About this file

This is a Request for Proposal for the construction of a Deployable Airbase Systems-Facilities, Equipment, and Vehicle storage complex at Sanem, Luxembourg. The scope of work includes three warehouses of varying sizes for storage of construction vehicles, equipment, and shipping containers. Supporting facilities will also be constructed, such as a refueling vehicle maintenance shop, fire alarm and smoke detection systems, and site improvements. Utilities, pavements, and environmental mitigation are required. Drawings can be requested via email from the points of contact provided. The Department of the Army European Command is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to Request for Proposal (RFP) for Project: Construct Deployable Airbase Systems – Facilities, Equipment, and Vehicles (DABS/FEV) Storage Complex at Sanem, Luxembourg, newest first.
File Type Posted
B.08.03 Amendment 0003 Sanem Luxembourg - Double Tee Information.pdf PDF
B.08.03 Amendment 0003 Sanem Luxembourg - Micropile Information.pdf PDF
B.08.03 Amendment 0003 41 22 13_REVISED 03.22.203.pdf PDF
B.08.03 Amendment 0003 to RFP W912GB23R0009.pdf PDF
A.03.09 Amendment 0002 SA-701.PDF PDF
A.03.09 Amendment 0002 SA-702.PDF PDF
B.08.03 Amendment 0002 RFP W912GB23R0009.pdf PDF
A.03.09 Amendment 0002 SA-700.PDF PDF
A.03.09 Amendment 0002 P-503 - PLUMBING STANDARD DETAILS III.pdf PDF
B.07.01 Luxembourg DABS_Pre_Proposal Final.pdf PDF
B.07.01 PPSV Attendance Sheet.pdf PDF
B.08.03 Amendment 01 to RFP W912GB23R0009.pdf PDF
B.08.02 RFP DC-23-0017 W912GB23R0009 Luxembourg DABS.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
A.03.09 Attachment 6_Specifications 01.26.2023.pdf PDF
A.02.17 Attachment 9_Statement of Work.pdf PDF
J.01.11 Attachment 11_DRAFT DD 1354 (Part 2).pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet 23R0009.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.02 Attachment 2_PPQ.pdf PDF
J.01.11 Attachment 10_DRAFT DD 1354 (Part 1).pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 61 PAGES

ERI: CONSTRUCT ECAOS DABS STORAGE

00 74 01 SD-01 Preconstruction Submittals

1.7.2List of Required HN Permits

1.7.2Permits And Notifications

1.7.1Approved Permits

SD-11 Closeout Submittals

1.7.3Final Acceptance

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 G ROList of Contact Personnel

01 22 00 SD-01 Preconstruction Submittals

GQuantity Measurement Plan

01 30 01 SD-01 Preconstruction Submittals

3.1.3Pre-Construction Documentation

3.2 GMobilization Plan

3.6.1 GEnvironmental Protection Plan

3.4.2 GTraffic Control Plan

3.5.2 GConstruction Fence/Screening

3.11.2 GTemporary Construction Plan

SD-03 Product Data

3.7.1 GHazardous Materials

SD-11 Closeout Submittals

3.1.5Weekly Status

01 30 06 SD-01 Preconstruction Submittals

1.5.4 GField Office Submittal

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.3.1 GPreliminary Project Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 61 PAGES

01 32 01 3.3.2 GInitial Project Schedule

SD-07 Certificates

3.3.3 GSchedule Update

3.8.6 GSchedule Update

3.3.4 GRevised Schedule

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.8.1 G DOProject Accident Prevention Plan

1.9 G DOProject Accident Prevention Plan

1.8.1 G DOHost Nation Equivalent Training

1.10 GActivity Hazard Analysis (AHA)

SD-06 Test Reports

1.13Notifications and Reports

1.13.2 G DOAccident Reports

01 45 00 SD-01 Preconstruction Submittals

3.2 GConstruction Quality Control

(CQC) Plan

SD-07 Certificates

3.6.2Testing Laboratory Certification

01 45 05 SD-01 Preconstruction Submittals

1.3 GSuperintendent and Alternate

Superintendent

1.4 GCQC and Alternate CQC SM

1.5 G DOSSHO and Alternate SSHO

1.4.3 GAdditional CQC Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 61 PAGES

01 45 35 SD-01 Preconstruction Submittals

3.1.1 G ROSIOR Letter of Acceptance

3.1.1 G ROProject Manual

3.1.1 G ROProject Manual

3.1.1Written NDT Practices

3.1.3Written NDT Practices

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

1.5.10Special Inspector of Record

1.5Special Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1 G ROInterim Report

3.1.3 G ROInterim Report

3.1.1 G ROComprehensive Final Report

3.1.3 G ROComprehensive Final Report

01 57 19 SD-01 Preconstruction Submittals

1.6.1 G ROPreconstruction Survey

1.11 G ROSolid Waste Management Permit

1.6.2 G RORegulatory Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 61 PAGES

01 57 19 1.7 G ROEnvironmental Protection Plan

3.2.1.1 G ROStormwater Pollution Prevention

Plan

3.2.1.2 G ROStormwater Notice of Intent

1.7.9.1 G RODirt and Dust Control Plan

1.6.5 G ROEmployee Training Records

1.6.4 G ROEnvironmental Manager

Qualifications

SD-06 Test Reports

3.2.1.3Inspection Reports

1.11.1Monthly Solid Waste Disposal

Report

SD-07 Certificates

1.6.5Employee Training Records

SD-11 Closeout Submittals

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.6.1 G ROWaste Determination

Documentation

1.6.5 G ROAssembled Employee Training

Records

1.11 G ROSolid Waste Management Permit

3.6.2.1 G ROProject Solid Waste Disposal

Documentation Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 61 PAGES

01 57 19 3.6.3.1 G ROHazardous Waste/Debris

Management

1.6.2 G RORegulatory Notifications

3.6.2.1 G ROSales Documentation

3.6.2.1Contractor Certification;

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Quarterly Reports

SD-11 Closeout Submittals

1.9 G ROFinal Construction Waste

Diversion Report

01 78 00 SD-01 Preconstruction Submittals

3.1.2 GCommissioning Plan

SD-02 Shop Drawings

3.2.3Working As-Built Markup

Drawings

SD-03 Product Data

1.8.4Warranty Management Plan

1.8.7Warranty Tags

1.6Spare Parts Data

1.9Equipment Guarantees

SD-08 Manufacturer’s Instructions

1.8.4Posted Instructions

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 61 PAGES

01 78 00 1.8.3Local Warranty Contractor

3.2 GAs-Built Drawings

3.3 GRecord Drawings

3.5.1 GInterim DD FORM 1354

1.8.6Warranty Repair Report

3.6 GConstruction Book

01 78 23 SD-10 Operation and Maintenance

Data

3.1 GOperation and Maintenance

Manuals

1.7 GData Package List

1.4 GO&M Database

3.2.1 GTraining Plan

3.2.3 GTraining Outline

3.2.2 GTraining Content

SD-11 Closeout Submittals

3.2.4 GTraining Video Recording

3.2.6 GValidation of Training Completion

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Team

1.7.2 G DOCommissioning Specialist (CxC)

SD-05 Design Data

3.1.2.1Design Phase Commissioning

Plan

3.1.5.1Pre-Functional Checks

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 61 PAGES

01 91 00.15 10 1.5.1 G DOPre-Functional Checklists

1.5.2 G DOPre-Functional Checklists

1.8Issues and Resolutions Log

1.5.1Testing, Adjusting, And Balancing

Report

1.5.2Duct Air Leakage Test

Procedures

1.5.2Functional Performance Testing

1.5.2Post-Test Deficiency Correction

1.5.2Re-Testing

1.5.2Seasonal Testing

3.1.4Commissioning Inspection And

Testing Team

3.1.5.2Testing, Adjusting, And Balancing

(Tab) Report And Field

Acceptance Testing

3.1.5.6Functional Performance Tests

SD-07 Certificates

1.9 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

1.5.2 G ROTraining Plan

1.7.1 G ROTraining Plan

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

1.5.2 G DOSystems Manual Documents

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 61 PAGES

01 91 00.15 10 1.5.2 G DOMaintenance and Service Life

Plans

3.1.8 G DOMaintenance and Service Life

Plans

3.1.7Systems Manual

3.2Updated Systems Manual

Documents

SD-11 Closeout Submittals

1.5.2Tab Schematic Drawings, Report

Forms, And Procedures

1.5.2Post-Construction Site Visit

02 41 00 SD-01 Preconstruction Submittals

1.3.2 G RODemolition Plan

1.9 G ROExisting Conditions

SD-07 Certificates

1.7Notification of Demolition

SD-11 Closeout Submittals

3.3.2Receipts

06 10 00 SD-03 Product Data

1.8 G DOFire-retardant Treatment

2.3.2 G DOAdhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.10.1Certificates of Grade

1.7Preservative Treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 61 PAGES

06 10 00 SD-10 Operation and Maintenance

Data

3.2 G ROTake-back Program

07 11 13 SD-07 Certificates

1.2Materials

07 21 16 SD-03 Product Data

2.1 G DOBlanket Insulation

2.3 G DOVapor Retarder

2.4 G DOPressure Sensitive Tape

2.5 G DOAccessories

SD-07 Certificates

2.5.1Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 60 00 SD-02 Shop Drawings

2.1.1 G DOExposed Sheet Metal

3.1.11 G DOGutters

3.1.12 G DODownspouts

2.1.1 G DOGravel Stops and fascia

3.1.14 G DOFlashing at Roof Penetrations

and Equipment Supports

3.1.10 G DODrip Edges

SD-04 Samples

1.4.2Finish Samples

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 61 PAGES

07 60 00 3.5Quality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 G ROCleaning and Maintenance

07 81 00 SD-03 Product Data

3.3 G DOFireproofing Material

SD-04 Samples

2.1Spray-Applied Fireproofing

SD-06 Test Reports

1.2.2Fire Resistance Rating

3.6Field Tests

1.2.3Evaluation Reports

SD-07 Certificates

1.4.1Installer Qualifications

3.1Surface Preparation Report

3.5.2Manufacturer's Inspection Report

07 84 00 SD-02 Shop Drawings

2.1 G DOFirestopping System

SD-03 Product Data

2.2 G DOFirestopping Materials

SD-06 Test Reports

3.3Inspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 61 PAGES

07 92 00 SD-03 Product Data

2.1 G DOSealants

2.2 G DOPrimers

2.3 G DOBond Breakers

2.4 G DOBackstops

SD-06 Test Reports

3.1Field Adhesion

SD-07 Certificates

2.1.1Indoor Air Quality For Interior

Sealants

2.1.3Indoor Air Quality For Interior

Floor Joint Sealants

08 11 13 SD-02 Shop Drawings

2.1 G DODoors

2.1 G DODoors

2.1Recycled Content for Steel Door

Product

2.5 G DOFrames

2.5 G DOFrames

2.5Recycled Content for Steel Frame

Product

2.3 G DOAccessories

2.7 G DOWeatherstripping

SD-03 Product Data

2.1 G DODoors

2.5 G DOFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 61 PAGES

08 11 13 2.3 G DOAccessories

2.7 G DOWeatherstripping

08 33 23 SD-02 Shop Drawings

2.2.1 G DOOverhead Coiling Doors

2.2.3 G DOCounterbalancing Mechanism

2.2.4 G DOManual Door Operators

2.2.5 G DOElectric Door Operators

2.2.1.4 G DOBottom Bars

2.1.1.1 G DOGuides

2.2.3.1 G DOMounting Brackets

2.2.2.2 G DOHood

2.1.1.1 G DOInstallation Drawings

SD-03 Product Data

2.2.1 G DOOverhead Coiling Doors

2.2.2 G DOHardware

2.2.3 G DOCounterbalancing Mechanism

2.2.4 G DOManual Door Operators

2.2.5 G DOElectric Door Operators

2.2.6 G DOFire-Rated Door Assembly

SD-05 Design Data

2.2.1 G DOOverhead Coiling Doors

2.2.2 G DOHardware

2.2.3 G DOCounterbalancing Mechanism

2.2.4 G DOManual Door Operators

2.2.5 G DOElectric Door Operators

1.3 G DOFire-Rated Door

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 61 PAGES

08 33 23 SD-10 Operation and Maintenance

Data

3.3.2 G ROOperation and Maintenance

Manuals

3.3.2 G ROMaterials

3.3.2 G RODevices

3.3.2 G ROProcedures

3.3.2 G ROManufacturer's Brochures

3.3.2 G ROParts Lists

SD-11 Closeout Submittals

3.3.1 G ROWarranty

08 71 00 SD-02 Shop Drawings

1.3 G DOManufacturer's Detail Drawings

1.3 G DOVerification of Existing Conditions

1.5 G DOHardware Schedule

2.3.7 G DOKeying System

SD-03 Product Data

2.3 G DOHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G ROHardware Schedule

SD-11 Closeout Submittals

1.6.1 G ROKey Bitting

08 81 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 61 PAGES

08 81 00 1.3 G DOGlazing Accessories

2.2.3.1 G DOSealants

SD-04 Samples

2.2.2Glazing Compound

2.2.5Tape

2.2.5Sealing Tapes

SD-08 Manufacturer’s Instructions

2.2Setting and Sealing Materials

3.2Glass Setting

08 91 00 SD-02 Shop Drawings

1.4 G DOWall louvers

1.5 G DOWall louvers

SD-03 Product Data

2.2 G DOMetal Wall Louvers

SD-04 Samples

1.4Wall louvers

1.5Wall louvers

1.5Door louvers

09 22 00 SD-02 Shop Drawings

2.1 G DOMetal Support Systems

SD-03 Product Data

2.1 G DOMetal Support Systems

09 29 00 SD-03 Product Data

2.1.2 G DOWater-Resistant Gypsum Backing

Board

2.1.4 G DOAbuse Resistant Gypsum Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 61 PAGES

09 29 00 2.1.8 G DOAccessories

2.1.1 G DOGypsum Board

2.1.5 SVOC Content of Joint Compound

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1Indoor Air Quality for Gypsum

Board

2.1.7Indoor Air Quality for Non-aerosol

Adhesives

2.1.7Indoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2 G DODetail Drawings

SD-03 Product Data

2.1.1 G DOMosaic Tile

2.1.2 G DOGlazed Wall Tile

2.2 G DOSetting-Bed

2.4 G DOMortar, Grout, and Adhesive

SD-04 Samples

2.1Tile

2.1Accessories

2.1Transition Strips

2.5Transition Strips

2.4.3Grout

SD-07 Certificates

2.4Indoor Air Quality for Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 61 PAGES

09 30 10 2.4.4Indoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 G ROInstallation

09 51 00 SD-02 Shop Drawings

2.1 G DOApproved Detail Drawings

SD-03 Product Data

2.1.1 G DOAcoustical Performance

SD-04 Samples

2.2 GAcoustical Units

SD-07 Certificates

2.5 SIndoor Air Quality for Adhesives

09 65 00 SD-02 Shop Drawings

2.8 G DOResilient Flooring and

Accessories

SD-03 Product Data

2.8 G DOResilient Flooring and

Accessories

2.4 G DOAdhesives

2.1Linoleum Tile

2.2Wall Base

SD-04 Samples

2.8Resilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 61 PAGES

09 65 00 SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.4Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.8 G ROResilient Flooring and

Accessories

09 90 00 SD-03 Product Data

2.1 G DOCoating

SD-04 Samples

1.10Color

SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2Qualification Testing

2.1Indoor Air Quality for Paints and

Primers

SD-08 Manufacturer’s Instructions

3.5.2Mixing

1.8.2Manufacturer's Safety Data

Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 61 PAGES

09 90 00 SD-10 Operation and Maintenance

Data

2.1 G ROCoatings

09 96 00 SD-01 Preconstruction Submittals

1.3 G ROEquipment List

SD-03 Product Data

2.1.1 G DOHeat-Resistant Coatings

2.2.1 G DOEpoxy Coatings

2.2.2 G DOPolyurethane Coatings

SD-04 Samples

1.3Color Chips

SD-07 Certificates

2.1.1Heat-Resistant Coatings

2.2.1Epoxy Coatings

2.2.2Polyurethane Coatings

3.1.4Manufacturer's Printed

Instructions

09 97 13 SD-01 Preconstruction Submittals

3.3.1.1 G ROInspection Forms

1.3 G ROSafety Plan

SD-03 Product Data

2.1.1 G DOAbrasive Blasting Material

2.1.2 G DOSealant Compound

2.1.3.1 G DOInorganic Zinc

2.1.3.1 G DOInhibitive Polyamide Epoxy

2.1.3.1 G DOAliphatic Polyurethane

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 61 PAGES

09 97 13 SD-04 Samples

1.3Manufacturer's Standard Color

Charts

3.3.1.1Inspection Forms

SD-05 Design Data

2.1.3.1 G DOInorganic Zinc

2.1.3.1 G DOInhibitive Polyamide Epoxy

2.1.3.1 G DOAliphatic Polyurethane

SD-06 Test Reports

3.3.1.2Inspection Reports

SD-07 Certificates

2.1.1Abrasive Blasting Material

2.1.2Sealant Compound

2.1.3.1Inhibitive Polyamide Epoxy

2.1.3.1Aliphatic Polyurethane

SD-08 Manufacturer’s Instructions

2.1.3Protective Coatings

10 14 00 SD-02 Shop Drawings

3.1 G DOApproved Detail Drawings

SD-03 Product Data

2.1 G DOModular Exterior Signage System

3.1Installation

1.2 G DOExterior Signage

SD-04 Samples

1.2Exterior Signage

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 61 PAGES

10 14 00 SD-10 Operation and Maintenance

Data

3.1.2 G ROProtection and Cleaning

10 14 01 SD-02 Shop Drawings

1.3.2 G DODetail Drawings

SD-03 Product Data

3.1 G DOInstallation

1.5 G DOWarranty

SD-04 Samples

1.3.1Interior Signage

SD-10 Operation and Maintenance

Data

3.1 G ROApproved Manufacturer's

Instructions

3.1.2 G ROProtection and Cleaning

10 28 13 SD-03 Product Data

2.1.2 G DOFinishes

2.2 G DOAccessory Items

SD-04 Samples

2.1.2Finishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

13 34 19 SD-01 Preconstruction Submittals

1.6.3 G ROManufacturer's Qualifications

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 61 PAGES

13 34 19 1.2.1.7 G DODetail Drawings

1.6.1 G DODetail Drawings

1.2.10 G DOErection Plan

SD-03 Product Data

1.6.1 G DOManufacturer's Catalog Data

SD-04 Samples

1.6.1Coil Stock

2.1.8Coil Stock

1.2.1.9Roof Panels

1.2.1.9Wall Panels

2.5Fasteners

2.7.1Metal Closure Strips

1.4.6Insulation

1.6.9Vapor Barrier

2.4.2Manufacturer's Color Charts and

Chips

SD-05 Design Data

1.6.1 G DOManufacturer's Descriptive and

Technical Literature

1.6.1 G DOManufacturer's Building Design

Analysis

SD-06 Test Reports

1.6.1Test Reports

1.6.1Coatings and Base Metals

1.6.1Factory Color Finish Performance

Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 61 PAGES

13 34 19 SD-07 Certificates

1.6.1System Components

1.6.1Coil Stock

2.1.8Coil Stock

1.6.1 GAluminized Steel Repair Paint

1.6.1 GGalvanizing Repair Paint

1.6.1 GEnamel Repair Paint

1.6.1Qualification of Manufacturer

1.6.1Qualification of Erector

SD-08 Manufacturer’s Instructions

1.6.2Installation of Roof and Wall panels

1.7Shipping, Handling, and Storage

SD-11 Closeout Submittals

3.13.1 G ROManufacturer's Warranty

3.13.2 G ROContractor's Warranty for

Installation

22 00 00 SD-02 Shop Drawings

3.8.1 G DOPlumbing System

SD-03 Product Data

2.4 G DOFixtures

2.4.2 G DOFlush Valve Water Closets

2.4.3 G DOFlush Valve Urinals

2.4.4 G DOWall Hung Lavatories

2.9 G DOWater Heaters

3.8.1.1 G DOBackflow Prevention Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 61 PAGES

22 00 00 3.4 G DOVibration-Absorbing Features

3.8.1 G DOPlumbing System

SD-06 Test Reports

3.8Tests, Flushing and Disinfection

3.8.1.1Test of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

SD-10 Operation and Maintenance

Data

3.8.1 G ROPlumbing System

22 15 14 SD-02 Shop Drawings

2.1 G DOInstallation Drawings

SD-03 Product Data

2.1.1 G DOEquipment and Performance

Data

2.3.1 G DOAboveground Piping Materials

2.2.1 G DOPiping Specialties

2.4.2 G DOSupporting Elements

2.2.2 G DOAir Compressors

2.2.3 G DOValves

3.1.1.1 G DOAccessories

2.4.1 G DOMiscellaneous Materials

2.2.2.1Refrigerated Air Dryer

SD-05 Design Data

2.1.1 G DODesign Analysis and Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 61 PAGES

22 15 14 SD-06 Test Reports

3.2.1.4Piping System Test Report

SD-07 Certificates

2.3.1Aboveground Piping Materials

2.4.2Supporting Elements

2.2.3Valves

2.4.1Miscellaneous Materials

SD-10 Operation and Maintenance

Data

3.4 G ROOperation and Maintenance

Manuals

23 00 00 SD-02 Shop Drawings

1.4.4 G DODetail Drawings

SD-03 Product Data

2.9.1.1Metallic Flexible Duct

2.9.2 G DODuct Access Doors

2.9.3 G DOFire Dampers

2.9.4 G DOManual Balancing Dampers

2.9.6 G DOSound Attenuation Equipment

2.9.6.3 G DOAcoustical Duct Liner

2.9.7.1 G DORegisters and Grilles

2.9.8 G DOLouvers

2.9.9 G DOAir Vents, Penthouses, and

Goosenecks

2.10.1.1 G DOIn-Line Centrifugal Fans

2.17 G DOHot Water Unit Heaters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 61 PAGES

23 00 00 2.11 G DOEnergy Recovery Devices

1.4.5 G DOTest Procedures

1.2.1.2 G DODiagrams

2.10.1.2 G DOMixed Flow Fans

2.13 G DOMini-Split-System Air

Conditioners Heat Pumps

SD-06 Test Reports

3.11Performance Tests

3.10Damper Acceptance Test

SD-07 Certificates

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.14.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.14.1 G ROOperation and Maintenance

Manuals

2.9.3 G ROFire Dampers

2.9.4 G ROManual Balancing Dampers

2.10.1.1 G ROIn-Line Centrifugal Fans

2.11 G ROEnergy Recovery Devices

2.16.1 G ROHydronic Modular Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 61 PAGES

23 00 00 SD-11 Closeout Submittals

3.12 G ROIndoor Air Quality During

Construction

3.12 G ROIndoor Air Quality During

Construction

23 05 15 SD-01 Preconstruction Submittals

1.2 G ROMaterial, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 G DORecord Drawings

1.2 G DOConnection Diagrams

1.2 G DOCoordination Drawings

1.2 G DOFabrication Drawings

3.1 G DOInstallation Drawings

SD-03 Product Data

2.1 G DOPipe and Fittings

2.2 G DOPiping Specialties

2.3 G DOValves

2.4 G DOMiscellaneous Materials

2.5 G DOSupporting Elements

1.2 G DOEquipment Foundation Data

SD-04 Samples

1.2Manufacturer's Standard Color

Charts

SD-05 Design Data

2.1 G DOPipe and Fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 61 PAGES

23 05 15 2.2 G DOPiping Specialties

2.3 G DOValves

SD-06 Test Reports

3.1Hydrostatic Tests

3.1Air Tests

3.1Valve-Operating Tests

3.1Drainage Tests

3.1Pneumatic Tests

3.1Non-Destructive Electric Tests

3.1System Operation Tests

SD-07 Certificates

1.4.2Record of Satisfactory Field

Operation

1.4.3List of Qualified Permanent

Service Organizations

1.2Listing of Product Installations

1.2Records of Existing Conditions

3.1Surface Resistance

3.1Shear and Tensile Strengths

3.1Temperature Ratings

3.1Bending Tests

3.1Flattening Tests

3.1Transverse Guided Weld Bend

Tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 61 PAGES

23 05 15 3.9 G ROOperation and Maintenance

Manuals

23 05 93 SD-01 Preconstruction Submittals

1.3.3 G RORecords of Existing Conditions

1.5.3.1 G ROTAB Firm

1.2 G ROTAB Team Assistants

1.2 G ROTAB Team Engineer

1.5.3.2 G ROTAB Specialist

1.2 G ROTAB Team Field Leader

SD-02 Shop Drawings

1.3.3 G DOTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 G DOEquipment and Performance

Data

1.5.3.4 G DOTAB Related HVAC Submittals

1.5.2 G DOTAB Procedures

1.5.2 G DOCalibration

1.3.3 G DOSystems Readiness Check

1.5.4 G DOTAB Execution

1.5.4.3 G DOTAB Verification

SD-06 Test Reports

3.3.5Completed Pre-Final DALT

Report

3.3.8Certified Final DALT Report

1.6.1.1TAB Design Review Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 61 PAGES

23 05 93 1.5.5.2TAB Report for Season 1

1.5.5.2TAB Report for Season 2

SD-07 Certificates

1.5.1Independent TAB Agency and

Personnel Qualifications

1.6.1DALT and TAB Submittal and

Work Schedule

1.6.1.3TAB Pre-Field Engineering

Report

1.5.3.1TAB Firm

1.3.3Design Review Report

1.6.1.2Pre-field DALT Preliminary

Notification

1.6.1Advanced Notice for Season 1

TAB Field Work

1.6.1Prerequisite HVAC Work Check

Out List For Season 1

3.3.2Advance Notice Of Pre-Final Dalt

Field Work

23 09 00 SD-02 Shop Drawings

3.2 G DODDC Contractor Design Drawings

3.2 G DODraft As-Built Drawings

3.2 G DOFinal As-Built Drawings

SD-03 Product Data

1.7.3 G DOProgramming Software

1.7.4 G DOController Application Programs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 61 PAGES

23 09 00 1.7.1 G DOConfiguration Software

1.7.2 G DOController Configuration Settings

1.1.1.3 G DOProprietary Multi-Split

Engineering Tool Software

2.2 G DOManufacturer's Product Data

SD-05 Design Data

1.8 G DOBoiler Plant Gateway Request

SD-06 Test Reports

3.4.2Start-Up Testing Report

1.9.1Pre-Construction Quality Control

(QC) Checklist

1.9.2Post-Construction Quality Control

(QC) Checklist

SD-10 Operation and Maintenance

Data

3.5 G ROOperation and Maintenance

(O&M) Instructions

3.7.1 G ROTraining Documentation

SD-11 Closeout Submittals

2.5 G ROEnclosure Keys

1.9.3 G ROCloseout Quality Control (QC)

Checklist

23 52 00 SD-02 Shop Drawings

1.5 G DODetail Layout Drawings

SD-03 Product Data

2.1.1 G DOMaterials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 61 PAGES

23 52 00 2.2 G DOBoilers

3.10 G DOSystem Layout Diagrams

2.3 G DOFuel burning equipment

2.4 G DOCombustion Control Equipment

2.5 G DOPumps

2.10 G DOFittings and Accessories

2.14 G DOFuel Oil Storage System

1.5 G DOSpare Parts

2.15 G DOWater Treatment System

2.15 G DOBoiler Water Treatment

3.8 GHeating System Tests

3.11 G DOFuel System Tests

2.7 G DOUnit Heaters

1.3 G DOWelding

3.8 G DOQualifications

3.10 G DOField Instructions

SD-06 Test Reports

3.8Heating System Tests

3.11Fuel System Tests

3.8.1Water Treatment Testing

SD-07 Certificates

2.10.10.3Bolts

2.10.2Continuous Emissions Monitoring

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 61 PAGES

23 52 00 3.10 G ROOperation and Maintenance

Instructions

2.15 G ROWater Treatment System

SD-11 Closeout Submittals

3.9.2 G ROIndoor Air Quality During

Construction

23 84 19 SD-02 Shop Drawings

1.2.2 G DODrawings

SD-03 Product Data

3.1 G DOVerification of Dimensions

2.1 G DOStandard Products

1.4 G DOSpare Parts

1.2.1 G DOQualifications

3.4 G DOField Instructions

3.5 G DOPerformance Tests

3.4 G DODemonstrations

SD-06 Test Reports

3.5Performance Tests

3.6Inspections

SD-07 Certificates

2.1Standard Products

SD-10 Operation and Maintenance

Data

3.4 G ROOperation and Maintenance

Manual

25 05 11 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 61 PAGES

25 05 11 3.2.2.2 G RODevice Account Lock Exception

Request

3.10 G ROMultiple IP Connection Device

Request

1.10.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.10.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-02 Shop Drawings

3.2.3.1 G DOUser Interface Banner Schedule

1.8.1 G DONetwork Communication Report

1.8.4 G DOCybersecurity Riser Diagram

1.8.2 G DOControl System Inventory Report

SD-03 Product Data

1.8.5 G DOControl System Cybersecurity

Documentation

SD-06 Test Reports

3.1Existing Configuration Report

SD-07 Certificates

1.9Software Licenses

SD-11 Closeout Submittals

3.6.2.2.5 G ROPassword Summary Report

1.8.3 G ROSoftware Recovery And

Reconstitution Images

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 61 PAGES

25 05 11 3.3.2.1 G RODevice Audit Record Upload

Software

25 05 12 SD-01 Preconstruction Submittals

1.10.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.10.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-02 Shop Drawings

1.8.1 G DOControl System Inventory Report

SD-03 Product Data

1.8.3 G DOControl System Cybersecurity

Documentation

SD-07 Certificates

1.9Software Licenses

SD-11 Closeout Submittals

1.8.2 G ROSoftware Recovery And

Reconstitution Images

3.2.1.1 G RODevice Audit Record Upload

Software

25 05 13 SD-01 Preconstruction Submittals

3.2.2.2 G RODevice Account Lock Exception

Request

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 61 PAGES

25 05 13 1.10.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.10.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-02 Shop Drawings

3.2.3.1 G DOUser Interface Banner Schedule

1.8.1 G DONetwork Communication Report

1.8.2 G DOControl System Inventory Report

SD-03 Product Data

1.8.4 G DOControl System Cybersecurity

Documentation

SD-06 Test Reports

3.1Existing Configuration Report

SD-07 Certificates

1.9Software Licenses

SD-11 Closeout Submittals

3.6.2.2.4 G ROPassword Summary Report

1.8.3 G ROSoftware Recovery And

Reconstitution Images

3.3.2.1 G RODevice Audit Record Upload

Software

26 05 13 SD-03 Product Data

2.2.1XLPE Shielded Power Cables

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 61 PAGES

26 05 13 2.2.2EPR Shielded Power Cables

(Alternative)

SD-06 Test Reports

3.2Dielectric-Absorption Tests

3.2Medium-Voltage Tests

3.2Radiographic Tests

SD-07 Certificates

2.5Flammability

3.1.4Minimum Bending Radius

3.2Medium-Voltage Tests

3.2Dielectric Absorption Tests

1.4Cable Splicers

SD-08 Manufacturer’s Instructions

3.3Medium-Voltage Power Cables

3.3Pothead Terminations

26 05 19 SD-03 Product Data

2.1.1 G DOWire and Cable

2.1.3.1 G DOConductors

3.1 G DOCable Manufacturing Data

SD-06 Test Reports

3.2Test Report(s), Inspection

Report(s), and Verification

Report(s)

26 05 26 SD-03 Product Data

2.1.1 G DOGround Rods

2.1.2 G DOGround Wires

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 61 PAGES

26 05 26 2.1.3 G DOConnectors and Fasteners

2.1.4 G DOTest Wells

2.1.5 G DOConductive Corrosion Inhibiting

Compounds

2.1.6 G DOGround Buses

SD-06 Test Reports

3.2.1Bond Resistance Test

3.2.2Ground Resistance Tests

3.2.3Ground Isolation Test

3.2.4Equipment Continuity Test

SD-07 Certificates

1.3.3Ground Resistance Test

Equipment

1.3.4Micro-Ohmmeter Test Equipment

SD-11 Closeout Submittals

3.3 G RORecord Drawings

26 05 43 SD-03 Product Data

1.6Product Data

SD-05 Design Data

3.1Locations And Elevations

SD-06 Test Reports

3.6Installation Of Underground Duct

And Duct Bank

3.6Joint Integrity And Adequate

Bend Radii

26 05 71 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 61 PAGES

26 05 71 2.1 G DOConnection Diagrams

2.1 G DOFabrication Drawings

3.1 G DOControl Devices

3.1 G DOProtective Devices

SD-03 Product Data

2.2.3 G DOFuses

2.2.1 G DOMotor Controllers

2.3.1 G DOInstrument Transformers

2.3.2 G DOEnclosures

2.2.2 G DOCircuit Breakers

3.1 G DOControl Devices

2.3.3 G DOTime Switches

2.3.4 G DOProtective Relays

2.3.5 G DOIndicating Instruments

2.3.6 G DOIndicating Lights

SD-06 Test Reports

3.2.1Dielectric Tests

3.2.1Final Test Reports

SD-07 Certificates

3.2.1Insulating Oil

SD-08 Manufacturer’s Instructions

3.1Control Devices

3.1Protective Devices

SD-10 Operation and Maintenance

Data

2.2.1.1 G ROManual Motor Controllers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 61 PAGES

26 05 71 2.2.1.2 G ROMagnetic Motor Controllers

2.2.1.3 G ROCombination Motor Controllers

2.2.2 G ROCircuit Breakers

2.3.3 G ROTime Switches

2.3.4 G ROProtective Relays

2.3.5 G ROIndicating Instruments

26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections

SD-07 Certificates

1.4.1Qualifications

1.4.3Acceptance test and inspections procedure

26 09 23 SD-02 Shop Drawings

2.1 G DOLighting System Drawings

SD-03 Product Data

3.1 G DOInstallation Instructions

2.2.2 G DODimming Ballast Controls

2.2.3 G DOLight Level Sensor

2.2.4 G DODimmer Switch

2.2.5 G DOLighting Contactor

2.2.6 G DOTime Switch

2.2.7 G DOPhotocell Switch

2.2.8 G DOOccupancy Sensors

SD-06 Test Reports

3.3System Operation Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 61 PAGES

26 09 23 SD-10 Operation and Maintenance

Data

3.4 G ROLighting Control System

26 13 00 SD-02 Shop Drawings

1.5.1 G DOSwitchgear Drawings

SD-03 Product Data

1.5.3 G DOElectronic Overcurrent Control

Curves

1.6.1 G ROSF6/High-Firepoint Fluid

Insulated Switchgear

2.1 G ROSF6/High-Firepoint Fluid

Insulated Switchgear

2.4 G DOInsulated Medium-Voltage

Connectors

2.5 G DOSurge Arresters

SD-06 Test Reports

3.4.1Acceptance Checks and Tests

SD-07 Certificates

1.5.2Paint Coating System

SD-09 Manufacturer’s Field

Reports

2.7.1Switchgear design and production tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 61 PAGES

26 13 00 1.6.1 G ROSF6/High-Firepoint Fluid

Insulated Switchgear

2.1 G ROSF6/High-Firepoint Fluid

Insulated Switchgear

26 20 00 SD-02 Shop Drawings

2.14 G DOPanelboards

2.16 G DOTransformers

2.4 G DOBUSBAR TRUNKING SYSTEMS

(BUSWAYS)

2.5 G DOCable Trays

2.20 G DOMotor Control Centers

3.1.13.1 GMarking Strips

SD-03 Product Data

2.13 G DOReceptacles

2.14.3 G DOCircuit Breakers

2.11 G DOSwitches

2.16 G DOTransformers

2.15 G DOEnclosed Circuit Breakers

2.18 G DOMotor Controllers

2.19 G DOManual Motor Starters

2.28 G DOMetering

2.23.3 G DOGrounding Busbar

2.29 G DOSurge Protective Devices

SD-06 Test Reports

3.5.2600-volt Wiring Test

3.5.6Grounding System Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 61 PAGES

26 20 00 3.5.3Transformer Tests

3.5.4Ground-fault Receptacle Test

3.5.5Arc-fault Receptacle Test

SD-07 Certificates

2.12Fuses

SD-09 Manufacturer’s Field

Reports

2.31.1Transformer Factory Tests

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 22 00 SD-02 Shop Drawings

3.2 G DOInstallation

SD-03 Product Data

1.5 G ROSpare Parts

SD-04 Samples

2.1Nameplates

SD-06 Test Reports

2.5Factory Inspection and Tests

26 23 00 SD-02 Shop Drawings

1.5.2 G DOSwitchgear Drawings

SD-03 Product Data

2.2 G DOLOW VOLTAGE Switchgear

SD-06 Test Reports

2.5.2Switchgear Design Tests

2.5.3Switchgear Production Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 61 PAGES

26 23 00 3.5.1Acceptance Checks and Tests

SD-10 Operation and Maintenance

Data

1.6.1 G ROSwitchgear Operation and

Maintenance

SD-11 Closeout…