This file is a comprehensive public projects manual prepared by CSX Transportation Inc. for the Massachusetts Department of Transportation Highway Division and other project sponsors undertaking construction and improvement projects that may involve CSX railroad property. The manual provides detailed guidance on preliminary engineering requirements, project review procedures, insurance requirements, entry onto CSX property, construction monitoring, railroad flagging services, and specific project types including highway-rail grade crossing maintenance and alterations, bridge projects (both overhead and undergrade), parallel road construction, bridge painting and cleaning, road crossing openings and closures, bicycle and pedestrian pathways, and quiet zone proposals. The document establishes that all projects with potential to affect CSX property or operations must undergo preliminary engineering review before construction, with CSX providing cost estimates and engineering oversight. Project sponsors must secure preliminary engineering agreements before work begins, attend required meetings and site reviews with CSX personnel, and submit detailed plans prepared by licensed professional engineers for CSX approval.
The manual specifies that all costs and expenses associated with CSX's review, engineering, construction monitoring, and flagging services must be reimbursed by the project sponsor through advance payment, with typical flagging costs estimated at $1,300 per day and flagging arrangements potentially requiring up to 90 days to schedule. Insurance requirements are mandatory, including commercial general liability coverage with $5 million combined single limits naming CSX as an additional insured, statutory workers' compensation, commercial automobile liability with $1 million limits, and railroad protective liability insurance with $5 million combined single limits and $10 million aggregate annual limits, all from A.M. Best-rated A- Class VII or better carriers. The manual notes that CSX may engage outside consultants and general engineering consultants (GECs) to assist with project management and that all standard agreements are available to streamline project execution. Projects requiring property rights or encroachments within CSX right-of-way must be coordinated with the CSX Real Estate Department, and specific design criteria for overhead bridges (23-foot minimum vertical clearance) and undergrade bridges (ballast deck requirement) are detailed in appendices to ensure future railroad expansion capabilities and operational needs are accommodated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00844-607420.pdf | ||
| A00811-607420.pdf | ||
| A00825-607420.pdf | ||
| 607420 - Bid Tabulations.pdf | ||
| A00814-607420.pdf | ||
| 607420 Bid Items List.txt | TXT text file | |
| A00812-607420.pdf | ||
| NATICK-607420-136650-A-1.pdf | ||
| A00875-607420.pdf | ||
| 607420 - Plan Holders List 10-26-2026.pdf | ||
| A00810-607420.pdf | ||
| A00813-607420.pdf | ||
| A00802-607420.pdf | ||
| 607420 - Notice to Contractors.pdf | ||
| A00801-607420.pdf | ||
| Link to Bid Opening 10-27-2026~1.pdf | ||
| BIDS OPENED - Tuesday - October 27-2026~3.pdf | ||
| NATICK-607420-136650-A-3.pdf | ||
| A00820-607420.pdf | ||
| A00815-607420.pdf | ||
| 607420 - Plan Holders List 10-13-2026.pdf | ||
| NATICK-607420-136650-A-2.pdf | ||
| A00808-607420.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 607420-136650
A00807 - 1
DOCUMENT A00807
2025 CSX PUBLIC PROJECT INFORMATION
FOR CONSTRUCTION AND IMPROVEMENT
PROJECTS THAT MAY INVOLVE THE
RAILROAD
Massachusetts Department Of Transportation Highway Division
A00807 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
PUBLIC PROJECT INFORMATION
For Construction and Improvement Projects That May Involve the Railroad
Prepared by the Public Projects Group CSX Transportation Inc. Jacksonville, FL
Last revised March 2025
A00807 - 3
To the Communities, Businesses and Government
Agencies We Serve:
INTRODUCTION
A00807 - 4
CSX Corporation and its business units provide rail and intermodal service in 26 states, the
District of Columbia and two Canadian provinces.
CSX operates over 20,000 miles of track, helping
North America maintain the strongest and most productive transportation system in the world.
In addition to CSX’s vitally important customer service responsibilities, the company wants to be a good neighbor in the communities where we operate.
That is why we have prepared this information.
We want to make it easier for communities and other project sponsors to work with us when they have construction and improvement projects that may involve CSX rail property.
CSX’s Public Projects team is involved in a wide variety of projects initiated by government agencies, local businesses and others. Accurate and timely communication of information between CSX and these parties improves planning, relationships and successful completion of projects. The tools in this manual explain important steps project sponsors must follow, including information required in connection with any public project proposal.
CSX places the highest priority on safety – for its employees and for the public. Because CSX is a business and its shareholders ultimately own its rail system, the company must also give careful consideration to anything that could adversely affect customer service, compensation for use of railroad property, and risk to railroad operation.
The Project Managers –
Public Projects Managers are the initial contact for CSX and are assigned territories by state. Please contact them directly about public projects using the information provided.
General Engineering Consultants (GEC) provide additional engineering services to assist CSX in managing public projects.
CSX hopes the information and procedures provided here will make it easier for us to work together.
Will Roseborough
Director Project Development and
Public Projects
A00807 - 5
PUBLIC PROJECT INFORMATION
For Construction and
Improvement Projects That
May Involve the Railroad
A00807 - 6
Table of Contents
Appendix
Information Covered in this Manual 6 | 1-10-2022
CSX Public Projects Staff and Territory Map 8 | 1-10-2022
Additional CSX Resources and Contacts 10 | 1-10-2022
Definitions 11 | 1-10-2022
Requirements for Preliminary Engineering Review 12 | 1-10-2022
Payment of CSX’s Cost and Expenses 15 | 1-10-2022
Insurance Requirements for Public Projects 16 | 1-10-2022
Entry onto CSX Property 18 | 1-10-2022
Construction Monitoring Requirements 20 | 1-10-2022
Railroad Flagging for Activities On or Near CSX Property and Tracks 22 | 1-10-2022
Highway-Rail Grade Crossing Surface Maintenance and Replacement
Alterations to Highway-Rail Grade Crossing Warning Devices 26 | 1-10-2022
Overhead and Undergrade Bridge Projects 28 | 1-10-2022
Parallel Road Construction 30 | 1-10-2022
Painting and Cleaning CSX Bridges to Improve Appearance 32 | 1-10-2022
Cleaning and Painting of Bridges over CSX 34 | 1-10-2022
Public Road Crossing Openings and Closures 36 | 1-10-2022
Bicycle/Pedestrian Pathways and Multi-Use Trails 38 | 1-10-2022
Quiet Zone Proposals 40 | 1-10-2022
24 | 1-10-2022
Additional information can be obtained by contacting the following:
American Railway Engineering and Maintenance of Way Association,
(301) 459-3200, or www.arema.org
Standard Preliminary Engineering Agreement 43 | 1-10-2022
Standard Construction Agreement 49 | 1-10-2022
Temporary Right of Entry Agreement 70 | 1-10-2022
ROE and Indemnity Agreement for 78 | 1-10-2022 Bridge Painting (Aesthetic)
Special Provisions for Construction 93 | 1-10-2022 near CSX Property
Overhead Bridge Criteria 100 | 1-10-2022
Undergrade Bridge Criteria 108 | 1-10-2024
Trail Construction Around CSX Bridges 137 | 1-10-2022
Construction Submission Criteria 141 | 1-10-2022
Drainage Criteria 155 | 1-10-2022
Soil and Water Management Policy 165 | 1-10-2022
U.S. Department of Transportation, Manual of Uniform Traffic Control Devices, http://mutcd.fhwa.dot.gov/
A00807 - 7
This information is intended to assist communities and other project sponsors to plan and implement construction and improvement projects that may involve the CSX rail property.
INFORMATION COVERED IN THIS MANUAL
Revised March 2025
A00807 - 8
Highway-Rail Grade Crossings:
Closure, removal, installation and alterations of public highway-rail grade crossings. CSX Real Estate department manages private crossings.
Bridges Over CSX:
Construction, reconstruction, rehabilitation, repair, removal, and maintenance of bridges over the railroad by outside parties.
Bridges Carrying CSX:
Construction, reconstruction, rehabilitation, repair, removal, and maintenance of bridges carrying CSX over highways and other public properties initiated by outside parties.
Parallel Roads/Facilities:
Construction, reconstruction, modification, removal, and maintenance of parallel roads or other public facilities affecting
CSX property or operations.
U.S. Army Corps of Engineers Projects:
Any project undertaken by the Corps of Engineers that involves CSX property or operations.
Entry Onto CSX Property:
Temporary rights of entry onto CSX property, easements, utility installation and bridge inspections.
Other Projects Involving CSX Rail Corridors:
Publicly sponsored projects involving or altering CSX facilities or its property. These projects may be on, above, adjacent to, or otherwise have the potential to impact CSX property.
Important notes:
The information herein is intended to be a tool only and all statements in this manual are intended to be for broad use.
This manual cannot be taken as authority to construct. Specific projects will be subject to analysis of all factors leading to formal agreements between all parties.
The purpose of review by CSX is solely to ensure compliance with the minimum standards of CSX, and not for any other purpose.
The guidelines and requirements herein are provided for reference only and are subject to revision without notice.
All new projects shall be designed in accordance with the most current policies, requirements, and standards of CSX.
Any items affecting railroad property not covered in this manual shall be subject to
CSX’s prior review and approval.
The safety of CSX employees and the general public is of paramount importance to CSX.
Examples of such projects include:
A00807 - 9
JACKSONVILLE
WAYCROSS
NEW ORLEANS
MOBILE
SAVANNAH
CHARLESTON
FLORENCE
HAMLET
ROCKY MOUNT
RICHMOND
BALTIMORE
SELKIRK
SYRACUSE
BUFFALO
CLEVELAND
PITTSBURGH
DETROIT
TOLEDO
WILLARD
COLUMBUS
RUSSELL
CINCINNATI
LOUISVILLE
NASHVILLE
MEMPHIS
BIRMINGHAM
MONTGOMERY
ATLANTA
CHICAGO
AVON
CUMBERLAND
TAMPA
PORTLAND
CSX PUBLIC PROJECTS
STAFF AND TERRITORY MAP
Revised March 2025
A00807 - 10
JACKSONVILLE
WAYCROSS
NEW ORLEANS
MOBILE
SAVANNAH
CHARLESTON
FLORENCE
HAMLET
ROCKY MOUNT
RICHMOND
BALTIMORE
SELKIRK
SYRACUSE
BUFFALO
CLEVELAND
PITTSBURGH
DETROIT
TOLEDO
WILLARD
COLUMBUS
RUSSELL
CINCINNATI
LOUISVILLE
NASHVILLE
MEMPHIS
BIRMINGHAM
MONTGOMERY
ATLANTA
CHICAGO
AVON
CUMBERLAND
TAMPA
PORTLAND
MICHAEL LIEBELT
804 226-7718
Michael_Liebelt@csx.com
DC • MARYLAND • NORTH CAROLINA
VIRGINIA • WEST VIRGINIA
4900 Old Osborne Tpke Richmond, VA 23231
MICHAEL SLIPER
518-767-6081
Michael_Sliper@csx.com
CONNECTICUT • DELAWARE • MAINE
MASSACHUSETTS • NEW HAMPSHIRE
NEW JERSEY • NEW YORK
PENNSYLVANIA • VERMONT • CANADA
1 Bell Crossing Selkirk, NY 12158
SCOTT WILLIS
904 359-1405
Scott_Willis@csx.com
ALABAMA • FLORIDA
LOUISIANA • MISSISSIPPI
500 Water Street, J-301 Jacksonville, FL, 32202
TODD ALLTON
404 350-5134
Todd_Allton@csx.com
GEORGIA • TENNESSEE
SOUTH CAROLINA
1590-A Marietta Blvd. Atlanta Svc Center Atlanta, GA 30318
BRAD ARMSTRONG
513-853-1221
Brad_Armstrong@csx.com
ILLINOIS - INDIANA - KENTUCKY -
OHIO - MICHIGAN
4802 Decoursey Pike Taylor Mill, KY 41015
WILL ROSEBOROUGH
904-359-1048
Will_Roseborough@csx.com
500 Water Street, J-301 Jacksonville, FL, 32202
DEBORAH ANDERSON
904-366-3051
Deborah_Anderson@csx.com
500 Water Street, J-301 Jacksonville, FL, 32202
DIRECTOR PROJECT
DEVELOPMENT AND
PUBLIC PROJECTS
CROSSING DATABASE
SPECIALIST
Proposal No. 607420-136650
A00807 - 11 mailto:Michael_Liebelt%40csx.com?subject= mailto:Michael_Sliper%40csx.com?subject= mailto:Scott_Willis%40csx.com?subject= mailto:Todd_Allton%40csx.com?subject= mailto:Brad_Armstrong%40csx.com?subject= mailto:Will_Roseborough%40csx.com?subject= mailto:Deborah_Anderson%40csx.com?subject=
ADDITIONAL CSX
RESOURCES AND CONTACTS
Many areas of community interest are outside the scope of this manual. The following is a list of contacts within CSX that may be helpful on other community matters:
• �Emergencies: Emergencies and suspicious situations should be reported immediately to the CSX Public Safety Coordination Center
(800) 232-0144.
• �Corporate Communications and Public Affairs: News media information, public affairs, state and community relations.
Contact: (904) 366-2949.
• �Industrial Development: New industry site locations, track proposals. Contact:
Director Technical Programs, Regional Development (904) 359-1617.
• �CSX Real Estate: Non-Construction and Environmental right-of-entry, wire line and pipeline crossings, private crossings, compliance with codes relating to right-of-way conditions.
Contact: https://www.csx.com/index.cfm/ customers/value-added-services/property-real-estate/permitting-utility-wireless-infrastructure-installations-and-rights-of-entry/
• �Quiet Zones:
Contact: crossingrequests@csx.com
• �Railroad Track and Signal Maintenance:
Non-emergency track maintenance, drainage maintenance, maintenance of highway-rail grade crossings surfaces and warning systems.
Contact: TellCSX@csx.com
• �Real Estate Lease or Purchase: Contact:
https://www.csx.com/index.cfm/customers/ value-added-services/ property-real-estate/
• �CSX Real Estate Easements for Public Improvement Projects: If no property rights are in place for the affected CSX property, those rights will need to be established thru CSX Real Estate prior to letting of the public project into construction.
Contact: Public_ProjectsRPI@csx.com
• Structures and Bridges: Maintenance of bridges that are CSXT’s responsibility.
Contact: Assistant Chief Engineer - Structures (904) 359-1104.
• �Passenger Operations: Amtrak, passenger train proposals, commuter train proposals, light rail corridors. Contact: Director Passenger Services Strategy (904) 359-1099.
• �Rails to Trails: Conversion of unused rail lines to trails. Contact: https://www.csx.com/index.
cfm/customers/value-added-services/property-real-estate/
• �Non Emergency Issues:
Contact: tellcsx@csx.com
Revised March 2025
Proposal No. 607420-136650
A00807 - 12 https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility mailto:crossingrequests%40csx.com?subject= mailto:TellCSX%40csx.com?subject= https://www.csx.com/index.cfm/customers/ value-added-services/ property-real-estate/ https://www.csx.com/index.cfm/customers/ value-added-services/ property-real-estate/ mailto:Public_ProjectsRPI%40csx.com?subject= https://www.csx.com/index. cfm/customers/value-added-services/property-real-estate/ https://www.csx.com/index. cfm/customers/value-added-services/property-real-estate/ https://www.csx.com/index. cfm/customers/value-added-services/property-real-estate/ mailto:tellcsx%40csx.com?subject=
1. �Agency – The project sponsor (i.e., State DOT, Local Agencies, Private Developer, etc.)
2. �AREMA – American Railway Engineering and Maintenance-of-Way Association – the North American railroad industry standards group. The use of this term shall be in specific reference to the AREMA Manual for Railway Engineering.
3. �Construction Submission – The Agency or it’s representative shall submit 1 hard copy set and 1 electronic set of plans, supporting calculations, and detailed means and methods procedures for the specific proposed activity. All plans, specifications, and supporting calculations shall be signed/ sealed by a Professional Engineer as defined below.
4. �Controlled Demolition – Removal of an existing structure or subcomponents in a manner that positively prevents any debris or material from falling, impacting, or otherwise affecting CSX employees, equipment or property. Provisions shall be made to ensure that there is no impairment of railroad operations or CSX’s ability to access its property at all times.
5. �Contractor – The Agency’s representative retained to perform the project work.
6. �Engineer – CSX Engineering Representative or a GEC authorized to act on the behalf of CSX.
7. �Field Construction Inspector (FCI): CSX may elect to use a contracted construction inspector in lieu of, or in addition to, a CSX employee flagman.
8. �Flagman – A qualified CSX employee with the sole responsibility to direct or restrict movement of trains, at or through a specific location, to provide protection for workers.
9. �GEC – General Engineering Consultant who has been authorized to act on the behalf of CSX. GECs perform preliminary engineering, construction inspection, and monitoring under the direction of the CSX Engineering personnel. GEC personnel also perform day-to-day administration of certain types of projects.
10. �Horizontal Clearance – Distance measured perpendicularly from centerline of any track to the nearest obstruction at any elevation between TOR and the maximum vertical clearance of the track.
11. �Professional Engineer – An engineer who is licensed in State or Commonwealth in which the project is to occur. All plans, specifications, and supporting calculations shall be prepared by the Professional Engineer and shall bear their seal and signature.
12. �Potential to Encroach – Work having the possibility of impacting CSX property or operations; defined as one or more of the following:
a. Any activity where access onto CSX property is required.
b. Any activity where work is being performed on CSX ROW.
c. Any excavation work adjacent to CSX tracks or facilities, within the Theoretical Railroad Live Load Influence Zone, or where the active earth pressure zone extends within the CSX property limits.
d. The use of any equipment where, if tipped and laid flat in any direction (360 degrees) about its center pin, can encroach within twenty five feet (25’-0”) of the nearest track centerline. This is based upon the proposed location of the equipment during use, and may be a function of the equipment boom length. Note that hoisting equipment with the potential to foul must satisfy the 150% factor of safety requirement for lifting capacities.
e. Any work where the scatter of debris or other materials has the potential to encroach within twenty five feet (25’-0”) of the nearest track centerline.
f. Any work where significant vibration forces may be induced upon the track structure or existing structures located under, over, or adjacent to the track structure.
g. Any other work which poses the potential to disrupt rail operations, threaten the safety of railroad employees, or otherwise negatively impact railroad property, as determined by CSX.
13. �ROW – Right of Way; Refers to CSX Right-of-Way as well as all CSX property and facilities. This includes all aerial space within the property limits, and any underground facilities.
14. �Submission Review Period – A minimum of 30 days will be required for the initial review response. Up to an additional 30 days may be required to review any/all subsequent submissions or resubmission.
15. �Theoretical Railroad Live Load Influence Zone – A 1 horizontal to 1 vertical theoretical slope line starting at bottom corner of tie.
16. �TOR – Top of Rail. This is the base point for clearance measurements. It refers to the crown (top) of the steel rail;
the point where train wheels bear on the steel rails. Use the higher of the two rails when track is superelevated.
17. �Track Structure – All load bearing elements which support the train. This includes, but is not limited to, the rail, ties, appurtenances, ballast, sub-ballast, embankment, retaining walls, and bridge structures.
18. �Vertical Clearance – Distance measured from TOR to the lowest obstruction, within six feet (6’-0”) of the track centerline, in either direction.
I. Definitions
A00807 - 13
REQUIREMENTS
FOR PRELIMINARY
ENGINEERING REVIEW • �Starting CSX Preliminary Engineering
(PE) early by providing conceptual plans lowers project costs and shortens the time required for CSX review and approval.
• �Using standard agreements lowers costs and saves time.
• �If the proposal requires an encroachment within CSXT Right-of-Way, the project sponsor should contact the CSX Real
Estate Department when beginning PE.
• �If the proposal requires a utility encroachment, the project sponsor should contact CSX Real Estate
Department when beginning PE.
• �CSX PE Review will not begin until the
PE Agreement is fully executed and PE funds are received.
Any project proposals that may affect or be near the CSX right-of-way must be evaluated by CSX. To initiate a construction or improvement project, a PE agreement is required to identify the project sponsor, the scope, define the tasks to be accomplished, and specify the payment required.
Once the plans for the project are approved by CSX, a construction agreement will be developed.
The purpose of PE is to identify issues related to safety, engineering, customer service, operations, legal and regulatory matters, expense, risk and other considerations specific to any proposed project. CSX review of plans is only to determine that the plans, and improvements constructed in accordance with the plans, satisfy CSX’s requirements and do not adversely impact or damage CSXT property interests. Plans should be submitted early in project development to ensure that CSX requirements can be incorporated.
Overview
Purpose
Key Points
Revised March 2025
A00807 - 14
Process Steps To Be Taken
• �Notify CSX Public Projects Group of the project by providing location information and conceptual plans.
• �Complete and Submit New Project Initiation Form.
• �Provide CSX authorization to incur preliminary engineering costs.
• �Review and complete a standard PE agreement and provide payment for expenses as specified in the agreement.
• �Provide project information; attend meetings (as needed), review site with CSX or GEC personnel.
• �Submit initial plans to CSX or designated GEC for review.
• �Respond to CSX or designated GEC comments and adjust design if necessary.
• Coordinate with CSX Real Estate as required
• �Submit final design for CSX or designated GEC review.
• �CSX will perform final review to ensure compliance with railroad requirements.
• �CSX will estimate the cost of the work to be done by CSX, including flagging.
• �If CSX takes no exceptions to the design plans
(or once all CSX concerns have been addressed), CSX will prepare a standard construction agreement for execution.
Costs and Expenses
These matters are covered in more detail in the section that follows (“Payment of CSX’s Costs and Expenses”).
For the reasons described in that section, CSX requires advance payment for its costs and expenses of reviewing and handling the PE. All expenses of the party seeking the review will be borne by that party, including expenses for CSX employees or GEC personnel attending meetings, reviewing plans, preparing correspondence and other activities to support the review of the project.
Timing
It is in the interest of all parties to complete the PE review before commitments are made or construction steps begin. CSX will work to be responsive, with timing depending upon the complexity of the project. CSX and its GEC will work with the project sponsor to schedule
PE and construction to meet project schedule objectives whenever possible, considering available resources.
A00807 - 15
Property Rights
Construction and improvement projects involving CSX property will require a conveyance of property rights, FOR EXAMPLE:
• Highway-Rail Grade Crossings
• Bridges Over CSX
• Parallel Roads/Facilities
• Road/Bridge Widening Projects
Before CSXT will issue a Notice to Proceed for construction within their property, formal property rights will need to be verified through the CSXT Real
Estate Department. CSXT Real Estate will confirm the real estate requirements for each project.
If an easement is necessary, the below listed information* will be required for review and processing:
• �Cover letter – identifies the type(s) of easement(s) and why each easement area is needed. This information will assist in ensuring the correct easement(s) is/are referenced in the deed. The
Construction Easement request, if temporary, includes the length of time this type of easement will be needed. The letter also includes contact information for the project contact. An email address for the project contact is to be included.
• Offer (Good Faith Offer or Fair Market Value (FMV)
• �Metes and bounds description for each easement area is required to identify the easement boundaries to be included within the deed. CSXT will not be able to commence review without the metes and bounds description.
• �Right-of-Way Detail Sheet calling out the easement area(s)
*Any missing information will result in a delay in processing
Standard Documents and Estimates
CSX executes hundreds of agreements each year for preliminary engineering and construction of projects.
CSX has developed standard agreements which can be executed by CSX without additional legal review.
Non-standard agreements or modifications to the CSX standard agreement terms will require additional legal review and may increase project duration and/or cost.
Sample standard agreement documents are available in the Appendix. CSX will begin each project with a
PE estimate and PE agreement. After execution of the
PE agreement and receipt of the PE deposit, CSX will complete the PE phase of the project. At the end of the PE phase, CSX will provide the project sponsor a construction estimate for all required CSX costs during the construction phase of the project. CSX provided estimates are valid for one year from date of approval noted on the estimate form.
Revised March 2025
A00807 - 16
PAYMENT OF
CSX’S COSTS AND
EXPENSES • �Preliminary Engineering (PE) costs are paid in advance.
• �CSX construction expenses will be estimated during PE and the estimate will be incorporated into the construction agreement. Advance payment is required to cover these expenses prior to the start of project construction.
• �If CSX anticipates that actual expenses will exceed the advance payment, additional payment will be required. Project work may be stopped until additional payment is received.
• �If CSX’s actual expenses are less than the sum of any deposits the difference will be refunded after final cost accounting.
• �All funding sources must be identified up front, and any time funding sources change, CSX must be immediately informed. CSX requires the completion of a “New Project Initiation Form” at the beginning of each project. By completion of this form, the project sponsor agrees to reimburse CSX for project related costs.
Each time project funding changes, a new “New Project Initiation Form” must be completed.
• All costs associated with any real estate or utility transaction will be handled separately with the CSX
Real Estate Department.
The types of projects being addressed in this manual usually do not directly benefit and, in some cases, create risk to, and hurdles for, CSX’s core business of providing transportation service vital to its customers and the North American economy.
For these reasons, CSX seeks payment for its costs and expenses incurred in connection with project review or construction.
Overview
Key Points
Revised March 2024
Examples of
Costs and Expenses
Agency shall reimburse CSX for all costs and expenses incurred by CSX in connection with the
Project, including, without limitation:
• All out of pocket expenses
• Travel and lodging expenses
• Telephone, facsimile, and mailing expenses
• �Costs for equipment, tools, materials and supplies
• �Sums paid to CSX’s consultants and subcontractors
• �CSX labor in connection with the Project (included but not limited to flagging), together with CSX labor overhead percentages established by CSX pursuant to applicable law
• �For estimating purposes only, typical flagging costs are $1,300 per day
A00807 - 17
INSURANCE REQUIREMENTS
FOR PUBLIC PROJECTS
I. Insurance Policies:
Agency and Contractor, if and to the extent that either is performing work on or about CSX’s property, shall procure and maintain the following insurance policies:
1. �Commercial General Liability coverage at their sole cost and expense with limits of not less than $5,000,000 in combined single limits for bodily injury and/or property damage per occurrence, and such policies shall name CSX as an additional named insured. The policy shall include endorsement ISO CG 24 17 evidencing that coverage is provided for work within 50 feet of a railroad. If such endorsement is not included, railroad protective liability insurance must be provided as described in item 4 below.
2. �Statutory Worker’s Compensation and
Employers Liability Insurance with limits of not less than $1,000,000, which insurance must contain a waiver of subrogation against CSX and its affiliates (if permitted by state law).
3. �Commercial automobile liability insurance with limits of not less than $1,000,000 combined single limit for bodily injury and/or property damage per occurrence, and such policies shall name CSX as an additional named insured. The policy shall include endorsement ISO CA 20 70 evidencing that coverage is provided for work within 50 feet of a railroad. If such endorsement is not included, railroad protective liability insurance must be provided as described in item 4 below.
4. �Railroad protective liability insurance with limits of not less than $5,000,000 combined single limit for bodily injury and/or property damage per occurrence and an aggregate annual limit of
$10,000,000, which insurance shall satisfy the following additional requirements:
a. �The Railroad Protective Insurance Policy must be on the ISO/RIMA Form of
Railroad Protective Insurance - Insurance
Services Office (ISO) Form CG 00 35.
b. �CSX Transportation must be the named insured on the Railroad Protective
Insurance Policy.
c. �Name and Address of Contractor and Agency must appear on the
Declarations page.
d. �Description of operations must appear on the Declarations page and must match the Project description.
e. �Authorized endorsements must include the Pollution Exclusion Amendment -
CG 28 31, unless using form CG 00 35 version 96 and later.
f. Authorized endorsements may include:
(i). �Broad Form Nuclear Exclusion - IL 00 21
(ii). �30-day Advance Notice of Non-renewal or cancellation
� �(iii). �Required State Cancellation
Endorsement
(iv). �Quick Reference or Index - CL/IL 240
Revised March 2025
A00807 - 18
g. �Authorized endorsements may not include:
(i). �A Pollution Exclusion Endorsement except CG 28 31
(ii). �A Punitive or Exemplary
Damages Exclusion
(iii). �A “Common Policy
Conditions” Endorsement
(iv). �Any endorsement that is not named in Section 4 (e) or (f) above.
(v). �Policies that contain any type of deductible
5. �All insurance companies must be A. M.
Best rated A- and Class VII or better.
6. �The CSX OP number or CSX contract number, as applicable, must appear on each Declarations page and/or certificates of insurance.
7. �Such additional or different insurance as
CSX may require.
II. Additional Terms:
1. �Contractor must submit the original Railroad
Protective Liability policy, Certificates of
Insurance and all notices and correspondence regarding the insurance policies to:
Insurance Department
CSX Transportation, Inc.
500 Water Street, C-907
Jacksonville, FL 32202 insurancedocuments@csx.com
2. �Neither Agency nor Contractor may begin work on the Project until it has received CSX’s written approval of the required insurance.
Proposal No. 607420-136650
A00807 - 19 mailto:insurancedocuments%40csx.com?subject=
ENTRY ONTO
CSX PROPERTY
Written permission is required for all parties entering CSX property.
• �Construction Agreements authorize entry onto CSX property.
• �Temporary right-of-entry agreements can also be used for limited purposes.
• �CSX Real Estate handles temporary rights of entry for non-construction activities.
• �CSX Public Projects handles temporary rights of entry for construction activities.
• �All parties must adhere to CSX
Safety procedures.
• �Appropriate insurance is required.
To maintain efficient customer service and to ensure the safety of CSX employees and of those parties requesting access to CSX property, CSX requires all parties accessing its right-of-way for investigative activities or for the performance of construction work to have a written agreement with CSX fully detailing each party’s responsibilities. Activities by others with the potential to affect CSX’s property, operations, and or personnel without actually entering CSX property must also be reviewed with CSX and appropriate arrangements and agreements completed.
The process by which an appropriate agreement covering entry and/or the other necessary conditions or requirements can be developed and implemented is typically dependent upon the scope of the activities proposed by an outside party or agency.
Although the type of agreement may vary, most agreements include insurance and liability provisions, work procedures and conditions and reimbursement provisions relating to payment to CSX for costs it may incur in relation to the entry or work. The following summarizes the various types of CSX agreements and contracts most frequently utilized to accommodate the requested entry and the proposed work activities.
Overview
Revised March 2025
Key Points
A00807 - 20
Entry for Construction Work
Entry for construction work (not exclusively associated with utility work) will require a Construction Agreement or a Temporary Right-of-Entry Agreement, as determined by the magnitude of potential impacts to CSX.
A Construction Agreement will be required for construction work that could impact CSX facilities or operation, such as construction or rehabilitation of a bridge over CSX, roadway construction or other highway improvements, or grading and/or drainage work. Additional agreements may be required for any permanent improvements/encroachments within
CSX corridors or property.
Construction work that will not impact CSX facilities or operation may be handled by a Temporary Right-of-Entry
Agreement, as determined by CSX Public Projects.
Entry for Non-Construction Work
A Temporary Right-of-Entry agreement is utilized by
CSX primarily in situations where outside parties or agencies desire to undertake investigative work such as performing survey work, taking borings, performing bridge inspections or undertaking other activities requiring only access to CSX property and not construction work activities. Different agreements are used for temporary private crossings.
Applications for Temporary Right-of-Entry agreements for investigative and non-construction work activities
(including movement of off-highway or oversized loads at grade crossings) within CSX’s right-of-way can be obtained by contacting CSX Real Estate at https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility-wireless-infrastructure-installations-and-rights-of-entry/
Entry For Other Purposes
CSX may use other forms of agreements covering entry by outside parties or agencies depending on work scope or other factors. The process to obtain right of entry for these purposes as listed below may also be initiated through CSX Real Estate at https://www.csx.com/ index.cfm/customers/value-added-services/property-real-estate/
• �Environmental Right-of-Entry
• �Utility Permit/License Agreement for pipeline and wire line construction – both for specifications and applications
• �Land Lease applications
• �Movement of oversized loads across
CSX tracks at private or public highway-rail grade crossings
• �Movement of off highway construction equipment across CSX tracks at private or public highway-rail grade crossings.
Proposal No. 607420-136650
A00807 - 21 https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility https://www.csx.com/index.cfm/customers/value-added-services/property-real-estate/permitting-utility https://www.csx.com/index.cfm/customers/value-added-services/property- real-estate/ https://www.csx.com/index.cfm/customers/value-added-services/property- real-estate/ https://www.csx.com/index.cfm/customers/value-added-services/property- real-estate/
CONSTRUCTION
MONITORING
REQUIREMENTS • �Construction work affecting CSX will be monitored by CSX and its consultants at the project sponsor’s expense.
• �Construction monitoring is in addition to flagging and other protective services.
To ensure the safety of the public and
CSX employees, maintain quality rail service to CSX customers and to protect CSX assets, CSX may require construction monitoring (in addition to flagging protection) of the project. The construction monitoring will be conducted by CSX and its consultants at project expense.
Overview
Revised March 2025
Key Points
A00807 - 22
General Guidelines
Construction monitoring includes intermittent or continuous on-site presence of CSX or its consultants during construction activities.
• �The construction project sponsor, owner, or agency in charge will pay for the cost of construction monitoring. Construction monitoring will be specified, and the estimated cost will be included in the construction agreement for the project.
• �Construction monitoring is in addition to railroad-approved flagging.
• �Construction monitoring includes CSX review and approval of all plan changes and required contractor submissions during the construction phase of the project.
• �The project sponsor is responsible for its safety and the safety of its property, contractors, and employees. CSX, as part of its construction monitoring, will review the work site for activities that could interfere with safe operation of the railroad.
• �CSX and its consultants are not responsible for monitoring the general work activities under the direction of the project sponsor for compliance with safety regulation. Any observed unsafe acts or conditions will be reported immediately to the project sponsor or contractor representative.
A00807 - 23
RAILROAD FLAGGING
FOR ACTIVITIES ON OR
NEAR CSX PROPERTY
AND TRACKS
Flagging services are required when projects are within close proximity to active rail lines, as required by federal law.
• �Flagging services can only be performed by personnel qualified by CSX.
• �Arrangements for flagging services may take up to 90 days to schedule.
• �It should be understood that occasions may arise during the life of the project when CSX must temporarily reassign the project Flagman to meet the changing demands of operating its railroad. This can occur without advance warning. CSX will make every effort to coordinate events to minimize scheduling conflicts, but there may be circumstances that will cause temporary inconvenience to the project.
Construction activities shall be planned in such a manner as to minimize the amount of time flagging services are needed.
In the interest of public safety and the safety of employees and property, CSX will work cooperatively with agencies, consultants, contractors and others who need to access railroad property when work brings them in close proximity to active railroad tracks to determine the appropriate flagging services needed and to make arrangements for those services.
Conditions When CSX Flagging Services Are Required:
• �When any entity is working on, near or adjacent to active railroad tracks.
• �When an outside party is using railroad property or performing operations that may affect railroad property or facilities. This includes occasions when a party has been given express permission from CSX to enter railroad property or perform such operations under the terms of a Construction agreement, Temporary Right-of-Entry agreement or other appropriate documentation.
• �When work off of railroad property has the potential to impact CSX property or operations.
• �When off-highway construction equipment is crossing the railroad at a private or public crossing.
• �When oversized equipment or highway vehicles are to cross the railroad at a private or public crossing.
• In other instances as determined by CSX.
Overview
Key Points
Revised March 2025
A00807 - 24
Qualified Flagging Personnel
CSX flagging services may only be performed by personnel qualified by CSX who are trained in the proper procedures related to rail operations and safety requirements, familiar with rail operations and procedures in a project area and able to communicate directly with CSX dispatching personnel and train crews.
Arrangements for CSX Flagging Services
• �CSX will make arrangements for flagging services related to planned work by an outside party under the terms of a temporary right-of-entry agreement, construction agreement, environmental license agreement or other mutually acceptable arrangements.
• �Advance notice must be provided to secure CSX flagging services. The level of advance notice may vary from site to site or project to project or if CSX determines, under the provisions of its labor agreements with its union forces, that flagging services can only be provided as a result of the flagging position being bid and awarded to qualified CSX personnel.
• �Advance notice must be provided to cancel CSX flagging services. If advance notice to cancel is not provided, the project sponsor will be responsible for paying for the flagging until CSX is notified. Requests to cancel or end flagging should be given at least 3 days in advance.
Responsibility for Costs and Expenses
• �All costs and expenses associated with CSX flagging services are the sole responsibility of the agency, consultant or contractor.
• �CSX will provide its estimated costs prior to the start of the project work or its assignment of flagging personnel.
• �Once flagging personnel are formally assigned by CSX to a specific work location, the period of assignment can only be changed with appropriate advanced arrangements.
• �Charges for providing flagging services beyond a normal eight-hour weekday are calculated and billed at an overtime rate.
• �For initial planning purposes, typical flagging cost is $1,300 per day.
Examples of Flagging Costs and Expenses
Charges billed by CSX to the agency, consultant or contractor may include, but are not limited to:
• Employee Salary
• �Hourly employee charges are based on the time an employee departs and returns to his or her headquarters location. As such, the charges can be expected to exceed the level actually incurred during the assigned coverage period or while the flagman is present at the specific work location.
• �This period also includes the time required for flagging personnel to perform the required preparations and termination procedures associated with flagging services at a location.
• Overhead Costs
• �These charges are assessed against the hourly employee charges and determined in accordance with standard accounting procedures or as mandated by governmental regulations.
• Employee Expenses or Per Diem Rate
• �This amount is calculated based on an employee’s actual expenses or on a per diem rate according to the terms of applicable collective bargaining agreements between CSX and its assigned union flagging employees.
• �The amount includes travel and lodging expenses and the cost for a leased, rented, CSX, or personal vehicle to be used for transportation.
• Administrative, Accounting, and Billing Services
• �This amount is related to the time associated with setting up the agreement, arranging for and supervising the employee, billing and collection of costs, and other expenses associated with CSX providing flagging services.
• Field Construction Inspector (FCI)
• �CSX may elect to use a contracted construction inspector in lieu of, or in addition to, a CSX employee flagman.
A00807 - 25
HIGHWAY-RAIL GRADE
CROSSING SURFACE
MAINTENANCE AND
REPLACEMENT
• �Report issues with crossing surfaces to TellCSX (TellCSX@csx.com)
• �Coordination is required for work near crossings.
• �Highways must be closed to vehicular traffic for crossing replacement or maintenance work.
• �Agreements with CSX are required for crossing work and work near crossings.
• �Crossing surface maintenance and replacement must be performed by CSX.
• �Crossing surfaces must meet criteria set by CSX’s Engineering Standards.
• �For identification purposes, each crossing has a distinct DOT inventory number (such as 123456A) posted at the crossing and the railroad milepost.
When track maintenance necessitates the repair of the crossing, the cost of said repair will be the responsibility of the Agency, per applicable agreements.
The crossing surface provides a path for highway vehicles to cross railroad tracks. The objective is to provide a safe, smooth, and cost effective crossing for highway and railroad traffic. Highway and railroad maintenance work in the vicinity of highway-rail grade crossings must consider safety concerns for both highway and railroad traffic before, during, and after the time the work is implemented.
Identification of the crossing and location
Each crossing has a unique DOT inventory identification number posted at the crossing.
There is often more than one crossing on the same road. The crossing number (such as 123456A) must be used to identify the specific crossing in all communications with the railroad to reduce possible confusion about the specific location.
Overview
Key Points
Revised March 2025
A00807 - 26
Crossing Construction
Railroad track is continuous through the crossing and includes railroad ties, rail and fasteners below the surface of the crossing. The crossing surface for highway traffic can be made of several different materials. Drainage is required for all four quadrants at a crossing.
Crossing Surface Types and Selection
Crossing surface material and construction methods are selected for each crossing based on the type of highway and railroad traffic, past experience and funding available from highway agencies for individual projects.
Standard types of CSX approved crossing surfaces are Concrete or Timber/Asphalt. Projects funded by outside parties may be constructed with other materials if specified by the outside party and approved by CSX. Modular Platform “Tub” type crossings may be considered for use at locations with slow rail operations of 15 MPH or less and high road vehicle count and/or heavy vehicles.
Crossing Maintenance and Replacement
Crossing maintenance and replacement of the track and crossing surface are performed by CSX and may be billable to an outside party or highway authority as specified in an agreement. The responsibility for the maintenance of public crossing approach pavement varies by state and is specified in some individual crossing agreements or orders.
Crossing work requires closing the entire highway-rail grade crossing. Replacement of track components through a crossing requires removal of the crossing surface, replacement of track ballast, and surfacing the track through the crossing prior to replacement of the crossing surface. If the subgrade needs to be improved, the application of a hot mixed asphalt underlayment should be considered. Drainage will be reestablished for all four quadrants. After the crossing surface is replaced, the highway approach paving is completed and then the road is opened to highway traffic. Replacement of the track and crossing surface usually requires that the highway be closed for several days.
Crossing surfaces are also removed and replaced when track maintenance work is performed through a crossing such as rail replacement, tie replacement, and track surfacing (smoothing). Each crossing has the surface removed and replaced after the work has been completed.
Crossings are usually closed for several days during this maintenance work.
Requesting Crossing Surface Replacement or Upgrades
Highway agencies seeking replacement of crossing surfaces should contact CSX Public Projects. The request for the work and the recommended surface must be reviewed and approved by CSX. If approved, Public Projects will prepare a standard agreement and include the cost estimate for the project.
A00807 - 27
ALTERATIONS TO
HIGHWAY-RAIL GRADE
CROSSING WARNING
DEVICES
• �Any alterations to highway-rail grade crossing warning systems must adhere to all applicable laws, regulations and national standards.
• �Requests to CSX for new or modified public at-grade crossing warning devices must be initiated by the highway agency.
• �Preliminary Engineering agreements are used to define the project scope and prepare design and estimate information for each project.
• �The requesting project sponsor will be responsible for advance payment for engineering, design and installation of warning devices.
• �The coordination of traffic intersection signals with warning devices will be determined by the highway agency or regulatory agency.
• �Construction agreements are used to implement the projects.
• �Advanced Preemption timing will be limited to 50 seconds.
The Public Projects Group will process all projects proposing alterations to public highway-rail grade crossing warning systems. Included will be projects for opening new crossings, closing existing crossings, modifying or widening of existing crossings, installing new warning systems, removing and/or relocating existing warning systems and modifying/upgrading existing warning systems.
Identification of the crossing and location
Each crossing has a unique DOT inventory identification number posted at the crossing.
There is often more than one crossing on the same road. The number (such as 123456A) must be used to identify the specific crossing in all communications with the railroad to reduce possible confusion about the specific location.
Overview
Key Points
Revised March 2025
A00807 - 28
Design Considerations
Highway-rail grade crossing warning systems must adhere to all applicable Federal and State standards and regulations, and local policies, laws and ordinances, as well as CSX standards. The highway agency, not CSX, is responsible for determining the level and configuration of warning devices for a public highway-rail grade crossing.
In addition, the highway agency or other governmental agency responsible for making warning system and equipment determinations is responsible for selecting appropriate vehicular traffic control signs and/or devices for a specific public highway. Loop Detection Circuitry will not be designed, installed, owned, or maintained by CSX.
Recommended practices and additional information are available in American Railway Engineering and Maintenance of Way Association (AREMA) manuals and the Manual on Uniform Traffic Control Devices (MUTCD)
Engineering, Cost Estimation, Installation
CSX will provide engineering, design, and cost estimates for the installation of highway-rail grade crossing warning devices at the expense of the project sponsor as part of the Preliminary Engineering for a project.
Changes to highway-rail grade crossing surfaces may also require engineering and estimating by CSX. Because of labor agreements with CSX’s union forces, CSX will install the highway-rail grade crossing warning devices.
Operation of Highway-Rail Grade Crossing Warning Devices
Highway-rail grade crossing warning systems are designed to activate in advance of a train entering the crossing. Train speed changes while approaching the crossing may cause the warning system to activate longer than expected.
Trains stopping or making forward and reverse movements near the crossing may cause the warning system to activate and then clear after an appropriate time without a train entering the crossing.
Traffic Light Preemption Interconnection
The highway agency will determine if preemption is required. Preemption of the cycle of traffic signals at highway intersections near highway-rail grade crossings requires careful review by highway traffic engineers to determine the appropriate timing and sequence for both the traffic signal and the highway-rail grade crossing warning system. Preemption for the traffic signal may be simultaneous with, or in advance of, the warning system activation. The appropriate sequence and timing shall be provided by the highway agency and distributed to CSX to facilitate CSX’s signal design. CSX will furnish one preemption interconnection circuit of a normally closed contact that is designed to open upon the approach or presence of a train and will terminate the closed preemption interconnection circuit in a common cable junction box to be used for the interconnection of the traffic signals and the grade crossing warning devices.
Advanced Preemption Timing
For grade crossing warning systems interconnected with highway traffic signals, the 2018 AREMA C&S Manual limits advanced preemption timing to 50 seconds (plus equipment response time), and CSX will abide by this standard. For more information refer to 2018 AREMA C&S Manual Part 3.1.10, section C.1
A00807 - 29
OVERHEAD AND
UNDERGRADE BRIDGE
PROJECTS • �Overhead and undergrade bridge projects must comply with CSX’s policies and standards, which are available in the appendices of this manual.
• �All work on overhead…