This is a Request for Proposal for the construction of a Deployable Airbase Systems-Facilities, Equipment, and Vehicle storage complex at Sanem, Luxembourg. The scope of work includes three warehouses of varying sizes for storage of construction vehicles, equipment, and shipping containers. Supporting facilities will also be constructed, such as a refueling vehicle maintenance shop, fire alarm and smoke detection systems, and site improvements. Utilities, pavements, and environmental mitigation are required. Drawings can be requested via email from the points of contact provided. The Department of the Army European Command is the issuing agency.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 61 PAGES
ERI: CONSTRUCT ECAOS DABS STORAGE
00 74 01 SD-01 Preconstruction Submittals
1.7.2List of Required HN Permits
1.7.2Permits And Notifications
1.7.1Approved Permits
SD-11 Closeout Submittals
1.7.3Final Acceptance
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1 G ROList of Contact Personnel
01 22 00 SD-01 Preconstruction Submittals
GQuantity Measurement Plan
01 30 01 SD-01 Preconstruction Submittals
3.1.3Pre-Construction Documentation
3.2 GMobilization Plan
3.6.1 GEnvironmental Protection Plan
3.4.2 GTraffic Control Plan
3.5.2 GConstruction Fence/Screening
3.11.2 GTemporary Construction Plan
SD-03 Product Data
3.7.1 GHazardous Materials
SD-11 Closeout Submittals
3.1.5Weekly Status
01 30 06 SD-01 Preconstruction Submittals
1.5.4 GField Office Submittal
01 32 01 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.3.1 GPreliminary Project Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 61 PAGES
01 32 01 3.3.2 GInitial Project Schedule
SD-07 Certificates
3.3.3 GSchedule Update
3.8.6 GSchedule Update
3.3.4 GRevised Schedule
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.8.1 G DOProject Accident Prevention Plan
1.9 G DOProject Accident Prevention Plan
1.8.1 G DOHost Nation Equivalent Training
1.10 GActivity Hazard Analysis (AHA)
SD-06 Test Reports
1.13Notifications and Reports
1.13.2 G DOAccident Reports
01 45 00 SD-01 Preconstruction Submittals
3.2 GConstruction Quality Control
(CQC) Plan
SD-07 Certificates
3.6.2Testing Laboratory Certification
01 45 05 SD-01 Preconstruction Submittals
1.3 GSuperintendent and Alternate
Superintendent
1.4 GCQC and Alternate CQC SM
1.5 G DOSSHO and Alternate SSHO
1.4.3 GAdditional CQC Personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 61 PAGES
01 45 35 SD-01 Preconstruction Submittals
3.1.1 G ROSIOR Letter of Acceptance
3.1.1 G ROProject Manual
3.1.1 G ROProject Manual
3.1.1Written NDT Practices
3.1.3Written NDT Practices
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
1.5.10Special Inspector of Record
1.5Special Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.1 G ROInterim Report
3.1.3 G ROInterim Report
3.1.1 G ROComprehensive Final Report
3.1.3 G ROComprehensive Final Report
01 57 19 SD-01 Preconstruction Submittals
1.6.1 G ROPreconstruction Survey
1.11 G ROSolid Waste Management Permit
1.6.2 G RORegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 61 PAGES
01 57 19 1.7 G ROEnvironmental Protection Plan
3.2.1.1 G ROStormwater Pollution Prevention
Plan
3.2.1.2 G ROStormwater Notice of Intent
1.7.9.1 G RODirt and Dust Control Plan
1.6.5 G ROEmployee Training Records
1.6.4 G ROEnvironmental Manager
Qualifications
SD-06 Test Reports
3.2.1.3Inspection Reports
1.11.1Monthly Solid Waste Disposal
Report
SD-07 Certificates
1.6.5Employee Training Records
SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
3.6.1 G ROWaste Determination
Documentation
1.6.5 G ROAssembled Employee Training
Records
1.11 G ROSolid Waste Management Permit
3.6.2.1 G ROProject Solid Waste Disposal
Documentation Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 61 PAGES
01 57 19 3.6.3.1 G ROHazardous Waste/Debris
Management
1.6.2 G RORegulatory Notifications
3.6.2.1 G ROSales Documentation
3.6.2.1Contractor Certification;
01 74 19 SD-01 Preconstruction Submittals
1.6 G ROConstruction Waste Management
Plan
SD-06 Test Reports
1.8.2Quarterly Reports
SD-11 Closeout Submittals
1.9 G ROFinal Construction Waste
Diversion Report
01 78 00 SD-01 Preconstruction Submittals
3.1.2 GCommissioning Plan
SD-02 Shop Drawings
3.2.3Working As-Built Markup
Drawings
SD-03 Product Data
1.8.4Warranty Management Plan
1.8.7Warranty Tags
1.6Spare Parts Data
1.9Equipment Guarantees
SD-08 Manufacturer’s Instructions
1.8.4Posted Instructions
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 61 PAGES
01 78 00 1.8.3Local Warranty Contractor
3.2 GAs-Built Drawings
3.3 GRecord Drawings
3.5.1 GInterim DD FORM 1354
1.8.6Warranty Repair Report
3.6 GConstruction Book
01 78 23 SD-10 Operation and Maintenance
Data
3.1 GOperation and Maintenance
Manuals
1.7 GData Package List
1.4 GO&M Database
3.2.1 GTraining Plan
3.2.3 GTraining Outline
3.2.2 GTraining Content
SD-11 Closeout Submittals
3.2.4 GTraining Video Recording
3.2.6 GValidation of Training Completion
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Team
1.7.2 G DOCommissioning Specialist (CxC)
SD-05 Design Data
3.1.2.1Design Phase Commissioning
Plan
3.1.5.1Pre-Functional Checks
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 61 PAGES
01 91 00.15 10 1.5.1 G DOPre-Functional Checklists
1.5.2 G DOPre-Functional Checklists
1.8Issues and Resolutions Log
1.5.1Testing, Adjusting, And Balancing
Report
1.5.2Duct Air Leakage Test
Procedures
1.5.2Functional Performance Testing
1.5.2Post-Test Deficiency Correction
1.5.2Re-Testing
1.5.2Seasonal Testing
3.1.4Commissioning Inspection And
Testing Team
3.1.5.2Testing, Adjusting, And Balancing
(Tab) Report And Field
Acceptance Testing
3.1.5.6Functional Performance Tests
SD-07 Certificates
1.9 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
1.5.2 G ROTraining Plan
1.7.1 G ROTraining Plan
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
1.5.2 G DOSystems Manual Documents
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 61 PAGES
01 91 00.15 10 1.5.2 G DOMaintenance and Service Life
Plans
3.1.8 G DOMaintenance and Service Life
Plans
3.1.7Systems Manual
3.2Updated Systems Manual
Documents
SD-11 Closeout Submittals
1.5.2Tab Schematic Drawings, Report
Forms, And Procedures
1.5.2Post-Construction Site Visit
02 41 00 SD-01 Preconstruction Submittals
1.3.2 G RODemolition Plan
1.9 G ROExisting Conditions
SD-07 Certificates
1.7Notification of Demolition
SD-11 Closeout Submittals
3.3.2Receipts
06 10 00 SD-03 Product Data
1.8 G DOFire-retardant Treatment
2.3.2 G DOAdhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.10.1Certificates of Grade
1.7Preservative Treatment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 61 PAGES
06 10 00 SD-10 Operation and Maintenance
Data
3.2 G ROTake-back Program
07 11 13 SD-07 Certificates
1.2Materials
07 21 16 SD-03 Product Data
2.1 G DOBlanket Insulation
2.3 G DOVapor Retarder
2.4 G DOPressure Sensitive Tape
2.5 G DOAccessories
SD-07 Certificates
2.5.1Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2.1Insulation
07 60 00 SD-02 Shop Drawings
2.1.1 G DOExposed Sheet Metal
3.1.11 G DOGutters
3.1.12 G DODownspouts
2.1.1 G DOGravel Stops and fascia
3.1.14 G DOFlashing at Roof Penetrations
and Equipment Supports
3.1.10 G DODrip Edges
SD-04 Samples
1.4.2Finish Samples
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 61 PAGES
07 60 00 3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 G ROCleaning and Maintenance
07 81 00 SD-03 Product Data
3.3 G DOFireproofing Material
SD-04 Samples
2.1Spray-Applied Fireproofing
SD-06 Test Reports
1.2.2Fire Resistance Rating
3.6Field Tests
1.2.3Evaluation Reports
SD-07 Certificates
1.4.1Installer Qualifications
3.1Surface Preparation Report
3.5.2Manufacturer's Inspection Report
07 84 00 SD-02 Shop Drawings
2.1 G DOFirestopping System
SD-03 Product Data
2.2 G DOFirestopping Materials
SD-06 Test Reports
3.3Inspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 61 PAGES
07 92 00 SD-03 Product Data
2.1 G DOSealants
2.2 G DOPrimers
2.3 G DOBond Breakers
2.4 G DOBackstops
SD-06 Test Reports
3.1Field Adhesion
SD-07 Certificates
2.1.1Indoor Air Quality For Interior
Sealants
2.1.3Indoor Air Quality For Interior
Floor Joint Sealants
08 11 13 SD-02 Shop Drawings
2.1 G DODoors
2.1 G DODoors
2.1Recycled Content for Steel Door
Product
2.5 G DOFrames
2.5 G DOFrames
2.5Recycled Content for Steel Frame
Product
2.3 G DOAccessories
2.7 G DOWeatherstripping
SD-03 Product Data
2.1 G DODoors
2.5 G DOFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 61 PAGES
08 11 13 2.3 G DOAccessories
2.7 G DOWeatherstripping
08 33 23 SD-02 Shop Drawings
2.2.1 G DOOverhead Coiling Doors
2.2.3 G DOCounterbalancing Mechanism
2.2.4 G DOManual Door Operators
2.2.5 G DOElectric Door Operators
2.2.1.4 G DOBottom Bars
2.1.1.1 G DOGuides
2.2.3.1 G DOMounting Brackets
2.2.2.2 G DOHood
2.1.1.1 G DOInstallation Drawings
SD-03 Product Data
2.2.1 G DOOverhead Coiling Doors
2.2.2 G DOHardware
2.2.3 G DOCounterbalancing Mechanism
2.2.4 G DOManual Door Operators
2.2.5 G DOElectric Door Operators
2.2.6 G DOFire-Rated Door Assembly
SD-05 Design Data
2.2.1 G DOOverhead Coiling Doors
2.2.2 G DOHardware
2.2.3 G DOCounterbalancing Mechanism
2.2.4 G DOManual Door Operators
2.2.5 G DOElectric Door Operators
1.3 G DOFire-Rated Door
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 61 PAGES
08 33 23 SD-10 Operation and Maintenance
Data
3.3.2 G ROOperation and Maintenance
Manuals
3.3.2 G ROMaterials
3.3.2 G RODevices
3.3.2 G ROProcedures
3.3.2 G ROManufacturer's Brochures
3.3.2 G ROParts Lists
SD-11 Closeout Submittals
3.3.1 G ROWarranty
08 71 00 SD-02 Shop Drawings
1.3 G DOManufacturer's Detail Drawings
1.3 G DOVerification of Existing Conditions
1.5 G DOHardware Schedule
2.3.7 G DOKeying System
SD-03 Product Data
2.3 G DOHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 G ROHardware Schedule
SD-11 Closeout Submittals
1.6.1 G ROKey Bitting
08 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 61 PAGES
08 81 00 1.3 G DOGlazing Accessories
2.2.3.1 G DOSealants
SD-04 Samples
2.2.2Glazing Compound
2.2.5Tape
2.2.5Sealing Tapes
SD-08 Manufacturer’s Instructions
2.2Setting and Sealing Materials
3.2Glass Setting
08 91 00 SD-02 Shop Drawings
1.4 G DOWall louvers
1.5 G DOWall louvers
SD-03 Product Data
2.2 G DOMetal Wall Louvers
SD-04 Samples
1.4Wall louvers
1.5Wall louvers
1.5Door louvers
09 22 00 SD-02 Shop Drawings
2.1 G DOMetal Support Systems
SD-03 Product Data
2.1 G DOMetal Support Systems
09 29 00 SD-03 Product Data
2.1.2 G DOWater-Resistant Gypsum Backing
Board
2.1.4 G DOAbuse Resistant Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 61 PAGES
09 29 00 2.1.8 G DOAccessories
2.1.1 G DOGypsum Board
2.1.5 SVOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1Indoor Air Quality for Gypsum
Board
2.1.7Indoor Air Quality for Non-aerosol
Adhesives
2.1.7Indoor Air Quality for Aerosol
Adhesives
09 30 10 SD-02 Shop Drawings
3.2 G DODetail Drawings
SD-03 Product Data
2.1.1 G DOMosaic Tile
2.1.2 G DOGlazed Wall Tile
2.2 G DOSetting-Bed
2.4 G DOMortar, Grout, and Adhesive
SD-04 Samples
2.1Tile
2.1Accessories
2.1Transition Strips
2.5Transition Strips
2.4.3Grout
SD-07 Certificates
2.4Indoor Air Quality for Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 61 PAGES
09 30 10 2.4.4Indoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 G ROInstallation
09 51 00 SD-02 Shop Drawings
2.1 G DOApproved Detail Drawings
SD-03 Product Data
2.1.1 G DOAcoustical Performance
SD-04 Samples
2.2 GAcoustical Units
SD-07 Certificates
2.5 SIndoor Air Quality for Adhesives
09 65 00 SD-02 Shop Drawings
2.8 G DOResilient Flooring and
Accessories
SD-03 Product Data
2.8 G DOResilient Flooring and
Accessories
2.4 G DOAdhesives
2.1Linoleum Tile
2.2Wall Base
SD-04 Samples
2.8Resilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 61 PAGES
09 65 00 SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.4Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.8 G ROResilient Flooring and
Accessories
09 90 00 SD-03 Product Data
2.1 G DOCoating
SD-04 Samples
1.10Color
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2Qualification Testing
2.1Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.5.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 61 PAGES
09 90 00 SD-10 Operation and Maintenance
Data
2.1 G ROCoatings
09 96 00 SD-01 Preconstruction Submittals
1.3 G ROEquipment List
SD-03 Product Data
2.1.1 G DOHeat-Resistant Coatings
2.2.1 G DOEpoxy Coatings
2.2.2 G DOPolyurethane Coatings
SD-04 Samples
1.3Color Chips
SD-07 Certificates
2.1.1Heat-Resistant Coatings
2.2.1Epoxy Coatings
2.2.2Polyurethane Coatings
3.1.4Manufacturer's Printed
Instructions
09 97 13 SD-01 Preconstruction Submittals
3.3.1.1 G ROInspection Forms
1.3 G ROSafety Plan
SD-03 Product Data
2.1.1 G DOAbrasive Blasting Material
2.1.2 G DOSealant Compound
2.1.3.1 G DOInorganic Zinc
2.1.3.1 G DOInhibitive Polyamide Epoxy
2.1.3.1 G DOAliphatic Polyurethane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 61 PAGES
09 97 13 SD-04 Samples
1.3Manufacturer's Standard Color
Charts
3.3.1.1Inspection Forms
SD-05 Design Data
2.1.3.1 G DOInorganic Zinc
2.1.3.1 G DOInhibitive Polyamide Epoxy
2.1.3.1 G DOAliphatic Polyurethane
SD-06 Test Reports
3.3.1.2Inspection Reports
SD-07 Certificates
2.1.1Abrasive Blasting Material
2.1.2Sealant Compound
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Aliphatic Polyurethane
SD-08 Manufacturer’s Instructions
2.1.3Protective Coatings
10 14 00 SD-02 Shop Drawings
3.1 G DOApproved Detail Drawings
SD-03 Product Data
2.1 G DOModular Exterior Signage System
3.1Installation
1.2 G DOExterior Signage
SD-04 Samples
1.2Exterior Signage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 61 PAGES
10 14 00 SD-10 Operation and Maintenance
Data
3.1.2 G ROProtection and Cleaning
10 14 01 SD-02 Shop Drawings
1.3.2 G DODetail Drawings
SD-03 Product Data
3.1 G DOInstallation
1.5 G DOWarranty
SD-04 Samples
1.3.1Interior Signage
SD-10 Operation and Maintenance
Data
3.1 G ROApproved Manufacturer's
Instructions
3.1.2 G ROProtection and Cleaning
10 28 13 SD-03 Product Data
2.1.2 G DOFinishes
2.2 G DOAccessory Items
SD-04 Samples
2.1.2Finishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
13 34 19 SD-01 Preconstruction Submittals
1.6.3 G ROManufacturer's Qualifications
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 61 PAGES
13 34 19 1.2.1.7 G DODetail Drawings
1.6.1 G DODetail Drawings
1.2.10 G DOErection Plan
SD-03 Product Data
1.6.1 G DOManufacturer's Catalog Data
SD-04 Samples
1.6.1Coil Stock
2.1.8Coil Stock
1.2.1.9Roof Panels
1.2.1.9Wall Panels
2.5Fasteners
2.7.1Metal Closure Strips
1.4.6Insulation
1.6.9Vapor Barrier
2.4.2Manufacturer's Color Charts and
Chips
SD-05 Design Data
1.6.1 G DOManufacturer's Descriptive and
Technical Literature
1.6.1 G DOManufacturer's Building Design
Analysis
SD-06 Test Reports
1.6.1Test Reports
1.6.1Coatings and Base Metals
1.6.1Factory Color Finish Performance
Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 61 PAGES
13 34 19 SD-07 Certificates
1.6.1System Components
1.6.1Coil Stock
2.1.8Coil Stock
1.6.1 GAluminized Steel Repair Paint
1.6.1 GGalvanizing Repair Paint
1.6.1 GEnamel Repair Paint
1.6.1Qualification of Manufacturer
1.6.1Qualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2Installation of Roof and Wall panels
1.7Shipping, Handling, and Storage
SD-11 Closeout Submittals
3.13.1 G ROManufacturer's Warranty
3.13.2 G ROContractor's Warranty for
Installation
22 00 00 SD-02 Shop Drawings
3.8.1 G DOPlumbing System
SD-03 Product Data
2.4 G DOFixtures
2.4.2 G DOFlush Valve Water Closets
2.4.3 G DOFlush Valve Urinals
2.4.4 G DOWall Hung Lavatories
2.9 G DOWater Heaters
3.8.1.1 G DOBackflow Prevention Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 61 PAGES
22 00 00 3.4 G DOVibration-Absorbing Features
3.8.1 G DOPlumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1Test of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
3.8.1 G ROPlumbing System
22 15 14 SD-02 Shop Drawings
2.1 G DOInstallation Drawings
SD-03 Product Data
2.1.1 G DOEquipment and Performance
Data
2.3.1 G DOAboveground Piping Materials
2.2.1 G DOPiping Specialties
2.4.2 G DOSupporting Elements
2.2.2 G DOAir Compressors
2.2.3 G DOValves
3.1.1.1 G DOAccessories
2.4.1 G DOMiscellaneous Materials
2.2.2.1Refrigerated Air Dryer
SD-05 Design Data
2.1.1 G DODesign Analysis and Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 61 PAGES
22 15 14 SD-06 Test Reports
3.2.1.4Piping System Test Report
SD-07 Certificates
2.3.1Aboveground Piping Materials
2.4.2Supporting Elements
2.2.3Valves
2.4.1Miscellaneous Materials
SD-10 Operation and Maintenance
Data
3.4 G ROOperation and Maintenance
Manuals
23 00 00 SD-02 Shop Drawings
1.4.4 G DODetail Drawings
SD-03 Product Data
2.9.1.1Metallic Flexible Duct
2.9.2 G DODuct Access Doors
2.9.3 G DOFire Dampers
2.9.4 G DOManual Balancing Dampers
2.9.6 G DOSound Attenuation Equipment
2.9.6.3 G DOAcoustical Duct Liner
2.9.7.1 G DORegisters and Grilles
2.9.8 G DOLouvers
2.9.9 G DOAir Vents, Penthouses, and
Goosenecks
2.10.1.1 G DOIn-Line Centrifugal Fans
2.17 G DOHot Water Unit Heaters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 61 PAGES
23 00 00 2.11 G DOEnergy Recovery Devices
1.4.5 G DOTest Procedures
1.2.1.2 G DODiagrams
2.10.1.2 G DOMixed Flow Fans
2.13 G DOMini-Split-System Air
Conditioners Heat Pumps
SD-06 Test Reports
3.11Performance Tests
3.10Damper Acceptance Test
SD-07 Certificates
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.14.1 G ROOperation and Maintenance
Manuals
2.9.3 G ROFire Dampers
2.9.4 G ROManual Balancing Dampers
2.10.1.1 G ROIn-Line Centrifugal Fans
2.11 G ROEnergy Recovery Devices
2.16.1 G ROHydronic Modular Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 61 PAGES
23 00 00 SD-11 Closeout Submittals
3.12 G ROIndoor Air Quality During
Construction
3.12 G ROIndoor Air Quality During
Construction
23 05 15 SD-01 Preconstruction Submittals
1.2 G ROMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 G DORecord Drawings
1.2 G DOConnection Diagrams
1.2 G DOCoordination Drawings
1.2 G DOFabrication Drawings
3.1 G DOInstallation Drawings
SD-03 Product Data
2.1 G DOPipe and Fittings
2.2 G DOPiping Specialties
2.3 G DOValves
2.4 G DOMiscellaneous Materials
2.5 G DOSupporting Elements
1.2 G DOEquipment Foundation Data
SD-04 Samples
1.2Manufacturer's Standard Color
Charts
SD-05 Design Data
2.1 G DOPipe and Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 61 PAGES
23 05 15 2.2 G DOPiping Specialties
2.3 G DOValves
SD-06 Test Reports
3.1Hydrostatic Tests
3.1Air Tests
3.1Valve-Operating Tests
3.1Drainage Tests
3.1Pneumatic Tests
3.1Non-Destructive Electric Tests
3.1System Operation Tests
SD-07 Certificates
1.4.2Record of Satisfactory Field
Operation
1.4.3List of Qualified Permanent
Service Organizations
1.2Listing of Product Installations
1.2Records of Existing Conditions
3.1Surface Resistance
3.1Shear and Tensile Strengths
3.1Temperature Ratings
3.1Bending Tests
3.1Flattening Tests
3.1Transverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 61 PAGES
23 05 15 3.9 G ROOperation and Maintenance
Manuals
23 05 93 SD-01 Preconstruction Submittals
1.3.3 G RORecords of Existing Conditions
1.5.3.1 G ROTAB Firm
1.2 G ROTAB Team Assistants
1.2 G ROTAB Team Engineer
1.5.3.2 G ROTAB Specialist
1.2 G ROTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 G DOTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 G DOEquipment and Performance
Data
1.5.3.4 G DOTAB Related HVAC Submittals
1.5.2 G DOTAB Procedures
1.5.2 G DOCalibration
1.3.3 G DOSystems Readiness Check
1.5.4 G DOTAB Execution
1.5.4.3 G DOTAB Verification
SD-06 Test Reports
3.3.5Completed Pre-Final DALT
Report
3.3.8Certified Final DALT Report
1.6.1.1TAB Design Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 61 PAGES
23 05 93 1.5.5.2TAB Report for Season 1
1.5.5.2TAB Report for Season 2
SD-07 Certificates
1.5.1Independent TAB Agency and
Personnel Qualifications
1.6.1DALT and TAB Submittal and
Work Schedule
1.6.1.3TAB Pre-Field Engineering
Report
1.5.3.1TAB Firm
1.3.3Design Review Report
1.6.1.2Pre-field DALT Preliminary
Notification
1.6.1Advanced Notice for Season 1
TAB Field Work
1.6.1Prerequisite HVAC Work Check
Out List For Season 1
3.3.2Advance Notice Of Pre-Final Dalt
Field Work
23 09 00 SD-02 Shop Drawings
3.2 G DODDC Contractor Design Drawings
3.2 G DODraft As-Built Drawings
3.2 G DOFinal As-Built Drawings
SD-03 Product Data
1.7.3 G DOProgramming Software
1.7.4 G DOController Application Programs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 61 PAGES
23 09 00 1.7.1 G DOConfiguration Software
1.7.2 G DOController Configuration Settings
1.1.1.3 G DOProprietary Multi-Split
Engineering Tool Software
2.2 G DOManufacturer's Product Data
SD-05 Design Data
1.8 G DOBoiler Plant Gateway Request
SD-06 Test Reports
3.4.2Start-Up Testing Report
1.9.1Pre-Construction Quality Control
(QC) Checklist
1.9.2Post-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.5 G ROOperation and Maintenance
(O&M) Instructions
3.7.1 G ROTraining Documentation
SD-11 Closeout Submittals
2.5 G ROEnclosure Keys
1.9.3 G ROCloseout Quality Control (QC)
Checklist
23 52 00 SD-02 Shop Drawings
1.5 G DODetail Layout Drawings
SD-03 Product Data
2.1.1 G DOMaterials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 61 PAGES
23 52 00 2.2 G DOBoilers
3.10 G DOSystem Layout Diagrams
2.3 G DOFuel burning equipment
2.4 G DOCombustion Control Equipment
2.5 G DOPumps
2.10 G DOFittings and Accessories
2.14 G DOFuel Oil Storage System
1.5 G DOSpare Parts
2.15 G DOWater Treatment System
2.15 G DOBoiler Water Treatment
3.8 GHeating System Tests
3.11 G DOFuel System Tests
2.7 G DOUnit Heaters
1.3 G DOWelding
3.8 G DOQualifications
3.10 G DOField Instructions
SD-06 Test Reports
3.8Heating System Tests
3.11Fuel System Tests
3.8.1Water Treatment Testing
SD-07 Certificates
2.10.10.3Bolts
2.10.2Continuous Emissions Monitoring
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 61 PAGES
23 52 00 3.10 G ROOperation and Maintenance
Instructions
2.15 G ROWater Treatment System
SD-11 Closeout Submittals
3.9.2 G ROIndoor Air Quality During
Construction
23 84 19 SD-02 Shop Drawings
1.2.2 G DODrawings
SD-03 Product Data
3.1 G DOVerification of Dimensions
2.1 G DOStandard Products
1.4 G DOSpare Parts
1.2.1 G DOQualifications
3.4 G DOField Instructions
3.5 G DOPerformance Tests
3.4 G DODemonstrations
SD-06 Test Reports
3.5Performance Tests
3.6Inspections
SD-07 Certificates
2.1Standard Products
SD-10 Operation and Maintenance
Data
3.4 G ROOperation and Maintenance
Manual
25 05 11 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 61 PAGES
25 05 11 3.2.2.2 G RODevice Account Lock Exception
Request
3.10 G ROMultiple IP Connection Device
Request
1.10.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
1.10.6 G ROContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
3.2.3.1 G DOUser Interface Banner Schedule
1.8.1 G DONetwork Communication Report
1.8.4 G DOCybersecurity Riser Diagram
1.8.2 G DOControl System Inventory Report
SD-03 Product Data
1.8.5 G DOControl System Cybersecurity
Documentation
SD-06 Test Reports
3.1Existing Configuration Report
SD-07 Certificates
1.9Software Licenses
SD-11 Closeout Submittals
3.6.2.2.5 G ROPassword Summary Report
1.8.3 G ROSoftware Recovery And
Reconstitution Images
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 61 PAGES
25 05 11 3.3.2.1 G RODevice Audit Record Upload
Software
25 05 12 SD-01 Preconstruction Submittals
1.10.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
1.10.6 G ROContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
1.8.1 G DOControl System Inventory Report
SD-03 Product Data
1.8.3 G DOControl System Cybersecurity
Documentation
SD-07 Certificates
1.9Software Licenses
SD-11 Closeout Submittals
1.8.2 G ROSoftware Recovery And
Reconstitution Images
3.2.1.1 G RODevice Audit Record Upload
Software
25 05 13 SD-01 Preconstruction Submittals
3.2.2.2 G RODevice Account Lock Exception
Request
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 61 PAGES
25 05 13 1.10.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
1.10.6 G ROContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
3.2.3.1 G DOUser Interface Banner Schedule
1.8.1 G DONetwork Communication Report
1.8.2 G DOControl System Inventory Report
SD-03 Product Data
1.8.4 G DOControl System Cybersecurity
Documentation
SD-06 Test Reports
3.1Existing Configuration Report
SD-07 Certificates
1.9Software Licenses
SD-11 Closeout Submittals
3.6.2.2.4 G ROPassword Summary Report
1.8.3 G ROSoftware Recovery And
Reconstitution Images
3.3.2.1 G RODevice Audit Record Upload
Software
26 05 13 SD-03 Product Data
2.2.1XLPE Shielded Power Cables
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 61 PAGES
26 05 13 2.2.2EPR Shielded Power Cables
(Alternative)
SD-06 Test Reports
3.2Dielectric-Absorption Tests
3.2Medium-Voltage Tests
3.2Radiographic Tests
SD-07 Certificates
2.5Flammability
3.1.4Minimum Bending Radius
3.2Medium-Voltage Tests
3.2Dielectric Absorption Tests
1.4Cable Splicers
SD-08 Manufacturer’s Instructions
3.3Medium-Voltage Power Cables
3.3Pothead Terminations
26 05 19 SD-03 Product Data
2.1.1 G DOWire and Cable
2.1.3.1 G DOConductors
3.1 G DOCable Manufacturing Data
SD-06 Test Reports
3.2Test Report(s), Inspection
Report(s), and Verification
Report(s)
26 05 26 SD-03 Product Data
2.1.1 G DOGround Rods
2.1.2 G DOGround Wires
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 61 PAGES
26 05 26 2.1.3 G DOConnectors and Fasteners
2.1.4 G DOTest Wells
2.1.5 G DOConductive Corrosion Inhibiting
Compounds
2.1.6 G DOGround Buses
SD-06 Test Reports
3.2.1Bond Resistance Test
3.2.2Ground Resistance Tests
3.2.3Ground Isolation Test
3.2.4Equipment Continuity Test
SD-07 Certificates
1.3.3Ground Resistance Test
Equipment
1.3.4Micro-Ohmmeter Test Equipment
SD-11 Closeout Submittals
3.3 G RORecord Drawings
26 05 43 SD-03 Product Data
1.6Product Data
SD-05 Design Data
3.1Locations And Elevations
SD-06 Test Reports
3.6Installation Of Underground Duct
And Duct Bank
3.6Joint Integrity And Adequate
Bend Radii
26 05 71 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 61 PAGES
26 05 71 2.1 G DOConnection Diagrams
2.1 G DOFabrication Drawings
3.1 G DOControl Devices
3.1 G DOProtective Devices
SD-03 Product Data
2.2.3 G DOFuses
2.2.1 G DOMotor Controllers
2.3.1 G DOInstrument Transformers
2.3.2 G DOEnclosures
2.2.2 G DOCircuit Breakers
3.1 G DOControl Devices
2.3.3 G DOTime Switches
2.3.4 G DOProtective Relays
2.3.5 G DOIndicating Instruments
2.3.6 G DOIndicating Lights
SD-06 Test Reports
3.2.1Dielectric Tests
3.2.1Final Test Reports
SD-07 Certificates
3.2.1Insulating Oil
SD-08 Manufacturer’s Instructions
3.1Control Devices
3.1Protective Devices
SD-10 Operation and Maintenance
Data
2.2.1.1 G ROManual Motor Controllers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 61 PAGES
26 05 71 2.2.1.2 G ROMagnetic Motor Controllers
2.2.1.3 G ROCombination Motor Controllers
2.2.2 G ROCircuit Breakers
2.3.3 G ROTime Switches
2.3.4 G ROProtective Relays
2.3.5 G ROIndicating Instruments
26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections
SD-07 Certificates
1.4.1Qualifications
1.4.3Acceptance test and inspections procedure
26 09 23 SD-02 Shop Drawings
2.1 G DOLighting System Drawings
SD-03 Product Data
3.1 G DOInstallation Instructions
2.2.2 G DODimming Ballast Controls
2.2.3 G DOLight Level Sensor
2.2.4 G DODimmer Switch
2.2.5 G DOLighting Contactor
2.2.6 G DOTime Switch
2.2.7 G DOPhotocell Switch
2.2.8 G DOOccupancy Sensors
SD-06 Test Reports
3.3System Operation Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 61 PAGES
26 09 23 SD-10 Operation and Maintenance
Data
3.4 G ROLighting Control System
26 13 00 SD-02 Shop Drawings
1.5.1 G DOSwitchgear Drawings
SD-03 Product Data
1.5.3 G DOElectronic Overcurrent Control
Curves
1.6.1 G ROSF6/High-Firepoint Fluid
Insulated Switchgear
2.1 G ROSF6/High-Firepoint Fluid
Insulated Switchgear
2.4 G DOInsulated Medium-Voltage
Connectors
2.5 G DOSurge Arresters
SD-06 Test Reports
3.4.1Acceptance Checks and Tests
SD-07 Certificates
1.5.2Paint Coating System
SD-09 Manufacturer’s Field
Reports
2.7.1Switchgear design and production tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 61 PAGES
26 13 00 1.6.1 G ROSF6/High-Firepoint Fluid
Insulated Switchgear
2.1 G ROSF6/High-Firepoint Fluid
Insulated Switchgear
26 20 00 SD-02 Shop Drawings
2.14 G DOPanelboards
2.16 G DOTransformers
2.4 G DOBUSBAR TRUNKING SYSTEMS
(BUSWAYS)
2.5 G DOCable Trays
2.20 G DOMotor Control Centers
3.1.13.1 GMarking Strips
SD-03 Product Data
2.13 G DOReceptacles
2.14.3 G DOCircuit Breakers
2.11 G DOSwitches
2.16 G DOTransformers
2.15 G DOEnclosed Circuit Breakers
2.18 G DOMotor Controllers
2.19 G DOManual Motor Starters
2.28 G DOMetering
2.23.3 G DOGrounding Busbar
2.29 G DOSurge Protective Devices
SD-06 Test Reports
3.5.2600-volt Wiring Test
3.5.6Grounding System Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 61 PAGES
26 20 00 3.5.3Transformer Tests
3.5.4Ground-fault Receptacle Test
3.5.5Arc-fault Receptacle Test
SD-07 Certificates
2.12Fuses
SD-09 Manufacturer’s Field
Reports
2.31.1Transformer Factory Tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 22 00 SD-02 Shop Drawings
3.2 G DOInstallation
SD-03 Product Data
1.5 G ROSpare Parts
SD-04 Samples
2.1Nameplates
SD-06 Test Reports
2.5Factory Inspection and Tests
26 23 00 SD-02 Shop Drawings
1.5.2 G DOSwitchgear Drawings
SD-03 Product Data
2.2 G DOLOW VOLTAGE Switchgear
SD-06 Test Reports
2.5.2Switchgear Design Tests
2.5.3Switchgear Production Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 61 PAGES
26 23 00 3.5.1Acceptance Checks and Tests
SD-10 Operation and Maintenance
Data
1.6.1 G ROSwitchgear Operation and
Maintenance
SD-11 Closeout…