This document is a Contract Data Requirements List (CDRL) for a Ship Trial Agenda, specifically Data Item Number DI-MGMT-81643. The CDRL provides detailed instructions for preparing a comprehensive ship trial agenda, which must include specific sections such as a table of contents, inspection/test methods, event descriptions, general introduction, ship drawings, event schedule, and personnel listings. The document specifies formatting requirements including paper size, page numbering, binding, and content details for each section.

Key requirements include creating a document that outlines all operations, tests, and inspections to be performed during ship trials, with precise documentation of test procedures, instrumentation, measurements, and personnel involvement. The agenda must cover different trial types (Builder's Trial, Operational Verification Trial, and Final Verification Trial), include detailed event descriptions with step-by-step procedures, and provide comprehensive information about the ship, trial personnel, safety procedures, and logistical arrangements. The document is part of a larger contract related to ship repair services for the Military Sealift Command, specifically supporting ship trials and documentation processes.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0003 A004

Ship Trial Agenda

DI-MGMT-81643 Section C-1, Para. 11.4

See Block 16 See Blk. 16

See Blk. 16 MSC Guam N7 2 MSC Guam N10 2 Ship's Force 5 MSC Principle Port Eng 1

0 10 0

Frequency: As specified in the Delivery Order (DO).

Date of First Submission: As specified in the DO.

Date of Subsequent Submission: As specified in the DO.

Format: Submit using Contractor's format in paper and electronic media. See DI-MGMT-81643 for specifics of paper copy format requirements.

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

0003 A004

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

DATA ITEM DESCRIPTION

Title: SHIP TRIAL AGENDA Number: DI-MGMT-81643 Approval Date: 20040316 AMSC Number: N7521 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: NSWCCD Applicable Forms: N/A

Use/relationship: The ship trial agenda details the Contractor’s plan for completing the requirements for trials by providing the general and detailed methods for operation of the ship and scheduling of tests with details of personnel participating, security, and a complete set of test procedures to be performed. The agenda outlines a program to test and evaluate the overall performance of the ship.

This DID contains the format, content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

Requirements:

1. Format and Content. The Ship Trial Agenda shall be in Contractor’s format and shall contain a cover page specifying the following:

a. Name of ship and hull number

b. Name of trials (e.g., “Builder’s Trial Agenda”)

c. Volume number

d. Name and address of the Contractor

1.2 The Trial Agenda shall be presented on 8.5 x 11.0 inch size, 20-pound white paper, except Ship Drawings, Event Schedule, and Personnel Listing, which may be on 11.0 x required length foldouts.

1.3 Pages shall be numbered with consecutive Arabic numerals. Double page number systems are acceptable (e.g., a test procedure’s original page numbers and the agenda’s overall page numbering system.).

1.4 The Trial Agenda shall be bound in stiff board covers. Different cover colors shall be used for BT, OVT, and FVT. The agenda shall be bound in two or more volumes with test procedures and event descriptions bound separately. Volumes shall be no more than three inches thick.

1.5. Classified material shall be avoided. Test procedures and event descriptions containing classified material shall be bound in separate volumes.

Source: http://assist.dla.mil -- Downloaded: 2021-02-02T03:35Z Check the source to verify that this is the current version before use.

DI-MGMT-81643

2. The Ship Trial Agenda shall specify:

a. All operations, tests, inspections performed

b. The proposed procedures to be performed

c. The trial displacement

2.1 Plans shall be included to show arrangements for measuring flow of fluids, and complete information as to the location of gages, thermometers, and all special instrumentation for collection of data.

2.2 The Agenda shall contain the following sections:

2.2.1 Table of Contents. The Table of Contents shall specify:

a. Section number(s)

b. Descriptive name or phrase

c. Page commencement and completion numbers, for extended test procedures, event descriptions, etc. (e.g., “31-47”).

2.2.2 The Table of Contents shall include all major subsection headings and every significant subject the reader may need to locate with dispatch in the performance of a sea trial (e.g., “Limited Access Spaces” or “Emergency Procedures”).

3. Inspection/Test Method. This section shall contain a general narrative description of the overall BT, OVT, and FVT performance covering the general areas of responsibility for ship repair, test performance personnel operational functions and assignments, a general trial and ship sailing schedule, sites for basic conferences and critiques, and a listing of primary Contractor personnel responsible for overall trial performance. The general trial schedule shall be in bar chart format with days of trial and hours (24 hour clock) and test and inspection listed on axes.

4. Event Description. The Event Description shall be included integral with the Agenda, providing a detailed statement of the inspections or tests to be performed. Measurements shall be specified and all information obtained during the inspection or test action . In addition following shall be included:

a. General test area name or description (e.g., “Machinery demonstrations”)

b. General test area (event) number (e.g., “2”)

c. Specific test name (e.g., “Quick Reversal Astern”)

d. Specific test identification number (e.g., “2.2”)

e. Purpose of the given inspection or test

f. Reference(s) (the referenced material shall not be required to perform the event described or shall be such as to be available as a normal condition in the space under inspection or test).

g. List of all instrumentation required with a complete description of hook-up and operation for performance of inspection or test

h. Method stating a detailed step-by-step, technician level test performance procedure which includes material turn-on, operation, measurements to be made, turn-off, shut-down, and, as required, material disassembly

i. Data Sheets keyed directly to method steps which provide full recording space for all observations, measurements, and data called for, with clear statement of units, required results, and the high and low tolerance values associated with each required result when applicable. Each sheet shall contain a signature and date specifying the Event Director (Contractor Representative) and the Government Representative

j. Additional information, observations, ambient conditions, equipment or environmental state or problems, etc. shall be included.

5. General Introduction. The General Introduction section shall contain :

a. “Welcome Aboard” and general narrative introduction

b. Emergency procedures and safety warnings

c. Emergency and key numbers

d. Limited access spaces listings

e. Pertinent ship data and specifications

f. Pertinent ship construction dates

g. General aboard-ship living information, including life boat and life raft general information, etc.

h. Security rules aboard ship e.g., restricted access areas, for available documentation, for ship-shore communications, etc.

i. Badges and other personnel control methods

j. General descriptions of trial performance in the broad-view

6. Ship Drawings. Small scale drawings, outline, annotated plan views of each deck and platform level and starboard elevation view shall be included for general guidance and assistance of trial personnel. The drawings shall be contain title and page number.

Major shipboard compartments, operation centers, conference sites, and major equipment complexes shall also be identified.

7. Event Schedule. The daily trial event schedule shall be tabular, with heading information on each sheet and shall identify the following and shall be placed on foldout sheets, when applicable.

a. Title (e.g., “Schedule of Events”)

b. Trial Day Number (e.g., “Trial Day 3”)

c. Time of day by 24 hour clock d Event or test duration (e.g., “2 hours”)

e. Event location, abbreviated when possible (e.g., “Xmit Rm”)

f. Event or test number

g. Event description or test name, abbreviated when possible (e.g., “RF HF Transmission Test”)

h. Name of Contractor assigned as Test Conductor

8. Personnel Listing. The Personnel Listing shall be presented in a tabular form specifying the following information:

a. Personnel name (e.g., “Blow, J.”)

b. Organization or agency affiliation (e.g., “ATEC” or “SUPSHIP”)

c. Work (duty) station and location, when applicable (e.g., “Navigation, 01- 79-2”)

d. Work telephone (e.g., “X-587”)

e. Trial function or title (e.g., “Government Navigation Lead”)

f. Berthing location (e.g., “Stat Rm. 26, 01-76-4”)

g. Lifeboat/raft station (e.g., “L/B #2”)

h. Messing location (e.g., “Officers Mess”)

8.1 In general, personnel listings shall be divided into the following categories:

a. ATEC personnel

b. Prospective ship officers, SUPSHIP officers, other participating officers

c. Contractor administrative personnel

d. Contractor operational personnel

e. Other Government personnel

f. Other identifiable personnel groupings, as applicable

8.2 Within a category, officers shall be listed primarily by official rank and secondarily in alphabetical order. The remaining personnel shall be listed within a category by name in alphabetical order.

End of DI-MGMT-81643

d
CDRL 004 DI Ship Trial Agenda