALL BE IN ACCORDANCE WITH SECTION 450.
THE EMBANKMENT SHALL BE IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR HIGHWAYS AND
BRIDGES SECTION 100 EARTHWORK.
WOOD RAIL FENCE NOTE:
REFERENCE CONSTRUCTION PLANS (SHEETS 8 - 17) FOR LOCATIONS OF WOOD RAIL FENCE.
12:112:1
2'-0"
SHLD
12'-0"
SHARED-USE PATH
4" LOAM BORROW &
SEED (M6.03.0-2) (TYP)
VARIES (6:1 MIN, 2:1 MAX)
EXISTING GROUND
MEET EXISTING (TYP)
TYPICAL FULL DEPTH TRAIL SECTION
NOT TO SCALE
STA 137+25± (RR CORRIDOR) TO STA 153+85± (SUMMER ST)
STA 154+24± (SUMMER ST) TO STA 157+38±
STA 161+20± TO STA 182+50±
SHOWN IN
TYPICAL FILL
PROP WOOD RAIL
FENCE (SEE
CONSTRUCTION
PLANS, SHEETS 8 -
17, FOR LOCATION)
ORDINARY BORROW (M1.01.0)
1.5%*
PROP FULL DEPTH
TRAIL PAVEMENT
TYPICAL CUT
VARIES
(6:1 MIN, 2:1 MAX)
* - TOLERANCE FOR CONSTRUCTION ±0.5% (TYP)
AI
LR
AD
SI
IN
TOWN OF LYNNFIELD INTENDS TO SECURE A
LEASE AGREEMENT WITH THE MBTA
VARIES (60' TO 124')
BL CONSTRUCTION
(6:1 MIN,
2:1 MAX)
STA 133+87± (FORD AVE) TO STA 137+25± (RR CORRIDOR)
PR
AN
EN
EA
SE
16'-0"
TE
PO
AR
TE
IV
10'-0"
VARIES (66' TO 85.5')
K-SERIES
IVW
IMPACT
STA 157+38± TO STA 161+20±
CL FORD AVENUE
YP
IC
AL
S
EC
S) _S
VN
TYPICAL SECTIONS
12:1 12:1
STA 182+50± TO STA 199+57± (PILLINGS POND RD)
STA 199+96± (PILLINGS POND RD) TO STA 230+30± (NICHOLS LN)
PROP WOOD RAIL
FENCE (SEE
CONSTRUCTION
PLANS, SHEETS 8 -
17, FOR LOCATION)
ORDINARY BORROW
(M1.01.0)
12:1
BL MIDDLE SCHOOL CONNECTION
10'-0"
CONNECTING PATH
ORDINARY BORROW
(M1.01.0)
12:1
(6:1 MIN,
2:1 MAX)
RUNNING
TRACK
TYPICAL FULL CONNECTING PATH SECTION
STA 10+25± TO STA 12+04±
2'-0" 2'-0"
CONST BL
L
IM
IM
(MAX)
(MAX)
VARIESVARIES
CLEARING & GRUBBING LIMIT
EO
EO
SELECTIVE CLEARING & THINNING
LIMIT (5' MAX BEYOND CLEARING
AND GRUBBING LIMIT) WHERE
SHOWN ON THE PLANS OR AS
REQUIRED BY THE ENGINEER
EXISTING TREE TO REMAIN
ALL BRUSH, WEEDS, GRASS, ETC. SHALL
BE TRIMMED OR MOWED TO A MAXIMUM
OF 2'-0" BEYOND THE LIMIT OF SLOPE
WORK ON BOTH SIDES, UNLESS ADJACENT
TO ENVIRONMENTAL RESOURCE AREAS
TRIM BRANCHES WITHIN THE LIMITS SHOWN
AS NEEDED FOR EQUIPMENT ACCESS. THE
CONTRACTOR IS NOT REQUIRED TO CUT
ALL BRANCHES WITHIN THE LIMITS OF
CONTRACT WORK CAN BE DONE WITHOUT
DAMAGING REMAINING TREES AND
BRANCHES.
LEANING TREES AND MAJOR BRANCHES
OVER 6-INCHES IN DIAMETER SHALL NOT
BE TRIMMED. THE CONTRACTOR WILL
BE REQUIRED TO WORK AROUND THESE
WITHOUT CAUSING DAMAGE.
TREE TRIMMING LIMIT - MAX 18'-0"
ABOVE PAVEMENT SURFACE AND
2'-0" BEYOND PROP EDGE OF
PAVEMENT, BOTH SIDES
SELECTIVE CLEARING & THINNING
LIMIT (5' MAX BEYOND CLEARING
AND GRUBBING LIMIT) WHERE
SHOWN ON THE PLANS OR AS
REQUIRED BY THE ENGINEER
VEGETATION MANAGEMENT FOR
CONSTRUCTION ACCESS
NOTES:
1. ALL TREES REQUIRING REMOVAL
SHALL BE MARKED AND APPROVED BY
THE ENGINEER PRIOR TO REMOVAL.
2. EXISTING PAVED AREAS WILL BE
EXCLUDED FROM PAYMENT UNDER
ITEM 101. - CLEARING AND GRUBBING.
3. CLEARING AND GRUBBING AND
SELECTIVE CLEARING AND THINNING
SHALL NOT OCCUR WITHIN WETLAND
RESOURCE AREAS.
* - TOLERANCE FOR CONSTRUCTION ±0.5% (TYP)
BL LYNNFIELD RAIL TRAIL
PROP WOOD RAIL FENCE
(SEE CONSTRUCTION
PLANS, SHEETS 8 - 17,
FOR LOCATION)
TY
LI
72'-0"VARIES
VARIES (60' TO 66')
YP
IC
AL
EC
TYPICAL SECTIONS
FORD AVENUE(PUBLIC - 40' WIDE)
PERRY AVENUE
(PUBLIC - 40' W
IDE)
PROP CONST BL
PROP 12' HMA TRAIL
APPROX SLOPE LIMITS
PROP LOAM AND SEED (TYP)
R&S EXIST RR TRACKS
PROP SEDIMENT
CONTROL BARRIER
(RET)
R&S EXIST
FENCE
R&D EXIST UP
(WORK BO)
RET EXIST
PROP CEM CONC PCR
PROP 2' WIDE IMPRINT
SYSTEM MEDIAN
PROP 10' HMA TRAIL
PROP MIDDLE SCHOOL CONNECTION BL
PROP 12' STONEDUST PATH
PROP TRAFFIC
SIGN (TYP)
PROP PERMANENT EASEMENT
(STA 10+30± TO 11+54±)
PROP CLF END POST
PROP CLF END POST
(REM)
RET EXIST CLF
RET EXIST HMA PATH
PROP GRAN CURB (TYPE VB)
PROP SAWCUT LINE
PROP CLF
END POST
RET EXIST GUY WIRE
PROP INDIVIDUAL TREE
PROTECTION (TYP)
ROADWAY
CONSTRUCTION
R&D 100' EXIST STONE WALL
R&D 117' EXIST FENCE
R&D EXIST WELL,
SHED & UP
R&D EXIST
CURB
R&D EXIST CURB
PROP TEMPORARY TREE
PROTECTION FENCE
(R&D)
PROP TEMPORARY
TREE PROTECTION
PROP INDIVIDUAL TREE
PROTECTION
NOTE:
1. THE CONTRACTOR SHALL STAKE THE ALIGNMENT
AND LIMITS OF WORK OF THE PROJECT BETWEEN
FORD AVENUE AND THE RAILROAD CORRIDOR IN
ORDER TO DETERMINE IMPACTS TO EXISTING
TREES. THE DESIGN INTENT IS TO HAVE THE TRAIL
ALGINEMNT MEANDER BETWEEN THE TREES, WHILE
MAINTAINING A 2-FT MINIMUM OFFSET BETWEEN
THE EDGE OF PAVEMENT AND THE EDGE OF TREES.
P-1
FE-1 FE-2
+5
8.5
AT
H
ST
7+
BORDERING LAND SUBJECT
TO FLOODING (EL 75.1) (TYP)
BORDERING LAND SUBJECT TO
FLOODING (EL 75.1) (TYP)
0'
BU
FF
NE
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS
PART 1 OF 10
. 9
WETLAND LINE
100-YEAR FLOODPLAIN
RESOURCE AREA LEGEND:
ORDINARY HIGH WATER
(OHW) LINE
(ISOLATED) IMPACT
OTHER WETLAND
100-FT WETLAND BUFFER
BORDERING LAND SUBJECT TO FLOODING (BLSF)
ELEVATIONS ARE AS DEPICTED ON FEMA's
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
ARE HIGHER, AND THUS MORE CONSERVATIVE
FOR PURPOSES OF OUR DESIGN.
(C
PROP 12' HMA TRAIL
(STA 138+40± TO 139+50±) PROP GRAN TENTH MILE
MARKER (MILE 1.7)
PARSONS AVENUE
EXTENSION
(PUBLIC)
FE-2
140 141
3+
FLOODING (EL 75.1) (TYP)
BUFF
ER LI
PROP 12' HMA TRAIL
R&R EXIST
STONE BOUND
PROP COMPOST AND SEED
OVER MODIFIED ROCKFILL
SLOPE (STA 148+70± TO 148+97±)
RET EXIST CULVERT,
REM DRAIN PIPE SEDIMENT
(STA 146+80± TO 147+30±)
(STA 148+20± TO 149+10±)
(STA 148+70± TO 150+40±)
PROP COMPOST AND
SEED OVER MODIFIED
ROCKFILL SLOPE
(STA 148+70± TO
148+97±)
PROP GRAN TENTH MILE MARKER (MILE 1.6)
RET EXIST STONE
HEADWALL, R&D EXIST
TEMPORARY TIMBER
RETAINING WALL
145 146 147
9+
100' BUFFER LINE
PART 2 OF 10
. 1
. 8
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
N PROP CONST BL
PROP SEDIMENT CONTROL BARRIER
WITH GUARDRAIL
(STA 150+90± TO 153+51±)
(R
ET)
(STA 148+70± TO 150+40±)
PROP GRAN TENTH MILE
MARKER (MILE 1.5)
1.5149 150 151 152
2+
SUM
STREET
(PUBLIC - W
IDTH VARIES)
WITH GUARDRAIL
(STA 150+90± TO 153+51±)
SEE "SUMMER STREET
INSET" THIS SHEET
.0
0'12
PROP 6' CEM CONC SDWK
PROP FDC HMA PARKING
RET EXIST UP
PROP TRAILHEAD AREA
(SEE SHEET NO. 49)
PROP TEMPORARY EASEMENT
(STA 152+50± TO 153+75±)
ADJ EXIST CB
PROP TRAFFIC SIGN (TYP)
SEEDING, AS REQUIRED
RET EXIST OHW
RET EXIST DMH
PROP TRAILHEAD AREA
(SEE SHEET NO. 49)
MARKER (MILE 1.4)
ABANDONED PIPE
15821
+0
8+
BUFF
ER LI
PROP
SEDIMENT
CONTROL
BARRIER
PROP K-SERIES WETLAND (ISOLATED)
REPLICATION AREA 3,092 SF (SEE SHEET NO. 33)
IMPACT (3,079 SF)
NON-JURISDICTIONAL DRAINAGE DITCH
SUMMER
(PUBLIC -
WIDTH VARIES)
PROP CEM
CONC SDWK
PROP LOAM
& SEED
CONC DWY
PROP
TEMPORARY
EASEMENT
PROP GRAN CURB
CORNER (TYPE A)
REM EXIST CBCI
APPROX
SLOPE
LIMITS
CONC PCR
PROP GRAN
CURB (TYPE VB)
PROP SAWCUT
LINE (TYP)
CONC PCRPROP CEM
CONC DWY
APPROX
SLOPE LIMITS
CONC SDWK
MEET
EXIST
MEET
EXIST
PROP 2' WIDE IMPRINT SYSTEM MEDIAN
100' BUFFER
LINE
RET EXIST GAS LINE(S)
PROP
RECTANGULAR
RAPID FLASHING
BEACON
PROP RECTANGULAR
RAPID FLASHING BEACON
PROP CB (P-CB-1)
CTE
PROP SAWCUT
LINE (TYP)
PART 3 OF 10
. 9
SUMMER STREET INSET
SCALE: 1" = 10'
0 20 30 40
NO. TYPE LEGEND LOCATION
PROP GRAN TENTH MILE MARKER (MILE 1.3)
1.3
161 162 163
50PERMANENT
(137 SF)
PERMANENT U-SERIES
IMPACT (715 SF)
IMPACT (3,079 SF)
R&D EXIST BUSHES
R&D EXIST TREE PROP GRAN TENTH MILE
MARKER (MILE 1.2)
DEBRIS PILE
1.2
166 167 168 169
100' B
UFFER LINE 100' BUFFER LINE
PART 4 OF 10
APPROX SLOPE LIMITS
PROP GRAN TENTH
MILE MARKER (MILE 1.1)
1.1
170 171 172 173 174 175
5+
APPROX SLOPE LIMITS
RET EXIST 24" RCP
(STA 180+80± TO 181+70±)
ET
PROP CEM CONC BENCH
PAD (SEE SHEET NO. 50)
PROP GRANITE MILE
MARKER POST (1 MI)
175 176 177 178 179 180 181
1+
00PROP CEM CONC BENCH
PAD (SEE SHEET NO. 31)
PART 5 OF 10
(RET)(RET)
R&S EXIST RR TRA
REM AND DISCARD
EXISTING BRIDGE
STRUCTURE
TO FLOODING (EL 101.9) (TYP)
(STA 180+80± TO 181+70±)
(STA 183+70± TO 184+60±)
(STA 186+20± TO 194+70±)
(STA 185+90± TO 193+80±)
SLOPE (STA 186+55± TO 186+75±)
PROP 6' WIDE HMA PATH STUB
TO STABILIZE EXISTING PATH
CONNECTION
PROP 6' WIDE HMA
PATH STUB TO
STABILIZE EXISTING
PATH CONNECTION
MARKER (MILE 0.9)
181 182 183 184 185 186 187
6+
PERMANENT V-SERIES
IMPACT(155 SF)
TO FLOODING (EL 104.3) (TYP)
BU
FF
REM DRAIN PIPE
SLOPE (STA 188+09± TO 188+79±)
MARKER (MILE 0.8)
SLOPE (STA 187+29± TO 187+82±)
0.8
187 188 189 190 191 192
FLOODING (EL 101.9) (TYP)
RET EXIST CULVERT, STREAM
BANK, AND STREAM BED,
REM DRAIN PIPE SEDIMENT
PART 6 OF 10
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
MARKER (MILE 0.7)
MARKER (MILE 0.6)
193 194 195 196 197 198
FLOODING (EL 101.9) (TYP)
FLOODING (EL 104.3) (TYP)
100' BUFFERLINE
PI
LL
PI
LL
(P
Y)
PROP GRAN CURB
(TYPE VB) (TYP)
PROP CEM CONC SDWK
MEET EXIST
PROP CEM CONC SDWK
MEET EXIST
RET EXIST WATER LINE
PROP SAWCUT LINE
MARKER (MILE 0.5)
R&D EXIST GUY POLE
(PREVIOUSLY ABANDONED)
(PAID UNDER ITEM 120.1)
198 199 200 201 202 203 204
PART 7 OF 10
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
N PROP CONST BL
APPROX SLOPE LIMITS
SLOPE (STA 209+00± TO 209+30±)
(STA 207+50± TO 211+50±)
(STA 207+50± TO 211+30±)
MARKER (MILE 0.4)
204 205 206 207 208 209
BORDERING LAND
SUBJECT TO FLOODING
(EL 104.3) (TYP)
(STA 207+50± TO 211+50±)
(STA 207+50± TO 211+30±)
(STA 213+90± TO 214+50±)
ESSEX STREET
CONSERVATION AREA
SPACE FENCE POSTS
TO AVOID CULVERT
MARKER (MILE 0.3)
210 211 212 213 214 215
100' BUFFERLINE
PART 8 OF 10
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
SLOPE (STA 217+60± TO 218+10±)
GAS PIPELINE
(SEE NOTE 1)
REM EXIST
GAS MARKER
(STA 216+90± TO 218+50±)
(STA 219+90± TO 221+50±)
(STA 220+20± TO 221+00±)
TENTH MILE
MARKER
(MILE 0.2)
216 217 218 219 220 221
(STA 219+90± TO 221+50±)
MARKER (MILE 0.1)
224 225
PART 9 OF 10
100-FT WETLAND BUFFER NOTE:
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
NICHOLS LANE EXTENSION
(PRIVATE)
NI
CH
OLS
UB
C)
CITY O
F PEABO
DY
TO
N O
F LYNNFIELD
NI
CH
OLS
RA
AY
F
RO
M E
DG
OF
PA
MEN
DG
OF
PA
MEN
T)
APPROX SLOPE LIMITS
PROP LOAM AND SEED
PROP TREATMENT AT EXISTING
RAILROAD MILE MARKER
(SEE DETAIL, SHEET 51)
WINONA
POND
PROP GRANITE MILE MARKER
POST (0 MI)
229 230
232+50
31)
APPROXIMATE 100-FT BUFFER ZONE
PART 10 OF 10
REVISED PRELIMINARY MAPS, DATED 2/20/2023.
WHILE THESE MAPS HAVE NOT BEEN ISSUED THE
FLOODPLAIN ELEVATIONS DEPICTED ON THEM
NAVD 88
BASE ELEV
70.00
133+00
.3
134+00
.4
.9
135+00
136+00
.5
.2
137+00
138+00
.6
139+00133+00 134+00 135+00 136+00 137+00 138+00 139+00
-0.50%
1.25%
2.50%
0.50%
0.50% 1.00%0.11% -1.50%
BR
K
EV
7.
4+
PVI STA = 135+20.65
PVI ELEV = 78.14
A.D. = -1.50% K = 16.67
25' VC
PV
: 1
8.
: 7
T:
+3 3.
731.9' SSD
HIGH POINT ELEV = 78.10
HIGH POINT STA = 135+24.82
PVI STA = 136+71.44
PVI ELEV = 80.12
A.D. = -2.00% K = 20.00
40' VC
1.
9.
+9
: 8
0.
559.6' SSD
PVI STA = 135+80.29
PVI ELEV = 77.84
A.D. = 3.00% K = 8.33
+6
2.
189.3' HSD
LOW POINT ELEV = 77.89
LOW POINT STA = 135+71.96
PVI STA = 134+05.73
PVI ELEV = 77.25
A.D. = 2.00% K = 12.48
+1
874.9' HSD
LOW POINT ELEV = 77.30
LOW POINT STA = 134+11.95
PVI STA = 137+66.01
PVI ELEV = 80.59
A.D. = 0.75% K = 40.00
30' VC
+8
EXISTING GRADE ALONG CONST BL
PROPOSED GRADE ALONG CONST BL
138+50
139+00
.8
140+00
.1
141+00
142+00
143+00
144+00
.7
144+50138+50 139+00 140+00 141+00 142+00 143+00 144+00 144+50
1.25%
0.60%
PVI STA = 140+81.74
PVI ELEV = 84.54
A.D. = -0.65% K = 76.92
50' VC
6.
4.
1685.2' SSD
FORD
AVENUE
N 3019857.0969 E 777133.1521
STA 136+92.84 LYNNFIELD RAIL TRAIL - PHASE 1 =
STA 11+58.57 MIDDLE SCHOOL CONNECTION
MIDDLE
SCHOOL
CONNECTION
ROADWAY
CONSTRUCTION (MEET
EXIST GRADE)
PROP DRAIN
18" RCP CLASS V
I=77.69
FI
:2
PROFILES
PART 1 OF 10
BE
LO
AB
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
4 4 8
75.00
80.00
144+00
145+00
146+00
147+00
148+00
149+00
150+00144+00 145+00 146+00 147+00 148+00 149+00 150+00
1.50%
0.60%
0.40%
PVI STA = 148+89.68
PVI ELEV = 89.08
A.D. = 1.10% K = 45.45
149+50
150+00
151+00
152+00
153+00
154+00
155+00
155+50149+50 150+00 151+00 152+00 153+00 154+00 155+00 155+50
0.95%
-0.53%
2.00%
GRADE BREAK STA = 154+23.94
ELEV = 96.44
GRADE BREAK STA = 153+91.33
ELEV = 96.30
5.
PVI STA = 153+67.93
PVI ELEV = 96.42
A.D. = -2.03% K = 9.84
20' VC
: 9
+7
: 9
541.1' SSD
HIGH POINT ELEV = 96.38
HIGH POINT STA = 153+72.69
SUMMER
STA 154+07.87 LYNNFIELD RAIL TRAIL - PHASE 1 =
STA 20+76.52 SUMMER STREET
1.5' x 1.5' STONE BOX
CULVERT BELOW
WATER LINE
BELOW
36" WATER LINE
6" BS GAS
LINE BELOW
3" ST GAS
LINE BELOW
PART 2 OF 10
. 2
90.00
155+00
156+00
157+00
158+00
159+00
160+00
161+00155+00 156+00 157+00 158+00 159+00 160+00 161+00
0.95%
0.80%
0+
PVI STA = 161+00.00
PVI ELEV = 102.75
A.D. = 1.20% K = 41.67
160+50
161+00
162+00
163+00
164+00
165+00
166+00
166+50160+50 161+00 162+00 163+00 164+00 165+00 166+00 166+50
0.80%
2.00%
0.84%
PVI STA = 162+02.00
PVI ELEV = 104.79
A.D. = -1.50% K = 20.00
7734.4' SSD
PVI STA = 161+00.00
PVI ELEV = 102.75
A.D. = 1.20% K = 41.67
+2
PART 3 OF 10
95.00
166+00
167+00
168+00
169+00
170+00
171+00
172+00166+00 167+00 168+00 169+00 170+00 171+00 172+00
0.84%
1.25%G
PVI STA = 171+94.48
PVI ELEV = 112.97
A.D. = -1.92% K = 52.17
100' VC
+4
5 613.0' SSD
HIGH POINT ELEV = 112.75
HIGH POINT STA = 172+09.70
171+50
172+00
173+00
174+00
175+00
176+00
177+00
177+50171+50 172+00 173+00 174+00 175+00 176+00 177+00 177+50
-0.67%
PVI STA = 171+94.48
PVI ELEV = 112.97
A.D. = -1.92% K = 52.17
4613.0' SSD
HIGH POINT ELEV = 112.75
HIGH POINT STA = 172+09.70
PART 4 OF 10
177+00
178+00
179+00
180+00
181+00
182+00
183+00177+00 178+00 179+00 180+00 181+00 182+00 183+00
-0.67% -0.53%
PVI STA = 181+24.58
PVI ELEV = 107.07
A.D. = 1.03% K = 96.96
LOW POINT ELEV = 107.20
LOW POINT STA = 181+26.10
182+50
183+00
184+00
185+00
186+00
187+00
188+00
188+50182+50 183+00 184+00 185+00 186+00 187+00 188+00 188+50
0.20% -0.50%
PVI STA = 183+67.50
PVI ELEV = 108.29
A.D. = -1.00% K = 49.97
61103.6' SSD
HIGH POINT ELEV = 108.23
HIGH POINT STA = 183+67.49
PVI STA = 187+96.47
PVI ELEV = 106.14
A.D. = 0.70% K = 43.07
LOW POINT ELEV = 106.16
LOW POINT STA = 188+03.03
EXISTING BRIDGE
STRUCTURE TO BE
REMOVED
24" RCP
PART 5 OF 10
188+00
189+00
190+00
191+00
192+00
193+00
194+00188+00 189+00 190+00 191+00 192+00 193+00 194+00
1.00%
PVI STA = 187+96.47
PVI ELEV = 106.14
A.D. = 0.70% K = 43.07
LOW POINT ELEV = 106.16
LOW POINT STA = 188+03.03
193+50
194+00
195+00
196+00
197+00
198+00
199+00
199+50193+50 194+00 195+00 196+00 197+00 198+00 199+00 199+50
-1.50%
1.00%
8 G
3.5' x 4' STONE BOX
PART 6 OF 10
100.00
199+00
200+00
201+00
202+00
203+00
204+00
205+00199+00 200+00 201+00 202+00 203+00 204+00 205+00
-0.60%
0.50% 1.10% 0.67%G
GRADE BREAK STA = 199+36.92
ELEV = 112.14
PVI STA = 202+93.45
PVI ELEV = 114.27
A.D. = -1.27% K = 78.95
: 2
7902.0' SSD
HIGH POINT ELEV = 114.12
HIGH POINT STA = 202+96.08
204+50
205+00
206+00
207+00
208+00
209+00
210+00
210+50204+50 205+00 206+00 207+00 208+00 209+00 210+00 210+50
-0.60%
-2.00%
0.00%
PVI STA = 207+01.98
PVI ELEV = 111.82
A.D. = -1.40% K = 71.43
820.8' SSD
PVI STA = 208+43.16
PVI ELEV = 109.00
A.D. = 2.00% K = 50.00
1178.8' HSD
LOW POINT ELEV = 109.00
LOW POINT STA = 208+93.16
PILLINGS
POND
ROAD
PART 7 OF 10
210+00
211+00
212+00
213+00
214+00
215+00
216+00210+00 211+00 212+00 213+00 214+00 215+00 216+00
0.00% 0.50% -0.50%
PVI STA = 212+15.74
PVI ELEV = 109.45
A.D. = -1.00%
31104.2' SSD
HIGH POINT ELEV = 109.39
HIGH POINT STA = 212+15.74
PVI STA = 215+74.52
PVI ELEV = 107.66
A.D. = 1.00% K = 333.76
334' VC
LOW POINT ELEV = 108.07
LOW POINT STA = 215+74.52
PVI STA = 211+25.45
PVI ELEV = 109.00
A.D. = 0.50%
LOW POINT ELEV = 109.00
LOW POINT STA = 211+12.95
215+50
216+00
217+00
218+00
219+00
220+00
221+00
221+50215+50 216+00 217+00 218+00 219+00 220+00 221+00 221+50
-0.75%
PVI STA = 218+61.72
PVI ELEV = 109.09
A.D. = -1.25% K = 48.00
60' VC
7893.3' SSD
HIGH POINT ELEV = 109.00
HIGH POINT STA = 218+55.72
PVI STA = 215+74.52
PVI ELEV = 107.66
K = 333.76
334' VC
LOW POINT ELEV = 108.07
LOW POINT STA = 215+74.52
15" RCP
TENNESSEE GAS
PIPELINE BELOW
2'x2' STONE BOX
PART 8 OF 10
221+00
222+00
223+00
224+00
225+00
226+00
227+00221+00 222+00 223+00 224+00 225+00 226+00 227+00
-0.75% 0.75%
1.50%G
PVI STA = 223+54.61
PVI ELEV = 105.40
A.D. = 1.50% K = 66.67
LOW POINT ELEV = 105.58
LOW POINT STA = 223+54.61
PVI STA = 226+75.00
PVI ELEV = 107.36
226+50
227+00
228+00
229+00
230+00 231+00 232+00 232+50226+50 227+00 228+00 229+00 230+00 231+00 232+00 232+50
-1.00%
1.50% G
GRADE BREAK STA = 230+30.21
ELEV = 107.02
PVI STA = 228+03.40
PVI ELEV = 109.29
A.D. = -2.50% K = 30.00
75' VC
469.2' SSD
HIGH POINT ELEV = 109.06
HIGH POINT STA = 228+10.90
PVI STA = 226+75.00
PVI ELEV = 107.36
STA 230+87.09
N 3020591.0708 E 786484.2813
NICHOLS
LANE
PART 9 OF 10
11+00
10+00 11+00
11+60
1.50% -4.50%
GRADE BREAK STA = 10+16.37
ELEV = 86.33
GRADE BREAK STA = 11+48.59
ELEV = 80.38
GRADE BREAK STA = 11+58.57
ELEV = 80.23
LYNNFIELD RAIL
TRAIL - PHASE 1
LIMIT OF WORK
STA 10+09.84
N 3020058.0616 E 777291.0441
STA 11+58.57 MIDDLE SCHOOL CONNECTION =
STA 136+92.84 LYNNFIELD RAIL TRAIL - PHASE 1
PART 10 OF 10
134 135
132+88.59
TRAIL CONST BL
FORD AVENUE
(PUBLIC - 40' WIDE)
PER
Y A
VEN
(PU
LIC
- 40' W
ID
E)
TRAIL AMENITY PLANS
PART 1 OF 3
_L
(A
PL
TRAIL AMENITY PLANTING SCHEDULE*
QTY ID BOTANICAL NAME COMMON NAME SIZE COMMENT
TREES
32 TO THUJA OCCIDENTALIS ARBORVITAE 5-6 FEET
* FOR WETLAND REPLICATION AREA PLANTINGS SEE SHEET 33
ORIDINARY HIGH WATER
ST. PAUL'SDRIVEWAY
SUMMER STREET CONST BLTRAIL AMENITY SCHEDULE
NAME
F
I
J
STATION
153+21.53
153+25.74
153+32.06
153+38.91
153+45.81
153+52.16
153+56.46
154+42.45
154+49.22
154+51.65
154+53.03
154+54.48
154+55.48
154+57.04
OFFSET
11.23', LT
12.51', LT
12.54', LT
13.43', LT
12.82', LT
13.05', LT
11.94', LT
31.33', RT
31.62', RT
28.13', RT
12.63', RT
24.98', RT
21.04', RT
17.20', RT
SITE FEATURE TYPE
GRANITE SEAT WALL
ADA ACCESSIBLE COMPANION SEATING AREA
BICYCLE RACK
INTERPRETIVE KIOSK - GRANITE BASE
E F G
J
2' (M
PROP GRANITE SEAT WALL
(TYP, 2 THIS LOCATION)
PROP BICYCLE RACK
(TYP, 3 THIS LOCATION)
PROP CEM CONC SIDEWALK
AT TRAILHEAD AREA
PROP BICYCLE RACK
PROP INTERPRETIVE
KIOSK-GRANITE BASE
1. STATIONS AND OFFSETS ARE TAKEN AT THE
GEOMETRIC CENTER OF THE TRAIL AMENITY,
DEPICTED AS A DOT ON THE PLAN.
2. UNLESS OTHERWISE NOTED, TRAIL AMENITIES
SHALL BE ORIENTED PARALLEL TO THE EDGE OF
THE PROPOSED CEMENT CONCRETE SIDEWALK AT
TRAILHEAD AREA SURFACE.
3. TRAIL AMENITIES SHALL BE INSTALLED AT LEAST
2-FEET FROM THE EDGE OF THE TRAIL PAVEMENT,
AS SHOWN ON THE PLANS.
4. FOR TIES SEE SHEET NO. 38.
BN
FOR WETLAND REPLICATION
PLANTINGS AND DETAILS
SEE SHEET 53
E 1.4
(PU
LIC
- W
ID
TH
VA
IES)
PART 2 OF 3
* FOR WETLAND REPLICATION AREA PLANTINGS SEE SHEET 33
SEE SHEET 33
TRAIL AMENITY PLANTING SCHEDULE*
TREES
3 AR ACER RUBRUM RED MAPLE 1"-1.5" CALIPER B&B
5 BN BETULA NIGRA RIVER BIRCH 1"-1.5" CALIPER B&B
16 TO THUJA OCCIDENTALIS ARBORVITAE 5-6 FEET
180 181 182
Q
TRAIL AMENITY SCHEDULE
180+50
180+54
180+57.50
180+61.50
11.21', LT
10.00', LT
TRAIL AMENITY SCHEDULE
180+50
180+54
180+57.50
180+61.50
PART 3 OF 3
PROPOSED HMA TRAIL
REMOVE 6" EXISTING TOPSOIL
AND REPLACE WITH 6" DEPTH
OF 1-1/2" CRUSHED STONE
2'-6"
5'-0"
90°
PROP CLEARING
AND GRUBBING
EXIST RAILROAD MILE MARKER
(TO BE RETAINED)
TREATMENT AT EXISTING RAILROAD MILE MARKER
(STATION 229+52±, RT)
5%
(L
T/
X-
T)
2'-0" 6"
1'-7"
NOMINAL
EASED EDGES (TYP)
SAWN AND THERMAL FINISH TOP.
SPLIT FACE
FINISH GRADE (TYP)
8" GRAVEL BORROW - TYPE b (TYP)
4" THICK CEMENT CONCRETE
SIDEWALK (TYP)
1. ALL BOTTOM FACES SHALL BE SAWN.
2. ALL INSIDE VERTICAL FACES SHALL BE
SAWN AND THERMAL FINISH WITH EASED
EDGES
6"
(TYP)
COMPACTED SUBGRADE (TYP)
COMPACTED DENSE
GRADED CRUSHED STONE
12"
1'-6"
EXPANSION JOINT FILLER (TYP)
SECTION
PLAN
4'-0"
3'-0"
4'-0"
ADA ACCESSIBLE
COMPANION
SEATING AREA TO BE
KEPT CLEAR OF
OBSTRUCTIONS
ADJACENT TO BENCH
LC
INTERPRETIVE PANEL
SECTION VIEW
PLAN VIEW
INTERPRETIVE KIOSK-GRANITE BASE
PANEL
COMPACTED 3/4"
DIA. CRUSHED
STONE ALL AROUND
GRANITE BASE FOR
8" GRAVEL BORROW (TYPE b)
FINISH
GRADE
SPLIT FACE,
ALL SIDES
INTERPRETIVE
PANEL
R=1/2" (RIGHT AND LEFT SIDE)
EQ
EQ
1/4"
-1
3' -0
4'
8'
1"
1.5"
5/8"
HONED EDGE AT
PERIMETER2"
1-1/2"
(MAX.)
DIVERGENCE
4" CEM CONC SIDEWALK
PROVIDE EXPANSION
JOINT FILLER (TYP)
1' -1
GRANITE 110 MILE MARKER
SET WITH TEXT FACING BIKE
PATH
"MILE
0.9ENGRAVED TEXT SHALL BE
3.5"-TAHOMA STYLE PAINTED
BLACK
GRANITE TENTH MILE MARKER
BI
KE
LD
1. "0.50" AND "1.5" MARKERS SHALL
BE INSTALLED ON THE LEFT
SIDE OF THE TRAIL WITH TEXT
FACING THE TRAIL, AS SHOWN.
2. ALL OTHER MARKERS SHALL BE
INSTALLED ON THE RIGHT SIDE
OF THE TRAIL WITH TEXT
FACING THE TRAIL, AS SHOWN.
10 MILE MARKER
LOCATION
MILE *STATION
AND SEED
SHOULDER
PROP BIKE
PATH SUBBASE
PROP BIKE
PATH PVMT
GRANITE 110
MILE MARKER
*STATIONING IS APPROXIMATE.
CONTRACTOR SHALL VERIFY
LOCATIONS PRIOR TO INSTALLATION
0.6 0.7 0.8 0.9 1.1 1.2 1.3 1.4 1.5
224+22 218+94 213+66 208+38 203+09 197+82 192+54 187+26 181+98 171+42 166+14 160+86 155+58 150+30 145+02 139+74
GROUND
4'
3'
-6
6" 6"
THERMAL FINISH (BACK
SIDE)
THERMAL FINISH WITH
ENGRAVED TEXT (3 SIDES).
'SIDE B' ON 2 OPPOSITE
SIDES.
BIKE PATH
ALL LETTERING TO BE 12"
"V" SUNK LETTER IN
TACOMA TEXT
MILE POST LOCATION
MILE *STATION
1 176+69.81
*STATIONING IS APPROXIMATE.
CONTRACTOR SHALL VERIFY
LOCATIONS PRIOR TO INSTALLATION
0 229+49.81
N N F I E
A
A
7"
SIDE A
4"
8"
3"
A
A
3"
HORIZTONAL
SEPARATOR,
CENTERED IN GAP
SIDE B
(STA 176+69.81)
SIDE B
(STA 229+49.81)
LS
* TOLERANCE FOR CONSTRUCTION ±0.5% (TYP.)
TRAIL AMENITY DETAILS
36"
(MIN)
BIKE RACK (TYP)
MINIMUM EXTENT
CONCRETE PAVING
TYPICAL SPACING
32 1/2"
BIKE RACK - SIDE VIEW -
2-3/8" O.D. SCHEDULE 40
STAINLESS STEEL PIPE -
"HORSESHOE" STYLE
EMBED BIKE RACK
THICKENED EXPOSED
CEM CONC SIDEWALK
AT BIKE RACK
8" GRAVEL BORROW - TYPE b
COMPACTED SUBGRADE
SECTION - SIDE VIEW
1. INSTALL IN ACCORDANCE WITH
MANUFACTURER'S
RECOMMENDATIONS
FINISH GRADE
BIKE RACK DETAIL
2"
BIKE RACK - FRONT VIEW -
2-3/8" O.D. SCHEDULE 40
STAINLESS STEEL PIPE -
"HORSESHOE" STYLE
EMBED BIKE RACK
SECTION - FRONT VIEW
THICKENED EXPOSED
AGGREGATE CEM CONC
PAVING AT BIKE RACK
8" GRAVEL BORROW - TYPE b
COMPACTED SUBGRADE
18"
DECIDUOUS TREE PLANTING
ROOTBALL SHALL BE PLACED ON EXISTING SUBSOIL
TREE WRAP SHALL NOT BE USED
COMPLETELY REMOVE SYNTHETIC BURLAP & LACING
BACKFILL MIX PER SPECIFICATIONS
DURING THE FIRST 24 HOURS AFTER PLANTING
WATERING SAUCER SHALL BE FLOODED TWICE
TREE SHALL BE SET PLUMB
CUT & ROLL BACK 1/3 OF BURLAP BEFORE BACKFILLING.
3 INCH HIGH EARTH WATERING SAUCER AROUND TREE PIT
3 INCHES AGED PINE BARK MULCH (PULL MULCH AWAY
ROOT FLARE SHOULD BE SLIGHTLY ABOVE
MIN. 2 X ROOTBALL DIAMETER
ROOTBALL
DO NOT CUT LEADER
FROM TRUNK OF TREE)
6 INCHES
REMOVE EXCESS SOIL TO EXPOSE ROOT FLARE
CUT & REMOVE WIRE BASKET SIDES
FINISH GRADE AFTER SETTLING
6 IN
AND BACKFILL WITH PLANTING MIX
EXCAVATE TO REQUIRED DEPTH
EXISTING SUBSOIL
WATER BY FLOODING TWICE IN FIRST TWO HOURS
AFTER PLANTING. WATER & MAINTAIN AS PER
SHRUBS SHALL BE SET PLUMB
STANDARD SPECIFICATIONS
BACKFILL MIX PER STANDARD SPECIFICATIONS
AWAY FROM BASE OF SHRUB)
AROUND SHRUB
2-3 INCH DEPTH AGED PINE BARK MULCH (PULL
3 INCH HIGH EARTH WATERING SAUCER
ACCEPTED FOR PLANTING
LOOSE OR CRACKED ROOTBALLS WILL NOT BE
3 X ROOTBALL
LACING. FOR CONTAINERIZED PLANTS, REMOVE
CONTAINER PRIOR TO PLANTING. SCORE SIDES OF
CONTAINER AND LOOSEN ANY ROOTS ENCIRCLING
THE ROOT BALL
COMPLETELY REMOVE SYNTHETIC BURLAP AND
CROWN OF SHRUB SHOULD BE SLIGHTLY ABOVE
FINISHED GRADE AFTER SETTLING
SHRUB PLANTING
LS
* TOLERANCE FOR CONSTRUCTION ±0.5% (TYP.)
TRAIL AMENITY DETAILS
(PUBLIC - WIDTH VARIES)
PC
21 22 22+25
SUMMER STREET CONST BL
X
95.5
WETLAND (ISOLATED)
(3,092± SF)
EXISTING WETLAND (ISOALATED)
VC
LB
RV
RV
BN
VD
SECTION A-A
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
8.36:1 8.95:18.95:1
EL = 95.5'
6' (TYP)
(AREA SKEWED
THIS SECTION)
6' (TYP)
PROPOSED K-SERIES WETLAND (ISOLATED) REPLICATION AREA
12" COMPOST TOPSOIL
WITH WETLAND SEED MIX
MEET EXISTING
EXISTING GRADE
WETLAND REPLICATION AREA
_E
V(
EP
:4
K-SERIES WETLAND (ISOLATED) REPLICATION/RESTORATION NOTES:
1. ALL WETLAND REPLICATION/RESTORATION SHALL BE CONDUCTED UNDER THE SUPERVISION AND DIRECTION OF
THE PROJECT WETLAND SPECIALIST.
2. AREAS OF TEMPORARY WETLAND ALTERATION ASSOCIATED WITH THE PROPOSED CONSTRUCTION, WILL BE RESTORED IN-KIND AT THE DIRECTION OF THE SUPERVISING WETLAND SCIENTIST BY RESTORING NATURAL WETLAND SOIL PROFILES (WHERE NEEDED) AND SEEDING WITH FACW MEADOW MIX. SEEDED AREAS SHALL BE STABILIZED VIA HYDRO-SEEDING, STRAW MULCH, AND/OR EROSION CONTROL BLANKETS AT THE DIRECTION OF
THE WETLAND SPECIALIST.
3. WETLAND REPLICATION AREA SHALL BE CONSTRUCTED IN ACCORDANCE WITH ITEM 755.35 OF THE SPECIAL PROVISIONS. EXCAVATE EXISTING SOIL TO TARGET ELEVATIONS. IF EXISTING SUBSOIL IS DETERMINED TO BE UNSUITABLE FOR PLANTING, EXCAVATE TO DEPTH NECESSARY FOR PLANTING AND BACKFILL WITH APPROPRIATE MANUFACTURED SOIL. BACKFILL SHALL BE INSTALLED AS PER MASSDOT STANDARD SPECIFICATIONS.
4. FOLLOWING WETLAND SOIL PLACEMENT, THE WRA SHALL BE PLANTED WITH THE SAPLING TREES AND SHRUBS
SPECIFIED HEREIN, AND SEEDED WITH FACW MEADOW MIX.
5. SEEDED AREAS SHALL BE STABILIZED VIA HYDRO-SEEDING, STRAW MULCH, AND/OR EROSION CONTROL
BLANKETS AT THE DIRECTION OF THE WETLAND SPECIALIST.
6. SEE SHEET 32 FOR PLANTING DETAILS.
XS
XS
WETLAND REPLICATION AREA PLANTING SCHEDULE
TREES
2 AR ACER RUBRUM RED MAPLE 1"-1.5" CALIPER B&B
2 BN BETULA NIGRA RIVER BIRCH 1"-1.5" CALIPER B&B
SHRUBS
11 VC VACCINIUM CORYMBOSUM HIGHBUSH BLUEBERRY 2'-3' HT.
6 VD VIBURNUM DENTATUM ARROWWOOD 2'-3' HT.
12 RV RHODODENDRON VISCOSUM SWAMP AZALEA 2'-3' HT.
7 LB LINDERA BENZOIN SPICEBUSH 2'-3' HT.
* FOR TRAIL AMENITY AREA PLANTINGS SEE SHEET 29
AREA OF SOIL
DISTURBANCE
PROTECTED ZONE
FLOW
1" X 1" X 4' HARDWOOD STAKES
STAKE A MIN. OF EVERY 5 FEET
TO SECURE TUBE OR PER
MANUFACTURERS' INSTRUCTION
9-12" DIA.
INSTALLED
18" MIN.
10' MIN
OVERLAP FOR
CONTINUOUS
BARRIER
9" MIN.
TYP.
PROTECTED
ZONE
COMPOST FILTER TUBE BERM (SLOPES 2:1 OR STEEPER)
12" DIA.
WOVEN
POLYPROPYLENE
FIBER FABRIC
1" x 1" x 4'
HARDWOOD
STAKE
FOLD FLAP (8" MIN.) AND
PLACE TUBE ON TOP. DO
NOT TRENCH FABRIC.
COMPOST FILTER TUBE & SILT FENCE
FOR SLOPES 3:1 OR AS
NECESSARY, STAKE OR
OTHERWISE SUPPORT TUBES
(I.E., TREES, CINDER BLOCKS)
BIODEGRADABLE
FABRIC
12" DIA.
CAPTURE SEDIMENT AND
PREVENT FLOW OFF SITE.
*9 INCH MAY BE USED FOR FLATTER
SURFACES WITH APPROVAL FROM
ENGINEER
REDUCE WATER FLOW
ONTO WORK ZONE
SEDIMENT BARRIERS - COMPOST FILTER TUBES
ENSURE FIRM CONTACT WITH
GROUND TO PREVENT FLOW
UNDERNEATH TUBES
SEDIMENT BARRIERS
PLACE TUBE ALONG CONTOURS AND PERPENDICULAR TO
FLOW.
PLACE AS CLOSE TO LIMIT OF SOIL DISTURBANCE AS POSSIBLE
ADJUST LOCATION AS REQUIRED FOR OPTIMUM
EFFECTIVENESS. DO NOT INSTALL IN WATERWAYS.
PLACE STAKES AS NEEDED TO SECURE TUBES IN PLACE.
CURVE ENDS
UPHILL
EXISTING
TREE
MIN. 3 FT OVERLAP
FOR CONTINUOUS
BARRIER.
HARDWOOD STAKES
PLACED OUTSIDE OF
TUBES OR PER
MANUFACTURERS'
INSTRUCTION
TREE PROTECTION - ROOT ZONE
CONSTRUCTION ZONE
FENCE AND POST MATERIAL
PER SPECIFICATIONS.
PLACE FENCE AS SHOWN
ON PLANS AND AS CLOSE
TO CONSTRUCTION LIMITS
(AS FAR FROM TRUNK) AS
POSSIBLE
NO TRESPASSING, STORAGE OF
EQUIPMENT, OR STOCKPILING OF
MATERIALS
PLACE FENCE AS SHOWN ON PLANS
AND AS CLOSE TO CONSTRUCTION
LIMITS (AS FAR FROM TRUNK) AS
POSSIBLE
EXISTING
TREES
LIMIT
CANOPY/ROOT
ZONE
TREE ROOT ZONE/
PLANT PROTECTION ZONE
CANOPY DRIP LINE
PLAN VIEW - FENCE PROTECTION OF ROOT ZONESECTION - FENCE PROTECTION OF ROOT ZONE
TR
Z
TREE ROOT ZONE/
PLANT PROTECTION ZONE
NO TRESPASSING,
STORAGE OF EQUIPMENT, OR
STOCKPILING OF MATERIALS
IN ROOT ZONE
SECTION - TRUNK ARMORING & PRUNING
CONSTRUCTION ZONE
PRUNE CANOPY AS REQUIRED TO
PREVENT DAMAGE FROM
CONSTRUCTION EQUIPMENT.
REMOVE DEAD/DAMAGED LIMBS IF
AND AS DIRECTED.
PRUNING SHALL BE PER ANSI
A300 STANDARDS
NO TRESPASSING, STORAGE OF
EQUIPMENT, OR STOCKPILING OF
MATERIALS
ARMOR TREES AS
SHOWN ON PLANS
OR PER ARBORIST
ARMOR FROM BASE OF TREE,
INCLUDING ROOT FLARE, TO
FIRST BRANCH.
TREE ROOT ZONE
TREE PROTECTION - TRUNK
FILTER TUBES SHALL BE
COMPRISED OF NATURAL AND
BIODEGRADABLE MATERIALS ONLY.
FILTER TUBES SHALL
BE COMPRISED OF
NATURAL AND
BIODEGRADABLE
MATERIALS ONLY.
COMPRISED OF NATURAL
AND BIODEGRADABLE
COMPRISED OF NATURAL
AND BIODEGRADABLE
TO MINIMIZE DAMAGE TO
BARK, CLADDING SHALL
ONLY BE INSTALLED ON THE
SIDE OF TREES FACING
PROPOSED WORK.
1'-0"
1'-6"
MEET FINAL GRADE
SEED OVER COMPOST
PER SPECIAL PROVISION
APPLY COMPOST OVER STONE
SUCH THAT COMPOST FILLS THE
VOIDS AND IS AT OR SLIGHTLY
BELOW THE SURFACE OF THE
STONES. NOT ALL STONES WILL
BE COMPLETELY COVERED
PLACE MODIFIED ROCKFILL
(M2.02.4)
CRUSHED STONE OVER
GRADED SLOPE (M2.01.2)
EXISTING SUBGRADE
TAPER STONE AND
COMPOST TO MEET
FINAL GRADE
1.5 (MIN)
COMPOST AND SEED OVER M