A006 B006 Quality Control Plan.pdf

PDF 162 KB Posted

Attached to
Point of Use (POU) Consumables Hill AFB UT
Solicitation number
FA8224-21-R-0005
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity. The CDRL requires the contractor to submit a Quality Assurance Program Plan (QAPP) also known as a Quality Control Plan. The plan is due at the time of contract proposal submission and must be approved by the Government. It must follow DI-QCIC-81794A and be submitted electronically to the Contracting Officer, Program Manager, and Contracting Officer Representative upon award. The related solicitation FA8224-21-R-0005 is for Point of Use consumables at Hill Air Force Base, Utah and its geographically separated units. The purpose is to procure and distribute consumable supplies and shop operating materials in Government owned vending machines or through non-stock requests. Proposals must be received by the specified due date and time. The requiring agency is the Air Force Sustainment Center under the Department of the Air Force Materiel Command.

View the file

Other files

File Type Posted
Attachment 8 Questions and Answers 17 May 2021.pdf PDF
Attachment 6 List of Attachments 17 May 2021.pdf PDF
Attachment 7 FA822421R0005 12 May 2021.pdf PDF
Attachment 3 Exhibit C D E F G H J K L M N P Market Basket - TEP Matrix 12 May 2021.xlsx XLSX spreadsheet
Attachment 6 List of Attachments 12 May 2021.pdf PDF
Attachment 8 Questions and Answers 12 May 2021.xlsx XLSX spreadsheet
Attachment 6 List of Attachments 11 May 2021.pdf PDF
Attachment 8 Questions and Answers 11 May 2021.xlsx XLSX spreadsheet
Attachment 3 Exhibit C D E F G H J K L M N P Market Basket - TEP Matrix 11 May 2021.xlsx XLSX spreadsheet
Attachment 7 FA822421R0005 10 May 2021.pdf PDF
Attachment 3 Exhibit C D E F G H J K L M N P Market Basket - TEP Matrix 10 May 2021.xlsx XLSX spreadsheet
Attachment 6 List of Attachments 10 May 2021.docx DOCX document
Attachment 8 Questions and Answers 10 May 2021.xlsx XLSX spreadsheet
Attachment 7 FA822421R0005 30 April 2021.pdf PDF
Attachment 6 List of Attachments 30 Apr 2021.pdf PDF
Attachment 1 SOW 30 Apr 2021.pdf PDF
Attachment 6 List of Attachments 15 April 2021.pdf PDF
Attachment 7 FA822421R0005 15 April 2021.pdf PDF
Attachment 8 - Questions and Answers 15 April 2021.pdf PDF
Attachment 8 Q and A - 02 April 2021.pdf PDF
Attachment 6 List of Attachments 02 April 2021.pdf PDF
Attachment 6 List of Attachments 31 Mar 2021.pdf PDF
Attachment 8 Q and A 31 Mar 2021.pdf PDF
Attachment 3 Exhibit C D E F G H J K L M N P Market Basket - TEP Matrix (1).xlsx XLSX spreadsheet
A001 B001 Monthly Invoice Summary.pdf PDF
FA822421R0005 19 Mar 2021.pdf PDF
A007 B007 Annual TCIR_DART Rates.pdf PDF
Attachment 2 Detailed Usage Aug 2018 - March 2020.xlsx XLSX spreadsheet
A008 Transition Plan.pdf PDF
Attachment 4 Instructions to Offerors 19 Mar 2021.docx DOCX document
A005 B005 Phase-Out Plan.pdf PDF
A003 B003 Shelf Life Changes Report.pdf PDF
A004 B004 Safety Plan.pdf PDF
Attachment 5 Evaluation - Commercial Item 19 Mar 2021.pdf PDF
A002 B002 Proof of Order.pdf PDF
Attachment 1 SOW 19 Mar 2021.docx DOCX document
Attachment 6 List of Attachments 19 Mar 2021.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A006, B006
title: Quality Assurance Program Plan (QAPP)
sub: Quality Control Plan
auth: DI-QCIC-81794A
ref: SOW Para 2.19.1
req_ofc: OO-ALC/OBC
dd250: XX
appcode: N/A
dist: A
freq: BLK 16
asof: BLK 16
firstsub: BLK 16
subsub: BLK 16
addressee1: AFSC OL:H/PZI (CO)
draft1:
reg1: 1
repro1:
addressee2: OO-ALC (COR)
draft2:
reg2: 1
repro2:
addressee3: OO-ALC (PM)
draft3:
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: (4) Contractor shall prepare a Quality Control Plan for Government approval due at time of

contract proposal.

(9) DISTRIBUTION STATEMENT A: Approved for public release, distribution unlimited

(10) (11) (12) (13): IAW PWS paragraph referenced in block 5.

(14) One (1) copy of the submittal shall be submitted in electronic format, in Microsoft Office or Adobe Acrobat PDF to the CO, PM and COR (Identified upon award of contract)

group: NSP
total_price:
prep_name: Justin L Marshburn
line_item: 0007/1007
exhibit: A/B
xtdp: Off
xtm: Off
othercat: QCIC
system: Consumables for Point of Use
ctr_no:
contr:
remarksb:
Page2: 2
Reset:
2021-02-02T00:45:00-0700
MARSHBURN.JUSTIN.LEE.1257774836
prep_date: 2 Feb 2021
app_by: Justin L. Simmons
2021-02-02T07:58:36-0700
SIMMONS.JUSTIN.LEE.1256189212
app_date: 2 Feb 2021
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .