A.03.09 Attachment 12 Appendix C - Survey Report.pdf
PDF 6 MB Posted
- Solicitation number
- W912GB23R0011
- Issued by
-
Department of the Army European Command
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Topographical survey of Kecskemét Air Base
TABLE OF CONTENTS:
1. Table of contents
2. Technical memorandum
3. Location map
4. Topographical layout 1:1000
TECHNICAL MEMORANDUM
Type of work: Topographical Survey
Object Location : Kecskemét Air Base, Kecskemét, Bács-Kiskun County, Hungary
Time of field work :November 2017
Time of internal work : November 2017
1.Brief overview of the situation on the ground:
The boundaries of surveying area were determined by The Project Definition report. The total surveyed area is 129 hectare. The surveyors used two different method to capture datas, Leica Pegasus:Two mobile mapping system and Topcon Hiper SR GPS-RTK. The whole area was surveyed and scanned by the
Leica Pegasus:Two, and the rainwater drainage system was measured by GPS-RTK method with depth determination at every manhole and gully.
All of the planimetric details were drawn by extracting the point cloud except the rain water drainage
(fences, buildings, roads, footpaths, maholes, ditches, poles and so on ), contained within the limits of the established perimeter, and the surface topography and the contours also came from the point cloud based
DEM.
2. Description of work:
The defined purpose of the survey was to determine ground reality and to prepare an accurate topographical layout to be used later in the design process. For this, the coordinates of all existing entities within the perimeter, were determined by specific survey methods.
The mobile mapping's point cloud was complemented with the RTK-GPS survey. The mobile mapping uses post processing method, and both surveying are based on the same permanent station (KECS), the average base line distance was 4 km.
Fwd/Rev Separation RMS Values on unpaved surface on paved surface
East 0.008 (m) 0.002 (m)
North 0.005 (m) 0.003 (m)
Height 0.020 (m) 0.004 (m)
NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS
SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
All coordinates are based on the Hungary, Uniform National Projection System of 1972 (HD72/EOV)
All heights are based on system of level “ Baltic Sea”
3. Used instruments and software:
Leica Pegasus:Two mobile mapping system
LASER SCANNER
Z+F PROFILER® 9012
Laser class 1 (according to EN60825-1 / ANSI Z136.1)
Beam divergence < 0.5 mrad
Beam diameter Approx. 1.9 mm (at 0.1 m distance)
Ambiguity distance 119 m (above, range reading restarts at zero)
Minimum distance 0.3 m
Range resolution 0.1 mm
Data acquisition rate Max. 1.016 million pixel/sec.
Linearity error ≤ 1 mm
Range drift (full -10° C ... +45° C) < 2 mm (without reference) < 0.3 mm (with ref.)
GNSS SYSTEM
NOVATEL ProPak6 + NOVATEL GPS-703-GGG Triple-Frequency Pinwheel® GNSS Antenna
Channel Configuration
240 Channels
Signal Tracking
GPS L1, L2, L2C, L5
GLONASS L1, L2, L2C
Galileo E1, E5a, E5b, AltBOC
BeiDou3 B1, B2
SBAS
QZSS L1, L2C, L5
L-Band
Measurement Precision (RMS)
Fully independent code and carrier measurements:
GPS GLO
L1 C/A code 4 cm 8 cm
L1 carrier phase 0.5 mm 1.0 mm
L2 P(Y) code 8 cm 8 cm
L2 carrier phase 1.0 mm 1.0 mm
L2C code 8 cm 8 cm
L2C carrier phase 1.0 mm 1.0 mm
L5 code 3 cm –
L5 carrier phase 0.5 mm –
Inertial measurement unit (IMU)
Frequency 200 Hz
MTBF 35,000 hour
Gyro bias in-run stability (±deg/hr) 0.75
Gyro bias offset (deg/hr) 0.75
Gyro angular rand. walk (deg/√hr) 0.1
Gyro scale factor (ppm) 300
Gyro range (±deg/s) 450
Accelerometer bias (mg) 1
Accelerometer scale factor (ppm) 300
Accelerometer range (±g) 5
Repeatability*
Based on open sky, GPS+GLONASS processing, and phase differential. Points were measured manually from within the point cloud. A ring with 26 check points were collected 4 times, for a total of 104 observations. Check points were measured with TPS and levelling.
Resulting mean error for X,Y,Z was -0.004,-0.004,0.001 meters, and the resulting standard deviation for
X,Y,Z was 0.011,0.012,0.008 meters.
Topcon Hiper SR
Channel Configuration
226-Channel Vanguard Technology with Universal Tracking
Signal Tracking
GPS L1, L2, L2C,
GLONASS L1, L2,
SBAS L1 C/A WAAS/MSAS/EGNOS/GAGAN
QZSS L1, C/A
Antenna Type Fence Antenna
Positioning Accuracy
RTK (L1 + L2) H: 10mm + 0.8ppm
V: 15mm + 1.0ppm
Used softwares:
Post processing: NovAtel Inertial Explorer
Point cloud generation: Leica Auto Processing
RTK GPS Calculation: Topcon Magnet tools
Point cloud extraction and editing: AutoCAD Civil 3D 2017
Date: 12.12.2017 Made by:
Checked by:
D i g i t a l
G l o b e
C
N
E
S s t r i b u t i o n
A r b u s
M c r o s o f t
C r p o r a t i n
N
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BaltiAltitude
Scale
Client:
1 : 10000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017.
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
SURVEYED AREA
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXX
F ü v r ü l e t t ö l t ő ü r í t ő b e to n á ro k b e to n á ro k beto n á ro k f ü v e s f ü v e s f ü v e s b e t o n b e t o n a s z f a l t b e t o n b e t o n f é m f é m beto n á ro k b e to n á ro k b e to n á ro k
Ta
Ta
Ta
T a
T a
T a
T a
T a
T a
T a
T a
T a
Ta
T a
T a
Ta
Ta
Ta
Ta
Ta Ta Ta Ta
Ta
Ta
Ta Ta
Ta
Ta Ta Ta Ta
T a
T a
T a
T a
Ta
T a
Ta Ta Ta Ta
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.8 m
Bo tt om -1
.9 m
Bo tt om -1
.8 m
Bo tt om -1
.8 m
Bo tt om -1
.8 m
Bo tt om -2
.0 m
Bo tt om -2
.4 m
Bo tt om -0
.6 m
18 117.9
17590070
176100
175600
N
UNPAVED ROAD
GRAVEL ROAD
G
R
A
V
L
R
O
A
D
A S
P H
A
T
A
D
A S
P H
A
A
D
A S
P H
A
A
D
A S
P H
A
A
D
C O
N C
R E
A
D
Bo tt om -1
.5 m
Bo tt om -1
.5 m
Bo tt om -1
.4 m
Bo tt om -1
.3 m
114.00
114.00
4.
114.00
114.00
114.00
114.00
114.50114.50
114.50
4.
5.
5.
5.
5.
5.
5.
5.
3.
113.75
114.25
114.25
114.25 114.25
4.
114.25
114.25
4.
5.
113.50
113.50
4.
114.00
4.
114.00
114.00
4.
114.50
4.
114.50
114.50
115.00 115.00
5.
115.00
115.00
115.00
115.00
115.00
5.
115.00
115.00
115.00
115.00
5.
115.50
115.50
115.50
115.50
116.00
116.00
116.50
116.50
117.00
117.00
117.50
117.50
118.00
118.00
118.50
118.50
119.00
119.00
119.50
119.50 120.00
120.00
120.50 120.50
113.75
4.
4.
25114.25
114.25
114.25
114.75
114.75
115.25
115.25
115.25
115.25
115.25
115.25
115.75
115.75
116.25
116.25
116.75
116.75
117.25
117.25
117.75
117.75
118.25
118.25
118.75
118.75
119.25
119.25
119.75
119.75 120.25
120.25
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
MH Manhole
Flight control lights
Project:
Bikszádi utca 6/a, 1119 Budapest
LEGEND
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
Electrical junction boxes
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXX
B o k r r ü l e t
Ta Ta
Ta Ta
Ta
Ta Ta
T a
T a
T a
T a
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXX
XXX
XXX
XX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XX
XXX
XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Bo tt om -1
.4 m
Bo tt om -1
.3 m
Bo tt om -1
.2 m
Bo tt om -1
.4 m
Bo tt om -1
.7 m
Bo tt om -1
.8 m
Bo tt om -1
.5 m
Bo tt om -1
.5 m
Bo tt om -1
.4 m
Bo tt om -1
.6 m
Bo tt om -1
.8 m
Bo tt om -1
.7 m
MH
Bottom -2.17 m
MH
Bottom -2.25 m
MH
Bottom -2.40 m
MH
Bottom -2.47 m
M H
Bo tt om -4
.1 m
175800
175600
175300
N
UNPAVED ROAD
G R
A V
E L R
O A
D
GRAVEL ROAD
113.00
113.00
113.00
113.00
113.50113.50
113.50
113.50
113.50 11 3.5
114.00
114.00
114.00
114.50114.50
3.
3.
113.25 11 3.2
5 113.25
3.
25113.25113.25
113.25
113.25
3.
113.75
113.75113.75 113.75113.75113.75
113.75
114.25 114.25114.25
113.50
3.2
3.2
113.00
113.00
3.
113.00
113.50
113.50
3.
3.
3.
113.50
113.50
113.50
113.25
113.25
113.25
113.25
U n s u r v e y e d a r e a
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
LEGEND
Electrical junction boxes
AutoCAD SHX Text S
AutoCAD SHX Text
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Makadám út
F ü v r ü l e t
F ü v r ü l e t
Ta Ta
Ta
Ta
Ta
Ta Ta Ta Ta
Ta Ta Ta Ta
Ta
Ta
Ta Ta
Ta Ta
Ta Ta Ta Ta
Ta
Ta Ta
Ta
Ta Ta
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXX
XX
XXX
XXX
XXX
XXX
XXX
XXX
X
Bo tt om -1
.8 m
Bo tt om -1
.6 m
Bo tt om -1
.9 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.6 m
Bo tt om -1
.5 m
Bo tt om -1
.4 m
Bo tt om -1
.4 m
Bo tt om -1
.3 m
Bo tt om -1
.4 m M
H
Bo tt om -4
.1 m
M H
Bo tt om -3
.5 m
175500
175300
N
UNPAVED ROAD
UNPAVED ROAD
GRAVEL ROAD
G R
A V
E L R
O A
D
113.00
113.00
113.00
113.00
113.50
113.50
3.5
3.
3.
113.25
113.75
113.75
3.
3.7
113.75
113.75
3.
3.
3.7
113.75
3.
3.2
113.50
113.50
3.
3.
3.5
114.00
113.25
3.
113.75
3.
113.75
113.75
114.25
114.25
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
LEGEND
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
F ü v r ü l e t
F ü v r ü l e t f ü v e s
T a
Ta
Ta
Ta
Ta
T a
T a
Ta
Ta
Ta
Ta
Ta
Ta
Ta
T a
T a
T a
Ta Ta
Ta Ta
Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta
Ta
Ta
Ta
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Bo tt om -1
.6 m
Bo tt om -1
.7 m
Bo tt om -1
.6 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.8 m
Bo tt om -1
.6 m
175500
175300
175000
N
UNPAVED ROAD
UNPAVED ROAD
UNPAVED ROAD
U N
P A
V E
D
R
O A
D
GRAVEL ROAD
113.00
113.00 113.00
3.
113.50
3.5
3.
3.
3.
3.
3.2
113.25
3.
113.75
113.00
113.00
113.50
113.50
113.50
113.50
113.50
113.50
113.50
113.50
113.50
113.25
113.25
3.2
113.25
113.25
113.25
113.25 113.25113.25113.25
113.25
113.75 113.75
3.
3.
3.
113.00
113.25
3.2
3.
113.50
3.5
3.
3.
3.
114.00
114.00
114.00
113.75
114.25
Unsurveyed area
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXX
XXXXXX
M a k a d á m
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Makadám út
Makadám út
B o k r r ü l e t
F ü v r ü l e t a s z f a l t
X
X
X X
XXXXX
X
X f ü v e s f ü v e s f ü v e s f ü v e s
Ta
Ta
Ta
Ta
Ta
Ta
Ta
Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta
Ta Ta Ta Ta
Ta Ta Ta
Ta
Ta
Ta
Ta Ta
Ta Ta
Ta Ta
Ta
Ta Ta
Ta Ta
Ta
T a
T a
T a
T a
T a
Ta
Ta TaTaTaTaTaTaTaTaTaTaTaTaTa
Ta
T a
TaTa
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Bo tt om -1
.7 m
Bo tt om -1
.7 m
Bo tt om -1
.8 m
Bo tt om -1
.5 m
Bo tt om -1
.5 m
Bo tt om -1
.5 m
Bo tt om -1
.6 m
Bo tt om -1
.6 m
Bo tt om -1
.5 m
Bo tt om -1
.7 m
Bo tt om -0
.3 m
Bo tt om -0
.3 m
Bo tt om -1
.7 m
Bo tt om -1
.6 m
5.170
174800
175000
174400
N
C O
N C
R E
A
D C
O N
C R
E T
E
R
O A
D
C O
N C
R E
A
D
A
S
P
H
A
A
D
UNPAVED ROAD
U
N
P
A
V
A
D
GRAVEL ROAD
GRAVEL ROAD
112.00
2.5
112.50
2.
2.
112.50
3.
113.00
3.
113.00
113.00
113.00
113.50
113.50
114.00
114.00
114.50
114.50
115.00
115.00
115.50
115.50
116.00
116.00
116.50
116.50
117.00
117.00
117.50
117.50
118.00
118.00
118.50
118.50
119.00
119.00
119.50119.50
112.25
112.75
112.75
112.75
2.
112.75
112.75
112.75
112.75
112.75
2.
113.25
113.25
113.25
113.75
113.75
114.25
114.25
114.75
114.75
115.25
115.25
115.75
115.75
116.25
116.25
116.75
116.75
117.25
117.25
117.75
117.75
118.25
118.25
118.75
118.75
119.25
119.25
112.50
2.
112.50
2.
113.00
3.
113.00
113.00 113.00
3.
112.25
2.
2.
112.75
112.75
2.
112.75
2.
2.7
112.75
2.
112.75112.75
2.
113.25
113.25 113.25
112.50
112.50
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
3.
3.
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.50
113.50
113.50
112.25
112.25
112.75
112.75
112.75112.75
2.
112.75
112.75
112.75
112.75
112.75
112.75
112.75
113.25
113.25
113.25113.25
3.
3.
113.25
113.25
113.25
113.25
3.2
113.25
113.25
113.25
113.25
113.25
113.25
Unsurveyed area
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXX
X X
M a k a d á m
XXXXXXXXX
Makadám út
Aszfalt út
B o k r r ü l e t
E r d ő
E r d ő
E r d ő
F ü v r ü l e t
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXX
XXXXXXXXXX
X X
X X
X X
X X
X X
X
X X
X X
X X
X b e t o n á r o k b e t o n á r o k b e t o n á r o k betonárok betonárok aszfalt aszfalt a s z f a l t a s z f a l t a s z f a l t a s z f a l t a s z f a l t a s z f a l t d í s z k ő d í s z k ő murva beton e r d ő e r d ő e r d ő e r d ő
F ü v r ü l e t
F ü v r ü l e t
F ü v r ü l e t
F ü v r ü l e t
F ü v r ü l e t
X X
X betonárok betonárok
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
XXXX
X
X X
X
X a s z f a l t a s z f a l t b e t o n b e t o n aszfalt betonárok b e t o n á r o k b e t o n á r o k b e t o n á r o k b e t o n á r o k
F ü v r ü l e t
F ü v r ü l e t
H o m o k l ö v é s z á r o k
R.
R.
R.
R.
R.
R.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
E r d ő betonárok betonárok betonárok b e t o n á r o k b e t o n b e t o n a s z f a l t b e t o n a s z f a l t aszfalt
T a
T a
T a
T a
T a
T a
T a
G
G
G
G
G
G
G
T a
T a
T a
T a
T a
T a
T a
Ta
T a
T a
R
R.
R.
R.
R.
R.
R.
R
R
R
R
R
R
R
R
T a
T a
T a
Ta
Ta Ta
Ta
Ta Ta
Ta Ta
Ta Ta
G
G
R
R
T a
T a
T a
T a
Ta
T a
T a
Ta
T a
T a
T a
T a
T a
Ta
Ta TaTa
R
R
R
R
R
R
R
R
R
R.
R.
R.
R.
R
R.
R
R
G
G
G
T a
T a
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G G G
G
G
G
G
G
G
M
M
M
M
M
M
M
M
M
M
M
M M
M
M
M
M
M
M
M
M
M
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Bottom -1.65 m
Bo tt om -1
.6 m
Bo tt om -1
.7 m
Bo tt om -1
.7 m
MH
Bottom -2.20 m
MH
Bottom -2.20 m
MH
Bottom -2.18 m
Botto m -1.18 m
Botto m -1.16 m
Botto m -1.33 m
Bo tt om -1
.6 m
Bo tt om -1
.4 m
Bo tt om -1
.4 m
174700
174400
N
C O
N C
R E
A
D C
O N
C R
E T
E
R
O A
D
C O
N C
R E
A
D
A
S
P
H
A
A
D
A
S
P
H
A
A
D
ASPHALT ROAD
U
N
P
A
V
A
D
GRAVEL ROAD
MH
Botto m -1.72 m
MH
Bottom -2.10 m
Bottom -0.60 m
Bottom -0.90 m
Bottom -0.90 m
112.00
2.
2.
2.
2.
112.50
112.50
2.5
112.50
112.50
112.50
2.
2.
2.5
112.50
2.
2.
112.50
113.00
113.00
113.00
113.00
3.
3.
113.00
3.
113.00
113.00
113.50
113.50
114.00
114.00
114.50
114.50
115.00
115.00
115.50
115.50
116.00
116.00
116.50
116.50
117.00
117.00
117.50
117.50
118.00
118.00
118.50
118.50
119.00
119.00
119.50119.50
112.25
112.25
2.
112.75
112.75
112.75
112.75
112.75
112.75
112.75
112.75
112.75
2.
112.75
112.75
112.75
2.
2.
112.75
112.75
112.75
112.75
112.75
2.
2.
112.75
112.75
113.25
113.25
113.75
113.75
114.25
114.25
114.75
114.75
115.25
115.25
115.75
115.75
116.25
116.25
116.75
116.75
117.25
117.25
117.75
117.75
118.25
118.25
118.75
118.75
119.25
119.25
2.5
2.
2.
112.50
3.
3.
112.25
2.
2.7
112.75
2.7
2.
112.75112.75
2.
2.
3.
3.
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
LEGEND
Electrical junction boxes
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
X X a s z f a lt
X X
X X
X
175000
175000
175000
N
N
C
O
N
C
R
E
T
E
P
L
A
T
F
O
R
M
A
S
P
H
A
A
D
C
O
N
C
R
E
T
E
P
L
A
T
F
O
R
M
A
S
P
H
A
A
D
113.50
113.50
113.50
114.00
114.00
113.75
113.75
113.75
113.75
113.75 114.25 114.25
113.50
114.00
114.00
114.00
4.
3.
113.75
113.75
114.50
114.50
114.50
115.00
115.00
115.00
114.75
114.75
114.75
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT
500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
K u t y a k n n e l n a to n r a k o d ó r á m p a b e t o n l a p b e t o n l a p f á z ó t o s f z ó t o s f ü v e s f z ó t o s
N y i t o z í n n a
R a k t á r n a
I r o d a n a a s z f a lt a s z f a lt f ü v e s f ü v e s f ü v e s a s z f a l t m a k a d á m m a k a d á m a s z f a l t e r d ő
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X
X f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s e r d ő e r d ő e r d ő b e t o n b e t o n b e t o n b e t o n j á r d a d í s z k ő j r d a a s z f a l t a s z f a l t a s z f a l t a s z f a l t t ü z i v í r o z ó f a c s o p o r t e r d ő
MH
Botto m -1.02 m
MH
Botto m -1.20 m
MH
Botto m -1.20 m
MH
Botto m -1.10 m
MH
Botto m -0.71 m
MH
Botto m -1.38 m
MH
Botto m -1.30 m
MH
Botto m -1.17 m
MH
Botto m -0.90 m
MH
Botto m -1.41 m
MH
Botto m -1.57 m
MH
Botto m -1.63 m
MH
Botto m -1.46 m
MH
Botto m -1.54 m
MH
Botto m -1.67 m
MH
Botto m -1.40 m
MH
Botto m -1.51 m
MH
Botto m -1.52 m
MH
Botto m -0.77 m
MH
Botto m -1.66 m
MH
Botto m -1.84 m
MH
Botto m -1.77 m
MH
Botto m -3.70 m
MH
Botto m -3.70 m
MH
Botto m -3.70 m
MH
Botto m -3.70 m
MH
Botto m -3.70 m
MH
Botto m -1.94 m
MH
Botto m -0.93 m
MH
Botto m -0.90 m
DN
DN200
Oil Trap Oil Trap
Pump Pump
Oil Trap Oil Trap
SS
175000
175000
N
A S
P H
A L T
R O
A D
A S
P H
A
A D
A S
P H
A L T
R O
A D
4.
4.
114.50 114.50
4.
4.
4.
4.
4.
4.
114.50 114.50
114.50
114.50
4.
4.
114.50
114.50
115.00
115.00
5.
5.
5.
5.
115.50
115.50
116.00
116.00
116.50
116.50
117.00
117.00
117.50
117.50
118.00
118.00
118.50
118.50
119.00
119.00
119.50
119.50
120.00
120.00
0.0
120.00
120.50
120.50
120.50
120.50
121.00
121.00
121.00
1.0
121.50
121.50
121.50
1.
122.00
122.00
122.00
2.
122.50
122.50
122.50
2.
123.00
123.00
123.00
123.00
123.50
123.50
123.50
123.50123.50
123.50
3.
3.
114.25
114.25
114.25
114.25
4.
4.
114.25 114.25
4.
4.
4.
4.
114.75
114.75
4.
4.7
114.75
114.75
4.
4.
114.75
5.
5.
115.25
115.25
115.75
115.75
116.25
116.25
116.75
116.75
117.25
117.25
117.75
117.75
118.25
118.25
118.75
118.75
119.25
119.25
119.75
9.
9.7
119.75
120.25
120.25
120.25
120.25
0.7
120.75
120.75
0.7
121.25
121.25
121.25
1.2
121.75
121.75
121.75
1.
122.25
122.25
122.25
2.
122.75
122.75
122.75
2.7
123.25
123.25
123.25
123.25
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT 500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
LEGEND
Electrical junction boxes
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text tű.
AutoCAD SHX Text tű.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text tű.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S tű.
k r o s f ü v e s a s z f a l t b e t o n b e t o n f ü v e s
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X f ü v e s f ü v e s f ü v e s a s z f a l t b e t o n f ü v e s b e t o n f a l a s z f a l t e r d ő e r d ő f z ó t o s f z ó t o s f ü v e s r a k t á r n a a s z f a l t a s z f a l t b e t o n r a k t á r n a
I r o d a n a b e t o n r a k t á r n a f ü v e s s z i v a t t y ú s z i v a t t y ú b e to n f ü v e s f ü v e s b e t o n
X
X f ü v e s f ü v e s x x x x l ö v é s z á r o k f e g y v r ö l t ő ü r í t ő je la d ó v e z e té k je la d ó v e z e té k je la d ó v e z e té k je la d ó v e z e té k je la d ó v e z e té k je la d ó v e z e té k r a k t á r á r o k f ü v e s a s z f a l t b e t o n ő r t o r o n y x x t ü z i v r o z ó ü z e m a n y g r o l ó ü z e m a n y g r o l ó árok á r o k b e t o n b e t o n a s z f a l t a s z f a l t k o n t é n e r k o n t é n e r k o n t é n e r k o n t é n e r k o n t é n e r k o n t é n e r k o n t é n e r k o n t é n e r t a r t á l y t ü z i v r o z ó x x g é p h á z g é p h á z a s z f a l t x x x x x x x x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X f ü v e s f ü v e s t ü z i v r o z ó t ü z i v r o z ó b e t o n b e t o n f ü v e s f ü v e s á r o k á r o k f o l y ó k a f o l y ó k a a s z f a l t f ü v e s f ü v e s b e t o n b e t o n f ü v e s f ü v e s
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X t ö r e d e z e z f a l t t ö r e d e z e z f a l t t ö r e d e z e z f a l t b e t o n
B
B
B
B
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Bo tto m -0
.7 m
Bo tto m -0
.5 m
MH
Botto m -1.15 m
MH
Botto m -1.21 m
MH
Botto m -1.32 m
MH
Botto m -0.51 m
MH
Botto m -1.40 m
MH
Botto m -1.49 m
MH
Botto m -0.96 m
MH
Botto m -1.37 m
MH
Bottom -0.85 m
MH
Bottom -2.70 m
MH
Bottom -2.70 m
MH
Bottom -2.70 m
MH
Bottom -2.70 m
MH
Bottom -0.96 m
DN
Oi l T ra p
Oi l T ra p
Oi l T ra p
Oi l T ra p
174500
174500 N
A
S
P
H
A
A
D
A
S
P
H
A
A
D
113.00
3.
3.5
113.50
113.50
113.50
113.50
113.50
113.50
113.50
113.50
114.00
114.0011 4.
4.
114.00
114.00
114.00
114.00
4.
4.
114.00
114.00
114.50
114.50
114.50
114.50
4.
4.
115.00
115.00
115.50
115.50
116.00
116.00
116.00 116.00
116.50
116.50
116.50
116.50
117.00
117.00
117.00
117.00
117.50
117.50
117.50
117.50
118.00
118.00
118.00
118.00
118.50
118.50
118.50
118.50
119.00
119.00
119.00
119.00
119.50
119.50
119.50
119.50
120.00
120.00
120.00
120.00
120.50
120.50
120.50
120.50
121.00
121.00
121.00
121.00
1.
121.50
121.50
121.50
2.
122.00
122.00
122.00
2.5
122.50
122.50
122.50
3.0
123.00
123.00
123.00
113.25
3.
113.25
113.25
113.75
113.75
3.
113.75
113.75
3.
113.75
113.75
113.75
114.25
114.25
4.
4.
114.25
114.25 114.25
4.
4.
114.75
114.75
115.25
115.25
115.75
115.75
116.25
116.25
116.25
116.25
116.75
116.75
116.75
116.75
117.25
117.25
117.25
117.25
117.75
117.75
117.75
117.75
118.25
118.25
118.25
118.25
118.75
118.75
118.75
118.75
119.25
119.25
119.25
119.25
119.75
119.75
119.75
119.75
120.25
120.25
120.25
120.25
120.75
120.75
120.75
120.75
1.2
121.25
121.25
121.25
1.
121.75
121.75
121.75
2.
122.25
122.25
122.25
122.75
122.75
122.75
122.75
Surveyed by
Edited/drawn by
Checked by
Date
Town
Date/Projection
HD-72
BalticAltitude
Scale
Client:
1 : 1000
István Zombor
Mária u.10, 5000 Szolnok
Bányamérési Agrotechnikai és
Ingatlangazdálkodási Kft.
Gábor Kovács
30.11.2017
Tebodin Hungary Kft.
Balázs Lévai
Kecskemét
KECSKEMÉT AIR BASE,
Project:
Bikszádi utca 6/a, 1119 Budapest
HUNGARY CONSTRUCT PARALLEL TAXIWAY
Pag./Sh
Din/Of
1 2 3 4 5 6
SCHEMA DE DISPUNERE A PLANSELOR
PLANS ARRANGEMENT 500 100 200 400
SURVEY NOTES :
1) SYSTEM OF PROJECTION "HUNGARY, UNIFORM NATIONAL PROJECTION SYSTEM OF 1972 (HD72/EOV)"
2) SISTEM OF LEVEL ''BalticC SEA ''
3) EXISTING CONDITIONS AND ELEVATIONS SHOWN HEREON ARE BASED FROM A FIELD OBSERVATIONS PERFOMED ON 14-11-2017
BY CENTRAL GEO Ltd. AND ACCURATELY DEPICT THE EXISTING CONDITIONS AS LOCATED ON THE DATE SHOWN HEREON.
THE RELATIVE CONDITIONS AS DEPICTED MAY CHANGE SUBSEQUENT TO THE DATE LOCATED DUE TO THE SUBSIDENCE OR UPHEAVAL
OF THE SOIL, ADDITION OR REMOVAL OF THE SOIL BY ACTS OF MAN, EROSION BY WIND OR WATER OR OTHER FACTORS.
THEREFORE, THIS LAYOUT MAY NOT ACCURATELY DEPICT THE CONTOURS OF THE ABOVE AREA AFTER THE DATE OF SURVEY.
4) NO UNDERGROUND UTILITIES WERE MEASURED OR LOCATED AS PART OF THIS SURVEY, EXCEPT THE RAINWATER DRAINAGE SYSTEM.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
Manhole
Concerte foundation
Concrete tile pavement
Bottom of bank
Top of bank
Solpes
Buildings
Buildings
Edge of forest
Grip
Fence
Oil Pipe
Asphalt Road
Concrete road
Dirt/Gravel road
Unpaved road
Drainage
Pipeline cathodic protection test post Concrete pole Gully
Fire hydrant
Lightning rod
Pipeline marker post
MH Manhole
Flight control lights
LEGEND
Electrical junction boxes
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text tű.
AutoCAD SHX Text tű.
AutoCAD SHX Text S
AutoCAD SHX Text tű.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S tű.
| Lapok és nézetek |
| 1 |
| Lapok és nézetek |
| A_E_C_Standard-1 A1_1 |
| A_E_C_Standard-1 A1_2 |
| A_E_C_Standard-1 A1_3 |
| A_E_C_Standard-1 A1_4 |
| A_E_C_Standard-1 A1_5 |
| A_E_C_Standard-1 A1_6 |
| A_E_C_Standard-1 A1_7 |
| A_E_C_Standard-1 A1_8 |
| A_E_C_Standard-1 A1_9 |
File details come from the government source that posted it. Updated .