91003119R00050007.pdf
PDF 1 MB Posted
- Attached to
- NextGen Enhanced Processing Solution
- Solicitation number
- 91003119R0005
About this file
91003119R0005 Amendment 7
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20_-_Pricing_Template_updated_093019.xlsx | XLSX spreadsheet | |
| 91003119R0005_0008.pdf | ||
| 26_-_Draft_DCC_CCP_Enablement_Guide.docx | DOCX document | |
| 25_-_Responses_to_Questions_-_updated_092019.xlsx | XLSX spreadsheet | |
| 27_-_DCC_Solution_Blueprint.pdf | ||
| 20_-_Pricing_Template_updated_092019.xlsx | XLSX spreadsheet | |
| 91003119R0005_0006.pdf | ||
| 91003119R0005_0005.pdf | ||
| 25_-_Responses_to_Questions_-_updated_032619.xlsx | XLSX spreadsheet | |
| Attachments_-_Updated_031919.zip | ZIP file | |
| 91003119R0005_0004.pdf | ||
| 04_-_Attachments_to_Addl_Current_State_Tech_Constraints_-_updated_030619.zip | ZIP file | |
| Attachments_Updated_030619.zip | ZIP file | |
| 91003119R0005_0003.pdf | ||
| 91003119R0005_0002.pdf | ||
| 91003119R0005_0001.pdf | ||
| 04_-_Attachments_to_Addl_Current_State_Tech_Constraints_-_updated_12519.zip | ZIP file | |
| 19R0005_Attachments.zip | ZIP file | |
| 04_-_Attachments_to_Addl_Current_State_Tech_Constraints.zip | ZIP file | |
| 03_-_Attachments_to_Finance_Technical_Requirements.zip | ZIP file | |
| 91003119R0005.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Attachment Page
PAGE 2 OF 3 91003119R00050007
The purpose of this amendment is to update the following:
1. Section L to revise the following:
a. L‐2.2 Proposal Volume Requirements
Additions are in color and underlined. All other terms and conditions remain unchanged.
Attachment Page
PAGE 3 OF 3 91003119R00050007
L‐2 Solicitation Response Requirements
L‐2.2 Proposal Volume Requirements
The proposal shall be accompanied by a cover letter (letter of transmittal) prepared on the company’s letterhead stationery.
The cover letter (letter of transmittal) shall identify all enclosures being transmitted and shall be used only to transmit the proposal and shall include no other information. The first or title page of each proposal volume shall be in accordance with FAR
52.215‐1, paragraph (c)(2).
Volume Page Limit
1. Technical Approach Cybersecurity Narrative (15 20 pages)
Completed checklist within Attachment “02 – Security Technical
Requirements” (no limit)
Performance Work Statement (70 pages)
Deliverables Acceptance Criteria Spreadsheet
Work Breakdown Structure (no limit)
Schedule (no limit)
Traceability Matrix (no limit)
Quality Control Plan (no limit)
2. Past Performance Supplemental Past Work Experience Narrative (2 pages per experience, no limit for actual samples or evidence)
Completed “17 – Past Work Experience Cover Memo” (2 pages each)
Completed “18 – Past Work Experience Reference Questionnaire”
(submitted directly by the reference to MPDSETeam@ed.gov)
Completed “19 – Consumer Protection Compliance Template”
3. Price Proposal Supplemental Price Narrative (no limit)
Pricing Detail Spreadsheet (no limit)
Completed “20 – Pricing Template”
4. Performance Measurement Completed “21 – Performance Measurement Template”
5. Small Business Subcontracting Plan and Other Solicitation Requirements (e.g.
Representations and Certifications, etc.)
Completed “16 ‐ Teaming Arrangements and Subcontracting Template”
Small Business Subcontracting Plan (if applicable) (no limit) Preliminary plan as required in FSA 37‐2 Continuation of Mission
Critical Contractor Services (no limit) Conflict of Interest Certification in accordance with 3452.209‐70 Representation Regarding Certain Telecommunications and Video
Surveillance Services or Equipment in accordance with 52.204‐24
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| Descript: |
| Descript1: See Attachment Page. |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 3 |
| DocNo: 91003119R00050007 |
| EffDate: SEP 24, 2019 |
| ReqNo: |
| ProjNo: |
| IssuedByCode: |
| IssuedBy: |
| AdminByCode: |
| AdminBy: |
| ContractorCode: |
| FacCode: |
| SolNo: 91003119R0005 |
| SolDate: JAN 15, 2019 |
| AwdNo: |
| AwdDate: |
| NoCopies: |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |
File details come from the government source that posted it.