A00806-614074.pdf

PDF 1017 KB Posted

Attached to
614074 DISTRICT 6 Standpipe & Fire Safety Inspection, Testing and Repairs
Solicitation number
BD-27-1030-0H100-0H002-131777
Issued by
Suffolk County, Massachusetts

About this file

Summary

This file is a Massachusetts Department of Transportation Highway Division safety specifications document (Section 01568: Construction Safety) applicable to MBTA projects and includes OSHA 1926 Construction Safety Standards. The document establishes comprehensive requirements for contractors to implement practical and effective accident prevention programs on construction projects. Key requirements include submission of a detailed Safety and Health Plan within 30 days of contract award, designation of a qualified Safety Supervisor with minimum 5 years of construction safety experience, monthly Accident Experience Reports, and prior submission of 3-year Injury/Illness Records. The Safety Supervisor must complete daily site inspections, establish project safety training programs, prepare weekly Safety Audit Checklists, and be present on-site during major work tasks. All contractor and subcontractor personnel must complete Right-of-Way Safety Awareness training and obtain OSHA 10-Hour Certification cards prior to site access. The Safety and Health Plan must address emergency action procedures, first aid facilities, serious accident reporting, emergency telephone numbers, public protection, site visit protocols, and substance abuse prevention and testing programs. Additional requirements include compliance with OSHA 1926 standards, establishment of an orientation program for new employees, proper personal protective equipment usage, housekeeping standards, work authorizations for specific tasks (excavation, hot work, confined space entry, cranes), and compliance with third-rail safety procedures when applicable.

The document specifies that contractors bear full responsibility for lower-tier subcontractor and vendor compliance with all safety requirements. Serious accidents must be reported immediately to the MBTA Resident Engineer, with the accident scene preserved except for emergency measures. The MBTA retains authority to notify contractors of non-compliance and mandate corrective actions, with authority to stop all or part of work and assess safety violation penalties if corrective actions are not taken promptly. No separate measurement or payment is provided for work required under these safety specifications; costs are absorbed within the overall contract pricing. The document also incorporates by reference OSHA Part 1926 standards, including detailed tables of contents covering all applicable construction safety subparts from general provisions through specialized operations such as cranes, derricks, excavations, steel erection, and hazardous substances.

View the file

Other files

File Type Posted
A00812-614074.pdf PDF
A00801-614074.pdf PDF
A00803-614074.pdf PDF
A00820-614074.pdf PDF
A00807-614074.pdf PDF
614074 Bid Items List.txt TXT text file
614074 - Plan Holders List 8-4-2026.pdf PDF
614074 - Notice to Contractors.pdf PDF
614074 - Bid Tabulations.pdf PDF
A00805-614074.pdf PDF
Link to Bid Opening 8-18-2026~1.pdf PDF
A00875-614074.pdf PDF
A00814-614074.pdf PDF
BIDS OPENED - Tuesday - August 18-2026~1.pdf PDF
614074 - Plan Holders List 8-17-2026.pdf PDF
DISTRICT 6-614074-135792-A-1.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 614074-135792

A00806 - 1

DOCUMENT A00806

MBTA SAFETY SPECIFICATIONS

Massachusetts Department Of Transportation Highway Division

A00806 - 2

THIS PAGE INTENTIONALLY LEEFT BLANK

SECTION 01568

CONSTRUCTION SAFETY

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section specifies requirements to establish a practical, sound, and effective program for the prevention of construction accidents, and to assign specific responsibilities to Contractors for program compliance.

B. Contractors and their supervisors must control hazardous activities and conditions within their respective areas of contract responsibility.

1.2 SUBMITTALS

A. Safety and Health Plan: The contractor shall, within thirty (30) days after receipt of the award of a contract, submit for approval to the MBTA, a detailed operational Safety and Health Plan.

B. Safety Supervisor: The Contractor shall within thirty (30) days after receipt of the award of a contract submit the resume of the qualifications and work experience of the designated Safety Supervisor proposed for assignment to the Project. No construction work shall begin until the project Safety Supervisor has been approved by the MBTA. The Safety Supervisor shall have a minimum of 5 years of experience in construction safety or a related field.

C. Monthly Accident Experience Summary: The Contractor shall submit an Accident Experience Report monthly during the course of construction to the MBTA.

D. Industrial Industry Records: Prior to start of work, the Contractor shall submit their Injury/Illness Records for the previous 3 years. In addition, the Contractor shall submit annually to the MBTA all subsequent Illness/Injury Reports for the duration of the project.

PART 2 - PRODUCTS

None

A00806 - 3

PART 3 - EXECUTION

3.1 SAFETY AND HEALTH PLAN

A. The Contractor shall submit a project Safety and Health Plan. At a minimum, the plan shall include the following sections:

i. Emergency Action Plan

ii. First Aid Facilities

iii. Serious Accidents

iv. Emergency Telephone Numbers

v. Protection of the Public

vi. Site Visits

vii. Substance Abuse/Prevention/Testing

3.2 SAFETY SUPERVISOR

A. Complete daily safety inspections of the job site and contiguous public areas, and take any corrective actions to eliminate unsafe conditions.

B. Establish and implement a project safety training program for supervisors and employees as applicable to their job.

C. Attend project safety meetings.

D. Review Foreman accident and investigation reports, and initiate corrective action to prevent reoccurrence.

E. Maintain copies of all Contractor Safety Reports.

F. Assist Foremen in accident investigations.

G. Encourage establishment of incentive programs designed to recognize individual employee safety efforts and contributions towards improved safety.

H. Prepare a Safety Audit Checklist and complete the checklist each week during the course of construction. The completed Audit Checklists shall be submitted to the Authority weekly.

I. The Safety Supervisor needs to be on the project site when major work tasks are being performed.

During work periods when the Contractor is not performing contract work, the Safety Supervisor can be absent from the project site with permission from the Authority.

A00806 - 4

3.3 ACCIDENT INVESTIGATION

A. Serious accidents shall be reported immediately to the MBTA Resident Engineer. Contractors shall issue standing orders to all supervisors directly in charge of operations that the scene of the accident shall not be disturbed, except for rescue or other emergency measures, until otherwise directed.

Contractor's forces either witnessing or party to the accident shall be detained at the site to provide detailed accounting of facts.

B. All reports shall be submitted to the MBTA. The accident investigation shall generate appropriate recommendations for corrective actions to prevent similar recurrence of similar accidents.

C. The requirements of MBTA Safety Procedure 7.3 Contractor Safety Violation Program shall be followed by the Contractor when completing an accident report.

3.4 FIRST AID FACILITIES

A. In formulating the Health and Safety Plan, the Contractor shall provide for the establishment and staffing of appropriate first aid facilities for the treatment of on the job injuries.

B. Off-site medical treatment of employee injuries shall be performed at medical facilities named in the Contractor's Safety Submittal.

3.5 EMERGENCY TELEPHONE NUMBERS

To ensure that emergency actions are promptly taken, Contractors shall post emergency telephone numbers in conspicuous places.

3.6 ORIENTATION PROGRAM

A. The Contractor shall establish and maintain an orientation program for new employees which shall include:

i. For each individual the hazards present in their work assignment and in the general area in which he will be working.

ii. Personal protective equipment required.

iii. Instruction in the proper procedure for reporting unsafe job conditions which he/she may encounter.

3.7 RIGHT OF WAY SAFETY AWARENESS

A. All Contractor and sub-contractor personnel shall complete either the MBTA Rapid Transit right-of-way safety training or the MBCR Commuter Rail right-of-way safety training prior to entering the project site. ROW safety training will be required on all MBTA property including the RR track, stations, parking garages and maintenance car houses. Personnel will not be allowed on the job site unless they have attended a Right-of-Way Safety Awareness training session. Workers are required to carry their certification card while on site.

A00806 - 5

3.8 OSHA

A. The Contractor shall comply with the OSHA 1926 Construction Safety Standards that apply to the project work. The Contractor shall meet the reporting requirements, and employers with eleven (11) or more employees must meet recordkeeping requirements.

B. All Contractor and Sub-Contractor personnel shall possess an OSHA 10 Hour Certification card when working on the project site.

C. All fatality cases and/or serious accidents and illness shall be reported to OSHA immediately by phone to an Occupational Safety and Health Area Office. Employers must report immediately all blasting accidents.

D. Part of the OSHA requirements is that each employer must post in a prominent location the "Safety and Health Protection on the Job" poster. The poster briefly states the intent and coverage of the Act.

Failure to post this document is a citable offense under the Act.

3.9 PROSECUTION OF THE WORK

A. The Contractor shall take all reasonable precautions in the performance of the work to protect the safety and health of its employees and members of the public and shall comply with all applicable MBTA, Local, State and Federal safety and health regulations and associated reporting requirements.

B. The Contractor Safety Supervisor is charged with sole responsibility of on-site safety management under the direction of the Contractor Project Superintendent. All potential safety hazards identified shall be promptly corrected. The Safety Supervisor shall complete daily reviews of the project site and document then results on the inspection.

C. The MBTA shall notify the Contractor of any non-compliance and of the corrective action required.

This notice, when delivered the Contractor or the Contractor's representative at the site of the work, shall be deemed sufficient notice of the non-compliance and corrective action required after receiving the notice, the contractor shall immediately take corrective action. If the contractor fails or refuses to take corrective action promptly, the MBTA may, without prejudice to other legal or contractual rights, issue an order stopping all or part of the work; and may subject contractor to safety violation assessments as deemed appropriate by the MBTA. Resumption of work may be issued by the MBTA Safety Department.

D. The Contractor shall maintain an accurate record of exposure data on all accidents and incidents occurring under this contract and report this data in a manner prescribed by the MBTA.

E. The Contractor shall be responsible for all its lower-tier sub-contractor's and vendor's compliance.

F. Contractor management shall make a commitment for accident prevention and fire prevention.

Safety shall take precedence over schedule and production. Enforcement action is mandatory.

A00806 - 6

3.10 WORK AUTHORIZATIONS

A. The following work authorizations will be issued by the MBTA:

i. Excavation

ii. Hot Work

iii. Confined Space Entry

iv. Cranes and Suspended Platforms

3.11 WORKING NEAR THE THIRD RAIL

A. When working on or near the third rail, when the power is off, the contractor must have a third rail high-voltage warning device on the job site approved by the MBTA Power Department. This device will warn work crews if the third rail becomes energized at any time during work activity involving the right-of-way.

3.12 HAZARDOUS SUBSTANCES

A. Any Contractor who uses substances on the hazardous substances list to which workers might be exposed under either normal work conditions or reasonable foreseeable emergency conditions resulting from work place operations must provide those workers with the required hazardous substance information.

3.13 PERSONAL PROTECTIVE EQUIPMENT

A. All Contractor personnel must wear the required personal protective equipment when on the job site. Personal protective equipment includes hard hats, safety vest, safety glasses and proper footwear.

3.14 PROTECTION OF THE PUBLIC

A. All necessary precautions to prevent injury to the public or damage to property of others shall be taken. The public is defined as all persons not employed by or under contract or subcontract to the MBTA. Installation of temporary barriers and/or fencing designated to protect the public shall be reviewed and approved by the MBTA. Precautions shall include but not be limited to the following:

B. Work shall not be performed in any area occupied by the public unless specifically permitted by the contract or in writing by the MBTA.

3.15 SUBSTANCE ABUSE/PREVENTION/TESTING PROGRAM

A. The Contractor shall establish a substance abuse policy and testing program that includes the following elements:

Deterrence

A00806 - 7

Treatment and Rehabilitation Detection Enforcement

The MBTA reserves the right to approve the proposed substance abuse program prior to commencing the contract.

3.16 CONDUCT OF TOURS

A. Group tours must be cleared through the MBTA, allowing maximum advance notice and in compliance with MBTA Policy and Procedures.

B. MBTA will coordinate the tour arrangements and ensure notification to the Contractors Project Manager.

3.17 HOUSEKEEPING

A. A basic concept in any effective accident prevention program is "good housekeeping." No one item has a great impact on the overall success of a safety program for a construction project. The importance of good housekeeping is such that it must be planned from the beginning of the job and carefully supervised through the final cleanup.

B. During the course of construction, work areas, passageways and stairs, in an around buildings and structures, shall be kept clear of debris. Construction materials shall be stored in an orderly manner. Storage areas and walkways on the site shall be maintained free of depressions, obstructions and debris.

PART 4 - MEASUREMENT AND PAYMENT

A. No separate measurement or payment will be made for work required under this Section.

A00806 - 8

Table of Contents - 1926 Page 1 of 7

A to Z Snitex En espanot Contact Us F4Q About OSHA

OSHA 535 ‘t S Paz’- Te S

Occupational Safety & Health Administration We Can Help What’s New Offices OSHA Home Workers Regulations Enforcement Data & Statistics Training Publications Newsroom Small Business Anti-

Retaliation

Rnggiations rds- 29- Table of Contents

. Part Number: 1926

. Part Title: Safety and Health Regulations for Construction

. Standard Number: 1926

. Title: Table of Contents

PART 1926 -- SAFETY AND HEALTh REGULATIONS FOR CONSTRUCTION

Subpart A-- General

Sec.

1926.1 Purpose and scope.

1926.2 Variances from safety and health standards.

1926.3 Inspections - right of entry.

1926.4 Rules of practice for administrative adjudications for enforcement of safety and health standards.

1926.5 0MB control numbers under the Paperwork Reduction Act.

1926.6 Incorporation by reference.

Subpart B -- General Interpretations

1926.10 Scope of subpart.

1926.11 Coverage under section 103 of the act distinguished.

1926.12 Reorganization Plan No, 14 of 1950.

1926.13 Interpretation of statutory terms.

1926.14 Federal contracts for mixed types of performance.

1926.15 Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act

1926.16 Rules of construction.

Subpart C -- General Safety and Health Provisions

1926.20 General safety and health provisions.

1926.21 Safety training and education.

1926.22 Recording and reporting of injuries. [Reserved]

1926.23 First aid and medical attention.

1926.24 Fire protection and prevention.

1926.25 Housekeeping.

1926.26 Illumination.

1926.27 Sanitation,

1926.28 Personal protective equipment.

1926.29 Acceptable certifications.

1926.30 Shipbuilding and ship repairing.

1926.31 Incorporation by reference.

1926.32 Definitions.

1926.33 Access to employee exposure and medical records,

1926.34 Means of egress.

1926.35 Employee emergency action plans.

Subpart D “- Occupational Health and Environmental Controls

1926.50 Medical services and first aid.

• 1926 51 Sanitatio 1026 52 Occuoational ‘mine exposure.

1926.53 Ionizing radiation.

1926.54 ‘iononiz,’g iadiatio

1926.55 Gases, vapors, fumes. dusts arid nets.

1926.56 IllurninaDon.

1926.57 Vent3ato’

1926.58 {Reseraeh 192n.59 hazard ‘mrnmunicaton.

1026.60 Methylenedianhline.

1026.61 Retention of DOT markngs, placards and abets

1926.61 Lead

1926 64 Process safety rranaaemnnt h gL y Lazard hem” als 1°25.65 Hazario wa te pe aters a I errer9e -y eso can 92n 66 Lena desigr and mr st’s be ii for spray b 0th

Subpart 6 Personal Protective and Life Saving Equipment ii’ 95 C ts at peru aI ntutsc rj nut 1 ts cp

Rc cued a ‘-3

1u -‘cad o-’’-,’-’ hups: sss ss osha.oos nis oshass choss adisp shnss dcurneit’5prahJe siandard’&p id1 )t) $ ‘1l1 4

A00806 - 9

Table of Contents - 1926 Page 2 of 7

1926101 Hearing protection.

1926.102 Eye and face protection.

1926.103 Respiratory protection.

1926.104 Safety belts, lifelines, and lanyards

1926.105 Safety nets

1926.106 Working over or near water.

1926.107 Definitions applicable to this subpart.

Subpart F - Fire Protection and Prevention

1926.150 Fire protection.

1926.151 Fire prevention.

1926.152 Flammable and combustible liquids.

1926.153 Liquefied petroleum gas (LP-Gas).

1926.154 Temporary heating devices.

1926.155 Definitions applicable to this subpart.

1926.156 Fixed extinguishing systems, general.

1926.157 Fixed extinguishing systems, gaseous agent.

1926.158 Fire detection systems.

1926.159 Employee alarm systems.

Subpart G -- Signs, Signals, and Barricades

1926.200 Accident prevention signs and tags.

1926.201 Signaling.

1926.202 Barricades.

1926.203 Definitions applicable to this subpart.

Subpart H -- Materials Handling, Storage, Use, and Disposal

1926.250 General requirements for storage.

1926.251 Rigging equipment for material handling.

1926.252 Disposal of waste materials.

Subpart I -- Tools-- Hand and Power

1926.300 General requirements.

1926.30 1 Hand tools.

1926.302 Power operated hand tools.

1926.303 Abrasive wheels and tools.

1926.304 Woodworking tools.

1926.305 Jacks - lever and ratchet, screw and hydraulic.

1926.306 Air Receivers.

1926.307 Mechanical power-transmission apparatus.

Subpart J -- Welding and Cutting

1926.350 Gas welding and cutting.

1926.35 1 Arc welding and cutting.

1926.352 Fire prevention.

1926.353 Ventilation and protection in welding, cutting, and heating.

1926.354 Welding, cutting and heating in way of preservative coatings.

Subpart K -, Electrical

GENERAL

1926.400 Introduction.

1926,401 [Reserved]

INSTALLATION SAFETY REQUIREMENTS

1926.402 Applicability.

1926.403 General requirements.

1926.404 Wiring design and protection.

1926.405 Wiring methods, components, and equipment for general use.

1926.406 Specific purpose equipment and installations, 1926,407 Hazardous (classified) locations, 1926,408 Special systems.

1926,409-1926,415 [Reserved]

SAFETY-RELATED WORK PRACFICES

1926.416 General requirements.

1926.417 Lockout and tagging of circuits.

1926.418-1926.430 [Reservedi

SAFETY-RELATED MAIRTENANCE AND ENVIRONMENTAL CONSIDERATIONS

1925431 Msi’de’-ancs of erloSSment 1920432 Envoonrsentai cl.eteiiorEor of

1926-SAL Flattery ocations ann- battern 5631900 1926 442-1926,446 [Reserved] https:;www.osha.oov1pls0oshaweh ouadisp.show douument?p tab1estanuards&p id- 1 053 42:2014

A00806 - 10

Table of Contents - 1926 Page 3 of 7

DEFINITIONS

1926.449 Definitions applicable to this subpart.

Subpart I -- Scaffolds

1926.450 Scope, application and definitions applicable to this subpart.

1926.451 General requirments.

1926.452 Additional requirements applicable to specific types of scaffolds.

1926.453 Aerial lifts

1926454 Training requirements.

APPENDIX A TO SUBPART L -- Scaffolds

APPENDIX B TO SUBPART L -- Scaffolds

APPENDIX C TO SUBPART L -- Scaffolds

APPENDIX D TO SUBPART L -- Scaffolds

APPENDIX E TO SUBPART L Scaffolds

Subpart M -- Fall Protection

1926.500 Scope, application, and definitions applicable to this subpart.

1926.501 Duty to have fall protection.

1926.502 Fall protection systems criteria and practices.

1926.503 Training requirements.

APPENDIX A TO SUBPART M — DETERMINING ROOF WIDTHS

APPENDIX B TO SUBPART M — GUARDRAIL SYSTEMS

APPENDIX C TO SUBPART M -- PERSONAL FALL ARREST SYSTEMS

APPENDIX D TO SUBPART M -- POSITIONING DEVICE SYSTEMS

APPENDIX E TO SUBPART M -- SAMPLE FALL PROTECTION PLANS

Subpart N -- Cranes, Derricks, Hoists, Elevators, and Conveyors

1926.550 [Reserved].

1926.551 Helicopters.

1926.552 Material hoists, personnel hoists and elevators.

1926.553 8asemounted drum hoists.

1926.554 Overhead hoists.

1926.555 Conveyors.

1926.556 [Removed].

Subpart 0-- Motor Vehicles, Mechanized Equipment, and Marine Operations

1926.600 Equipment.

1926.60 1 Motor vehicles.

1926.602 Material handling equipment.

1926.603 Pile driving equipment.

1926.604 Site clearing.

1926.605 Marine operations and equipment.

1926.606 Definitions applicable to this subpart.

Subpart P -- Excavations

1926.650 Scope, application, and definitions applcabie to this subpart.

1926551 Specific Excavation Requirements, 1926,652 Repuirernents for p’otective systems.

APPENDIX A TO SUBPART P

-- SOIL CLASSIFICATION

APPENDIX B TO SUBPART P - SLOPING AND BENCHING

1APPENDIX C TO SUBPART P TIMBER SHORING FOR TRENCHES

APPENDIX 0 TO SUBPART P ALUMiNUM HYDRAUUC SHORING FOR TRENCHES

APPENDIX E TO SUBPART P -- ALTERNATIVES TO TIMBER SHORING

APPENDIX F TO SUE PART P -- SEt ECTION OF PROTECTIVE SYSTEMS

Subpart Q -- Concrete and Masonry Construction

1926.700 Scope, appfcabon, and detinSons, pp5cabie to tiPs subpart,

1926.701 General requirements.

1926.702 Requirements for eqrspment and tools.

1926.703 Requirements for cast-in-place concrs.te.

1926.704 Requirements for precast concrete,

1926.705 Requirements for lift-slab construr;t:on operations.

1926,706 Renuirements of maccray construe-finn.

APPFNtT1XTO SUBeAfET 0-- REFF FENCES TO SUBPARTOCF PARt 1526 https:’ \vww.osha.oov/pIsoshaweb/owadisp,show document?n tahIestandards&n id I 0593 4/2 ‘20 1 4

A00806 - 11

Table of Contents - 1926 Page 4 of 7

Subpart R -- Steel Erection

1926.750 Scope.

1926.751 Definitions.

1926.752 Site layout, site-specific erection plan and construction sequence.

1926753 Hoisting and rigging.

1926.754 Structural steel assembly.

1926.755 Column anchorage.

1g26.756 Beams and columns.

1926.757 Open web steel joists.

1926.758 Systems-engineered metal buildings.

1926.759 Falling object protection.

1926.760 Fall protection.

1926.761 Training.

APPENDIX A TO SUBPART R -- GUIDEUNES FOR ESTABUSHING THE COMPONENTS OF A SITE-SPECIFIC EREC1]ON PLAN: NON- MANDATORY GUIDELINES FOR COMPLYING WITH § 1926.752(e)

APPENDIX B TO SUBPART R -- [RESERVED]

APPENDIX C TO SUBPART R -- ILLUSTRATIONS OF BRIDGING TERMINUS POINTS: NON-MANDATORY GUIDLINES FOR COMPLYING WITH § 1926.757(a)(10) and § 1926.757(c)(5)

APPENDIX D TO SUBPART R -- ILLUSTRATION OF THE USE OF CONTROL LINES TO DEMARCATE CONTROLLED DECKING ZONES (CD7s):

NON-MANDATORY GUIDEUNES FOR COMPLYING WITH § 1926.760(c)(3)

APPENDIX E TO SUBPART R -- TRAINING: NON-MANDATORY GUIDEUNES FOR COMPLYING WITH § 1926.761

APPENDIX F TO SUBPART R -- PERIMETER COLUMNS: NON-MANDATORY GUIDELINES FOR COMPLYING WITH § 1926.756(e) TO PROTECT

THE UNPROTECTED SIDE OR EDGE OF A WALKING/WORKING SURFACE

APPENDIX G TO SUBPART R -- FALL PROTECTION SYSTEMS CRITERIA AND PRACTICES FROM § 1926.502: NON-MADATORY GUIDELINES FOR COMPLYING WITH § 1926.760(d)

APPENDIX H TO SUBPART R -- DOUBLE CONNECTIONS: ILLUSTRATION OF A CUPPED END CONNECTION AND A STAGGERED CONNECTION: NON-MADATORY GUIDEUNES FOR COMPLYING WITH § 1926.756(c)(1)

Subpart S -- Tunnels and Shafts, Caissons, Cofferdams, and Compressed Air

1926.800 Underground construction.

1926.801 Caissons.

1926.802 Cofferdams.

1926.803 Compressed air.

1926.804 Definitions applicable to this subpart.

APPENDIX A TO SUBPART S -- DECOMPRESSION TABLES

Subpart T -- Demolition

1926.850 Preparatory operations,

1926.851 Stairs, passageways, and ladders.

1926.852 Chutes.

1926.853 Removal of materials through floor openings.

1926,854 Removal of walls, masonry sections, and chimneys.

1926.855 Manual removal of floors.

1926.856 Removal of walls, floors, and material with equipment.

1926.857 Storage.

1926.858 Removal of steel construction.

1926.859 Mechanical demolition.

1926.860 Selective demolition by explosives.

Subpart U -- Blasting and Use of Explosives

1926.900 General provisions.

11926.901 Blaster qualifications.

1926.902 Surface transportation of explosives,

1926.903 Underground transportation of explosives.

1926.904 Storage of explosives and blasting agents.

1926,905 Loading of explosives or blasting agents.

1926.906 Initiation of explosive charges - electoc blasting.

1926.907 Use of safe fuse,

1926.908 Use of detonating cord.

1926.909 Firing the blast,

1926.910 Inspection after blasting,

1926.911 Misfires.

1926.912 Underwater blasting.

0 Pb — —‘v ss

1226.914 Defiriticns acocabie to ths sunpart, Subpart V -- Power Transmission and Distribution

1926.952 t-tacha-oca 000’orcent.

1926.951 MateriSi nandlino.

1926.955 Oversead ines, https:\vw\s’,osha.t2ovp1s.’os1ia\vebowadisp.show docunient?p tah1estandarcls&r Id i U5 422014

A00806 - 12

Table of Contents - 1926 Page 5 of 7

11926.956 Underground lines.

1926.957 Construction in energized substations.

1926.958 External load helicopters.

1926.959 Lineman’s body belts, safety straps, and lanyards.

1926.9613 Definitions applicable to this subpart.

Subpart W -- Rollover Protective Structures; Overhead Protection

1926.1000 Rollover protective structures (ROPS) for material handling equipment.

1926.1001 Minimum performance criteria for rollover protective structures for designated scrapers, loaders, dozers, graders, and crawler tractors.

1926.1002 Protective frames (roll-over protective structures, known as ROPS) for wheel-type agricultural and industrial tractors used in construction.

1926.1003 Overhead protection for operators of agricultural and industrial tractors.

APPENDIX A TO SUBPART W -- Figures W-14 through W-28

Subpart X -- Stairways and Ladders

1926.1050 Scope, application, and definitions applicable to this subpart.

1926.1051 General Requirements.

1926.1052 Stairways.

1926.1053 Ladders.

i 1926.1054-1926.1059 [Reserved]

1926.1060 Training Requirements

APPENDIX A TO SUBPART X -- Ladders

Subpart V -- Commercial Diving Operations

GENERAL

1926.1071 Scope and application.

1926.1072 Definitions.

PERSONNELL REQUIREMENTS

1926.1076 Qualifications of dive team.

GENERAL OPERATIONS PROCEDURES

1926.1080 Safe practices manual.

1926.1081 Pre-dive procedures.

1926.1082 Procedures during dive.

1926.1083 Post-dive procedures.

SPECIFIC OPERATIONS PROCEDURES

1926.1084 SCUBA diving.

1926.1085 Surface-supplied air diving.

1926.1086 Mixed-gas diving.

1926.1087 Liveboating.

EQUIPMENT PROCEDURES AND REQUIREMENTS

1926.1090 Equipment

RECORDKEEPING

1926.1091 Recordkeeping requirements.

1926.1092 [Removed]

APPENDIX A TO SUBPART Y -- EXAMPLES OF CONDITIONS WHICH MAY RESTRICT OR LIMIT EXPOSURE TO HYPERBARIC CONDITIONS

APPENDIX B TO SUBPART Y

-- GUIDEUNES FOR SCIENTIFIC DIVING

Subpart Z -- Toxic and Hazardous Substances

11926.1100 [Reserved] 1926,1101 Asbestos

1926.1102 coal tar pitch volatiles; interpretation of term,

1926.1103 13 Carcinogens (4-Nitrobiphenyl. etc.).

1926.1104 alpha-Naphthylamne.

1926.1105 [Reserved]

1925.1106 Methy cnioromethyi ether

6 1 i ccnocberzidneia its .it

1926.1108 his-Chloromelhyl ether

1926.1109 neta-Nahthyiamne.

12261110 Benzioeie.

1926.1111 4-AminodiphenyL

1926.1112 Ethyleneimine.

1926.1113 heta-Propiolactone.

1926.1114 2-Acetylaminofluorene.

1926.1115 4-Dim.ethylaminoazoben2ene.

1926.1116 N-Nitrosodimethnlamine.

11926.1117 Vinyl chloride, 1926,1118 inorganic arsenic, https:’:www.osha.]iov/pls;oshaweb’o adisp,shosv documeni2n tahle=standards&n id I fl9’ 4[’ ‘(II 4

A00806 - 13

Table of Contents - 1926 Page 6 of 7

1926.1128 Benzene.

1926.1129 Coke oven emissions.

1926.1144 1,2-dibromo-3-chloropropane.

1926.1145 Acrylonitrile.

1926.1147 Ethylene oxide.

1926.1148 Formaldehyde.

1926.1152 Methylene Chloride.

Subpart AA-BB -- [RESERVED]

Subpart CC -- Cranes and Derricks in Construction

1926.1400 Scope.

1926.1401 Definitions.

1926.1402 Ground conditions.

1926.1403 Assembly/Disassembly--selection of manufacturer or employer procedures.

1926.1404 Assembly/Disassembly--general requirements (applies to all assembly and disassembly operations).

1926.1405 Disassembly--additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures).

1926.1406 Assembly/Disassembly--employer procedures--general requirements.

1926.1407 Power line safety (up to 350 kV)--assembly and disassembly.

1926.1408 Power line safety (up to 350 kV)--equipment operations.

1926.1409 Power line safety (over 350 kV).

1926.1410 Power line safety (all voltages)--equipment operations closer than the Table A zone.

1926.1411 Power line safety--while traveling.

1926.1412 Inspections.

1926.1413 Wire rope--inspection.

1926.1414 Wire rope--selection and installation criteria.

1926.1415 Safety devices.br> 1926.1416 Operational aids.

1926.1417 Operation.

1926.1418 Authority to stop operation.

1926.1419 Signals--general requirements.

1926.1420 Signals--radio, telephone or other electronic transmission of signals.

1926.1421 Signals--voice signals--additional requirements.

1926.1422 Signals--hand signal chart.

1926.1423 Fall protection.

1926.1424 Work area control.

1926.1425 Keeping clear of the load.

1926.1426 Free fall and controlled load lowering.

1926.1427 Operator qualification and certification.

1926.1428 Signal person qualifications.

1926.1429 Qualifications of maintenance & repair employees.

1926.1430 Training.

1926.1431 Hoisting personnel.

1926.1432 Multiple-crane/derrick lifts--supplemental requirements.

1926.1433 Design, construction and testing.

1926.1434 Equipment modifications.

1926.1435 Tower cranes.

1926.1436 Derricks.

1926.1437 Floating cranes/derricks and land cranes/derricks on barges.

1926.1438 Overhead & gantry cranes.

1926.1439 Dedicated pile drivers.

1926.1440 Sideboom cranes.

1926.1441 Equipment with a rated hoisting/lifting capacity of 2,000 pounds or less.

1926.1442 Severability.

Appendix A to Subpart CC of part 1926--Standard Hand Signals

Appendix 810 Subpart CC of part 1926--Assembly/Disassembly--Sample Procedures for Minimizing the Risk of Unintended Dangerous Boom Movement

Appendix C to Subpart CC of part 1926--Operator Certification--Written Examination--Technical Knowledge Criteria

APPENDIX A TO PART 1926-- DESIGNATIONS FOR GENERAL INDUSTRY STANDARDS INCORPORATED INTO BODY OF CONSTRUCTION

STANDARDS.

SOURCE: 44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, 1979, unless otherwse noted.

EDITORIAL. NOTE: At 44 R 8577, Feb. 9. 1979, and correctec at 44 FR 20940, Apr. 6, 1979, OSHA repented without change the ent:re text of 29 CFR Part 1926 together with certain General Industry Occupational Safety and Health Standards contained in 29 CFR Part 1910, which have been Identified as also applcabIe to construction work. This republication developed a singre set of OSHA regulations fqr both labor and management forces wrthir the construction industry.

Editorial Note: The Federal Register of August 2, 1995, oage 39254 issued a rrnal Rule; correcting amendment, 081-IA will marntarn the existrng fall protection requirements for steel erection activities pending rcilemaking that addresses the steel erection industry. This affected 1926. 104, 1926.105, 1926. 107, 1926.500, and 1926.753.

[55 FR 42328. Oct. 18. 1990; 55CR 47687, No, 14. :990: 58 FR 26627, Des 4. 1993; 58CR 35077. June 313, 1993; 59 FR 215,,Ja” 3. 1994; 59 FR 36695. July 19, 1994; 59 FR 40729, Aug 9, 1994; 59 FR 409f’4, Au. 10. 199-ic 00 FR 5131, Jan 26.

4 “ F c , -‘ “ “a — ..‘

7 FR

46025. Aug. 30. 1996; 62FF; 1493. Jan, 10. 1997; 63 FR 1152, Jan, 5. .1998:93 FR 1919. Jan. 13, 1995; 63 FR 13, Jan. 27, 906 63 FR 13338 Mar90 ‘ 94 u P 14vu pnl 8 19C0 6 hR I -S 40 L 1”8 63 FR 3345i line r’ -, 63 c_p 35137 Jure ° 1°’8 94 PP 8510 April 6 1999 66 FR 5)98 lar 18 2901 0 FR 76985 Dec 20 )9’, 7 P cr10, Jan 18 2006 7 FR lrcc up i Z0,.r6 7548130 peg p1

A00806 - 14

A00806-1 MBTA Safety Specifications
A00806-2_MBTA Safety Specs with OSHA TOC August 2012
MBTA Safety Specs
1926 List