613163 LYNNFIELD FAP No. STP-0034(033)X Rail Trail Construction, from Ford Avenue to the Peabody
Solicitation number
BD-27-1030-0H100-0H002-131771
Issued by
Essex County, Massachusetts

About this file

This is a detail sheet document from the Massachusetts Department of Transportation Highway Division for Proposal No. 613163-135786, outlining construction specifications for rail trail development from Ford Avenue to the Peabody City Line in Lynnfield. The project encompasses extensive site preparation and paving work, including 4,000 cubic yards of earth excavation, 5,550 cubic yards of gravel borrow, 1,660 cubic yards of loam for roadsides, and various rock excavation categories totaling 145 cubic yards. Pavement construction includes 12,811 square yards of full depth trail pavement with superpave surface and intermediate courses and an 8-inch minimum gravel base, 158 square yards of full depth roadway pavement, 184 square yards of cement concrete sidewalks, 88 square yards of pedestrian curb ramp sections, and 60 square yards of stabilized stonedust areas. The scope of work addresses site clearing and grubbing, installation of granite curbing in straight and curved configurations at multiple stations with specific locations identified, removal and replacement of fencing, drainage infrastructure adjustments, traffic control measures including temporary impact attenuators and pavement markings, sign installation and relocation, and wetland mitigation involving tree removal and replacement activities. The project requires disposal of treated wood products including wooden railroad ties and timber retaining walls.

The project carries a total estimated value of $4.894 million with price adjustment provisions for hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural and reinforcing steel as specified by MassDOT. A proposal guaranty equal to 5 percent of the bid value is mandatory. Bidders must be pre-qualified by MassDOT in the HIGHWAY - BIKE PATHS category prior to submission and must obtain valid MassDOT vendor codes and Digital IDs from www.bidx.com at least 14 days before bid opening. Proposals are due August 25, 2026 at 2:00 p.m. via www.bidx.com. The project is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development and the U.S. Department of Labor, Federal Equal Employment Opportunity Contract Specifications, minority and female participation goals and timetables, and Architectural Access Board regulations and Title VI Civil Rights Act compliance. Proposal documents are available on www.bidx.com for official bidders, and informational documents may be requested from MassDOTBidDocuments@dot.state.ma.us. Bidders must not use COMMBUYS to submit bids on this project.

View the file

Other files

File Type Posted
LYNNFIELD-613163-135786-A-1.pdf PDF
BIDS OPENED - Tuesday - August 25-2026~4.pdf PDF
A00855-613163.pdf PDF
LYNNFIELD-613163-135786-A-2.pdf PDF
A00875-613163.pdf PDF
613163 - Bid Tabulations.pdf PDF
A00856-613163.pdf PDF
A00830-613163.pdf PDF
613163 - Notice to Contractors.pdf PDF
Link to Bid Opening 8-25-2026~5.pdf PDF
613163 - Plan Holders List 8-24-2026.pdf PDF
A00860-613163.pdf PDF
A00805-613163.pdf PDF
A00820-613163.pdf PDF
A00813-613163.pdf PDF
A00812-613163.pdf PDF
A00806-613163.pdf PDF
613163 - Plan Holders List 8-11-2026.pdf PDF
A00870-613163.pdf PDF
613163 Bid Items List.txt TXT text file
A00801-613163.pdf PDF
A00831-613163.pdf PDF
A00807-613163.pdf PDF
A00861-613163.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 613163-135786

A00802 - 1

DOCUMENT A00802

DETAIL SHEETS

A00802 - 2

THIS PAGE INTENTIONALLY LEFT BLANK

A00802 - 3

Earth Excavation 4,000 CY Gravel Borrow 5,550 CY Class A Rock Excavation 105 CY Ordinary Borrow 920 CY Class B Rock Excavation 40 CY Loam for Roadsides 1,660 CY Class B Trench Excavation 10 CY Modified Rockfill 90 TON

PAVEMENT NOTES

Full Depth Trail Pavement Sections Area = 12,811 SY Surface: 1 ½” Superpave Surface Course 9.5 (SSC-9.5) Tack Coat: Asphalt Emulsion for Tack Coat (RS-1H) Intermediate: 2 ½” Superpave Intermediate Course 19.0 (SIC-19.0) Base: 8” (Min) Gravel Borrow, Type b

Full Depth Roadway Pavement Sections Area = 158 SY Surface: 2” Superpave Surface Course 12.5 (SSC-12.5) Tack Coat: Asphalt Emulsion for Tack Coat (RS-1H) Intermediate: 2 ½” Superpave Intermediate Course 19.0 (SIC-19.0) Tack Coat: Asphalt Emulsion for Tack Coat (RS-1H) Base: 4” Superpave Base Course 37.5 (SBC-37.5) 4” Dense Graded Crushed Stone 8” (Min) Gravel Borrow, Type b

Full Depth Curb Setting Pavement Sections Area = 36 SY Surface: 2” HMA for Patching Tack Coat: Asphalt Emulsion for Tack Coat (RS-1H) Base: 10”± Cement Concrete 6” (Min) Gravel Borrow, Type b

Full Depth Cement Concrete Sidewalk Sections Area = 184 SY Surface: 4” Cement Concrete (4000 psi, ¾”, 610 lbs. Air Entrained) Base: 8” (Min) Gravel Borrow, Type b

Full Depth Cement Concrete Pedestrian Curb Ramp Sections Area = 88 SY Full Depth Cement Concrete Driveway Sections Area = 10 SY Surface: 6” Cement Concrete (4000 psi, ¾”, 610 lbs. Air Entrained) Base: 8” (Min) Gravel Borrow, Type b

Full Depth Stabilized Stonedust Area Sections Area = 60 SY Surface: 4” Stabilized Stonedust Base: 8” (Min) Gravel Borrow, Type b

A00802 - 4

ITEM 101. CLEARING AND GRUBBING

To be used project wide to remove trees & vegetation from the site within the limit of work, as required by The Engineer.

ITEM 120. EARTH EXCAVATION

To be used as required by the Engineer and at the following locations:

Full Depth Trail Construction Summer Street Parking Area Cement Concrete Sidewalks, Driveways, Ped. Curb Ramps, and Trailheads Stonedust Areas Compost and Seed Over Modified Rockfill Areas Wetland Replication Area Demo of Existing Abutments at Station 184+20 Fencing to Be Removed and Discarded Removal of Timber Retaining Wall at Station 149+90, RT Removal of Guy Pole at Station 200+15, RT Removal of Stockpiled Wooden Railroad Ties

ITEM 121. CLASS A ROCK EXCAVATION

To be used when rock or ledge is encountered, and must be removed within the project limits, as required by the Engineer.

ITEM 144. CLASS B ROCK EXCAVATION

To be used for removal of boulders during excavation for fencing installation.

ITEM 150. ORDINARY BORROW

To be used as fill material project wide, including as backfill to fill voids left during track excavation & railroad bridge demolition, under the shared-use path when the bottom of the proposed pavement box is higher than existing ground, and as required by the Engineer.

ITEM 156. CRUSHED STONE

To be used as a base material for modified rockfill areas (Item 986.), as bedding under proposed drain structures (Item 201) and drain pipes (Item 244.18), and as required by The Engineer.

A00802 - 5

ITEM 170. FINE GRADING AND COMPACTING – SUBGRADE AREA

To be used where gravel borrow (Item 151.) is placed as a paving subgrade.

ITEM 184.1 DISPOSAL OF TREATED WOOD PRODUCTS

To be used for the disposal of wooden railroad ties, disposal of the timber retaining wall at Station 149+90, RT, disposal of the timber decking at the existing rail bridge at Station 184+20, disposal of the guy pole at Station 200+15, RT, and as required by the Engineer.

ITEM 358. GATE BOX ADJUSTED

To be used for any water gate boxes in conflict with the proposed work and requiring adjustment, as required by the Engineer.

ITEM 381.3 SERVICE BOX ADJUSTED

To be used for any water service boxes in conflict with the proposed work and requiring adjustment, as required by the Engineer.

ITEM 451. HMA FOR PATCHING

To be used at full depth curb setting construction areas and project wide as required by the Engineer.

ITEM 472. TEMPORARY ASPHALT PATCHING

To be used for temporary paving required to maintain continuity in pedestrian and vehicle routes in the travelled way during construction, project wide as required by the Engineer.

A00802 - 6

ITEM 506. GRANITE CURB TYPE VB – STRAIGHT

To be used as required by the Engineer and at the following locations:

Sta. To Sta.

133+71 133+81 Left 133+76 133+81 Right 153+67 153+78 Left 153+89 153+91 Left 153+92 153+92 Right 153+92 153+92 Left 154+24 154+24 Right 154+24 154+24 Right 154+28 154+37 Right 154+28 154+37 Right 199+63 199+63 Left 199+64 199+64 Right 199+89 199+90 Left 199+91 199+91 Right

ITEM 506.1 GRANITE CURB TYPE VB – CURVED

Sta. To Sta.

153+89 153+91 Left 154+24 154+31 Right 154+24 154+37 Right 154+25 154+28 Right 154+31 154+37 Right

ITEM 509. GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS –

STRAIGHT

133+81 133+87 Right 133+81 133+87 Left 153+60 153+67 Left 153+79 153+85 Left 153+92 153+92 Right 153+92 153+92 Left 154+24 154+24 Left 154+24 154+24 Right 154+37 154+37 Right 154+37 154+37 Right

A00802 - 7

ITEM 509.1 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS –

CURVED (Continued)

199+63 199+63 Left 199+63 199+64 Right 199+64 199+65 Right 199+90 199+90 Left 199+90 199+91 Right

ITEM 509.1 GRANITE CURB FOR PEDESTRIAN CURB RAMPS – CURVED

To be used as required by the Engineer and at the following location:

133+69 133+76 Right

ITEM 594. CURB REMOVED AND DISCARDED

To be used where existing vertical granite curbs are not suitable for reuse at the following locations, as required by the Engineer.

Sta. To Sta.

133+67 133+85 Left 133+69 133+86 Right 153+89 153+92 Left/Right 153+90 153+92 Left 154+23 154+24 Left/Right 199+63 199+64 Left/Right 199+89 199+91 Left/Right

ITEM 628.304 TEMPORARY IMPACT ATTENUATOR, NON-REDIRECTIVE, TL-2

To be used as required by the Engineer at the Summer Street crossing during installation of the RRFB.

ITEM 645.072 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE POST

OPTION)

To be used as required by the Engineer to address locations of existing fencing adjacent to Item 652.072 requiring replacement.

ITEM 657. TEMPORARY FENCE

To be used at the following location:

150+85 153+85 Left

A00802 - 8

ITEM 669. FENCE REMOVED AND STACKED

To be used as required by the Engineer and at the following locations:

Station 134+47 to 135+01, 52’ LT Station 134+99 to 135+06, 28’ LT/RT

ITEM 697.1 SILT SACK

To be used as required by The Engineer and at the following locations:

Sta. Offset

153+92 63.00 RT

153+93 45.65 LT

154+24 38.00 LT

154+24 62.26 RT

ITEM 698.3 GEOTEXTILE FABRIC FOR SEPARATION

To be used at compost and seed over modified rockfill areas, as shown under Item 986., and as required by the Engineer.

ITEM 710.4 BOUND – PLAIN GRANITE

To be used when existing bounds to be reset under Item 711. are too damaged to be re-used, as required by the Engineer.

TEM 799.1 TREE REMOVAL AND REPLACEMENT REPORTS WITHIN

WETLAND RESOURCE AREAS

To be used to document tree removal and replacement within wetland resource areas, as required by the Engineer.

ITEM 799.11 TREE-DECIDUOUS 4-5 FEET HT

ITEM 799.12 TREE-DECIDUOUS-5-6 FEET HT

ITEM 799.13 TREE-EVERGREEN 4-5 FEET HT

To be used to provide replacement plantings within wetland resource areas, as required by the Engineer. Locations to be determined during construction, in conjunction with the Arborist (Item 102.55) after the extent of tree removal is documented under Item 799.1.

A00802 - 9

ITEM 832. WARNING-REGULATORY AND ROUTE MARKER - ALUM. PANEL

(TYPE A)

To be used along the shared-use path and roadways at the following locations:

Ford Avenue Middle School Connecting Path Summer Street Pillings Pond Road

ITEM 847.1 SIGN SUP (NOT GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

To be used with Item 832. and Item 874.

ITEM 864.04 PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE

(THERMOPLASTIC)

To be used along the shared-use path and roadways at the following locations:

Ford Avenue & Perry Avenue: Shared-Use Path and Street Middle School Connecting Path Summer Street: Shared-Use Path and Street Pillings Pond Road: Shared-Use Path and Street

ITEM 866.106 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)

To be used as required by the Engineer in locations where the solid white line at roadway intersections requires restriping.

ITEM 866.112 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)

To be used for stop lines and crosswalks at the following locations:

Ford Avenue Middle School Connecting Path

ITEM 867.104 4 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)

To be used for solid yellow lines and broken yellow lines along the shared-use path at the following locations:

Ford Avenue Middle School Connecting Path

A00802 - 10

ITEM 867.106 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)

To be used as required by the Engineer in locations where the double yellow center line at roadway intersections requires restriping.

ITEM 874. STREET NAME SIGN

To be used along the shared-use path and roadways at the following locations:

Ford Avenue

ITEM 874.2 TRAFFIC SIGN REMOVED AND RESET

To be used where existing traffic signs and posts require relocation, project wide as required by the Engineer

ITEM 874.41 TRAFFIC SIGN REMOVED AND DISCARDED

To be used where existing traffic signs and posts require removal, project wide as required by the Engineer

ITEM 986. MODIFIED ROCKFILL

To be used at the following locations, where sideslopes are steeper than 2:1, as required by the Engineer:

Sta. To Sta. Side 148+70 148+96 Left 148+70 148+97 Right 186+55 186+75 Left 187+29 187+82 Right 188+09 188+79 Right 209+02 209+32 Left 217+62 218+12 Left

END OF DOCUMENT

A00802-1 - Detail Shts
A00802-2_613163_lynnfield-rt-p1_detail sheets
ITEM 120. EARTH EXCAVATION
ITEM 121. CLASS A ROCK EXCAVATION
ITEM 144. CLASS B ROCK EXCAVATION
ITEM 150. ORDINARY BORROW
ITEM 156. CRUSHED STONE
ITEM 170. FINE GRADING AND COMPACTING – SUBGRADE AREA
ITEM 184.1 DISPOSAL OF TREATED WOOD PRODUCTS
ITEM 358. GATE BOX ADJUSTED
ITEM 381.3 SERVICE BOX ADJUSTED
ITEM 451. HMA FOR PATCHING
ITEM 472. TEMPORARY ASPHALT PATCHING
ITEM 506. GRANITE CURB TYPE VB – STRAIGHT
ITEM 506.1 GRANITE CURB TYPE VB – CURVED
ITEM 509. GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS – STRAIGHT
ITEM 509.1 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS – CURVED (Continued)
ITEM 509.1 GRANITE CURB FOR PEDESTRIAN CURB RAMPS – CURVED
ITEM 594. CURB REMOVED AND DISCARDED
ITEM 628.304 TEMPORARY IMPACT ATTENUATOR, NON-REDIRECTIVE, TL-2
ITEM 645.072 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE POST OPTION)
ITEM 657. TEMPORARY FENCE
ITEM 669. FENCE REMOVED AND STACKED
ITEM 697.1 SILT SACK
ITEM 698.3 GEOTEXTILE FABRIC FOR SEPARATION
ITEM 710.4 BOUND – PLAIN GRANITE
TEM 799.1 TREE REMOVAL AND REPLACEMENT REPORTS WITHIN WETLAND RESOURCE AREAS
ITEM 799.11 TREE-DECIDUOUS 4-5 FEET HT
ITEM 799.12 TREE-DECIDUOUS-5-6 FEET HT
ITEM 799.13 TREE-EVERGREEN 4-5 FEET HT
ITEM 832. WARNING-REGULATORY AND ROUTE MARKER - ALUM. PANEL (TYPE A)
ITEM 847.1 SIGN SUP (NOT GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL
ITEM 864.04 PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE (THERMOPLASTIC)
ITEM 866.106 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)
ITEM 866.112 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)
ITEM 867.104 4 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)
ITEM 867.106 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)
ITEM 874. STREET NAME SIGN
ITEM 874.2 TRAFFIC SIGN REMOVED AND RESET
ITEM 874.41 TRAFFIC SIGN REMOVED AND DISCARDED
ITEM 986. MODIFIED ROCKFILL