About this file
This is a bid items list document for the Massachusetts Department of Transportation (MassDOT) related to Federal Aid Project No. STP-0034(033)X, a rail trail construction project in Lynnfield extending from Ford Avenue to the Peabody City Line. The project encompasses comprehensive trail development including clearing and grubbing, selective clearing and thinning, tree protection and pruning, demolition of a former railroad bridge, earth and rock excavation, drainage structure work, fine grading and compacting, asphalt paving in multiple courses, concrete sidewalk and curb installation, fencing, landscaping with native plantings, sediment control, stormwater management, and traffic control signage and markings. The bid items list contains 147 line items with specified quantities and units, including 5.2 acres of clearing and grubbing, 4,000 cubic yards of earth excavation, 22,300 square yards of fine grading and compacting, 3,030 tons of asphalt course materials, 625 linear feet of various curb types, 4,050 linear feet of wood rail fence, and 11,800 square yards of seeding. Proposals are due August 25, 2026 at 2:00 p.m. via www.bidx.com, with a project value of $4.894 million. Bidders must be pre-qualified by MassDOT in the HIGHWAY - BIKE PATHS category prior to submission.
The contract requires a Proposal Guaranty equal to 5% of the bid value and is subject to price adjustments for hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural and reinforcing steel, with adjustment indices specified by MassDOT's Highway Division. All bidders must obtain a valid MassDOT vendor code and secure a Digital ID from www.bidx.com at least 14 days prior to bid opening, and submit a Request Proposal Form (R109) to prequal.r109@dot.state.ma.us for pre-qualification approval. The project is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development and the U.S. Department of Labor, Standard Federal Equal Employment Opportunity Contract Specifications including minority and female participation goals, and Architectural Access Board regulations and Title VI Civil Rights Act compliance. Proposal documents are available on www.bidx.com for official bidders; informational contract documents may be requested free of charge from MassDOTBidDocuments@dot.state.ma.us. Bidders should not use COMMBUYS to submit proposals.
Text of this file
PRO_FILENO = 613163,DESCPT = Rail Trail Construction, from Ford Avenue to the Peabody City Line,Location = LYNNFIELD,DB_CONTRACT = 135786
OFF_QUANT,UNITS,DESCPT1,ITEM_NO
"5.200","A","CLEARING AND GRUBBING","101."
"2.400","A","SELECTIVE CLEARING AND THINNING","102."
"5.000","DAY","TREE TRIMMING CREW","102.001"
"25.000","EA","TREE PROTECTION - ARMORING AND PRUNING","102.511"
"600.000","FT","AIR EXCAVATION AND ROOT PRUNING","102.513"
"2270.000","FT","TREE AND PLANT PROTECTION FENCE","102.521"
"60.000","HR","ARBORIST","102.55"
"1.000","LS","DEMOLITION OF FORMER RAILROAD BRIDGE","114.4"
"4000.000","CY","EARTH EXCAVATION","120."
"105.000","CY","CLASS A ROCK EXCAVATION","121."
"9600.000","FT","TRACK EXCAVATION","129.5"
"130.000","CY","TEST PIT FOR EXPLORATION","141.1"
"10.000","CY","CLASS B TRENCH EXCAVATION","142."
"40.000","CY","CLASS B ROCK EXCAVATION","144."
"1.000","EA","DRAINAGE STRUCTURE REMOVED","146."
"920.000","CY","ORDINARY BORROW","150."
"5550.000","CY","GRAVEL BORROW","151."
"51.000","TON","CRUSHED STONE","156."
"22300.000","SY","FINE GRADING AND COMPACTING - SUBGRADE AREA","170."
"1.000","LS","ENVIRONMENTAL HEALTH AND SAFETY PROGRAM","180.01"
"40.000","HR","PERSONAL PROTECTION LEVEL C UPGRADE","180.02"
"40.000","HR","LICENSED SITE PROFESSIONAL SERVICES","180.03"
"210.000","TON","DISPOSAL OF UNREGULATED SOIL","181.11"
"520.000","TON","DISPOSAL OF REGULATED SOIL - IN-STATE FACILITY","181.12"
"210.000","TON","DISPOSAL OF REGULATED SOIL - OUT-OF-STATE FACILITY","181.13"
"105.000","TON","DISPOSAL OF HAZARDOUS WASTE","181.14"
"600.000","TON","DISPOSAL OF TREATED WOOD PRODUCTS","184.1"
"2.000","EA","CATCH BASIN","201."
"1.000","EA","DRAINAGE STRUCTURE ADJUSTED","220."
"1.000","EA","SANITARY STRUCTURE ADJUSTED","220.7"
"1.000","EA","FRAME AND GRATE - MASSDOT CASCADE TYPE","222.1"
"7.000","CY","REMOVAL OF DRAINAGE STRUCTURE SEDIMENT","227.3"
"155.000","FT","REMOVAL OF DRAINAGE PIPE SEDIMENT","227.31"
"2.000","EA","18 INCH REINFORCED CONCRETE PIPE FLARED END","242.18"
"45.000","FT","18 INCH REINFORCED CONCRETE PIPE CLASS V","244.18"
"1.000","EA","GATE BOX ADJUSTED","358."
"1.000","EA","SERVICE BOX ADJUSTED","381.3"
"20.000","CY","DENSE GRADED CRUSHED STONE FOR SUB-BASE","402."
"133200.000","LB","CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL","440."
"95.000","MGL","WATER FOR ROADWAY DUST CONTROL","443."
"1160.000","TON","SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5)","450.22"
"20.000","TON","SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)","450.23"
"1950.000","TON","SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)","450.32"
"40.000","TON","SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)","450.42"
"5.000","TON","HMA FOR PATCHING","451."
"975.000","GAL","ASPHALT EMULSION FOR TACK COAT","452."
"1085.000","FT","HMA JOINT ADHESIVE","453."
"10.000","TON","TEMPORARY ASPHALT PATCHING","472."
"8.000","EA","GRANITE CURB TYPE VA4 - SPLAYED END","504.2"
"150.000","FT","GRANITE CURB TYPE VB - STRAIGHT","506."
"75.000","FT","GRANITE CURB TYPE VB - CURVED","506.1"
"120.000","FT","GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT","509."
"10.000","FT","GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED","509.1"
"1.000","EA","GRANITE CURB CORNER TYPE A","516."
"340.000","FT","CURB REMOVED AND DISCARDED","594."
"1.000","EA","CURB INLET REMOVED AND DISCARDED","595."
"2.000","EA","TEMPORARY IMPACT ATTENUATOR, NON-REDIRECTIVE, TL-2","628.304"
"25.000","FT","72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE POST OPTION)","645.072"
"4.000","EA","72 INCH CHAIN LINK FENCE END POST","652.072"
"4050.000","FT","WOOD RAIL FENCE","655.3"
"290.000","FT","WOOD RAIL FENCE WITH GUARDRAIL","655.5"
"340.000","FT","TEMPORARY FENCE","657."
"85.000","FT","FENCE REMOVED AND STACKED","669."
"9.000","EA","SILT SACK","697.1"
"155.000","SY","GEOTEXTILE FABRIC FOR SEPARATION","698.3"
"200.000","SY","CEMENT CONCRETE SIDEWALK","701."
"15.000","SY","CEMENT CONCRETE SIDEWALK AT DRIVEWAYS","701.1"
"95.000","SY","CEMENT CONCRETE PEDESTRIAN CURB RAMP","701.2"
"55.000","SY","IMPRINT SYSTEM - MEDIAN","703.4"
"10.000","TON","STONE DUST WALKS","704."
"5.000","EA","BICYCLE RACK","707.9"
"1.000","EA","BOUND - PLAIN GRANITE","710.4"
"6.000","EA","GRANITE SEAT WALL","710.52"
"1.000","EA","INTERPRETIVE KIOSK – GRANITE BASE","710.53"
"10.000","EA","BOUND REMOVED AND RESET","711."
"1.000","EA","INTERPRETIVE SIGN PANEL","716.1"
"2.000","EA","GRANITE MILE MARKER POST","720."
"16.000","EA","GRANITE TENTH MILE MARKER","720.2"
"1.000","LS","SCHEDULE OF OPERATIONS (TYPE B) - FIXED PRICE $37,500","722.2"
"20.000","MO","ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE A)","740."
"1.000","LS","MOBILIZATION","748."
"1660.000","CY","LOAM FOR ROADSIDES","751."
"15.000","CY","COMPOST BLANKET","751.7"
"1.000","LS","INLAND WETLAND REPLICATION AREA","755.35"
"40.000","HR","WETLAND SPECIALIST","755.75"
"1.000","LS","NPDES STORMWATER POLLUTION PREVENTION PLAN","756."
"11800.000","SY","SEEDING","765."
"11100.000","FT","SEDIMENT CONTROL BARRIER","767.121"
"16.000","EA","MIXED EVERGREEN PLANTINGS AT SUMMER STREET","772.1"
"34.000","EA","MIXED EVERGREEN PLANTINGS AT FORD AVENUE","772.2"
"5.000","EA","MAPLE - RED - 1-1.5 INCH CALIPER","776.525"
"7.000","EA","BIRCH - RIVER 1-1.5 INCH CALIPER","778.157"
"7.000","EA","COMMON SPICEBUSH 2-3 FEET","793.714"
"12.000","EA","SWAMP AZALEA 2-3 FEET","796.769"
"11.000","EA","HIGHBUSH BLUEBERRY 2-3 FEET","796.771"
"6.000","EA","ARROWWOOD 2-3 FEET","796.772"
"1.000","LS","TREE REMOVAL AND REPLACEMENT REPORTS WITHIN WETLAND RESOURCE AREAS","799.1"
"10.000","EA","TREE-DECIDUOUS 4-5 FEET HT","799.11"
"10.000","EA","TREE-DECIDUOUS-5-6 FEET HT","799.12"
"10.000","EA","TREE-EVERGREEN 4-5 FEET HT","799.13"
"1.000","EA","RRFB (2-POST ASSEMBLY SYSTEM)","825.21"
"155.000","SF","WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A)","832."
"40.000","EA","SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL","847.1"
"40.000","HR","ROADWAY FLAGGER","850.41"
"550.000","SF","SAFETY SIGNING FOR TRAFFIC MANAGEMENT","852."
"100.000","FT","TEMPORARY PEDESTRIAN BARRICADE","852.11"
"2.000","EA","TEMPORARY PEDESTRIAN CURB RAMP","852.12"
"4.000","EA","PORTABLE BREAKAWAY BARRICADE TYPE III","853.1"
"58.000","SF","PAVEMENT MARKING REMOVAL","854.1"
"50.000","DAY","ARROW BOARD (TYPE B)","856.060"
"90.000","DAY","PORTABLE CHANGEABLE MESSAGE SIGN","856.12"
"1800.000","DAY","REFLECTORIZED DRUM","859."
"410.000","SF","PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE (THERMOPLASTIC)","864.04"
"50.000","FT","6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)","866.106"
"510.000","FT","12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)","866.112"
"695.000","FT","4 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)","867.104"
"50.000","FT","6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)","867.106"
"11.000","EA","STREET NAME SIGN","874."
"5.000","EA","TRAFFIC SIGN REMOVED AND RESET","874.2"
"5.000","EA","TRAFFIC SIGN REMOVED AND DISCARDED","874.41"
"90.000","TON","MODIFIED ROCKFILL","986."
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .