A-008_BulkGasStorageAreaPictures.pdf
PDF 4 MB Posted
- Solicitation number
- 89243321QFE000210
About this file
This document summarizes a Request for Quote (RFQ) issued by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) for the supply and delivery of hydrogen gas to NETL's Morgantown, WV site location. The RFQ is a total small business set-aside requiring quotes from small business concerns only. Interested vendors are encouraged to attend an organized site visit on December 14, 2020 to survey planned equipment locations. Quotes are due by the date and time specified in the RFQ using the attached "Specs-Pricing Worksheet" template via the FedConnect portal or via email. NETL will select the quote deemed technically acceptable with the lowest firm-fixed price. The selected vendor will supply hydrogen gas on an FOB Destination basis as detailed in the attached Statement of Work and technical drawings of the site facilities and equipment. Questions about the RFQ are due by December 15, 2020 with any NETL responses provided via amendment.
The RFQ includes attachments providing the Statement of Work, pricing worksheet template, and technical drawings of the Morgantown site facilities and underground utilities relevant to the hydrogen gas supply and delivery requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-007_EngineeringDesignCodesStandards.pdf | ||
| A-001_Statement of Work.docx | DOCX document | |
| A-004_DrawingE890241.pdf | ||
| A-005_DrawingD920039.pdf | ||
| A-003_DrawingD9864R15.pdf | ||
| A-009_FAR 52.237-1 Site Visit Clause.docx | DOCX document | |
| A-002_Specs-Hydrogen Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Sol_89243321QFE000210.pdf | ||
| A-006_NETLProcedure414.1-3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NETL Bulk Gas Storage Area
• Site shown with current 10-cylinder,
965.5 ft3 supply
• Fenced area
• Continuous concrete slab
• NETL-owned and -operated manifold
• Dual connection points, Swagelok ½”, adaptable
• Maximum 3000 psig supply pressure to manifold
• NETL-owned and -operated manifold
• Dual connection points, Swagelok ½”, adaptable
• NETL-owned and -operated manifold
• Dual connection points, Swagelok ½”, adaptable