- 613163 LYNNFIELD FAP No. STP-0034(033)X Rail Trail Construction, from Ford Avenue to the Peabody
- Solicitation number
- BD-27-1030-0H100-0H002-131771
- Issued by
- Essex County, Massachusetts
About this file
This is a bid tabulation document from the Massachusetts Department of Transportation (MassDOT) for rail trail construction in Lynnfield, Massachusetts, Project No. 613163, Contract No. 135786. The project encompasses rail trail construction extending from Ford Avenue to the Peabody City Line and includes clearing and grubbing, selective clearing and thinning, tree trimming and protection, excavation work, drainage structure installation and removal, asphalt paving, curbing, fencing, pedestrian infrastructure, signage, and landscaping and seeding. Bids were opened on August 25, 2026, with five contractors submitting proposals: ET & L Corp ($3,912,034.00), David G Roach & Sons Inc ($3,965,630.00), J Tropeano Inc ($4,313,516.75), MDR Construction Co Inc ($4,831,957.00), Albanese Brothers Inc ($4,962,321.00), and UEL Contractors Inc ($5,166,680.00). The office estimate for the project totaled $4,893,928.50. The bid tabulation itemizes approximately 180 line items representing various construction activities with quantities, unit prices, and total amounts for each bidder.
The pricing structure reflects individual unit prices for each construction item, with significant variation among bidders on key cost categories such as track excavation (ranging from $34 to $66 per linear foot), superpave surface course installation ($215 to $300 per ton), and wood rail fence installation ($54 to $75 per linear foot). Notable discrepancies appear in specialized items such as the inland wetland replication area ($10,000 to $106,000), demolition of the former railroad bridge ($20,000 to $300,000), and interpretive kiosk installation ($7,500 to $15,300), suggesting varying contractor interpretations of scope and risk. The low bid was submitted by ET & L Corp at approximately $3.9 million, representing approximately 20 percent below the office estimate. All bids include mobilization costs, engineer's field office expenses, schedule of operations, and environmental health and safety programs as required components of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LYNNFIELD-613163-135786-A-1.pdf | ||
| A00802-613163.pdf | ||
| BIDS OPENED - Tuesday - August 25-2026~4.pdf | ||
| A00855-613163.pdf | ||
| LYNNFIELD-613163-135786-A-2.pdf | ||
| A00875-613163.pdf | ||
| A00856-613163.pdf | ||
| A00830-613163.pdf | ||
| 613163 - Notice to Contractors.pdf | ||
| Link to Bid Opening 8-25-2026~5.pdf | ||
| 613163 - Plan Holders List 8-24-2026.pdf | ||
| A00860-613163.pdf | ||
| A00805-613163.pdf | ||
| A00820-613163.pdf | ||
| A00813-613163.pdf | ||
| A00812-613163.pdf | ||
| A00806-613163.pdf | ||
| 613163 - Plan Holders List 8-11-2026.pdf | ||
| A00870-613163.pdf | ||
| 613163 Bid Items List.txt | TXT text file | |
| A00801-613163.pdf | ||
| A00831-613163.pdf | ||
| A00807-613163.pdf | ||
| A00861-613163.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prelims Unit
Bid Tabulations
Project # : 613163 Bids Open Date : 25 Aug 2026 Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
Office Estimate E T & L CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 5.200 A CLEARING AND GRUBBING $60,000.00 $312,000.00 $60,000.00 $312,000.00
102. 2.400 A SELECTIVE CLEARING AND THINNING $30,000.00 $72,000.00 $5,250.00 $12,600.00
102.001 5.000 DAY TREE TRIMMING CREW $2,000.00 $10,000.00 $7,000.00 $35,000.00
102.511 25.000 EA TREE PROTECTION - ARMORING AND PRUNING $550.00 $13,750.00 $450.00 $11,250.00
102.513 600.000 FT AIR EXCAVATION AND ROOT PRUNING $100.00 $60,000.00 $15.50 $9,300.00
102.521 2,270.000 FT TREE AND PLANT PROTECTION FENCE $12.00 $27,240.00 $10.00 $22,700.00
102.55 60.000 HR ARBORIST $270.00 $16,200.00 $180.00 $10,800.00
114.4 1.000 LS DEMOLITION OF FORMER RAILROAD BRIDGE $15,000.00 $15,000.00 $20,000.00 $20,000.00
120. 4,000.000 CY EARTH EXCAVATION $60.00 $240,000.00 $55.00 $220,000.00
121. 105.000 CY CLASS A ROCK EXCAVATION $85.00 $8,925.00 $165.00 $17,325.00
129.5 9,600.000 FT TRACK EXCAVATION $50.00 $480,000.00 $34.00 $326,400.00
141.1 130.000 CY TEST PIT FOR EXPLORATION $150.00 $19,500.00 $180.00 $23,400.00
142. 10.000 CY CLASS B TRENCH EXCAVATION $50.00 $500.00 $42.00 $420.00
144. 40.000 CY CLASS B ROCK EXCAVATION $250.00 $10,000.00 $215.00 $8,600.00
146. 1.000 EA DRAINAGE STRUCTURE REMOVED $1,100.00 $1,100.00 $750.00 $750.00
150. 920.000 CY ORDINARY BORROW $70.00 $64,400.00 $75.00 $69,000.00
151. 5,550.000 CY GRAVEL BORROW $70.00 $388,500.00 $80.00 $444,000.00
156. 51.000 TON CRUSHED STONE $80.00 $4,080.00 $90.00 $4,590.00
170. 22,300.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$10.00 $223,000.00 $3.40 $75,820.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $7,500.00 $7,500.00 $17,500.00 $17,500.00
180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $15.00 $600.00 $5.00 $200.00
180.03 40.000 HR LICENSED SITE PROFESSIONAL SERVICES $220.00 $8,800.00 $130.00 $5,200.00
181.11 210.000 TON DISPOSAL OF UNREGULATED SOIL $50.00 $10,500.00 $72.00 $15,120.00
181.12 520.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$85.00 $44,200.00 $98.00 $50,960.00
181.13 210.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$120.00 $25,200.00 $178.00 $37,380.00
181.14 105.000 TON DISPOSAL OF HAZARDOUS WASTE $600.00 $63,000.00 $580.00 $60,900.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 1 of 20
Project # : 613163 Bids Open Date : 25 Aug 2026 Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
Office Estimate E T & L CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
184.1 600.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $525.00 $315,000.00 $250.00 $150,000.00
201. 2.000 EA CATCH BASIN $7,000.00 $14,000.00 $5,000.00 $10,000.00
220. 1.000 EA DRAINAGE STRUCTURE ADJUSTED $1,200.00 $1,200.00 $1,250.00 $1,250.00
220.7 1.000 EA SANITARY STRUCTURE ADJUSTED $650.00 $650.00 $1,250.00 $1,250.00
222.1 1.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,700.00 $1,700.00 $1,950.00 $1,950.00
227.3 7.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $450.00 $3,150.00 $380.00 $2,660.00
227.31 155.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $15.00 $2,325.00 $16.00 $2,480.00
242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED
END
$2,000.00 $4,000.00 $2,100.00 $4,200.00
244.18 45.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS V $220.00 $9,900.00 $165.00 $7,425.00
358. 1.000 EA GATE BOX ADJUSTED $400.00 $400.00 $315.00 $315.00
381.3 1.000 EA SERVICE BOX ADJUSTED $400.00 $400.00 $260.00 $260.00
402. 20.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $130.00 $2,600.00 $160.00 $3,200.00
440. 133,200.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.50 $66,600.00 $0.20 $26,640.00
443. 95.000 MGL WATER FOR ROADWAY DUST CONTROL $125.00 $11,875.00 $75.00 $7,125.00
450.22 1,160.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $300.00 $348,000.00 $220.00 $255,200.00
450.23 20.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $280.00 $5,600.00 $215.00 $4,300.00
450.32 1,950.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$225.00 $438,750.00 $195.00 $380,250.00
450.42 40.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $250.00 $10,000.00 $425.00 $17,000.00
451. 5.000 TON HMA FOR PATCHING $350.00 $1,750.00 $300.00 $1,500.00
452. 975.000 GAL ASPHALT EMULSION FOR TACK COAT $30.00 $29,250.00 $11.60 $11,310.00
453. 1,085.000 FT HMA JOINT ADHESIVE $5.50 $5,967.50 $6.40 $6,944.00
472. 10.000 TON TEMPORARY ASPHALT PATCHING $360.00 $3,600.00 $400.00 $4,000.00
504.2 8.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $600.00 $4,800.00 $720.00 $5,760.00
506. 150.000 FT GRANITE CURB TYPE VB - STRAIGHT $70.00 $10,500.00 $75.00 $11,250.00
506.1 75.000 FT GRANITE CURB TYPE VB - CURVED $80.00 $6,000.00 $92.00 $6,900.00
509. 120.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$95.00 $11,400.00 $86.00 $10,320.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 2 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
Office Estimate E T & L CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
509.1 10.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - CURVED
$100.00 $1,000.00 $96.00 $960.00
516. 1.000 EA GRANITE CURB CORNER TYPE A $500.00 $500.00 $500.00 $500.00
594. 340.000 FT CURB REMOVED AND DISCARDED $12.00 $4,080.00 $10.50 $3,570.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $500.00 $500.00 $250.00 $250.00
628.304 2.000 EA TEMPORARY IMPACT ATTENUATOR, NON-
REDIRECTIVE, TL-2
$10,000.00 $20,000.00 $7,800.00 $15,600.00
645.072 25.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$60.00 $1,500.00 $41.00 $1,025.00
652.072 4.000 EA 72 INCH CHAIN LINK FENCE END POST $325.00 $1,300.00 $200.00 $800.00
655.3 4,050.000 FT WOOD RAIL FENCE $110.00 $445,500.00 $58.00 $234,900.00
655.5 290.000 FT WOOD RAIL FENCE WITH GUARDRAIL $155.00 $44,950.00 $108.00 $31,320.00
657. 340.000 FT TEMPORARY FENCE $25.00 $8,500.00 $20.00 $6,800.00
669. 85.000 FT FENCE REMOVED AND STACKED $20.00 $1,700.00 $10.00 $850.00
697.1 9.000 EA SILT SACK $350.00 $3,150.00 $425.00 $3,825.00
698.3 155.000 SY GEOTEXTILE FABRIC FOR SEPARATION $10.00 $1,550.00 $6.00 $930.00
701. 200.000 SY CEMENT CONCRETE SIDEWALK $100.00 $20,000.00 $130.00 $26,000.00
701.1 15.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $110.00 $1,650.00 $145.00 $2,175.00
701.2 95.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $131.00 $12,445.00 $185.00 $17,575.00
703.4 55.000 SY IMPRINT SYSTEM - MEDIAN $60.00 $3,300.00 $290.00 $15,950.00
704. 10.000 TON STONE DUST WALKS $105.00 $1,050.00 $150.00 $1,500.00
707.9 5.000 EA BICYCLE RACK $2,000.00 $10,000.00 $1,750.00 $8,750.00
710.4 1.000 EA BOUND - PLAIN GRANITE $775.00 $775.00 $950.00 $950.00
710.52 6.000 EA GRANITE SEAT WALL $3,500.00 $21,000.00 $3,500.00 $21,000.00
710.53 1.000 EA INTERPRETIVE KIOSK – GRANITE BASE $7,500.00 $7,500.00 $12,500.00 $12,500.00
711. 10.000 EA BOUND REMOVED AND RESET $900.00 $9,000.00 $1,100.00 $11,000.00
716.1 1.000 EA INTERPRETIVE SIGN PANEL $2,500.00 $2,500.00 $2,100.00 $2,100.00
720. 2.000 EA GRANITE MILE MARKER POST $2,000.00 $4,000.00 $3,000.00 $6,000.00
720.2 16.000 EA GRANITE TENTH MILE MARKER $1,000.00 $16,000.00 $1,700.00 $27,200.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 3 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
Office Estimate E T & L CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $37,500
$37,500.00 $37,500.00 $37,500.00 $37,500.00
740. 20.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$4,680.00 $93,600.00 $3,800.00 $76,000.00
748. 1.000 LS MOBILIZATION $142,542.00 $142,542.00 $112,000.00 $112,000.00
751. 1,660.000 CY LOAM FOR ROADSIDES $100.00 $166,000.00 $105.00 $174,300.00
751.7 15.000 CY COMPOST BLANKET $150.00 $2,250.00 $215.00 $3,225.00
755.35 1.000 LS INLAND WETLAND REPLICATION AREA $35,000.00 $35,000.00 $15,000.00 $15,000.00
755.75 40.000 HR WETLAND SPECIALIST $200.00 $8,000.00 $385.00 $15,400.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$11,000.00 $11,000.00 $7,500.00 $7,500.00
765. 11,800.000 SY SEEDING $4.00 $47,200.00 $1.25 $14,750.00
767.121 11,100.000 FT SEDIMENT CONTROL BARRIER $9.50 $105,450.00 $10.50 $116,550.00
772.1 16.000 EA MIXED EVERGREEN PLANTINGS AT SUMMER
STREET
$500.00 $8,000.00 $50.00 $800.00
772.2 34.000 EA MIXED EVERGREEN PLANTINGS AT FORD AVENUE $500.00 $17,000.00 $50.00 $1,700.00
776.525 5.000 EA MAPLE - RED - 1-1.5 INCH CALIPER $400.00 $2,000.00 $960.00 $4,800.00
778.157 7.000 EA BIRCH - RIVER 1-1.5 INCH CALIPER $450.00 $3,150.00 $970.00 $6,790.00
793.714 7.000 EA COMMON SPICEBUSH 2-3 FEET $100.00 $700.00 $205.00 $1,435.00
796.769 12.000 EA SWAMP AZALEA 2-3 FEET $90.00 $1,080.00 $185.00 $2,220.00
796.771 11.000 EA HIGHBUSH BLUEBERRY 2-3 FEET $55.00 $605.00 $155.00 $1,705.00
796.772 6.000 EA ARROWWOOD 2-3 FEET $65.00 $390.00 $190.00 $1,140.00
799.1 1.000 LS TREE REMOVAL AND REPLACEMENT REPORTS
WITHIN WETLAND RESOURCE AREAS
$5,000.00 $5,000.00 $5,500.00 $5,500.00
799.11 10.000 EA TREE-DECIDUOUS 4-5 FEET HT $700.00 $7,000.00 $425.00 $4,250.00
799.12 10.000 EA TREE-DECIDUOUS-5-6 FEET HT $1,000.00 $10,000.00 $560.00 $5,600.00
799.13 10.000 EA TREE-EVERGREEN 4-5 FEET HT $400.00 $4,000.00 $765.00 $7,650.00
825.21 1.000 EA RRFB (2-POST ASSEMBLY SYSTEM) $35,000.00 $35,000.00 $22,500.00 $22,500.00
832. 155.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$21.00 $3,255.00 $20.00 $3,100.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 4 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
Office Estimate E T & L CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
847.1 40.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$315.00 $12,600.00 $290.00 $11,600.00
850.41 40.000 HR ROADWAY FLAGGER $80.00 $3,200.00 $74.00 $2,960.00
852. 550.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $35.00 $19,250.00 $28.00 $15,400.00
852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $20.00 $2,000.00 $58.00 $5,800.00
852.12 2.000 EA TEMPORARY PEDESTRIAN CURB RAMP $100.00 $200.00 $1,450.00 $2,900.00
853.1 4.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $150.00 $600.00 $225.00 $900.00
854.1 58.000 SF PAVEMENT MARKING REMOVAL $3.00 $174.00 $5.00 $290.00
856.060 50.000 DAY ARROW BOARD (TYPE B) $15.00 $750.00 $16.50 $825.00
856.12 90.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $30.00 $2,700.00 $28.50 $2,565.00
859. 1,800.000 DAY REFLECTORIZED DRUM $1.00 $1,800.00 $0.50 $900.00
864.04 410.000 SF PAVEMENT ARROWS AND LEGENDS
REFLECTORIZED WHITE (THERMOPLASTIC)
$15.00 $6,150.00 $27.00 $11,070.00
866.106 50.000 FT 6 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$2.55 $127.50 $2.20 $110.00
866.112 510.000 FT 12 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$7.00 $3,570.00 $7.60 $3,876.00
867.104 695.000 FT 4 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.50 $2,432.50 $1.20 $834.00
867.106 50.000 FT 6 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.50 $175.00 $2.20 $110.00
874. 11.000 EA STREET NAME SIGN $215.00 $2,365.00 $165.00 $1,815.00
874.2 5.000 EA TRAFFIC SIGN REMOVED AND RESET $170.00 $850.00 $165.00 $825.00
874.41 5.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $100.00 $500.00 $165.00 $825.00
986. 90.000 TON MODIFIED ROCKFILL $110.00 $9,900.00 $92.00 $8,280.00
Total : $4,893,928.50 Total : $3,912,034.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 5 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
DAVID G ROACH & SONS INC J TROPEANO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 5.200 A CLEARING AND GRUBBING $21,500.00 $111,800.00 $60,000.00 $312,000.00
102. 2.400 A SELECTIVE CLEARING AND THINNING $25,000.00 $60,000.00 $30,000.00 $72,000.00
102.001 5.000 DAY TREE TRIMMING CREW $3,650.00 $18,250.00 $8,000.00 $40,000.00
102.511 25.000 EA TREE PROTECTION - ARMORING AND PRUNING $570.00 $14,250.00 $500.00 $12,500.00
102.513 600.000 FT AIR EXCAVATION AND ROOT PRUNING $1.00 $600.00 $15.00 $9,000.00
102.521 2,270.000 FT TREE AND PLANT PROTECTION FENCE $10.00 $22,700.00 $15.00 $34,050.00
102.55 60.000 HR ARBORIST $350.00 $21,000.00 $350.00 $21,000.00
114.4 1.000 LS DEMOLITION OF FORMER RAILROAD BRIDGE $94,500.00 $94,500.00 $20,000.00 $20,000.00
120. 4,000.000 CY EARTH EXCAVATION $50.00 $200,000.00 $65.00 $260,000.00
121. 105.000 CY CLASS A ROCK EXCAVATION $170.00 $17,850.00 $50.00 $5,250.00
129.5 9,600.000 FT TRACK EXCAVATION $45.00 $432,000.00 $45.00 $432,000.00
141.1 130.000 CY TEST PIT FOR EXPLORATION $220.00 $28,600.00 $250.00 $32,500.00
142. 10.000 CY CLASS B TRENCH EXCAVATION $320.00 $3,200.00 $65.00 $650.00
144. 40.000 CY CLASS B ROCK EXCAVATION $340.00 $13,600.00 $250.00 $10,000.00
146. 1.000 EA DRAINAGE STRUCTURE REMOVED $3,050.00 $3,050.00 $1,000.00 $1,000.00
150. 920.000 CY ORDINARY BORROW $40.00 $36,800.00 $55.00 $50,600.00
151. 5,550.000 CY GRAVEL BORROW $65.00 $360,750.00 $70.00 $388,500.00
156. 51.000 TON CRUSHED STONE $65.00 $3,315.00 $70.00 $3,570.00
170. 22,300.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$7.00 $156,100.00 $5.50 $122,650.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $55,000.00 $55,000.00 $15,000.00 $15,000.00
180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $9.00 $360.00 $10.00 $400.00
180.03 40.000 HR LICENSED SITE PROFESSIONAL SERVICES $220.00 $8,800.00 $215.00 $8,600.00
181.11 210.000 TON DISPOSAL OF UNREGULATED SOIL $55.00 $11,550.00 $40.00 $8,400.00
181.12 520.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$1.00 $520.00 $67.00 $34,840.00
181.13 210.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$1.00 $210.00 $85.00 $17,850.00
181.14 105.000 TON DISPOSAL OF HAZARDOUS WASTE $1.00 $105.00 $285.00 $29,925.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 6 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
DAVID G ROACH & SONS INC J TROPEANO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
184.1 600.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $260.00 $156,000.00 $375.00 $225,000.00
201. 2.000 EA CATCH BASIN $5,350.00 $10,700.00 $7,500.00 $15,000.00
220. 1.000 EA DRAINAGE STRUCTURE ADJUSTED $980.00 $980.00 $750.00 $750.00
220.7 1.000 EA SANITARY STRUCTURE ADJUSTED $980.00 $980.00 $750.00 $750.00
222.1 1.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,400.00 $1,400.00 $1,250.00 $1,250.00
227.3 7.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $570.00 $3,990.00 $500.00 $3,500.00
227.31 155.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $25.00 $3,875.00 $25.00 $3,875.00
242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED
END
$1,700.00 $3,400.00 $2,500.00 $5,000.00
244.18 45.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS V $140.00 $6,300.00 $250.00 $11,250.00
358. 1.000 EA GATE BOX ADJUSTED $720.00 $720.00 $350.00 $350.00
381.3 1.000 EA SERVICE BOX ADJUSTED $340.00 $340.00 $300.00 $300.00
402. 20.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $750.00 $15,000.00 $95.00 $1,900.00
440. 133,200.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.01 $1,332.00 $0.01 $1,332.00
443. 95.000 MGL WATER FOR ROADWAY DUST CONTROL $100.00 $9,500.00 $75.00 $7,125.00
450.22 1,160.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $210.00 $243,600.00 $225.00 $261,000.00
450.23 20.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $210.00 $4,200.00 $225.00 $4,500.00
450.32 1,950.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$180.00 $351,000.00 $225.00 $438,750.00
450.42 40.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $430.00 $17,200.00 $400.00 $16,000.00
451. 5.000 TON HMA FOR PATCHING $500.00 $2,500.00 $300.00 $1,500.00
452. 975.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $9,750.00 $12.00 $11,700.00
453. 1,085.000 FT HMA JOINT ADHESIVE $7.00 $7,595.00 $6.00 $6,510.00
472. 10.000 TON TEMPORARY ASPHALT PATCHING $410.00 $4,100.00 $350.00 $3,500.00
504.2 8.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $910.00 $7,280.00 $750.00 $6,000.00
506. 150.000 FT GRANITE CURB TYPE VB - STRAIGHT $60.00 $9,000.00 $75.00 $11,250.00
506.1 75.000 FT GRANITE CURB TYPE VB - CURVED $80.00 $6,000.00 $75.00 $5,625.00
509. 120.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$100.00 $12,000.00 $85.00 $10,200.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 7 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
DAVID G ROACH & SONS INC J TROPEANO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
509.1 10.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - CURVED
$220.00 $2,200.00 $85.00 $850.00
516. 1.000 EA GRANITE CURB CORNER TYPE A $1,100.00 $1,100.00 $400.00 $400.00
594. 340.000 FT CURB REMOVED AND DISCARDED $15.00 $5,100.00 $10.00 $3,400.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $600.00 $600.00 $75.00 $75.00
628.304 2.000 EA TEMPORARY IMPACT ATTENUATOR, NON-
REDIRECTIVE, TL-2
$9,250.00 $18,500.00 $8,500.00 $17,000.00
645.072 25.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$70.00 $1,750.00 $85.00 $2,125.00
652.072 4.000 EA 72 INCH CHAIN LINK FENCE END POST $340.00 $1,360.00 $500.00 $2,000.00
655.3 4,050.000 FT WOOD RAIL FENCE $65.00 $263,250.00 $75.00 $303,750.00
655.5 290.000 FT WOOD RAIL FENCE WITH GUARDRAIL $120.00 $34,800.00 $178.75 $51,837.50
657. 340.000 FT TEMPORARY FENCE $35.00 $11,900.00 $40.00 $13,600.00
669. 85.000 FT FENCE REMOVED AND STACKED $3.50 $297.50 $20.00 $1,700.00
697.1 9.000 EA SILT SACK $180.00 $1,620.00 $200.00 $1,800.00
698.3 155.000 SY GEOTEXTILE FABRIC FOR SEPARATION $10.00 $1,550.00 $8.00 $1,240.00
701. 200.000 SY CEMENT CONCRETE SIDEWALK $130.00 $26,000.00 $105.00 $21,000.00
701.1 15.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $300.00 $4,500.00 $140.00 $2,100.00
701.2 95.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $290.00 $27,550.00 $150.00 $14,250.00
703.4 55.000 SY IMPRINT SYSTEM - MEDIAN $310.00 $17,050.00 $350.00 $19,250.00
704. 10.000 TON STONE DUST WALKS $400.00 $4,000.00 $105.00 $1,050.00
707.9 5.000 EA BICYCLE RACK $1,600.00 $8,000.00 $2,500.00 $12,500.00
710.4 1.000 EA BOUND - PLAIN GRANITE $2,100.00 $2,100.00 $850.00 $850.00
710.52 6.000 EA GRANITE SEAT WALL $6,800.00 $40,800.00 $4,500.00 $27,000.00
710.53 1.000 EA INTERPRETIVE KIOSK – GRANITE BASE $11,500.00 $11,500.00 $15,000.00 $15,000.00
711. 10.000 EA BOUND REMOVED AND RESET $720.00 $7,200.00 $1,500.00 $15,000.00
716.1 1.000 EA INTERPRETIVE SIGN PANEL $1,600.00 $1,600.00 $2,000.00 $2,000.00
720. 2.000 EA GRANITE MILE MARKER POST $2,450.00 $4,900.00 $1,000.00 $2,000.00
720.2 16.000 EA GRANITE TENTH MILE MARKER $830.00 $13,280.00 $1,000.00 $16,000.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 8 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
DAVID G ROACH & SONS INC J TROPEANO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $37,500
$37,500.00 $37,500.00 $37,500.00 $37,500.00
740. 20.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$4,500.00 $90,000.00 $6,500.00 $130,000.00
748. 1.000 LS MOBILIZATION $117,000.00 $117,000.00 $150,000.00 $150,000.00
751. 1,660.000 CY LOAM FOR ROADSIDES $85.00 $141,100.00 $80.00 $132,800.00
751.7 15.000 CY COMPOST BLANKET $160.00 $2,400.00 $250.00 $3,750.00
755.35 1.000 LS INLAND WETLAND REPLICATION AREA $106,000.00 $106,000.00 $10,000.00 $10,000.00
755.75 40.000 HR WETLAND SPECIALIST $340.00 $13,600.00 $450.00 $18,000.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$63,500.00 $63,500.00 $15,000.00 $15,000.00
765. 11,800.000 SY SEEDING $1.50 $17,700.00 $2.00 $23,600.00
767.121 11,100.000 FT SEDIMENT CONTROL BARRIER $5.50 $61,050.00 $6.50 $72,150.00
772.1 16.000 EA MIXED EVERGREEN PLANTINGS AT SUMMER
STREET
$50.00 $800.00 $55.00 $880.00
772.2 34.000 EA MIXED EVERGREEN PLANTINGS AT FORD AVENUE $50.00 $1,700.00 $55.00 $1,870.00
776.525 5.000 EA MAPLE - RED - 1-1.5 INCH CALIPER $1,050.00 $5,250.00 $1,200.00 $6,000.00
778.157 7.000 EA BIRCH - RIVER 1-1.5 INCH CALIPER $1,050.00 $7,350.00 $1,200.00 $8,400.00
793.714 7.000 EA COMMON SPICEBUSH 2-3 FEET $220.00 $1,540.00 $250.00 $1,750.00
796.769 12.000 EA SWAMP AZALEA 2-3 FEET $200.00 $2,400.00 $250.00 $3,000.00
796.771 11.000 EA HIGHBUSH BLUEBERRY 2-3 FEET $170.00 $1,870.00 $250.00 $2,750.00
796.772 6.000 EA ARROWWOOD 2-3 FEET $200.00 $1,200.00 $250.00 $1,500.00
799.1 1.000 LS TREE REMOVAL AND REPLACEMENT REPORTS
WITHIN WETLAND RESOURCE AREAS
$94,000.00 $94,000.00 $5,000.00 $5,000.00
799.11 10.000 EA TREE-DECIDUOUS 4-5 FEET HT $470.00 $4,700.00 $650.00 $6,500.00
799.12 10.000 EA TREE-DECIDUOUS-5-6 FEET HT $610.00 $6,100.00 $650.00 $6,500.00
799.13 10.000 EA TREE-EVERGREEN 4-5 FEET HT $840.00 $8,400.00 $950.00 $9,500.00
825.21 1.000 EA RRFB (2-POST ASSEMBLY SYSTEM) $25,000.00 $25,000.00 $25,000.00 $25,000.00
832. 155.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$25.00 $3,875.00 $30.00 $4,650.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 9 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
DAVID G ROACH & SONS INC J TROPEANO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
847.1 40.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$270.00 $10,800.00 $285.00 $11,400.00
850.41 40.000 HR ROADWAY FLAGGER $90.00 $3,600.00 $1.00 $40.00
852. 550.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $40.00 $22,000.00 $35.00 $19,250.00
852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $35.00 $3,500.00 $40.00 $4,000.00
852.12 2.000 EA TEMPORARY PEDESTRIAN CURB RAMP $1,000.00 $2,000.00 $1,500.00 $3,000.00
853.1 4.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $220.00 $880.00 $200.00 $800.00
854.1 58.000 SF PAVEMENT MARKING REMOVAL $3.50 $203.00 $3.00 $174.00
856.060 50.000 DAY ARROW BOARD (TYPE B) $20.00 $1,000.00 $20.00 $1,000.00
856.12 90.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $30.00 $2,700.00 $30.00 $2,700.00
859. 1,800.000 DAY REFLECTORIZED DRUM $0.50 $900.00 $0.40 $720.00
864.04 410.000 SF PAVEMENT ARROWS AND LEGENDS
REFLECTORIZED WHITE (THERMOPLASTIC)
$25.00 $10,250.00 $75.00 $30,750.00
866.106 50.000 FT 6 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$3.50 $175.00 $25.00 $1,250.00
866.112 510.000 FT 12 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$9.00 $4,590.00 $8.00 $4,080.00
867.104 695.000 FT 4 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.50 $2,432.50 $2.35 $1,633.25
867.106 50.000 FT 6 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.50 $175.00 $3.30 $165.00
874. 11.000 EA STREET NAME SIGN $180.00 $1,980.00 $200.00 $2,200.00
874.2 5.000 EA TRAFFIC SIGN REMOVED AND RESET $150.00 $750.00 $300.00 $1,500.00
874.41 5.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $150.00 $750.00 $45.00 $225.00
986. 90.000 TON MODIFIED ROCKFILL $75.00 $6,750.00 $95.00 $8,550.00
Total : $3,965,630.00 Total : $4,313,516.75
CMS105 - Report Date: 8/25/2026 2:56 PM Page 10 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
MDR CONSTRUCTION CO INC ALBANESE BROTHERS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 5.200 A CLEARING AND GRUBBING $78,000.00 $405,600.00 $50,000.00 $260,000.00
102. 2.400 A SELECTIVE CLEARING AND THINNING $47,250.00 $113,400.00 $24,000.00 $57,600.00
102.001 5.000 DAY TREE TRIMMING CREW $8,900.00 $44,500.00 $7,000.00 $35,000.00
102.511 25.000 EA TREE PROTECTION - ARMORING AND PRUNING $575.00 $14,375.00 $750.00 $18,750.00
102.513 600.000 FT AIR EXCAVATION AND ROOT PRUNING $14.00 $8,400.00 $50.00 $30,000.00
102.521 2,270.000 FT TREE AND PLANT PROTECTION FENCE $13.50 $30,645.00 $11.00 $24,970.00
102.55 60.000 HR ARBORIST $125.00 $7,500.00 $226.00 $13,560.00
114.4 1.000 LS DEMOLITION OF FORMER RAILROAD BRIDGE $155,000.00 $155,000.00 $220,000.00 $220,000.00
120. 4,000.000 CY EARTH EXCAVATION $64.00 $256,000.00 $69.00 $276,000.00
121. 105.000 CY CLASS A ROCK EXCAVATION $160.00 $16,800.00 $250.00 $26,250.00
129.5 9,600.000 FT TRACK EXCAVATION $66.00 $633,600.00 $55.00 $528,000.00
141.1 130.000 CY TEST PIT FOR EXPLORATION $165.00 $21,450.00 $100.00 $13,000.00
142. 10.000 CY CLASS B TRENCH EXCAVATION $1.00 $10.00 $50.00 $500.00
144. 40.000 CY CLASS B ROCK EXCAVATION $235.00 $9,400.00 $250.00 $10,000.00
146. 1.000 EA DRAINAGE STRUCTURE REMOVED $990.00 $990.00 $2,700.00 $2,700.00
150. 920.000 CY ORDINARY BORROW $45.00 $41,400.00 $68.00 $62,560.00
151. 5,550.000 CY GRAVEL BORROW $54.00 $299,700.00 $68.00 $377,400.00
156. 51.000 TON CRUSHED STONE $55.00 $2,805.00 $60.00 $3,060.00
170. 22,300.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$8.50 $189,550.00 $4.00 $89,200.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $16,000.00 $16,000.00 $25,000.00 $25,000.00
180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $9.00 $360.00 $35.00 $1,400.00
180.03 40.000 HR LICENSED SITE PROFESSIONAL SERVICES $145.00 $5,800.00 $301.00 $12,040.00
181.11 210.000 TON DISPOSAL OF UNREGULATED SOIL $69.00 $14,490.00 $74.00 $15,540.00
181.12 520.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$96.00 $49,920.00 $101.00 $52,520.00
181.13 210.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$164.00 $34,440.00 $170.00 $35,700.00
181.14 105.000 TON DISPOSAL OF HAZARDOUS WASTE $525.00 $55,125.00 $554.00 $58,170.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 11 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
MDR CONSTRUCTION CO INC ALBANESE BROTHERS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
184.1 600.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $425.00 $255,000.00 $560.00 $336,000.00
201. 2.000 EA CATCH BASIN $6,900.00 $13,800.00 $7,500.00 $15,000.00
220. 1.000 EA DRAINAGE STRUCTURE ADJUSTED $650.00 $650.00 $550.00 $550.00
220.7 1.000 EA SANITARY STRUCTURE ADJUSTED $650.00 $650.00 $550.00 $550.00
222.1 1.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,250.00 $1,250.00 $1,500.00 $1,500.00
227.3 7.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $190.00 $1,330.00 $500.00 $3,500.00
227.31 155.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $20.00 $3,100.00 $20.00 $3,100.00
242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED
END
$1,800.00 $3,600.00 $2,000.00 $4,000.00
244.18 45.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS V $185.00 $8,325.00 $240.00 $10,800.00
358. 1.000 EA GATE BOX ADJUSTED $750.00 $750.00 $330.00 $330.00
381.3 1.000 EA SERVICE BOX ADJUSTED $625.00 $625.00 $330.00 $330.00
402. 20.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $90.00 $1,800.00 $130.00 $2,600.00
440. 133,200.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.45 $59,940.00 $0.50 $66,600.00
443. 95.000 MGL WATER FOR ROADWAY DUST CONTROL $95.00 $9,025.00 $120.00 $11,400.00
450.22 1,160.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $215.00 $249,400.00 $223.00 $258,680.00
450.23 20.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $215.00 $4,300.00 $223.00 $4,460.00
450.32 1,950.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$189.00 $368,550.00 $191.00 $372,450.00
450.42 40.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $265.00 $10,600.00 $453.00 $18,120.00
451. 5.000 TON HMA FOR PATCHING $220.00 $1,100.00 $300.00 $1,500.00
452. 975.000 GAL ASPHALT EMULSION FOR TACK COAT $13.00 $12,675.00 $13.00 $12,675.00
453. 1,085.000 FT HMA JOINT ADHESIVE $6.00 $6,510.00 $8.00 $8,680.00
472. 10.000 TON TEMPORARY ASPHALT PATCHING $275.00 $2,750.00 $300.00 $3,000.00
504.2 8.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $635.00 $5,080.00 $1,000.00 $8,000.00
506. 150.000 FT GRANITE CURB TYPE VB - STRAIGHT $62.00 $9,300.00 $161.00 $24,150.00
506.1 75.000 FT GRANITE CURB TYPE VB - CURVED $68.00 $5,100.00 $176.00 $13,200.00
509. 120.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$76.00 $9,120.00 $173.00 $20,760.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 12 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
MDR CONSTRUCTION CO INC ALBANESE BROTHERS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
509.1 10.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - CURVED
$78.00 $780.00 $181.00 $1,810.00
516. 1.000 EA GRANITE CURB CORNER TYPE A $750.00 $750.00 $883.00 $883.00
594. 340.000 FT CURB REMOVED AND DISCARDED $22.00 $7,480.00 $15.00 $5,100.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $75.00 $75.00 $115.00 $115.00
628.304 2.000 EA TEMPORARY IMPACT ATTENUATOR, NON-
REDIRECTIVE, TL-2
$7,600.00 $15,200.00 $10,000.00 $20,000.00
645.072 25.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$48.75 $1,218.75 $125.00 $3,125.00
652.072 4.000 EA 72 INCH CHAIN LINK FENCE END POST $235.00 $940.00 $300.00 $1,200.00
655.3 4,050.000 FT WOOD RAIL FENCE $69.00 $279,450.00 $68.00 $275,400.00
655.5 290.000 FT WOOD RAIL FENCE WITH GUARDRAIL $128.00 $37,120.00 $108.00 $31,320.00
657. 340.000 FT TEMPORARY FENCE $24.00 $8,160.00 $25.00 $8,500.00
669. 85.000 FT FENCE REMOVED AND STACKED $10.00 $850.00 $15.00 $1,275.00
697.1 9.000 EA SILT SACK $270.00 $2,430.00 $100.00 $900.00
698.3 155.000 SY GEOTEXTILE FABRIC FOR SEPARATION $5.50 $852.50 $6.00 $930.00
701. 200.000 SY CEMENT CONCRETE SIDEWALK $118.00 $23,600.00 $177.00 $35,400.00
701.1 15.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $118.00 $1,770.00 $200.00 $3,000.00
701.2 95.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $140.00 $13,300.00 $200.00 $19,000.00
703.4 55.000 SY IMPRINT SYSTEM - MEDIAN $1,845.00 $101,475.00 $200.00 $11,000.00
704. 10.000 TON STONE DUST WALKS $325.00 $3,250.00 $200.00 $2,000.00
707.9 5.000 EA BICYCLE RACK $2,750.00 $13,750.00 $1,500.00 $7,500.00
710.4 1.000 EA BOUND - PLAIN GRANITE $1,100.00 $1,100.00 $2,100.00 $2,100.00
710.52 6.000 EA GRANITE SEAT WALL $3,650.00 $21,900.00 $7,900.00 $47,400.00
710.53 1.000 EA INTERPRETIVE KIOSK – GRANITE BASE $7,800.00 $7,800.00 $15,300.00 $15,300.00
711. 10.000 EA BOUND REMOVED AND RESET $950.00 $9,500.00 $1,500.00 $15,000.00
716.1 1.000 EA INTERPRETIVE SIGN PANEL $3,725.00 $3,725.00 $1,892.00 $1,892.00
720. 2.000 EA GRANITE MILE MARKER POST $1,600.00 $3,200.00 $3,000.00 $6,000.00
720.2 16.000 EA GRANITE TENTH MILE MARKER $1,150.00 $18,400.00 $600.00 $9,600.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 13 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
MDR CONSTRUCTION CO INC ALBANESE BROTHERS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $37,500
$37,500.00 $37,500.00 $37,500.00 $37,500.00
740. 20.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$5,100.00 $102,000.00 $9,000.00 $180,000.00
748. 1.000 LS MOBILIZATION $130,000.00 $130,000.00 $125,000.00 $125,000.00
751. 1,660.000 CY LOAM FOR ROADSIDES $88.00 $146,080.00 $116.00 $192,560.00
751.7 15.000 CY COMPOST BLANKET $300.00 $4,500.00 $241.00 $3,615.00
755.35 1.000 LS INLAND WETLAND REPLICATION AREA $72,000.00 $72,000.00 $50,000.00 $50,000.00
755.75 40.000 HR WETLAND SPECIALIST $245.00 $9,800.00 $271.00 $10,840.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$8,500.00 $8,500.00 $50,000.00 $50,000.00
765. 11,800.000 SY SEEDING $2.45 $28,910.00 $3.00 $35,400.00
767.121 11,100.000 FT SEDIMENT CONTROL BARRIER $8.25 $91,575.00 $7.00 $77,700.00
772.1 16.000 EA MIXED EVERGREEN PLANTINGS AT SUMMER
STREET
$64.00 $1,024.00 $54.00 $864.00
772.2 34.000 EA MIXED EVERGREEN PLANTINGS AT FORD AVENUE $64.00 $2,176.00 $54.00 $1,836.00
776.525 5.000 EA MAPLE - RED - 1-1.5 INCH CALIPER $975.00 $4,875.00 $1,105.00 $5,525.00
778.157 7.000 EA BIRCH - RIVER 1-1.5 INCH CALIPER $990.00 $6,930.00 $1,120.00 $7,840.00
793.714 7.000 EA COMMON SPICEBUSH 2-3 FEET $260.00 $1,820.00 $235.00 $1,645.00
796.769 12.000 EA SWAMP AZALEA 2-3 FEET $240.00 $2,880.00 $221.00 $2,652.00
796.771 11.000 EA HIGHBUSH BLUEBERRY 2-3 FEET $215.00 $2,365.00 $178.00 $1,958.00
796.772 6.000 EA ARROWWOOD 2-3 FEET $240.00 $1,440.00 $214.00 $1,284.00
799.1 1.000 LS TREE REMOVAL AND REPLACEMENT REPORTS
WITHIN WETLAND RESOURCE AREAS
$5,600.00 $5,600.00 $30,000.00 $30,000.00
799.11 10.000 EA TREE-DECIDUOUS 4-5 FEET HT $595.00 $5,950.00 $492.00 $4,920.00
799.12 10.000 EA TREE-DECIDUOUS-5-6 FEET HT $725.00 $7,250.00 $648.00 $6,480.00
799.13 10.000 EA TREE-EVERGREEN 4-5 FEET HT $865.00 $8,650.00 $885.00 $8,850.00
825.21 1.000 EA RRFB (2-POST ASSEMBLY SYSTEM) $24,730.00 $24,730.00 $35,000.00 $35,000.00
832. 155.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$24.00 $3,720.00 $28.00 $4,340.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 14 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
MDR CONSTRUCTION CO INC ALBANESE BROTHERS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
847.1 40.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$295.00 $11,800.00 $289.00 $11,560.00
850.41 40.000 HR ROADWAY FLAGGER $65.00 $2,600.00 $120.00 $4,800.00
852. 550.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $36.00 $19,800.00 $32.00 $17,600.00
852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $16.00 $1,600.00 $86.00 $8,600.00
852.12 2.000 EA TEMPORARY PEDESTRIAN CURB RAMP $1,600.00 $3,200.00 $1,160.00 $2,320.00
853.1 4.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $1.00 $4.00 $224.00 $896.00
854.1 58.000 SF PAVEMENT MARKING REMOVAL $4.00 $232.00 $3.50 $203.00
856.060 50.000 DAY ARROW BOARD (TYPE B) $14.00 $700.00 $15.00 $750.00
856.12 90.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $35.00 $3,150.00 $31.00 $2,790.00
859. 1,800.000 DAY REFLECTORIZED DRUM $0.40 $720.00 $0.40 $720.00
864.04 410.000 SF PAVEMENT ARROWS AND LEGENDS
REFLECTORIZED WHITE (THERMOPLASTIC)
$22.00 $9,020.00 $73.00 $29,930.00
866.106 50.000 FT 6 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$3.25 $162.50 $4.00 $200.00
866.112 510.000 FT 12 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$8.60 $4,386.00 $9.00 $4,590.00
867.104 695.000 FT 4 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.25 $2,258.75 $3.00 $2,085.00
867.106 50.000 FT 6 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.25 $162.50 $4.00 $200.00
874. 11.000 EA STREET NAME SIGN $270.00 $2,970.00 $193.00 $2,123.00
874.2 5.000 EA TRAFFIC SIGN REMOVED AND RESET $190.00 $950.00 $157.00 $785.00
874.41 5.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $40.00 $200.00 $45.00 $225.00
986. 90.000 TON MODIFIED ROCKFILL $90.00 $8,100.00 $217.00 $19,530.00
Total : $4,831,957.00 Total : $4,962,321.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 15 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
UEL CONTRACTORS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 5.200 A CLEARING AND GRUBBING $75,000.00 $390,000.00
102. 2.400 A SELECTIVE CLEARING AND THINNING $15,000.00 $36,000.00
102.001 5.000 DAY TREE TRIMMING CREW $5,200.00 $26,000.00
102.511 25.000 EA TREE PROTECTION - ARMORING AND PRUNING $500.00 $12,500.00
102.513 600.000 FT AIR EXCAVATION AND ROOT PRUNING $20.00 $12,000.00
102.521 2,270.000 FT TREE AND PLANT PROTECTION FENCE $15.00 $34,050.00
102.55 60.000 HR ARBORIST $250.00 $15,000.00
114.4 1.000 LS DEMOLITION OF FORMER RAILROAD BRIDGE $300,000.00 $300,000.00
120. 4,000.000 CY EARTH EXCAVATION $60.00 $240,000.00
121. 105.000 CY CLASS A ROCK EXCAVATION $200.00 $21,000.00
129.5 9,600.000 FT TRACK EXCAVATION $50.00 $480,000.00
141.1 130.000 CY TEST PIT FOR EXPLORATION $200.00 $26,000.00
142. 10.000 CY CLASS B TRENCH EXCAVATION $100.00 $1,000.00
144. 40.000 CY CLASS B ROCK EXCAVATION $250.00 $10,000.00
146. 1.000 EA DRAINAGE STRUCTURE REMOVED $1,500.00 $1,500.00
150. 920.000 CY ORDINARY BORROW $100.00 $92,000.00
151. 5,550.000 CY GRAVEL BORROW $110.00 $610,500.00
156. 51.000 TON CRUSHED STONE $100.00 $5,100.00
170. 22,300.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$15.00 $334,500.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $5,000.00 $5,000.00
180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $20.00 $800.00
180.03 40.000 HR LICENSED SITE PROFESSIONAL SERVICES $250.00 $10,000.00
181.11 210.000 TON DISPOSAL OF UNREGULATED SOIL $60.00 $12,600.00
181.12 520.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$100.00 $52,000.00
181.13 210.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$200.00 $42,000.00
181.14 105.000 TON DISPOSAL OF HAZARDOUS WASTE $600.00 $63,000.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 16 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
UEL CONTRACTORS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
184.1 600.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $350.00 $210,000.00
201. 2.000 EA CATCH BASIN $6,000.00 $12,000.00
220. 1.000 EA DRAINAGE STRUCTURE ADJUSTED $500.00 $500.00
220.7 1.000 EA SANITARY STRUCTURE ADJUSTED $500.00 $500.00
222.1 1.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,500.00 $1,500.00
227.3 7.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $400.00 $2,800.00
227.31 155.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $15.00 $2,325.00
242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED
END
$2,000.00 $4,000.00
244.18 45.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS V $200.00 $9,000.00
358. 1.000 EA GATE BOX ADJUSTED $200.00 $200.00
381.3 1.000 EA SERVICE BOX ADJUSTED $200.00 $200.00
402. 20.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $150.00 $3,000.00
440. 133,200.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.50 $66,600.00
443. 95.000 MGL WATER FOR ROADWAY DUST CONTROL $100.00 $9,500.00
450.22 1,160.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $220.00 $255,200.00
450.23 20.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $220.00 $4,400.00
450.32 1,950.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$196.00 $382,200.00
450.42 40.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $240.00 $9,600.00
451. 5.000 TON HMA FOR PATCHING $300.00 $1,500.00
452. 975.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $9,750.00
453. 1,085.000 FT HMA JOINT ADHESIVE $2.00 $2,170.00
472. 10.000 TON TEMPORARY ASPHALT PATCHING $300.00 $3,000.00
504.2 8.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $300.00 $2,400.00
506. 150.000 FT GRANITE CURB TYPE VB - STRAIGHT $95.00 $14,250.00
506.1 75.000 FT GRANITE CURB TYPE VB - CURVED $105.00 $7,875.00
509. 120.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$120.00 $14,400.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 17 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
UEL CONTRACTORS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
509.1 10.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - CURVED
$120.00 $1,200.00
516. 1.000 EA GRANITE CURB CORNER TYPE A $500.00 $500.00
594. 340.000 FT CURB REMOVED AND DISCARDED $10.00 $3,400.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $500.00 $500.00
628.304 2.000 EA TEMPORARY IMPACT ATTENUATOR, NON-
REDIRECTIVE, TL-2
$8,000.00 $16,000.00
645.072 25.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$135.00 $3,375.00
652.072 4.000 EA 72 INCH CHAIN LINK FENCE END POST $300.00 $1,200.00
655.3 4,050.000 FT WOOD RAIL FENCE $54.00 $218,700.00
655.5 290.000 FT WOOD RAIL FENCE WITH GUARDRAIL $220.00 $63,800.00
657. 340.000 FT TEMPORARY FENCE $15.00 $5,100.00
669. 85.000 FT FENCE REMOVED AND STACKED $12.00 $1,020.00
697.1 9.000 EA SILT SACK $400.00 $3,600.00
698.3 155.000 SY GEOTEXTILE FABRIC FOR SEPARATION $10.00 $1,550.00
701. 200.000 SY CEMENT CONCRETE SIDEWALK $95.00 $19,000.00
701.1 15.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $120.00 $1,800.00
701.2 95.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $130.00 $12,350.00
703.4 55.000 SY IMPRINT SYSTEM - MEDIAN $300.00 $16,500.00
704. 10.000 TON STONE DUST WALKS $100.00 $1,000.00
707.9 5.000 EA BICYCLE RACK $900.00 $4,500.00
710.4 1.000 EA BOUND - PLAIN GRANITE $1,000.00 $1,000.00
710.52 6.000 EA GRANITE SEAT WALL $6,000.00 $36,000.00
710.53 1.000 EA INTERPRETIVE KIOSK – GRANITE BASE $8,000.00 $8,000.00
711. 10.000 EA BOUND REMOVED AND RESET $500.00 $5,000.00
716.1 1.000 EA INTERPRETIVE SIGN PANEL $3,000.00 $3,000.00
720. 2.000 EA GRANITE MILE MARKER POST $3,000.00 $6,000.00
720.2 16.000 EA GRANITE TENTH MILE MARKER $3,000.00 $48,000.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 18 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
UEL CONTRACTORS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $37,500
$37,500.00 $37,500.00
740. 20.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$4,000.00 $80,000.00
748. 1.000 LS MOBILIZATION $100,000.00 $100,000.00
751. 1,660.000 CY LOAM FOR ROADSIDES $100.00 $166,000.00
751.7 15.000 CY COMPOST BLANKET $250.00 $3,750.00
755.35 1.000 LS INLAND WETLAND REPLICATION AREA $50,000.00 $50,000.00
755.75 40.000 HR WETLAND SPECIALIST $250.00 $10,000.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$20,000.00 $20,000.00
765. 11,800.000 SY SEEDING $3.00 $35,400.00
767.121 11,100.000 FT SEDIMENT CONTROL BARRIER $10.00 $111,000.00
772.1 16.000 EA MIXED EVERGREEN PLANTINGS AT SUMMER
STREET
$200.00 $3,200.00
772.2 34.000 EA MIXED EVERGREEN PLANTINGS AT FORD AVENUE $200.00 $6,800.00
776.525 5.000 EA MAPLE - RED - 1-1.5 INCH CALIPER $1,000.00 $5,000.00
778.157 7.000 EA BIRCH - RIVER 1-1.5 INCH CALIPER $1,000.00 $7,000.00
793.714 7.000 EA COMMON SPICEBUSH 2-3 FEET $200.00 $1,400.00
796.769 12.000 EA SWAMP AZALEA 2-3 FEET $200.00 $2,400.00
796.771 11.000 EA HIGHBUSH BLUEBERRY 2-3 FEET $200.00 $2,200.00
796.772 6.000 EA ARROWWOOD 2-3 FEET $200.00 $1,200.00
799.1 1.000 LS TREE REMOVAL AND REPLACEMENT REPORTS
WITHIN WETLAND RESOURCE AREAS
$15,000.00 $15,000.00
799.11 10.000 EA TREE-DECIDUOUS 4-5 FEET HT $1,000.00 $10,000.00
799.12 10.000 EA TREE-DECIDUOUS-5-6 FEET HT $1,000.00 $10,000.00
799.13 10.000 EA TREE-EVERGREEN 4-5 FEET HT $1,000.00 $10,000.00
825.21 1.000 EA RRFB (2-POST ASSEMBLY SYSTEM) $25,000.00 $25,000.00
832. 155.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$30.00 $4,650.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 19 of 20
Location : LYNNFIELD Contract # : 135786 District : 4 Description : LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO THE PEABODY CITY LINE
UEL CONTRACTORS INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
847.1 40.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$240.00 $9,600.00
850.41 40.000 HR ROADWAY FLAGGER $80.00 $3,200.00
852. 550.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $50.00 $27,500.00
852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $100.00 $10,000.00
852.12 2.000 EA TEMPORARY PEDESTRIAN CURB RAMP $1,000.00 $2,000.00
853.1 4.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $225.00 $900.00
854.1 58.000 SF PAVEMENT MARKING REMOVAL $10.00 $580.00
856.060 50.000 DAY ARROW BOARD (TYPE B) $50.00 $2,500.00
856.12 90.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $100.00 $9,000.00
859. 1,800.000 DAY REFLECTORIZED DRUM $1.00 $1,800.00
864.04 410.000 SF PAVEMENT ARROWS AND LEGENDS
REFLECTORIZED WHITE (THERMOPLASTIC)
$20.00 $8,200.00
866.106 50.000 FT 6 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$3.00 $150.00
866.112 510.000 FT 12 INCH REFLECTORIZED WHITE LINE
(THERMOPLASTIC)
$10.00 $5,100.00
867.104 695.000 FT 4 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$3.00 $2,085.00
867.106 50.000 FT 6 INCH REFLECTORIZED YELLOW LINE
(THERMOPLASTIC)
$5.00 $250.00
874. 11.000 EA STREET NAME SIGN $300.00 $3,300.00
874.2 5.000 EA TRAFFIC SIGN REMOVED AND RESET $200.00 $1,000.00
874.41 5.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $100.00 $500.00
986. 90.000 TON MODIFIED ROCKFILL $200.00 $18,000.00
Total : $5,166,680.00
CMS105 - Report Date: 8/25/2026 2:56 PM Page 20 of 20
File details come from the government source that posted it. Updated .