A.03.09 Attachment 10 Appendix A - Drawings_REV01.pdf

PDF 12 MB Posted

Attached to
Request for Proposal (RFP) for Project: Petroleum, Oil, and Lubricant (POL) Increase Capacity at Kecskemet Air Base, Hungary
Solicitation number
W912GB23R0011
Issued by

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers®

Europe

WIESBADEN GERMANY

KECSKEMÉT AIR BASE

POL - INCREASE STORAGE CAPACITY

CONTRACT NUMBER:

SOLICITATION NUMBER:

15 SEPTEMBER 2022

7,8005, Existing storage tank

Existing sotrage tank

New fuel storage tank (1.900.000 or 2.500.000 l)

Existing Building

Existing road/paving

Existing pump house

Existing truck loading station

Existing truck loading station

Corridor

New Operations building

New road with 2 parking spaces and paving around the building

SITE "A"

green area

7.80

0.20 0.20 7.00 0.20 0.20

5.

0.

0.

2.

0.

2.

0.

0.

0.20 3.10 0.20 3.70 0.20

0.

3.

0.

1.

0.

0.20 3.30 0.20 1.70 0.10 0.90 0.10 0.90 0.20 0.20

1.

1.60 2.35

0.

0.

5.

0.

0.

0.20 7.00 0.20

0.

0.

0.

3.

0.

3.

0.

0.

3.

0.

0.

0.

3.

0.10 7.20 0.10 7.40

0.10 0.10 7.00 0.10 0.10 0.40

0.40 2.90 0.40 3.50 0.40

0.

0.

0.

1.

0.

0.

0.

2.

0.

0.

0.

2.

0.

0.16 0.20 5.00

1.

00 5.20

0.10 0.10 5.00 0.10

0.20 0.20 4.80 0.20 0.20

3.30 3.90 0.

0.

2.

0.

0.

0.

2.

5.72 5.80

7.72 7.80

5.72 5.80

7.72 7.80

20 cm reinforced concrete wall

20 cm reinforced concrete wall pavement around the building hollow metal door and frame with insulation, panic handle (splinter proof design) pair hollow metal doors and frame with insulation, panic handles (splinter proof design)

10 cm non-load partition brick wall facade wall:

20 cm reinforced concrete wall with 20 cm heating insulation ho llo w m et al d oo r a nd fr am e w ith in su la tio n, p an ic h an dl e (s pl in te r p ro te ct io n de si gn fa ca de w al l:

c m re in fo rc ed c on cr et e w al l w ith cm h ea tin g in su la tio n

Gutter

HVAC and electrical zone fa ca de w al l:

c m re in fo rc ed c on cr et e w al l w ith cm h ea tin g in su la tio n fa ca de w al l:

c m re in fo rc ed c on cr et e w al l w ith cm h ea tin g in su la tio n fa ca de w al l:

c m re in fo rc ed c on cr et e w al l w ith cm h ea tin g in su la tio n

HVAC and electrical zone galvanized steel bracket to raise a portable ladder pavement around the building pavement around the building

20 cm reinforced concrete slab with 3% slope and rainwaterproofing and insulation

20 cm reinforced concrete slab with 3% slope and rainwaterproofing and insulation metal sheet ledge metal sheet ledge

(L 60.3 mm curved flat steel 50 cm distance) ga lv an iz ed st ee l b ra ck et to ra is e a po rta bl e la dd er metal sheet ledge facade heat insulated plaster system granular footing plaster

Gutter

Gutter metal sheet ledge facade heat insulated plaster system granular footing plaster pavement around the building pavement around the building metal sheet ledge facade heat insulated plaster system granular footing plaster

Gutter pavement around the building hollow metal door and frame with insulation, panic handle (splinter protection design) facade heat insulated plaster system granular footing plaster metal sheet ledge hollow metal door and frame with insulation, panic handle (splinter protection design) pair hollow metal doors and frame with insulation, panic handles

(splinter proof design) certified security point (protection against falling) certified security point

(protection against falling) certified security point

(protection against falling) certified security point (protection against falling) certified security point

(protection against falling) certified security point (protection against falling) from 2,20 m height the cage is compulsory water dripping profile water dripping profile water dripping profile water dripping profile galvanized steel bracket to raise a portable ladder galvanized steel bracket to raise a portable ladder galvanized steel bracket to raise a portable ladder galvanized steel bracket to raise a portable ladder

EXCIPIENT STORAGE

03.

7,60 m smooth concrete

ADDITIVE AND

TESTING

01.

15,30 m ceramic

ADMINISTRATION/

02.

7,44 m smooth concrete

SAMPLE STORAGE

04.

1,35 m ceramic

LAV.

05.

1,35 m ceramic

WC

N

-1,35

-0,35 -0,15

±0,00 +0,25

+3,15

+3,615

+3,00 +3,195

+3,44

±0,00

+3,11

-0,02 +0,25

+3,46 +3,615

-0,02 +0,25

+2,13

+3,28 +3,44

-0,02 +0,25

+3,315

+3,46 +3,615

-0,02 +0,25

+3,46 +3,615

-0,02 +0,25

+3,28

-0,02 +0,25

+2,13

+3,46

+3,615

+0,25 A

A

B B

SECTION A-A SECTION B-B

3%

NORTHWEST FACADE

FLOOR PLAN

3%

SOUTHWEST FACADE

SOUTHEAST FACADE

3%

NORTHEAST FACADE

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

AP

PR

US Army Corps of Engineers

TE

BO

D

IN

H U

N G

AR

Y

KF

T.

BU

D

AP

ES

T H

-1

BI

KS

ZÁ

D

I U . 6

/A

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IE

SB

AD

EN

G

ER

M

AN

Y

EU

R

O

PE

SU

BM

IT

TE

D B

Y

A1

FI

LE

N O

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

KE

C

SK

EM

ÉT

A

IR

B

AS

E

PO

L

- I N

C R

EA

SE

S

TO

R

AG

E C

AP

AC

IT

Y

A-101

PO

L

O

PE

R

AT

IO

N

S

BU

IL

D

IN

G

ES

ZT

ER

B

O R

BÉ

LY

OPERATIONS BUILDING PLAN (SCALE: 1:50)

SITE LAYOUT (SCALE: 1:500)

GENERAL NOTES

- Reinforced concrete quality: min. C30/37-XC2-24-F3-MSZ4798-1

- Reinforcement applicable standard B500B MSZ EN 10080

- Structural steel sections, plates, flates applicable standards S235 JR EN 10025

- Steel ladder applicable standard MSZ 15670 and OSHA 1910

Please see the 3.5. ARCHITECTURAL section in RFP document also.

.1

1.

1:

, 1 :5

LA

YO

UT

F O

R

DE

SI

G

N

CH

AR

ET

TE

PO

L O

PE

R

AT

IO

N S

BU

IL

D

IN

G

T

EN

DE

R

DE

SI

G N

FO

R

RF

P

DR

AF

T

.1 2.

Conceptual drawing. Provided for planning purposes only.

T

EN

DE

R

DE

SI

G N

FO

R

RF

P

FI

NA

LI

ZE

D

.0 3.

CAUTION: This drawing conceptual design only . Provided for reference purposes only !

.0

4.

.0

4.

AR

RA

NG

EM

EN

T

O F

NE

W

F

UE

L

ST

O

RA

G E

TA

NK

.0

4.

7, 2, 4, 2, 1,75 5

2,26

1,38 5 cc a.

cc a.

1, 5,80

5,40

7, 1,20

90°

90°

90°

90° galvanized steel bracket to raise a portable ladder existing road new reinfoced concrete splinter protection wall existing pit cover existing cathode protection existing outdoor container existing inspection pit existing incoming fuel pipeline (horizontal section) existing incoming fuel pipeline (vertical section) existing incoming fuel pipeline (vertical section) existing 40x40x5 cm concrete tiles concrete tiles have to be demolished and removed (landscaping is required) edge of strip foundation moved and recycled concrete tiles moved and recycled concrete tiles splinter protected steel door without insulation moved and recycled or new concrete tiles

N

Existing storage tank

Existing storage tank

Existing road/paving

Incoming pipeline Existing inspection pit

Existing outdoor container Existing cathode protection

New fuel storage tank (1.900.000 or 2.500.000 l)

New splinter protection wall

SITE "B"

gr ee n ar ea

-1,30 -0,30

+2,695

+2,75

40 5,20 40

5,80

±0,00

+2,87

+2,925

20 5,40 20

2, 50 2, ±0,00 fa ca de w al l:

c m re in fo rc ed c on cr et e w al l w ith ou t p ai nt in g

20 cm reinforced concrete slab with 3% slope and rainwaterproofing certified security point (protection against falling) metal sheet ledge existing incoming fuel pipeline (vertical section)

Gutter galvanized steel bracket to raise a portable ladder3%

STEEL BRACKET

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

AP

PR

US Army Corps of Engineers

TE

BO

D

IN

H U

N G

AR

Y

KF

T.

BU

D

AP

ES

T H

-1

BI

KS

ZÁ

D

I U . 6

/A

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IE

SB

AD

EN

G

ER

M

AN

Y

EU

R

O

PE

SU

BM

IT

TE

D B

Y

A1

FI

LE

N O

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

KE

C

SK

EM

ÉT

A

IR

B

AS

E

PO

L

- I N

C R

EA

SE

S

TO

R

AG

E C

AP

AC

IT

Y

A-102

IN

C

O M

IN

G

P

IP

EL

IN

E

SP

LI

N

TE

R

P R

O

TE

C

TI

O N

ES

ZT

ER

B

O R

BÉ

LY

.0

4.

.0

4.

1:

0, :5

IN

C

O M

IN

G

P

IP

EL

IN

E

SP

LI

N

TE

R

P R

O

TE

C

TI

O N

T

EN

DE

R

DE

SI

G N

FO

R

RF

P

DR

AF

T

.1 2.

SITE LAYOUT (SCALE: 1:500)

GENERAL

NOTES

- Reinforced concrete quality: min. C30/37-XC2-24-F3-MSZ4798-1

- Reinforcement applicable standard B500B MSZ EN 10080

- Structural steel sections, plates, flates applicable standards S235 JR EN 10025

INCOMING PIPELINE PROTECTION WALL (SCALE: 1:100)

SECTION

(SCALE:

1:100)

M O

DI

FI

ED

T

EN

DE

R

DE

SI

G

N

FO

R

RF

P

DR

AF

T

.1

2.

Please see the 3.4.5. Incoming Supply Pipeline Modifications section in RFP document also.

CAUTION: This drawing conceptual design only . Provided for reference purposes only !

M O

DI

FI

ED

T

EN

DE

R

DE

SI

G

N

FO

R

RF

P

FI

NA

LI

ZE

D

.0

3.

AR

RA

NG

EM

EN

T

O F

NE

W

F

UE

L

ST

O

RA

G E

TA

NK

.0

4.

EXCIPIENT STORAGE

03.

ADDITIVE AND

TESTING

01.

15,30 m ceramic

ADMINISTRATION/

02.

SAMPLE STORAGE

05.

WC

N

7.80

0.20 0.20 7.00 0.20 0.20

0.20 3.10 0.20 3.70 0.20

0.20 3.30 0.20 1.70 0.10 0.900.10 0.900.20 0.20

1.60

2.35

0.20 7.00 0.20

A A

B B

20 cm reinforced concrete wall pavement around the building hollow metal door and frame with insulation, panic handle (splinter proof design) pair hollow metal doors and frame with insulation, panic handles (splinter proof design)

10 cm non-load partition brick wall facade wall:

20 cm reinforced concrete wall with 20 cm heating insulation h o l l o w m e t a l d o o r a n d f r a m e w i t h i n s u l a t i o n p a n i c h a n d l e s p l i n t e r p r o t e c t i o n d e s i g n

Gutter

FLOOR PLAN

04.

Lav

1,5m

1,5m

1,5m m m m m m m

1,5m

1,5m

Ex

Ex

Ex

Ex

ExEx

Surface mounted LED luminaire 1x55W IP66

Ex

Surface mounted LED luminaire 1x55W Ex proof

Surface mounted LED downlight 1x20 W IP20 wall mounted LED luminaire 1x20 W IP65

Distributor panel

1,5m

Ex

2P wall mounted switch IP54

1P wall mounted switch IP23

2P wall mounted switch Ex

2P+PE wall mounted socket

Ex

2P+PE wall mounted socket

Ex

Installation level

Informatic socket

Motion detector

REMARK

g a l v a n i z e d s t e e l b r a c k e t t o r a i s e a p o r t a b l e l a d d e r

Conceptual design only and for reference only

S O

L I C

I T

A T

I O

N

N

O

F I L E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N M

A R

K A

P P

R

D A

T E

F I

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L O

T

S

C A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

C T

O

SHEET ID

D A

T E

A P

P R

US Army Corps of Engineers

T E

B O

D I

H

N

G A

R Y

K

F T

B U

D A

P E

S T

H

B I K

S Z

Á D

I

U

A

U S

A

R M

Y

C

O R

P S

E

N G

I N

E E

R S

W I E

S B

A D

G

R

M A

N Y

E U

R O

P E

K E

C S

K E

M É

T

A

B

S

E

P O

L

I N

C R

E A

O

R A

P

A C

I T

Y

E-101

G E

N E

R A

L

E

L E

C T

R I C

P

D r a f t f o r

C o m m e n t s

R e v

O

E r n ő f y

E P

O L O

P E

R A

T I O

N S

B

U I L D

I N

G

L i g h t i n g

O

E r n ő f y

P O

L

O

P E

R A

T I O

I L D

I N

G

L I G

H T

I N

G

F i n a l

R

F P

R e v

N

1.60

2.35

A A

B

20 cm reinforced concrete wall

10 cm non-load partition brick wall g a l v a n i z e d s t e e l b r a c k e t

Gutter

FLOOR PLAN

04.

Lav

1,5m grounding frame under the ground -1 m

DN 10 hot dip galvanized wire

Grounding rod DN20x2m

Grounding rod DN20x2m

-1,35

-0,35

-0,15

±0,00

+0,25

+3,15

+3,61

+3,00

+3,19

+3,44

0.40

0.16 0.20 5.00

5.20

0.10 0.10

5.00

0.10

0.20 0.20 4.80 0.20 0.20

Gutter

HVAC and electrical zone

20 cm reinforced concrete slab with 3% slope and rainwaterproofing and insulation metal sheet ledge galvanized steel bracket to raise a portable ladder

SECTION A-A

3%

L i g h t n i n g d o w n c o n d u c t o r

G r o u n d i n g r o d

D

N x m

Conceptual design only and for reference only

EXCIPIENT STORAGE

03.

ADDITIVE AND

TESTING

01.

15,30 m ceramic

ADMINISTRATION/

02.

SAMPLE STORAGE

05.

WC

certified security point

(protection against falling)

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N M

A R

K A

P P

R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET ID

D A

T E

A P

P R

US Army Corps of Engineers

T E

B O

D

N

G A

T

B U

D A

P E

S T

H

B I K

S Z

Á D

I

U

A

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

W I E

S B

A D

R

M A

N Y

E U

R O

P E

K E

C S

K E

M É

T

A

S

E

P O

L

I N

C R

E A

O

R A

P

A C

I T

Y

E-102

G E

N E

R A

L

E

L E

C T

R I C

P

D r a f t f o r

C o m m e n t s

R e v

O

E r n ő f y

E P

O L O

P E

R A

T I O

N S

B

U I L D

I N

G

L i g h t n i n g

O

E r n ő f y

P O

L

O

P E

R A

T I O

I L D

I N

G

L I G

H T

I N

G

F i n a l

R

F P

R e v

Garden curb

Low curb

Asphalt pavement demolish

Concrete pavement demolish

Concrete pavement constrution

Asphalt pavement construction

LEGEND

Road edge

Sidewalk constrution

Conceptual design only and for reference only

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X b e t o n r a k o d ó r á m p a b e t o n l a p b e t o n l a p f á s b z ó t o s f z ó t o s a s z f a l t f ü v e s f ü v e s aszfa lt m a k a d á m

X

X

X

X

X

X X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s f ü v e s e r d ő e r d ő e r d ő b e t o n b e t o n b e t o n b e t o n j á r d a d í s z k ő j r d a a s z f a l t a s z f a l t a s z f a l t a s z f a l t t ü z i v í z t r o z ó f a c s o p o r t e r d ő

N w p e r a t i o n u i l d i n g

C o n c r e a c c e d w i h r k i g a c e s

S i d e w a l k f r d e s t r i c c e s s

S t o r a n k

L a d d e r

V e n t i l o u t l e t

V e n t i l i n l e t

L i g h t n i r e s t o r

D i s t r i b u t o r

L a l e

N

Y

Y

J x m m

LEGEND:

Lightning arrestor, Ø2"x6500mmhot dop galvanized steel rod fixed to the flame arrester

Grounding rod

Ø20x3000mm hot dip galvanized grounding wire DN10 galv.steel, -1m

Lamp pole 4.5m with reflector 1x70W

Local distributor panel with 16A/3P+N+PE/16A

1P+N+PE socket, RCD relay 30mA, 2P-16A switch , Ex

Cable NYY-J 5x6mm2

P:\HUT00319_00_B&V_AIR_BASE_POL\04_PROJECT\DESIGN VALIDATION\00_DWG\02_ELECTRICAL\2022.09.14._NEW_DWG\DWG\E103_104_ST5_ST6_STORAGE_TANK_LIGHTNING_PROTECTION_AND_POWER_SUPPLY.DWG

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N M

A R

K A

P P

R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET ID

D A

T E

A P

P R

US Army Corps of Engineers

T E

B O

D

N

G A

T

B U

D A

P E

S T

H

B I K

S Z

Á D

I

U

A

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

W I E

S B

A D

R

M A

N Y

E U

R O

P E

K E

C S

K E

M É

T

A

S

E

P O

L

I N

C R

E A

O

R A

P

A C

I T

Y

E-103

R F

P

D r a f t f o r

C o m m e n t s

R e v

R

K i e f e r

E S

T S

T O

R A

G E

T

A N

K L I G

H T

N I N

G P

R O

T E

C T

I O

N A

N D

P

O W

E R

S

U P

P L Y

R

K i e f e r

S T

S

T O

R A

N

K

L I G

H T

N I N

G

P

R O

T E

C T

I O

N

A N

D

P

O W

P

P L Y

G E

N E

R A

L

E

L E

C T

R I C

Garden curb

Low curb

Asphalt pavement demolish

Concrete pavement demolish

Concrete pavement constrution

Asphalt pavement construction

LEGEND

Road edge

Sidewalk constrution

Conceptual design only and for reference only a s z f a l t b j betonárok beton

X X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X

X X

X

X

X

X X

X

X X

X

X

X

X

X

XXXXXXXXXXXX

X

X X

X X

X X

X X

X

XXXXXXXXXXX

XX

füves f ü v e s b e t o n f a l e r d ő f z ó t o s f z ó t o s f ü v e s aszfalt aszfalt b e t o n b e t o n f ü v e s beton s z i v a t t y ú s z i v a t t y ú b e t o n f ü v e s f ü v e s beton

XXXXXX

XX

XXXXXX

X

X füves

X f ü v e s l ö v é s z á r o k f e g y v ö l t ő ü r í t ő je la d ó v z e t é k je la z e t é k je la z e t é k je la z e t é k je la z e t é k je la z e t é k á r o k f ü v e s a s z f a l t b e t o n f o l y ó k a x x t ü z i v r o z ó ü z e m a n y r o l ó ü z e m a n y r o l ó á r o k á r o k beton beton a s z f a l t a s z f a l t k o n té n e r konténer k o n té n e r konténer konténer k o n t é n e r k o n t é n e r k o n t é n e r t a r t á l y t ü z i v r o z ó a s z f a l t x x x x x x x x

X

XXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X f ü v e s f ü v e s t ü z i v r o z ó t ü z i v r o z ó b e t o n b e t o n f ü v e s f ü v e s á r o k á r o k folyóka folyóka aszfa lt f ü v e s f ü v e s b e t o n b e t o n f ü v e s f ü v e s

X

X

X t ö r e d e z e z f a l t

5,59

5,46

Storage tank

Asphalt road

Reconstruction of the concrete pavement

(existing road)

Reconstruction of the concrete pavement

(existing road)

Replace existing gate

E

S

N

W

L a d d e r

V e n t i l o u t l e t

V e n t i l i n l e t

L a l e

N Y

Y J x m m

L i g h t n i r e s t o r

D i s t r i b u t o r

LEGEND:

Lightning arrestor, Ø2"x6500mmhot dop galvanized steel rod fixed to the flame arrester

Grounding rod

Ø20x3000mm hot dip galvanized grounding wire DN10 galv.steel, -1m

Lamp pole 4.5m with reflector 1x70W

Local distributor panel with 16A/3P+N+PE/16A

1P+N+PE socket, RCD relay 30mA, 2P-16A switch Ex , Cable NYY-J 5x6mm2

P:\HUT00319_00_B&V_AIR_BASE_POL\04_PROJECT\DESIGN VALIDATION\00_DWG\02_ELECTRICAL\2022.09.14._NEW_DWG\DWG\E103_104_ST5_ST6_STORAGE_TANK_LIGHTNING_PROTECTION_AND_POWER_SUPPLY.DWG

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N M

A R

K A

P P

R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET ID

D A

T E

A P

P R

US Army Corps of Engineers

T E

B O

D

N

G A

T

B U

D A

P E

S T

H

B I K

S Z

Á D

I

U

A

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

W I E

S B

A D

R

M A

N Y

E U

R O

P E

K E

C S

K E

M É

T

A

S

E

P O

L

I N

C R

E A

O

R A

P

A C

I T

Y

E-104

R F

P

D r a f t f o r

C o m m e n t s

R e v

R

K i e f e r

E S

T S

T O

R A

G E

T

A N

K L I G

H T

N I N

G P

R O

T E

C T

I O

N A

N D

P

O W

E R

S

U P

P L Y

R

K i e f e r

S T

S

T O

R A

N

K

L I G

H T

N I N

G

P

R O

T E

C T

I O

N

A N

D

P

O W

P

P L Y

G E

N E

R A

L

E

L E

C T

R I C

L I C

I T

A T

I O

N

N

O

F I

M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N M

A R

K A

P P

R

D A

T E

F I

M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L O

T

S

C A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET ID

D A

T E

A P

P R

US Army Corps of Engineers

T E

B O

D

N

G A

T

B U

D A

P E

S T

H

B I K

S Z

Á D

I

U

A

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

W I E

S B

A D

R

M A

N Y

E U

R O

P E

K E

C S

K E

M É

T

A

S

E

P O

L

I N

C R

E A

O

R A

P

A C

I T

Y

E-105

G E

N E

R A

L

E

L E

C T

R I C

P

D r a f t f o r

C o m m e n t s

R e v

O

E r n ő f y

E S

T

S

T O

R A

N

K

E

L E

C T

R I C

A L

S

C H

E M

A

O

E r n ő f y

S T

S

T O

R A

N

K

E

L E

C T

R I C

A L

S

C H

E M

L I C

I T

A T

I O

N

N

O

F I

M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N M

A R

K A

P P

R

D A

T E

F I

M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L O

T

S

C A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET ID

D A

T E

A P

P R

US Army Corps of Engineers

T E

B O

D

N

G A

T

B U

D A

P E

S T

H

B I K

S Z

Á D

I

U

A

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

W I E

S B

A D

R

M A

N Y

E U

R O

P E

K E

C S

K E

M É

T

A

S

E

P O

L

I N

C R

E A

O

R A

P

A C

I T

Y

E-106

G E

N E

R A

L

E

L E

C T

R I C

P

D r a f t f o r

C o m m e n t s

R e v

O

E r n ő f y

E S

T

S

T O

R A

N

K

E

L E

C T

R I C

A L

S

C H

E M

A

O

E r n ő f y

S T

S

T O

R A

N

K

E

L E

C T

R I C

A L

S

C H

E M

LI

C

IT

A

TI

O

N N

O

FI

LE

N A

M E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

E D

B Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K A

PP

R

D

AT

E:

FI

LE

N U

M B

ER

S

IZ

E:

S U

B M

IT

TE

D B

Y:

P

LO

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E A

PP

R

US Army Corps of Engineers

S U

B M

IT

T

E D

B Y

A

-1

2-

M

-1

-F B

D -S

IT

E

A -R

C O

N

TR

A C

T N

O

S O

LI

C

IT

A

T

IO

N N

O

-1

1-

M-101

RAILCAR

UNLOADING

STANDS

C O

N C

E

PT

S

KE

TC

H

F O

R D

E

SI

G N

C H

A R

ET

TE

-1

1-

P . R

U

ZS

A

TLS 1

FUEL SUPPLY

PIPELINE

NOTES:

1. THE BLOCK FLOW DIAGRAM PROVIDES GENERAL OVERVIEW OF PRIMARY

PROCESS

TLS 2

RLP

RUP 6

RUP 5

RUP 4

RUP 3

RUP 2

RUP 1

DP1

VALVE ASSEMBLY

PIT

MANIFOLD PUMP & FILTER STATION

SITE A

R

R

FO

R

C

LI

EN

T'

S

AP

PR

O

VA

L

-1

2-

P . R

U

ZS

A

ZS

. T

ÍM

ÁR

Conceptual design only and for reference only

LI

C

IT

A

TI

O

N N

O

FI

LE

N A

M E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

E D

B Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K A

PP

R

D

AT

E:

FI

LE

N U

M B

ER

S

IZ

E:

S U

B M

IT

TE

D B

Y:

P

LO

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E A

PP

R

US Army Corps of Engineers

T E

B O

D

IN

H U

N G

A R

Y

A

-1

2-

M

-1

-F B

D -S

IT

E

B -R

C O

N

TR

A C

T N

O

S O

LI

C

IT

A

T

IO

N N

O

-1

1-

M-102

C O

N C

E

PT

S

KE

TC

H

F O

R D

E

SI

G N

C H

A R

ET

TE

-1

1-

P . R

U

ZS

A

TLS 3

FUEL SUPPLY

PIPELINE

NOTES:

1. THE BLOCK FLOW DIAGRAM PROVIDES GENERAL OVERVIEW OF PRIMARY

PROCESS

TLS 4

MANIFOLD PUMP & FILTER STATION

SITE B

P . R

U

ZS

A

R

R

FO

R

C

LI

EN

T'

S

AP

PR

O

VA

L

-1

2-

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

AP

PR

US Army Corps of Engineers

BI

LF

IN

G

ER

T

EB

O

D

IN

H U

N G

AR

Y

KF

T.

BU

D

AP

ES

T H

-1

LO

M

B U

TC

A

-3

9.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IE

SB

AD

EN

G

ER

M

AN

Y

EU

R

O

PE

BI

LF

IN

G

ER

T

EB

O

D

IN

H U

N G

AR

Y

A1

-0

8-

M

-1

-P

ID

-S

IT

EA

-R

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

-0

3-

KE

C

SK

EM

ÉT

A

IR

B

AS

E

SI

TE

A

PI

PI

N G

IN

ST

R

U M

EN

TA

TI

O

N D

IA

G

R

AM

PO

L

- I N

C R

EA

SE

S

TO

R

AG

E C

AP

AC

IT

Y

M-110

D

ES

IG

N

C H

AR

ET

TE

R

IP

O

R T

-1

1-

P.

R

U

ZS

A

1 2 3 4 5

HEADER NO.3 DN200

FUEL PIPELINE

CF 1

BV 150GV 150

HEADER NO.2 DN200

BV 150

BV 150

FSR No. 1

PSV 25

BV 25 HOSE CONNECTION

IG 25

IG 50

CF 2

DPI PI

BV 150

PIPI

FSR No. 5

PSV 25

BV 25 HOSE CONNECTION

IG 25

IG 50

BV 150 BV 150 CVTF 150

FS

P 1

BV 150

FSR No. 2

PSV 25

BV 25 HOSE CONNECTION

IG 25

IG 50

CF 2

DPI PI

BV 150

PIPI

BV 150 BV 150 CVTF 150

FS

P 2

BV 150

HEADER NO.1 DN300

BV 25

BV 25

DN 200 FROM ST2 CS FUEL RETURN

GV 200

DN 200 FROM ST1 CS FUEL RETURN

GV 200

DN 200 FROM ST5 CS FUEL RETURN

5-GV200-05

BV 150

BCVF 150

QVDF 150BV 150

QVDF 150BV 150

200x150

Turbine Flow Meter

100x200 DN100 Unite

Q = 30-300 m3/h

10D10D

200x100

BV 25

BV 25

QVDF 150 BV 150

GV 150

BV 150

DPI

PI

GV 150 GV 150 5-GV150-01

DN 150 TO ST2 CS FUEL SUPPLY

DN 150 TO ST1 CS FUEL SUPPLY

DN 150 TO ST5 CS FUEL SUPPLY

BV 25

BV 150

GV 150

BV 150

10 m3 DRAIN TANK

BV 50

HEADER NO.4 DN300

PT

TT

DN25

BV 15BV 20

PT

Additives dosing unit

200x150

CI/CL storage FSII storage 60 lit 600 lit

GV 150

GV 150

10 m3 DRAIN TANK

BV 25

25x50

DN 25

DN 25

DN 50

25x50

BV 25

BV 25

BV 25

GV 200

GV 150HLV 150GV 150

LSA

HH

DN 150 TO ST1 CS

DN 200 FROM ST1 CS

DN 50 FROM ST1 SS DRAIN

DN 32 FROM SUMP SS DRAIN

HP

XA

ST1 1250 m3

BV 25

GV 200

GV 150HLV 150GV 150

LSA

HH

DN 150 TO ST2 CS

DN 200 FROM ST2 CS

DN 50 FROM ST2 SS DRAIN

DN 32 FROM SUMP SS DRAIN

HP

XA

ST2 1250 m3

5-BV50-03

5-GV200-04

5-GV150-035-HLV150-015-GV150-02

LSA H, HH

DN 150 TO ST5 CS

DN 200 FROM ST5 CS

DN 50 FROM ST5 SS DRAIN

DN 32 FROM SUMP SS DRAIN

HP-5-1

XA

ST5 1900 m3 (ST5 2500 m3)

BV 50

BV 50

5-BV50-02

BV 32

BV 50

P

CV 50

BV 50

CV 50

DN50 SS

GV 100

GV 100

BV 150 CV 50

BV 150

BV 25

BV 25

AE AA

DN 80 5-BV80-01

BV 80 CVP 80 BV 80

PI

CC FIRE

5-1

5-2

5-5 5-6

NT

NT

NT

CONTROL ROOM PLC

AE AA

CC FIRE

CONTROL ROOM PLC

AE AA

CC FIRE

CONTROL ROOM PLC

DN150 CS

BV 50

DN 50 FROM ST5 SS DRAIN

DN 50 FROM ST1 SS DRAIN

DN 50 FROM ST2 SS DRAIN

C 100

DN100 CS

BV 100

PRV

SPR 80 BV 80

CV 100

PRV

PT 80 80x100 TLV 100

FQ

FQ

BV 100 100x150

BV 50

BV 25

PRV

BV 50

BV 50 CV 50

C 100 BV 100

PRV

SPR 80 BV 80

CV 100

PRV

FQ

BV 100 100x150

BV 50

BV 25

PRV

BV 50

BV 50 CV 50

PIPI

PT 80 80x100 TLV 100

PIPI

AA

FIRE

AA

FIRE

MBV 150 CV 80150x80 80x150

PI

PT TIT

BV 25

IF 150

DN50 SS

DN50 SS

DN100 CS

DN150 CS

DN50 SS

FO

R

C U

ST

O

M

ER

'S A

PP

R

O

VA

L

-1 2-

G Y.

B

EL

IC

ZA

Y

P.

R

U

ZS

A

MPFS MECHANICAL ROOM SITE A

TLS 2

TLS 1

FUEL RECEIPT

ST2 FUEL STORAGE TANK

ST1 FUEL STORAGE TANK

ST5 FUEL STORAGE TANK

SDD SDD

PI TI

5-3 5-4

PI

5-7

PI

5-8

PI

5-9

PI

5-10

LG

5-11

SDD

SDD SDD

PI TIPI

PI

PI

PI

LG

SDD

VC VC VC

VC VC VC

SDD SDD

PI TIPI

PI

PI

PI

LG

SDD

VC VC VC

LEGEND

BALL VALVEBV

GATE VALVEGV

CHECK VALVECV

PUMP START VALVE WITH FLOW CONTROLCVTF

PRESSURE CONTROL VALVECVP

FLOW METER

FILTER/SEPARATOR

FQ

FSR

HLV

HP

IG

P

PI

HIGH LEVEL SHUT-OFF VALVE

HAND PUMP

INSPECTION GLASS

PUMP

PRESSURE GAUGE WITH STOPCOCK

PRV

PT

VC

SS

CS

PRESSURE RELIEF VALVE

PRESSURE TRANSMITTER

VENTING CAP

STAINLESS STEEL

CARBON STEEL

IJ INSULATING JOINT

QVFD

SDD

FILTER/SEPARATOR VALVE WITH DIFF.PRESSURE SHUT-OFF

SAFETY DEVICE AGAINST DETONATION; DRY TYPE

DPI DIFFERENTIAL PRESSURE INDICATOR

PAC PANTOGRAPH CONNECTION

FLOW SWITCHFS

IG INSPECTION GLASS

NT ROTARY MACHINE IN OPERATION SIGNAL

XA LEAKAGE DETECTION AND ALARM

NT ROTARY MACHINE IN OPERATION SIGNAL

AE VAPOR CONCENTRATION ANALYZATOR

AA FIRE ALARM

MPFS MANIFOLD PUMP FILTER STATION

R

R

LSA

L, LL5-12

R

FI

N

AL

R

FP

-0 2-

LSA LIQUID LEVEL SWITCH/ALARM

HH HIGH-HIGH LIQUID LEVEL

H HIGH LIQUID LEVEL

LL LOW-LOW LIQUID LEVEL

L LOW LIQUID LEVEL

XA LEAKAGE DETECTION - ALARM

D

ES

IG

N

R

EV

IE

W

C O

M M

EN

TS

-0

8-

R

BV 150 BV 150

BV 150

RAILCAR UNLOADING SYSTEM

DN150 CS

DP1 TIT TEMPERATURE INDICATOR AND

TRANSMITTER

EXISTING PIPELINE

NEW FUEL SUPPLY PIPELINE

NEW FUEL RETURN PIPELINE

NEW DRAIN PIPELINE

SUBSYSTEM BORDER

INSTRUMENTATION LINE

PNEUMATIC LINE

R

C O

M M

EN

TS

O N

L

EG

EN

D

-0

3-

Conceptual design only and for reference only

R

D O

U

BL

E- W

AL

LE

D P

IP

E

-0

8-

Indicated diameters on double-walled pipes apply to the inner carrier pipe dimensions

Buried double-walled pipe between concrete tank enclosure and existing concrete wall at piping tunnel or pump house.

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

AP

PR

US Army Corps of Engineers

BI

LF

IN

G

ER

T

EB

O

D

IN

H U

N G

AR

Y

KF

T.

BU

D

AP

ES

T H

-1

LO

M

B U

TC

A

-3

9.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IE

SB

AD

EN

G

ER

M

AN

Y

EU

R

O

PE

BI

LF

IN

G

ER

T

EB

O

D

IN

H U

N G

AR

Y

A1

-0

8-

M

-1

-P

ID

-S

IT

EB

-R

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

-0

3-

KE

C

SK

EM

ÉT

A

IR

B

AS

E

SI

TE

B

PI

PI

N G

IN

ST

R

U M

EN

TA

TI

O

N D

IA

G

R

AM

PO

L

- I N

C R

EA

SE

S

TO

R

AG

E C

AP

AC

IT

Y

M-111

D

ES

IG

N

C H

AR

ET

TE

R

IP

O

R T

-1

1-

P.

R

U

ZS

A

1 2 3 4 5

HEADER NO.3 DN200

FUEL PIPELINE

CF 1

BV 150GV 150

HEADER NO.2 DN200

BV 150

BV 150

FSR No. 1

PSV 25

BV 25 HOSE CONNECTION

IG 25

IG 50

CF 2

DPI PI

BV 150

PIPI

FSR No. 5

PSV 25

BV 25 HOSE CONNECTION

IG 25

IG 50

BV 150 BV 150 CVTF 150

FS

P 1

BV 150

FSR No. 2

PSV 25

BV 25 HOSE CONNECTION

IG 25

IG 50

CF 2

DPI PI

BV 150

PIPI

BV 150 BV 150 CVTF 150

FS

P 2

BV 150

HEADER NO.1 DN300

BV 25

BV 25

DN 200 FROM ST4 CS FUEL RETURN

GV 200

DN 200 FROM ST3 CS FUEL RETURN

GV 200

DN 200 FROM ST5 CS FUEL RETURN

6-GV200-05

BV 150

BCVF 150

QVDF 150BV 150

QVDF 150BV 150

200x150

Turbine Flow Meter

100x200 DN100 Unite

Q = 30-300 m3/h

10D10D

200x100

BV 25

BV 25

QVDF 150 BV 150

GV 150

BV 150

DPI

PI

GV 150 GV 150 6-GV150-01

DN 150 TO ST4 CS FUEL SUPPLY

DN 150 TO ST3 CS FUEL SUPPLY

DN 150 TO ST5 CS FUEL SUPPLY

BV 25

BV 150

GV 150

BV 150

10 m3 DRAIN TANK

BV 50

HEADER NO.4 DN300

PT

TT

DN25

BV 15BV 20

PT

Additives dosing unit

200x150

CI/CL storage FSII storage 60 lit 600 lit

GV 150

GV 150

10 m3 DRAIN TANK

BV 25

25x50

DN 25

DN 25

DN 50

25x50

BV 25

BV 25

BV 25

GV 200

GV 150HLV 150GV 150

LSA

HH

DN 150 TO ST3 CS

DN 200 FROM ST3 CS

DN 50 FROM ST3 SS DRAIN

DN 32 FROM SUMP SS DRAIN

HP

XA

ST3 1250 m3

BV 25

GV 200

GV 150HLV 150GV 150

LSA

HH

DN 150 TO ST4 CS

DN 200 FROM ST4 CS

DN 50 FROM ST4 SS DRAIN

DN 32 FROM SUMP SS DRAIN

HP

XA

ST4 1250 m3

6-BV50-03

6-GV200-04

6-GV150-03

6-HLV150-016-GV150-02

DN 150 TO ST6 CS

DN 200 FROM ST6 CS

DN 50 FROM ST6 SS DRAIN

DN 32 FROM SUMP SS DRAIN

HP-6-1

SDD SDD

PI TIXA

ST6 1900 m3 (ST6 2500 m3)

BV 50

BV 50

6-BV50-02

BV 32

BV 50

P

CV 50

BV 50

CV 50

DN50 SS

GV 100

GV 100

BV 150 CV 50

BV 150

BV 25

BV 25

AE AA

DN 80 6-BV80-01

BV 80 CVP 80 BV 80

PI

CC FIRE

6-2 6-3 6-4

6-5 6-6

NT

NT

NT

CONTROL ROOM PLC

AE AA

CC FIRE

CONTROL ROOM PLC

AE AA

CC FIRE

CONTROL ROOM PLC

DN150 CS

BV 50

DN 50 FROM ST5 SS DRAIN

DN 50 FROM ST3 SS DRAIN

DN 50 FROM ST4 SS DRAIN

C 100

DN100 CS

BV 100

PRV

SPR 80 BV 80

CV 100

PRV

PAC 80 80x100 TLV 100

FQ

FQ

BV 100 100x150

BV 50

BV 25

PRV

BV 50

BV 50 CV 50

C 100 BV 100

PRV

SPR 80 BV 80

CV 100

PRV

FQ

BV 100 100x150

BV 50

BV 25

PRV

BV 50

BV 50 CV 50

PIPI

PAC 80 80x100 TLV 100

PIPI

AA

FIRE

AA

FIRE

MBV 150 CV 80150x80 80x150

PI

PT TIT

BV 25

IJ 150

DN50 SS

DN50 SS

DN100 CS

DN150 CS

DN50 SS

FO

R

C U

ST

O

M

ER

'S A

PP

R

O

VA

L

-1 2-

G Y.

B

EL

IC

ZA

Y

P.

R

U

ZS

ATLS 4

TLS 3

FUEL RECEIPT

MPFS MECHANICAL ROOM SITE B

PI

6-7

PI

6-8

PI

6-9

PI

6-10

LG

6-11

SDD

SDD SDD

PI TIPI

PI

PI

PI

LG

SDD

SDD SDD

PI TIPI

PI

PI

PI

LG

SDD

BALL VALVEBV

GATE VALVEGV

CHECK VALVECV

PUMP START VALVE WITH FLOW CONTROLCVTF

PRESSURE CONTROL VALVECVP

FLOW METER

FILTER/SEPARATOR

FQ

FSR

HLV

HP

IG

P

PI

HIGH LEVEL SHUT-OFF VALVE

HAND PUMP

INSPECTION GLASS

PUMP

PRESSURE GAUGE WITH STOPCOCK

PRV

PT

VC

SS

CS

PRESSURE RELIEF VALVE

PRESSURE TRANSMITTER

VENTING CAP

STAINLESS STEEL

CARBON STEEL

VC VC VC

VC VC VC

VC VC VC

IJ INSULATING JOINT

QVFD

SDD

FILTER/SEPARATOR VALVE WITH DIFF.PRESSURE SHUT-OFF

SAFETY DEVICE AGAINST DETONATION; DRY TYPE

DPI DIFFERENTIAL PRESSURE INDICATOR

PAC PANTOGRAPH CONNECTION

FLOW SWITCHFS

IG INSPECTION GLASS

NT ROTARY MACHINE IN OPERATION SIGNAL

XA LEAKAGE DETECTION AND ALARM

NT ROTARY MACHINE IN OPERATION SIGNAL

AE VAPOR CONCENTRATION ANALYZATOR

AA FIRE ALARM

MPFS MANIFOLD PUMP FILTER STATION

ST6 STORAGE TANK

ST3 STORAGE TANK

ST4 STORAGE TANK

R

R

LSA LIQUID LEVEL SWITCH/ALARM

HH HIGH-HIGH LIQUID LEVEL

H HIGH LIQUID LEVEL

LL LOW-LOW LIQUID LEVEL

L LOW LIQUID LEVEL

XA LEAKAGE DETECTION - ALARM

LSA H, HH

6-1

LSA

L, LL6-12

R

D

ES

IG

N

R

EV

IE

W

C O

M M

EN

TS

-0

8-

R

FI

N

AL

R

FP

-0 2-

LEGEND

TIT TEMPERATURE INDICATOR AND

TRANSMITTER

EXISTING PIPELINE

NEW FUEL SUPPLY PIPELINE

NEW FUEL RETURN PIPELINE

NEW DRAIN PIPELINE

SUBSYSTEM BORDER

INSTRUMENTATION LINE

PNEUMATIC LINE

R

C O

M M

EN

TS

O N

L

EG

EN

D

-0

3-

R

D O

U

BL

E- W

AL

LE

D P

IP

E

-0

8-

Buried double-walled pipe between concrete tank enclosure and existing concrete wall at piping tunnel or pump house.

Indicated diameters on double-walled pipes apply to the inner carrier pipe dimensions

Revision Date

20-12-20170

ApprovedCheckedMadeDescription

Zs. TímárZs. Szabó

K. Pető Gy. Beliczay

2 27-03-2020

Site Location

P. RuzsaPressure class revision

POL fuel storage

HUT00065

PROCESS DATA FOR VALVES

RFP Draft P. Ruzsa

09-08-2019 Design review comments P. Ruzsa Gy. Beliczay

1 4

RevisionDocument No.

1 Zs. Szabó

M-120 2

Black & Veatch

Date

27-03-2020

Kecskemét Air Base

Client

Unit

Job No. OfSheet

General notes / Általános megjegyzések

1. Valve ID concept is according to the followings: 0-XX000-00, where 0: Storage tank ID, which the valve belongs to

(5 stands for ST5 and 6 for ST6); XX000 represents the type of valve and nominal diameter (e.g. BV150 stands for ball valve with nominal diameter of 150mm); 00: sequence number.

2. Revision 1 stands for: 5-HLV-01 and 6-HLV-01 "Service" description line no. 9 & 18.

3. Revision 2 stands for pressure class revision: PN6 to PN16

Of

HUT00065 M-120 2 27-03-2020 2 4

Job No. Document No. Revision Date Sheet

3 / 4 .

30 °C50000 80000 l/hIndoor location HOLD JP-8 jet fuel L 8000

6-HLV150-

High level shut down valve actuated via float operated pilot

M-111 Y HOLD 150 HOLD HOLD PN16 HOLD CS -5 20

-5 20 30 °CHOLD PN16 HOLD CS JP-8 jet fuelIndoor location HOLD

6-GV200-

Fuel return line connection to Header

No. 1

M-111 N HOLD 200 HOLD

20 30 °CPN16 HOLD CS Indoor location HOLD -5

6-GV200-

Fuel return line from ST6 M-111 N HOLD 200 HOLD HOLD

-5 20 30 °CIndoor location HOLD JP-8 jet fuel L 8000 50000150 HOLD HOLD PN16 HOLD CS

6-GV150-

Fuel supply line connection to ST6 -gate valve

M-111 N HOLD

20 30 °CHOLD HOLD PN16 HOLD CS -5Indoor location HOLD JP-8 jet fuel L

6-GV150-

Closing valve prior to HLV switch valve -gate valve

M-111 N HOLD 150

80000 l/h -5 20 30 °C150 HOLD HOLD PN16 HOLD CS Indoor location HOLD

6-GV150-

ST6 fuel supply line connection to

Header No. 2 - gate valve M-111 N HOLD JP-8 jet fuel L 8000 50000

20 30 °CHOLD SS -510 m3/h normally closed 6-BV50-03 ST6 connection to drain line - ball valve M-111 N HOLD 50 HOLD HOLD PN16

20 30 °CL 0

normally closed 10 m3/h -5PN16 HOLD SS

JP-8 jet fuel drain Indoor location HOLD6-BV50-02

ST6 drain line connection to main drain line - ball valve

M-111 N HOLD 50 HOLD HOLD

20 30 °CHOLD CS Indoor location HOLD -5JP-8 jet fuel L 0 normally closed

6-BV80-01

Fuel issue recirculation to storage tank lines - ball valve

M-111 N HOLD 80 HOLD HOLD PN16

l/h -5 20 30 °CHOLD JP-8 jet fuel L 8000 50000 80000150 HOLD HOLD PN16 HOLD CS

5-HLV150-

High level shut down valve actuated via float operated pilot

M-110 Y HOLD

20 30 °CPN16 HOLD CS -5120 120 m3/hIndoor location HOLD JP-8 jet fuel

5-GV200-

Fuel return line connection to Header

No. 1

M-110 N HOLD 200 HOLD HOLD

°C12 m3/h -5 20 30120 120HOLD HOLD PN16 Indoor location HOLD JP-8 jet fuelHOLD CS

5-GV200-

Fuel return line from ST5 M-110 N HOLD 200

30 °C8000 50000 80000 l/h -5 20

5-GV150-

Fuel supply line connection to ST5 -gate valve

M-110 N HOLD 150 HOLD HOLD PN16

-5 20 30 °CHOLD PN16 HOLD CS Indoor location l/h8000HOLD 50000 80000 Closing valve prior to HLV switch valve -gate valve

M-110 N HOLD 150 HOLD

30 °C8000 50000 80000 l/h -5 20HOLD CS Indoor location HOLD JP-8 jet fuel L

5-GV150-

ST5 fuel supply line connection to

Header No. 2 - gate valve

M-110 N HOLD 150 HOLD HOLD PN16

10 m3/h -5 20 30 °CIndoor location HOLD JP-8 jet fuel drain L 0 normally closed 50 HOLD HOLD PN16 HOLD SS5-BV50-03 ST5 connection to drain line - ball valve M-110 N HOLD

-5 20 30 °C JP-8 jet fuel drain L 0 normally closed 10 m3/hHOLD PN16 HOLD SS Indoor location HOLD5-BV50-02

ST5 drain line connection to main drain line - ball valve

M-110 N HOLD 50 HOLD

20 30 °CL 0

normally closed 120 m3/h -5HOLD JP-8 jet fuelN HOLD 80 HOLD HOLD

PROCESS DATA FOR VALVES

Client:

POL fuel storage

Location:

N o

Tag No.

M e m b e r o f

S

IS

Line / equip.

No.

L in e s iz e mm

Service

PID

No.

L in e s c h e d u le

L in e I

D

C o n n e c t.

R a ti n g

P ip e C la s s

E n v ir o n m e n ta l c o n d it io n

M a te ri a l

Material Flow

Min. Normal Max. Unit

Kecskemét Air Base

H a z a rd

Z o n e

Min Norm Max Unit

Inlet temperature

27-03-2020

1/2

HUT00065

M-120

Job No.

Doc. No.

Revision

Date

Sheet

Unit:

5-BV80-01

Fuel issue recirculation to storage tank lines - ball valve M-110

5-GV150-

JP-8 jet fuel

PN16 HOLD CS Indoor location

HOLD

Black & Veatch

L

CS Indoor location HOLD JP-8 jet fuel L

Fluid name

P h a s e

L

L

120 m3/h

Indoor location HOLD JP-8 jet fuel drain L 0

Indoor location

8000 50000 80000 l/h

JP-8 jet fuel L 12 120

80000 l/h

L 12 120

120 m3/h

120 m3/h

4 / 4 .

6-HLV150-

6-GV200-

6-GV200-

6-GV150-

6-GV150-

6-GV150-

6-BV50-03

6-BV50-02

6-BV80-01

5-HLV150-

5-GV200-

5-GV200-

5-GV150-

5-GV150-

5-BV50-03

5-BV50-02

N o

Tag No.

5-BV80-01

5-GV150-

HOLD 6n.a. n.a. n.a. bar Diaphragm

CLOS

E

HOLD

0,775 -

0,840 g/cm3 8 mm2/s

@ -20°C n.a. n.a.1 1 - 2 2 barg HOLD HOLD n.a. n.a. n.a.n.a. bar Gate valve n.a.HOLD °CHOLD8 mm2/s

@ -20°C n.a. n.a. HOLD manual valve n.a. n.a. 6 barhydrostatic n.a. HOLD HOLD

0,775 -

0,841 g/cm4hydrostatic hydrostatic n.a. n.a. n.a.HOLD 6 bar n.a. HOLD manual valve mm2/s

@ -20°C n.a. n.a. n.a. n.a. Gate valveHOLD °C n.a. barn.a. HOLD HOLD

0,775 -

0,840 g/cm3 8hydrostatic hydrostatic hydrostatic n.a. n.a.6 bar HOLD n.a. bar Gate valve8 mm2/s

@ -20°C n.a. n.a. n.a. n.a.2 barg HOLD HOLD

0,775 -

0,840 g/cm31 1 - 2 mm2/s

@ -20°C 8 n.a. n.a. n.a. n.a. °Cbarg HOLD HOLD

0,775 -

0,840 g/cm31 1 - 2 2

HOLD

manual valve n.a. n.a. n.a.Gate valve n.a.n.a. n.a. 6 bar HOLD °CHOLD

0,775 -

0,840 g/cm3 8 mm2/s

@ -20°C n.a. n.a.1 1 - 2 2 barg HOLD HOLD n.a. n.a.

mm2/s

@ -20°C n.a. n.a. n.a.6 bar HOLD °CHOLDn.a. HOLD HOLD

0,775 -

1,000 g/cm3 8hydrostatic hydrostatic hydrostatic n.a.Ball valve n.a. HOLD manual valve n.a. n.a.

mm2/s

@ -20°C n.a. n.a. n.a. n.a. 6n.a. HOLD HOLD

0,775 -

1,000 g/cm3 8hydrostatic hydrostatic hydrostatic n.a. n.a.

mm2/s

@ -20°C n.a. n.a. n.a. n.a. Ball valveHOLD °C n.a. barbarg HOLD HOLD

0,775-

0.840 g/cm3 80 1 - 2 2 n.a.bar Diaphragm

CLOS

E HOLD n.a. n.a.n.a. HOLD 6 bar HOLD n.a.g/cm3 8 mm2/s

@ -20°C n.a. n.a. n.a.1 - 2 2 barg HOLD HOLD

0,775 -

0,840 mm2/s

@ -20°C 8 n.a. n.a. n.a. n.a. °Cn.a. HOLD HOLD

0,775 -

0,841 g/cm4hydrostatic hydrostatic hydrostatic manual valve n.a. n.a. n.a.°C Gate valven.a. bar n.a. HOLDn.a. n.a. HOLD 6 bar HOLD

0,775 -

0,840 g/cm3 8 mm2/s

@ -20°C n.a. n.a.hydrostatic hydrostatic n.a. HOLD HOLDhydrostatic n.a.n.a.HOLD °C bar Gate valve n.a.n.a. n.a. n.a. n.a. HOLD 6HOLD HOLD 0,775 -

0,840 g/cm3 8 mm2/s

@ -20°C 1 1 - 2 2 barg n.a.8 mm2/s

@ -20°C n.a. n.a. barHOLDn.a. n.a. n.a. HOLD2 barg HOLD HOLD

0,775 -

0,840 g/cm31 1 - 2 n.a. HOLD manual valve n.a. n.a. n.a.bar HOLD °C n.a. bar Gate valven.a. n.a. n.a. n.a. HOLD 6HOLD HOLD

0,775 -

0,840 g/cm3 8 mm2/s

@ -20°C 1 1 - 2 2 barg n.a.Ball valve n.a.

0,775 -

1,000 g/cm3 8 mm2/s

@ -20°C n.a.n.a. n.a. HOLD HOLD manual valve n.a.n.a. bar°Cn.a. n.a.hydrostatic hydrostatic hydrostatic n.a. HOLD HOLD n.a.Ball valve n.a. HOLD manual valve n.a.n.a. HOLD 6 °C n.a. bar8 mm2/s

@ -20°C n.a. n.a. n.a. n.a.hydrostatic n.a. HOLD HOLD

0,775 -

1,000 g/cm3hydrostatic hydrostatic

°Cbarg HOLD HOLD 0,775-

0.840 g/cm3 80 1 - 2 2

Job No. HUT00065

Doc. No. M-120

Client: Black & Veatch Revision 2

PROCESS DATA FOR VALVES

27-03-2020

Location: Kecskemét Air Base Sheet 2/2

Unit:

Unit Value

Inlet pressure

At min

Flow

At norm

Flow

At max

Flow Unit Value Unit Value Unit

For vapor

Density Viscosity Mol. Weight

C o m p re s s

C p

C v

Valve type

F a il u re p o s it io n

L e a k a g e C la s s

Value Unit

POL fuel storage Date

Unit

Design pressure Design Temp.

Value Unit sec

S tr o k in g t im e

Heat tracing

For liquids

Corrosive / erosive comp.

Type

Max. shut-off press.

n.a. HOLD 6 bar n.a.n.a. n.a.6 bar HOLD °C n.a. n.a.n.a. bar Gate valve n.a.

n.a. HOLD n.a.

n.a.

manual valve manual valve

HOLD 6 bar HOLD HOLD

°CHOLD

n.a.n.a. n.a.bar Ball valve n.a. HOLD manual valve bar

HOLD 6 bar

HOLD bar HOLD °C n.a. bar n.a.n.a. bar Gate valve n.a.

n.a.

n.a. HOLD manual valve n.a.

n.a.

manual valve

HOLD 6 bar HOLD HOLD

°C n.a.

manual valve n.a. n.a.Gate valve n.a.

n.a. HOLD manual valve n.a.

6 bar °C HOLD bar

Ball valve n.a.

6 bar HOLD n.a. n.a. n.a.n.a. bar bar HOLD

HOLD

manual valve

HOLD

mm2/s

@ -20°C n.a. n.a. n.a.

Max. allow.

press. Drop

Value Unit Value Unit Value

← 2 %

1:2

5 % → ← 5 %

← 1 % 1 % →

ANNULAR SPACE

STEEL LADDER

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

AP

PR

US Army Corps of Engineers

TE

BO

D

IN

H U

N G

AR

Y

KF

T.

BU

D

AP

ES

T H

-1

LO

M

B U

TC

A

-3

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IE

SB

AD

EN

G

ER

M

AN

Y

EU

R

O

PE

A1

.0

8.

.0

8.

KE

C

SK

EM

ÉT

A

IR

B

AS

E

AS

SE

M

BL

Y D

R

AW

IN

G

F O

R T

EN

D

ER

PO

L

- I N

C R

EA

SE

S

TO

R

AG

E C

AP

AC

IT

Y

M-200

.1

0.

ST

5, S T6 m

3 S to ra ge

T an k 1:

ZS

IG

M O

N D

S

ZA

BÓ

AS

SE

M

BL

Y

DR

AW

IN

G F

O R

DE

SI

G N

CH

AR

ET

TE

M

-2

A ss em bl y r0

LIGHTING ROD

FLAME ARRESTER

VENTILATION OUTLET

VENTILATION INLET

EARTHING

EARTHING

TANK STAIRS

LEAKAGE CONTROL PIT

.1

2.

AS

SE

M

BL

Y

DR

AW

IN

G F

O R

AP

PR

O

VA

L

TANK STAIRS

MANUAL ACTUATOR

CONCRETE BASE SLAB

(B

ID

O

PT

IO

N

LADDER

LADDER

PLATFORM

PLATFORM

VENTILATION OUTLET

VENTILATION INLET

SUMP

BOTTOM

ROOF

LUG

TOP OF BERM

CONCRETE WALL RING

STEEL PIPE SUPPORT

(10 PCS.)

STEEL PIPE SUPPORT

(4 PCS.)

DE

SI

G N

RE

VI

EW

C

O M

M

EN

TS

.0

8.

Conceptual design only and for reference only

ST

AN

DA

RD

R

EV

IE

W

.0 7.

Double-walled pipes

DO

UB

LE

-W

AL

LE

D

PI

PE

.0

8.

← 2 % 5 % → ← 5 %

← 1 % 1 % →

STEEL LADDER

ANNULAR SPACE

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

AP

PR

US Army Corps of Engineers

BI

LF

IN

G

ER

T

EB

O

D

IN

H U

N G

AR

Y

KF

T.

BU

D

AP

ES

T H

-1

LO

M

B U

TC

A

-3

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IE

SB

AD

EN

G

ER

M

AN

Y

EU

R

O

PE

A1

.0

8.

.0

8.

KE

C

SK

EM

ÉT

A

IR

B

AS

E

AS

SE

M

BL

Y D

R

AW

IN

G

F O

R T

EN

D

ER

PO

L

- I N

C R

EA

SE

S

TO

R

AG

E C

AP

AC

IT

Y

M-201

.1

2.

ST

5, S T6 m

3 S to ra ge

T an k 1:

ZS

IG

M O

N D

S

ZA

BÓ

AS

SE

M

BL

Y

DR

AW

IN

G F

O R

AP

PR

O

VA

L

M -2

A

SS

EM

BL

Y

R

1:2

LIGHTING ROD

FLAME ARRESTER

VENTILATION OUTLET

VENTILATION INLET

LEAKAGE CONTROL PIT

TANK STAIRS

MANUAL ACTUATOR

CONCRETE WALL RING

CONCRETE BASE SLAB

STEEL PIPE SUPPORT

(10 PCS.)

TANK STAIRS

LADDER

PLATFORM

LADDER

PLATFORM

VENTILATION OUTLET

VENTILATION INLET

EARTHING

EARTHING

SUMP

BOTTOM

ROOF

LUG

TOP OF BERM

(B

AS

E)

.0

8.

DE

SI

G N

RE

VI

EW

C

O M

M

EN

TS

Conceptual design only and for reference only

.0

7.

ST

AN

DA

RD

R

EV

IE

W

.0

8.

DO

UB

LE

-W

AL

LE

D

PI

PE

Double-walled pipes

Rev./ Revision

Projektszám / Oldal / Page Project No.

huT00013.00

Dátum / Date

2 06.08.2019.

Design review comments Zsigmond Szabó Péter Ruzsa Károly Pető

1 15.12.2017. For approval Zsigmond Szabó Péter Ruzsa Zsolt Tímár

0 20.12.2017. For approval Zsigmond Szabó Péter Ruzsa Zsolt Tímár Rev Dátum / Date Megnev./ Denom. Készítette/Prepared by Ellenőrizte/Checked by Jóváh./App. by

BID OPTION

2500 m ST5, ST6 jelű Tárolótartály /

2500 m ST5, ST6 Tank

Projekt megnevezése / Project Denomination

Kecskemét Air Base, POL, Increase Storage Capacity

Megrendelő / Client Dokumentum azonosító / Document Number

M-210 US Army

Corps of Engineers

Mechanikai Adatlap

Tank

Mechanical Data Sheet

1 / 5

Tárolótartály

Megnevezés / Denomination

Mechanical Datasheet for Tank

Tárolótartály Mechanikai Adatlap 06.08.2019.

M-210_Tank_MDS_2500_r2.xlsx

Projekt megnevezése / Project Denomination Rev.

Kecskemét Air Base, POL, Increase Storage Capacity 2 álló

Vertical fekvő horizont.

beltér indoor

Acél szerk.

Steel structure kültér outdoor

Betonalap

Conc. foundation

Blokk megnevezés / Block Denomination Dátum / Date

Tárolótartály Mechanikai Adatlap / Mechanical Datasheet for Tank 06.08.2019.

Proj.szám/No.: Megrendelő / Client Dokumentum azonosító / Document Number Oldal / Page huT00013.00 US Army Corps of Engineers M-210 2 / 5

3 Darabszám

No Required 1+1 = 2

Típus:

Type:4

1 Készülékjel

Item No.

ST5, ST6

Megnevezés

Designation 2500 m3 ST5, ST6 jelű Tárolótartály / 2500 m3 ST5, ST6 Tank Rev.

with fixed roof

Beépítés helye:

Site:

Kecskemét, Air Base

Szabályzat

Legal Code

AW 078-24-33, AC-

4N(2017)0002 (INV),

API 650, MSZ 9910,

1/2016. (I.5.), 54/2014 (XII.5.)

decree

5 Elhelyezés

Orientation

Telepítés

Location

Engedélyezés

Authorization8

Tervezési előírás

Design Code

AW 078-24-33, AC-

4N(2017)0002 (INV),

API 650, MSZ 9910,

1/2016. (I.5.), 54/2014 (XII.5.)

decree

Ministry of Defense

TECHNOLÓGIAI ADATOK

PROCESS CONDITIONS

Üres tömeg

Empty weight kg ~80 000

Üzemi tömeg

Operating w.

kg ~2 180 000

Méret (ID x H)

Dimension 22 000 x 7 320

Gyártási töm.

Fabricated w.

kg ~80 000

Ny.pr.tömeg

Hydrotest w.

kg ~2 580 000

Üzemi nyomás

Operating pressure bar abs atmospherical

Közeg megnevezése

Fluid name JET-A1 Jet fuel

13 Térfogat

Volume névl./hasznos/teljes nom. / net / full m

3 2 7852 500 / 2 501 /

Korrózív vegyületek

Corrosive compaunds no

TERVEZÉSI ADATOK

DESIGN CONDITIONS

Üzemi hőmérséklet

Operating temperature °C ambient

Párnagáz & nyomás

Blanket gas & pressure mbarg no

Min. tervezési fém hőmérséklet

Min. design metal temperature °C -20

Tervezési hőmérséklet

Design temperature

Tervezési nyomás

Design pressure mbar -5...+20

Tervezési eset

Design case

Normál

Normal

Feltöltés sebessége:

Inlet flow rate:

Ürítés sebessége:

Outlet flow rate:

m /h m /h max. 80 max. 264°C -20 / +80

Sűrűség t max / t min

Density t max / t min kg/m

3 775 - 840

Próbanyomás (vízsz./függ.)

Test pressure (horizontal / vertical) barg JET-A1 Jet fuel

Varrattényező

Joint efficiency

- 1

Köpeny

Shell

Fenék

Bottom

Korr.pótlék / Plattir

Corr. allow. /Cladding 1mm

Tető

Roof

Belső részek

Internal parts

Acélszerkezet

Steel structure igen/yes nem/no

Különleges követelm.

Special services igen/yes nem/no amin / amine klorid / chloride mérgező lethal igen/yes nem/no igen/yes nem/no

Közeg/techn.miatt by process req.

igen/yes nem/no

Előírás miatt

By code req.

Részleges

Partial str.r.req.

BIZONYLATOK, VIZSGÁLATOK

CERTIFICATION, TESTING

Spec.

Átvilágítási vizsg.

Radiography Test (RT) Code

Code Egyéb:

Other:

Vizsgálati bizonyl.

Test certificates by Code

100%

Full Full Techn. Spec.:Techn. Spec.:

100%

Code

Anyagbizonylat

Material cert. By

Hegesztési bizonyl.

Welding certificates

Ultrahang vizsg.

Ultra sonic Test (UT) Code

H 2

HELYSZÍNI ADATOK

SITE CONDITIONS

Alapanyag max. keménysége max. hardness of base material

HB

Ütőmunka vizsgálat

Impact Test Code

Szélterhelés

Wind Design Code

Szeizmikus terhelés

Seismic Design Code

EuroCode 8, Part 1,4&6 (EN1998-1:2004 &

EN1998-4:2006 & EN1998-6:2005 )

Szél lökés (max.)

Wind velocity (max. gust.)

km/h -

Fontossági tényező

Importance factor 1,5

Csillapítási tényező

Damping factor

Terep típus

Terrain category

Talajtényező

Soil class C mm -

Hóterhelés

Snow Load kg/m

2 - Ref. gyorsulás

Reference accelerat. max.

Hőkez. szükséges

Str.reliev.required m/s 2 0,15g wet H 2 S kénhidrogén

Hóvastagság max.

Snow Cover thickness

Techn. Spec.

Állandó szélsebesség

Wind velocity (continuous) km/h -

Külső

Outside igen/yes nem/no

Alapozó / Primer - Közbenső / Intermediate - Fedő / Final

Test

Vessel

Vastagság

Thickness

Vastagság

Thickness mm -

Típus

Type

Helye

Location

Tető

Roof

Szigetelés

Insulating igen/yes nem/no

Típus

Type

HC

Lehorgonyzás

Fixing elektromos/electrical hőátadás/heat transf. fluid

Tűzvédelmi szigetelés

Fire proofing igen/yes nem/no csőkígyó kül./coil out.

csőkígyó bel./coil ins.

félcső/half pipe duplikatura/jacket

Kialakítás

Type of construc.

Köpeny átmérő

Diameter of shell mm külső / O.D.

belső / I.D.

21 980 igen/yes nem/no

Alapozó / Primer - Közbenső / Intermediate - Fedő / Final

Belső

Inside

Festés

Painting

Egyéb elemek

Other elements

Belső bevonat

Internal coating igen/yes nem/no

Készülék fűtés

Vessel heating igen/yes nem/no

Fűtés típus

Type of heating

Projekt megnevezése / Project Denomination Rev.

Kecskemét Air Base, POL, Increase Storage Capacity 2

Blokk megnevezés / Block Denomination Dátum / Date

Tárolótartály Mechanikai Adatlap / Mechanical Datasheet for Tank 06.08.2019.

Tető típusa

Type of Roof

Úszótető típusa:

Type of Floating Roof

Proj.szám/No.: Megrendelő / Client Dokumentum azonosító / Document Number Oldal / Page huT00013.00 US Army Corps of Engineers supported dome külső / O.D.

belső / I.D.

M-210 3 / 5

3 KIALAKÍTÁS

4 CONSTRUCTION

1 Készülékjel ST5, ST6 Rev.

2 Item No.

Megnevezés

Designation 2500 m3 ST5, ST6 jelű Tárolótartály / 2500 m3 ST5, ST6 Tank

CC PP Win. -mm

22 000 Tető átmérő

Diameter of Roof mm

7 320 Kúpszög

Cone Angle mm

7 Köpeny magasság H.

Shell Height H.

Hőátadó közeg

Heat transf. Fluid

ANYAGMINŐSÉGEK

MATERIAL SPECIFICATION

Merevítő gallér

Reinforcement Pad

S235JR

Merevítő szögacélok

Angle / Rafter S235J2

Szükséges felület

Total surface required feszültség/Frekvencia

Voltage/Frequency V/Hz -

Teljesítmény

Power

KW -

tartály/védőgy.

Tank/Retent.ring

Úszótető

Floating Roof

Csonk karima

Nozzle Flange

P285QH

Csőidomok

Fittings

P235GH

Búvónyílás karima / Vakkarima

Manhole flange / Blind

P285QH

Búvónyílás köpeny

Manhole shell S235J2

Csonktoldat, Csonkcső

Nozzle Neck, Nozzle Pipe

Külső tömítések

External Gaskets

REINZ AFM 34

Belső tömítések

Internal Gaskets

REINZ AFM 34

Külső csavar / anya

External Bolting / Nuts

8.8 / 8

Belső csavar / anya

Internal Bolting / Nuts

8.8 / 8

Külső hegesztett elemek

External Welded Attachments S235J2

Belső hegesztett elemek

Internal Welded Attachment S235J2

EGYÉB ELEMEK

ACCESSORIES

Védőgyűrű

Retention Ring

Kettős fenék

Double Bottom

Zsomp

Sump

Földelőfül

Earthing Lug 1.4301

Adattábla tartó / adattábla

Nameplate Bracket / Nameplate S235J2 / 1.4301

Szélmerevítő

Wind Girder

Habvédelem

Foam Protection

Palásthűtés

Tank Shell Cooling

Tartalék alkatrészek

Spare parts

Belső karima

Internal Flange

Szigetelés tartók/gyűrű

Insulation clips/ring

Villámvédelem

Lightning Protection

Spirál lépcső, pódium, korlát

Stairway, Platform, Handrail

P235GH

Alapcsavar / anya

Anchor Bolt / Nut

Alapcsavar merevítés

Anchor Chair

Belső úszótető

Internal Floating Roof

Külső úszótető

External Floating Roof

LP gőz/LP-steam

MP gőz/MP-steam olaj/hot oil más/other

Tetőhűtés

Tank Roof Cooling

Tető

Roof

S235J2

S235JRS235J2

S235J2

Köpeny

Shell tartály/védőgy.

Tank/Retent.ring

Fenéklemezek

Bottom plate tartály/védőgy.

Tank/Retent.ring

Csőtartók

Pipe Supports

Alapcsavar

Anchor Bolts

Belső létra/kapaszkodó

Internal ladder/rungs

Emelőfül

Lifting Lug

Belső cső

Internal Pipe

Búvóny. elfordító

Davit for manhole

Különleges bevonat

Special coating

Felület előkészítés

Surface preparation

Bevonat típus

Type of coating

Fuel proof epoxy-enamel

Rétegek

Coats

Rétegek

Coats

Sa 2,5

Felület előkészítés

Surface preparation Sa 2,5 barg -m 2 -

Elektromos fűtés:

Electrical heater:

Üzemi/Terv. Hőm.

Op./Design temp.

Alapgyűrű

Annular base plate

°C - Üzemi/Terv./Próbanyomás

Op./Design/Test press.

t s3 6 t s5 6

AD 1

t b1

Alapcsavarok száma

Number of Anchor Bolts pcs.

d AB

N AB -

Fenék átmérő OD/ID

Bottom diameter mm

Fenék vastagság

Thickness of bottom plates mm

22 120 / -t r 6

33 Tetőlemezek vastagsága

Thickness of Roof Plates mm

31 Merevítő idomacél

Top Angle mm

L70x70x7

25 3. öv vastagsága

Thickness of 3. course mm

5. öv vastagsága

Thickness of 5. course mm

4. öv vastagsága

Thickness of 4. course mm t s4

2. öv vastagsága

Thickness of 2. course mm t s1 8

1. öv vastagsága

Thickness of 1. course mm t s2 6

Köpenyövek száma

Number of shell course pcs.

Alapcsavarok mérete

Diameter of Anchor Bolts mm

Köpenymagasság

Height of Shell mm

ID 1 22 000

Belső átmérő

Internal diameter mm

H 1 7 320

Jel.

Mark.

Tartály

Tank

Megjegyzés

Remark

Projekt megnevezése / Project Denomination Rev.

Kecskemét Air Base, POL, Increase Storage Capacity 2

M-210 4 / 5

Blokk megnevezés / Block Denomination Dátum / Date

Proj.szám/No.: Megrendelő / Client Dokumentum azonosító / Document Number Oldal / Page huT00013.00 US Army Corps of Engineers

Tárolótartály Mechanikai Adatlap / Mechanical Datasheet for Tank 06.08.2019.

3 MÉRETEK

4 DIMENSIONS

1 Készülékjel ST5, ST6 Rev.

2 Item No.

Megnevezés 2500 m3 ST5, ST6 jelű Tárolótartály / 2500 m3 ST5, ST6 Tank

Designation

C16 1 25 16 B1 11 Felső vészszint kapcsoló (HHLS)

4 db bordával / with 4 ribs

C15 1 25 16 B1 11 Felső szintkapcsoló (HLS)

4 db bordával / with 4 ribs

C14 1 25 16 B1 11 Alsó szintkapcsoló (LLS)

4 db bordával / with 4 ribs

C13 1 25 16 B1 11 Alsó vészszint kapcsoló (LLLS)

4 db bordával / with 4 ribs

Jel

Item

Db

Pcs.

DN PN

B1 11

C7

C8

C9

Töm.felület

Fl.facing

Karimatípus

Flange type

150 16

B1 11

B1

1 100 16

Roof manhole

Tetőbúvónyílás with flame arrester lángzárral

1 200

Légző

Vent

16 11 Szintmérő

Level gauge -B1

16 B1 11 Hőmérő

Thermometer with ladder létrával

ST5, ST6

Egyéb:

Other:

EN 1092-1

Tetőcsonk

Roof nozzle

16 B1 11 Felső szintmérő

Max. Level Switch vakkarimával with Blind Flange

Töltő

Inlet

Szívó

Outlet

16 B1 vakkarimával with Blind Flange

B1

2 150

3 1000

Rev.

2 Item No.

3 CSONKJEGYZÉK

NOZZLE DATA LIST

ASME B16.5

1 Készülékjel

Dátum / Date

Tárolótartály Mechanikai Adatlap / Mechanical Datasheet for Tank 06.08.2019.

1. Assembly drawing: See sheet ID M-200.

C10 1

C2

C1

C3

C5

Kecskemét Air Base, POL, Increase Storage Capacity 2

Proj.szám/No.: Megrendelő / Client Dokumentum azonosító / Document Number Oldal / Page huT00013.00 US Army Corps of Engineers M-210 5 / 5

1 32 16

1 150

Projekt megnevezése / Project Denomination

Blokk megnevezés / Block Denomination

2. All thickness must be checked by strength calculation.

C6

Rev.

Leak test pipe

Szivárgásfigyelő cső

Leakage control pipe

Szivárgásellenőrző cső

Megnevezés 2500 m3 ST5, ST6 jelű Tárolótartály / 2500 m3 ST5, ST6 Tank

Designation

1 100

11 -

Fenékszívó

Drain

4 db bordával / with 4 ribs

Karimaszabvány

Standard for flanges

C4 1 300 with pedal pedállal

16 B1

C11

C12 B1

16 B1 11

API 650

MEGJEGYZÉSEK

NOTES

s.s pipe rozsdamentes cső

16 B1 11 Mintavevő

Sample

Megnevezés

Service

Megjegyzések

Remarks

Rev./ Revision

Projektszám / Oldal / Page Project No.

huT00013.00

Dátum / Date

1 06.08.2019.

Design review comments Zsigmond Szabó Péter Ruzsa Károly Pető

0 15.12.2017. For Approval Zsigmond Szabó Péter Ruzsa Zsolt Tímár Rev Dátum / Date Megnev./ Denom. Készítette/Prepared by Ellenőrizte/Checked by Jóváh./App. by

BASE

M-211 US Army

Corps of Engineers

Mechanikai Adatlap

Tank

Mechanical Data Sheet

1 / 5

1900 m ST5, ST6 jelű Tárolótartály /

1900 m ST5, ST6 Tank

Tárolótartály

Megnevezés / Denomination

Mechanical Datasheet for Tank

Tárolótartály Mechanikai Adatlap 06.08.2019.

Projekt megnevezése / Project Denomination

Kecskemét Air Base, POL, Increase Storage Capacity

Megrendelő / Client Dokumentum azonosító / Document Number

M-211_Tank_MDS_1900_r1.xlsx

Techn. Spec.

Állandó szélsebesség

Wind velocity (continuous) km/h -

Hőkez. szükséges

Str.reliev.required m/s 2 0,15g wet H 2 S kénhidrogén

Hóvastagság max.

Snow Cover thickness mm -

Hóterhelés

Snow Load kg/m

2 - Ref. gyorsulás

Reference accelerat. max.

Szélterhelés

Wind Design Code

Szeizmikus terhelés

Seismic Design Code

EuroCode 8, Part 1,4&6 (EN1998-1:2004 &

EN1998-4:2006 & EN1998-6:2005 )

Szél lökés (max.)

Wind velocity (max. gust.)

km/h -

Fontossági tényező

Importance factor 1,5

Csillapítási tényező

Damping factor

Terep típus

Terrain category

Talajtényező

Soil class C

HELYSZÍNI ADATOK

SITE CONDITIONS

Alapanyag max. keménysége max. hardness of base material

HB

Ütőmunka vizsgálat

Impact Test Code

Anyagbizonylat

Material cert. By

Hegesztési bizonyl.

Welding certificates

Ultrahang vizsg.

Ultra sonic Test (UT) Code

H 2

Spec.

Átvilágítási vizsg.

Radiography Test (RT) Code

Code Egyéb:

Other:

Vizsgálati bizonyl.

Test certificates by Code

100%

Full Full Techn. Spec.:Techn. Spec.:

100%

Code igen/yes nem/no

Különleges követelm.

Special services igen/yes nem/no amin / amine klorid / chloride mérgező lethal igen/yes nem/no igen/yes nem/no

Közeg/techn.miatt by process req.

igen/yes nem/no

Előírás miatt

By code req.

Részleges

Partial str.r.req.

BIZONYLATOK, VIZSGÁLATOK

CERTIFICATION, TESTING

Varrattényező

Joint efficiency

- 1

Köpeny

Shell

Fenék

Bottom

Korr.pótlék / Plattir

Corr. allow. /Cladding 1mm

Tető

Roof

Belső részek

Internal parts

Acélszerkezet

Steel structure

Sűrűség t max / t min

Density t max / t min kg/m

3 775 - 840

Próbanyomás (vízsz./függ.)

Test pressure (horizontal / vertical) barg JET-A1 Jet fuel

Feltöltés sebessége:

Inlet flow rate:

Ürítés sebessége:

Outlet flow rate:

m /h m /h max. 80 max. 264°C -20 / +80

Min. tervezési fém hőmérséklet

Min. design metal temperature °C -20

Tervezési hőmérséklet

Design temperature

Tervezési nyomás

Design pressure mbar -5...+20

Tervezési eset

Design case

Normál

Normal

TERVEZÉSI ADATOK

DESIGN CONDITIONS

Üzemi hőmérséklet

Operating temperature °C ambient

Párnagáz & nyomás

Blanket gas & pressure mbarg no

Üzemi nyomás

Operating pressure bar abs atmospherical

Közeg megnevezése

Fluid name JET-A1 Jet fuel

13 Térfogat

Volume névl./hasznos/teljes nom. / net / full m

3 2 1201 900 / 1 905 /

Korrózív vegyületek

Corrosive compaunds no

TECHNOLÓGIAI ADATOK

PROCESS CONDITIONS

Üres tömeg

Empty weight kg ~70 000

Üzemi tömeg

Operating w.

kg ~1 975 000

Méret (ID x H)

Dimension 19 200 x 7 320

Gyártási töm.

Fabricated w.

kg ~70…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .