91003119R0005_0005.pdf
PDF 7 MB Posted
- Attached to
- NextGen Enhanced Processing Solution
- Solicitation number
- 91003119R0005
About this file
91003119R0005 - Amendment 05
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20_-_Pricing_Template_updated_093019.xlsx | XLSX spreadsheet | |
| 91003119R0005_0008.pdf | ||
| 91003119R00050007.pdf | ||
| 26_-_Draft_DCC_CCP_Enablement_Guide.docx | DOCX document | |
| 25_-_Responses_to_Questions_-_updated_092019.xlsx | XLSX spreadsheet | |
| 27_-_DCC_Solution_Blueprint.pdf | ||
| 20_-_Pricing_Template_updated_092019.xlsx | XLSX spreadsheet | |
| 91003119R0005_0006.pdf | ||
| 25_-_Responses_to_Questions_-_updated_032619.xlsx | XLSX spreadsheet | |
| Attachments_-_Updated_031919.zip | ZIP file | |
| 91003119R0005_0004.pdf | ||
| 04_-_Attachments_to_Addl_Current_State_Tech_Constraints_-_updated_030619.zip | ZIP file | |
| Attachments_Updated_030619.zip | ZIP file | |
| 91003119R0005_0003.pdf | ||
| 91003119R0005_0002.pdf | ||
| 91003119R0005_0001.pdf | ||
| 04_-_Attachments_to_Addl_Current_State_Tech_Constraints_-_updated_12519.zip | ZIP file | |
| 19R0005_Attachments.zip | ZIP file | |
| 04_-_Attachments_to_Addl_Current_State_Tech_Constraints.zip | ZIP file | |
| 03_-_Attachments_to_Finance_Technical_Requirements.zip | ZIP file | |
| 91003119R0005.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Attachment Page
PAGE 2 OF 66 91003119R00050005
The purpose of this amendment is to update the following:
1. Section C to revise the following:
a. C.1 Introduction
b. C.2 Background, Goals and Vision
c. C.3 Objectives, Requirements and Milestones
2. Section J to revise Attachment 25 – Responses to Questions – updated 3/26/19
3. Section L to revise the following:
a. Section L-2.4.1 Volume 1: Technical Approach
b. Section L-2.4.2 Volume 2: Past Performance
4. Section M to revise Section M-1.1 Evaluation Factors
Additions are in bold and underlined. All other terms and conditions remain unchanged.
PAGE 3 OF 66 91003119R00050005
SECTION B, SUPPLIES OR SERVICES AND PRICES/COSTS
See Attachment “20-Pricing Template”. This template includes instructions, pricing categories, and an opportunity for offerors to include their volume and pricing assumptions.
SECTION C, DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 - INTRODUCTION
The U.S. Department of Education, Office of Federal Student Aid (FSA), is embarking on a transformation known as the Next Generation Financial Services Environment (NextGen). Through this initiative, FSA seeks to implement a flexible, world-class financial solution to leverage support for our customers, school partners, and taxpayers. Initially, FSA will modernize its technical and operational architecture, in a manner that provides flexibility to expand and support other financial services. In addition to improving the overall customer experience, the new environment will improve operational flexibility, enhance cost and operational efficiency, and generate better outcomes for customers and taxpayers.
This contract is for the Enhanced Processing Solution.
C.1.2 Contract Type
The resulting award will be a hybrid of a firm-fixed priced (FFP) contract and an indefinite-delivery indefinite-quantity (IDIQ) contract. Indefinite-delivery indefinite-quantity CLINs will be incorporated for the Optional Imaging/Printing/Mailing and Optional Digital Engagement Layer objectives. The Government anticipates the following periods of performance:
• Solution Delivery (FFP) – no greater than three months after award
• Solution Operations and Maintenance (FFP) – a base period of one year, with nine one-year option periods
• Optional Imaging/Printing/Mailing (IDIQ) – a base ordering period of five years, with one five-year optional ordering period
• Optional Digital Engagement Layer (IDIQ) – a base ordering period of two years, with one one-year optional ordering period
C.2 – BACKGROUND, GOALS, AND VISION
C.2.1 Background
FSA’s core mission is to ensure that all eligible customers benefit from Federal financial assistance – grants, loans, work-study programs, etc. – for education beyond high school. The programs FSA administers comprise the nation’s largest source of student financing. Every year, over 18 million students apply for Federal financing and FSA has over 42 million customers across the life cycle of student financing. FSA’s total lending portfolio is $1.4+ trillion in outstanding loans including $1.1 trillion that is directly serviced. The lending portfolio is growing at 7% per year, driven by nearly $100 billion in annual disbursements across more than 17 million annual loan originations.
In conjunction with institutions of higher learning and third-party vendors, FSA provides student financing information and services across the full Federal life cycle of student financing, from application through servicing and recovery.
At the beginning of the life cycle, customers apply for federal financing via the Free Application for Federal Student Aid (“FAFSA”). FSA uses this information to calculate eligibility for federal student loans. For eligible customers, FSA then originates and disburses loans, primarily through higher educational institutions, to FSA customers.
Once customers enter repayment, customer loans are currently assigned to one of nine servicers, which perform a complete set of Federal student loan servicing activities including: customer service; loan counseling; loan consolidation; billing and payment application and processing; repayment plan adjustments and application of benefits such as deferments, forbearance, PAGE 4 OF 66 91003119R00050005 or loan forgiveness/discharge; outreach and default aversion; quality control; and financial and other data reporting. Each of the nine servicers operates its own engagement layer with proprietary branding (e.g., websites, tools, contact centers), utilizes one of four servicing platforms, and maintains certain additional technical systems (e.g., identity and access management solutions). Individual customers may have several loans on different repayment plans and may be enrolled in specialty programs (e.g., Public Service Loan Forgiveness (“PSLF”), Total and Permanent Disability Discharge (“TPD”), Teacher Education Assistance for College and Higher Education Grants (“TEACH”), Federal Perkins Loans (“Perkins”), Grant overpayments ).
For customers who fail to pay their loans, currently FSA and private collection agencies share Federal default recovery activities.
Once a loan defaults, FSA transfers the loan to a default management and collection system (DMCS) and attempts to bring the loan back to good standing. If unsuccessful, collections activity is turned over to one of a group of contracted third-party Private Collection Agencies (PCAs) that pursue default resolution. Customers may rehabilitate a defaulted loan by making a series of payments or consolidating their loans out of default. This process often results in rehabilitated borrowers being handed off multiple times between DMCS/PCAs and the servicers.
Today’s fragmented landscape has created many issues across the full life cycle of student financing, including:
■ Inconsistent customer experience: FSA customers move through the life cycle of student financing working with multiple vendors and partners from application to repayment and recovery, each of which has different interfaces, processes, and standards;
■ Limited branding opportunities for FSA: The lack of consistent branding can leave customers confused and unclear about the role the Federal government, particularly FSA, plays in their student financing journey; and
■ Operational complexity and inefficiency: Across the life cycle, vendors have built redundant technical and operational solutions, creating inefficiencies resulting in a poor experience for customers. Further, across vendors, data management and cybersecurity practices are inconsistent and siloed.
Additional information about FSA can be found in Exhibit 1, below, in the Attachment “01 – As-Is” and the 2018 Annual Report located at: https://www2.ed.gov/about/reports/annual/2018report/fsa-report.pdf.
EXHIBIT 1: TODAY’S ENVIRONMENT ACROSS THE LIFE CYCLE OF STUDENT FINANCING
C.2.2 Goals and Vision
FSA holds one of the largest consumer loan portfolios in the world and believes it should deliver an experience for its customers on par with world-class financial services organizations. To do that, FSA has established four goals for the future state environment that apply to the Enhanced Processing Solution, including:
First, FSA intends to provide a world-class customer and partner experience throughout the life cycle of student financing to that will ensure:
■ Easier, more seamless customer interactions with FSA through an enterprise-wide, FSA-branded, omni-channel digital platform, featuring a mobile-first, mobile-complete, and mobile-continuous solution (i.e., allowing FSA to maintain a relationship with its customers throughout the customer lifecycle) to enable customers to receive additional support through the channel most appropriate to their needs;
■ Customers receive an experience informed by a holistic understanding of the life cycle of student financing and customer needs, refined through ongoing analysis of customer data and feedback and continuously improved through activities like iterative user testing;
■ Customers better understand the financial implications of their student debt and make more informed decisions regarding the various repayment options and protections available to Federal customers; and
■ Customers receive a consistent experience solely under the FSA brand across all vendors.
PAGE 5 OF 66 91003119R00050005
Second, FSA intends to improve its operational flexibility by creating an environment that can efficiently and effectively integrate new and existing capabilities and features, continuously improve and innovate, and adjust to stay in compliance with changing Federal rules, regulations, and law.
Third, FSA intends to drive greater operational efficiency; reduce complexity; improve the stability, resiliency, enterprise risk management, and cybersecurity of its systems; and ensure effective and efficient use of taxpayer dollars.
Fourth, FSA intends to measure its success in part on how well it improves customer outcomes and facilitates compliance with Federal consumer protection standards and Title IV legal requirements. Examples of improved customer outcomes include:
■ Increased customer satisfaction scores;
■ Better informed borrowing decisions;
■ Decreased percentage of borrowers in delinquency or default;
■ Reduction of borrowers in deferment and forbearance;
■ Increased borrower repayment rate;
■ Increased digital self-service by customers (instead of calls to FSA); and
■ Reduction in mail correspondence and payments (in favor of digital solutions).
FSA intends to accomplish these goals by deploying a new technical and operational architecture that will provide a more efficient and effective world-class customer (i.e., student, parent, borrower) and partner (e.g., schools) experience across the entire life cycle of student financing, including both enterprise-wide solutions and solutions specifically for student financing processing and servicing. This architecture will include:
Omni-channel, enterprise-wide customer engagement led by a mobile-first, mobile-complete, and mobile-continuous solution
To enable a more efficient and effective world-class customer experience, FSA intends to procure an enterprise-wide, FSA-branded omni-channel digital platform featuring a mobile-first, mobile-complete, and mobile-continuous solution. The digital platform will be FSA’s “digital front door” for all customer journeys to replace FSA’s multiple customer facing websites. To realize this vision, the digital platform will consolidate the functionalities of the multiple websites, mobile applications, and contact centers that currently exist across the full customer lifecycles (from application to school to servicing to default). This will require the digital platform to be closely integrated with the Unified Servicing Platform, existing FSA systems, including legacy systems and those that serve partners, and be easily able to integrate with future solutions. This layer will provide customers with a personalized, self-service experience across multiple channels, robust self-service options, and seamless escalation to additional support when needed.
Common, integrated data management
FSA envisions a solution to ensure customer touchpoints feed into a common integrated data management platform which contains all of a student’s information throughout the lifecycle. This common, integrated data management system will allow FSA to:
■ Generate customer and loan portfolio insights through advanced analytics that improve services and reduce risk;
■ Reduce error rates to lessen customer frustration and processing expense; and
■ Lower operating expenses through efficiency gains; and
■ Consolidate processing activities across various current systems onto fewer new and/or upgraded platforms.
PAGE 6 OF 66 91003119R00050005
Robust cybersecurity and data protection
State-of-the-art cybersecurity protection shall be integrated into all existing and future-state solutions, and enterprise-wide cybersecurity will be holistically assessed and tested on an ongoing basis to ensure customer and FSA data is consistently protected.
Integration across the enterprise and potential to further scale solutions
Solutions will need to be integrated with existing and new solutions and vendors from across the life cycle of student financing.
Accordingly, all solutions will be implemented with both integration and future scalability in mind, ensuring third-parties can “plug in” to use common tools and feed into common interfaces.
Implementation approach that minimizes risk and disruption for customers while deploying more efficient and effective world-class solutions
In the near term, FSA anticipates the need for multiple loan processing solutions. Long-term, however, FSA’s goal is to move towards the future-state of a single platform operating environment. Most immediately, and on a rapid schedule, FSA intends to migrate, through conversion, nearly 200 million loan accounts from existing servicers to the Enhanced Processing Solution, while minimizing disruptions for customers.
Given that the Enhanced Processing Solution will service existing customers and legacy products, FSA anticipates that this solution will be capable of servicing specialty programs (e.g., TPD, TEACH, PSLF, Perkins, grant overpayments) and specialty claims (e.g., discharge, forgiveness). Solution will need to provide an enhanced environment that supports FSA’s goals and vision more effectively and efficiently than today’s existing environment and continue to deploy enhanced features going forward. Solution will need to integrate seamlessly with existing and future solutions provided by FSA or other vendors. Those solutions include NextGen solutions such as the FSA-branded digital platform, contact center technical backbone and support, Customer Relationship Management (CRM), business process operations, identity and access management, and analytics platform. Further, FSA may opt to exercise optional tasks for the Enhanced Processing Solution to provide some temporary support activities as other NextGen solutions are implemented, namely a transitional digital engagement layer, and support for imaging, printing and mailing. Timing for phasing out these temporary support activities will be later determined by FSA.
Consistent with the FY2019 Department of Defense and Labor, Health and Human Services, and Education Appropriations Act, FSA intends to make multiple awards for the Business Process Operations.
FSA will have dedicated resources to monitor vendor accountability and performance to ensure a high caliber of service delivery across the operating environment.
C.3 – OBJECTIVES, REQUIREMENTS, AND MILESTONES
C.3.1 Solution Objectives
The Enhanced Processing Solution (Solution) will serve as the student financing servicing environment for FSA’s existing customers. Solution will provide full “life of the loan” servicing: servicing loans for customer accounts of all statuses, including those that are in default. Solution will rapidly migrate existing loans from current servicers, through loan migration (maintaining dynamic and complete customer historical data) while minimizing customer disruption, per target milestones 2 and 3 (Section C.3.5). Solution will also deploy advanced capabilities to provide customers with a more efficient and effective world-class customer experience, improve automation (i.e., reduce manual processing) and system flexibility, and reduce operational complexity and inefficiency for FSA.
At FSA’s discretion, the solution may also initially and temporarily provide the full suite of current capabilities associated with student financing servicing in the FSA environment, including a digital engagement layer, and support for imaging, printing, and mailing. Solution will phase out those capabilities as new solutions (e.g., Digital Platform, CRM, etc.) are fully implemented, at the discretion of FSA.
PAGE 7 OF 66 91003119R00050005
C.3.2 General Operating Requirements:
The Enhanced Processing Solution shall satisfy these general requirements for all operating requirements identified in C.3.3:
a. Integration: Solution shall be developed and implemented to ensure easy integration with existing FSA or third-party solutions and NextGen solutions, as necessary to execute required functions. Solution shall include features which enable FSA, other government agencies, and designated third-parties to interface or engage with it as necessary.
Solution shall care for broad integration needs including, but not limited to, supporting or re-engineering existing APIs, building and exposing new APIs, exchanging and harmonizing business rules for workflows, providing development and test environments, and collaborating with FSA and other vendors to resolve integration issues which arise.
b. Adaptability, flexibility, and ongoing innovation: Solution shall efficiently and effectively adapt to changes in the FSA operating environment (including changing Federal rules, regulations, and laws), innovation in commercial financial services, and FSA’s goals. Solution shall easily scale to handle changes in account and transaction volumes and have the flexibility to enable incremental modifications without necessitating full production implementation efforts or additional costs.
c. Customer experience focus: Solution shall prioritize customer and partner needs and preferences to deliver a more efficient and effective world-class customer experience throughout the life cycle of student financing. Helpful additional context can be found in the “05 – Current State Customer Tasks,” “06 – Current State Partner Tasks,” “07 – Top Customer Pain Points,” and “12 – Life of the Loan Servicing Intended State” attachments.
d. Adherence to and monitoring for changes in laws and regulations: Solution shall meet or exceed existing Federal rules, laws, regulations, agency guidelines or court mandates applicable to the FSA operating environment (including all accessibility elements such as 504/508 compliance). Solution shall establish a process for monitoring new or pending changes to applicable laws and regulations, and then proactively partner with FSA to determine the implications to technical design and/or operational procedures.
e. Contribution to knowledge and training of Business Process Operations personnel: Solution shall work with the separately-provided Command Center on common knowledge resources, contact scripts, agent desktop guides, and other training materials, ensuring that customer-facing instructions and resolution steps as well as back-office processing procedures are accurate in relation to Enhanced Processing Solution. The Command Center is responsible for coordinating the development, improvement, maintenance, and distribution of knowledge and training for Business Process Operations and other FSA-designated personnel.
f. Cybersecurity, Hosting and Middleware: Solution shall include robust cybersecurity protections and features to protect customer data. The solution must comply with the conditions in the attached “02 – Security Technical Requirements” at contract award.
The vendor’s solution shall meet Federal Information Security Management Act (FISMA), NIST standards, and all cybersecurity regulations and mandates, including Presidential Executive Order (EO) 13800 - Strengthening the Cybersecurity of Federal Networks and Critical Infrastructure, to Identify, Protect, Detect, Respond, and Recover. The vendor’s solution shall ensure that all development and management tools, including project management, version control, code repositories, DevSecOps management, monitoring, and cybersecurity, etc., are identified in the technical solution and in the system security boundary.
Solution shall be hosted in a secure environment. If any aspect of the solution is hosted in the cloud, the solution must be FedRAMP-approved or FedRAMP-“ready”, or must be hosted in a private cloud, per the definition in the attached “02-Security Technical Requirements.” The solution may not be hosted in a shared, multi-tenant environment.
- Please note the FedRAMP-approved cloud shall require a Department/Agency-level Authorization to Operate
(ATO), followed by the FSA-issued ATO for the system, which shall be FISMA and/or FedRAMP-approved at either a FIPS-199 High level or Moderate level, depending on the proposed architecture and corresponding FIPS- 199 category of the system.
Special Notices
- Hosting and Infrastructure: All vendors are hereby placed on notice that FSA, in seeking to comply with FITARA, ED’s Strategic IT goals, as well as Office of Management and Budget’s (OMB)-mandated goals established in the Data Center Optimization Initiative (DCOI), may require all new applications and information systems, once created and stabilized, to transition to and leverage common cloud infrastructure services (e.g. through FSA’s
PAGE 8 OF 66 91003119R00050005
Next Generation Data Center (NGDC) or some other FSA-identified services), and/or leverage common enterprise-wide traditional data center services and infrastructure hosting provider (e.g. through FSA’s NGDC or some other FSA-identified services/provider). The NGDC program provides a physical data center structure, access to FISMA High private cloud infrastructure services, and access to FedRAMP High and FedRAMP Moderate cloud infrastructure services, including AWS and Azure.
- Middleware: All vendors are hereby placed on notice that FSA, in seeking to build a future state environment with a consistent, reliable, and scalable architecture; prevent duplication, redundancy, and incompatibility; and reduce costs and complexity, reserves the option to require all new applications and information systems, once created and stabilized, to transition to and leverage a common Enterprise IT Architecture (EITA), FSA’s enterprise middleware architecture program, for middleware and cloud platform services and support. At present, EITA includes Integrated Technical Architecture (ITA) and Enterprise Service Bus (ESB), future middleware capabilities, as well Platform-as-a-Service services support in the cloud.
- Section 6103: All vendors are hereby placed on notice that compliance with the security requirements that are provided in IRS 1075 Publication (See Publication 1075, Tax Information Security Guidelines for Federal, State and Local Agencies) may be applicable and should be considered in the solution design.
- In regards to these Special Notices, any future changes will be managed through the change management process identified in the contract.
g. Identity and access management: Solution shall eventually implement and use FSA’s chosen identity and access management (IAM) solutions for authorization, authentication, single-sign-on (SSO) via standards-based federation, self-services, and identity management. This will enable FSA to build a future state environment with a consistent and scalable set of security services for provisioning and managing all users. The Digital Engagement Layer shall immediately implement FSA’s IAM solutions for customers. In the long-term, it is intended that the Enhanced Processing Solution will also implement FSA’s IAM solutions for its personnel, other vendors or third-parties, and FSA staff – eventual timeline will be determined by FSA. Attachment “10 – FSA Identity & Access Management Solution Overview” provides an overview of FSA’s IAM solutions.
h. Financial accuracy and compliance: Solution shall include robust measures for ensuring the compliance and accuracy of financial transactions and reporting. Technical requirements for existing financial standards are included in the attached “03 - Finance Technical Requirements.”
i. Additional current state technical constraints: In addition to security and financial requirements, vendors also shall understand other categories of current state technical constraints as relevant (e.g., processing, websites, and communications). For a broader informational view of FSA’s current environment, vendors are encouraged to review the attached “04 – Additional Current State Technical Constraints,” which provides a representative, though not comprehensive, set of technical constraints. A comprehensive set of binding requirements will be defined post award.
─ These constraints are derived from existing laws, regulations, agency guidance, and business rules, and will change based on acts of Congress, updates to Federal regulatory and non-regulatory guidance, and FSA goals.
─ Vendors may propose solution-relevant alternative, more efficient, accurate, or customer-centered approaches and processes (vs. those detailed in the current state technical constraints) to accomplish FSA’s outcomes.
─ Life cycle of student financing functions such as application processing (e.g., repayment, consolidation, deferment, forbearance, specialty claims) impact the Enhanced Processing Solution, among other existing and future solutions, and often relate to multiple constraints/requirements.
─ Specialty programs (e.g., PSLF, TEACH, TPD, Perkins, grant overpayments) and specialty claims (e.g., discharge, forgiveness) require special handling as well as specific and unique processing rules that impact the Enhanced Processing Solution, along with other existing and future solutions, and often relate to multiple constraints/requirements.
j. Trained personnel: Solution shall ensure personnel are trained and aware of pertinent changes in laws, regulations, programs, or FSA’s performance expectations.
k. Performance management: Solution shall have performance management mechanisms that would enable improved and ongoing achievement of metrics to be defined at award. Example metrics may include, but are not limited to, processing error rates, processing time for account changes, manual processing rates, and speed of complaint resolution.
PAGE 9 OF 66 91003119R00050005
l. Quality control: Solution shall be supported by documented policies/procedures on the vendor’s quality management system to ensure that more efficient and effective best-in-class service can be provided.
m. Software licenses: Commercial software licenses acquired under this contract shall be licensed to the Government.
C.3.3 Operating Elements and Related Requirements:
a. Customer accounts migration: Solution shall migrate historical and current customer loan and grant accounts from existing servicers and the Default Management Collection System (DMCS). See the “01 - As is Updated” attachment for further details on portfolio breakdown across current servicers and various loan types. This also includes specialty programs (e.g., PSLF, TEACH, TPD, grant overpayments, Perkins).
─ Solution shall ensure the migrations are completed on schedule, aligned with Milestones 2 and 3 (Section C.3.5) that maximizes operational and cost efficiency while minimizing customer disruption.
─ Solution shall ensure that the migration (e.g. conversion, transfer, etc.) successfully converts and maintains complete and accurate (error free) customer data, including, but not limited to, customer’s historical record of balances and transactions, loan consolidation origination records (e.g., underlying loan pay-off, lender detail, funding histories), auto-pay preferences, prior loan transfer imaged records, live and closed DMCS account data, AWG and TOP details, customer service data (e.g., call center audio files or transcripts).
─ Solution shall tag all accounts with a unique FSA account number (FAN) identifier, which will be used to retrieve and share customer/partner data with other solutions enterprise-wide. FSA will provide the FAN for each customer account.
─ Solution shall support the development and execution of customer communications about the migration of their accounts before, during, and after the migration, working effectively with the Digital Customer Care (DCC) solution.
─ Solution shall migrate all underlying loan detail and payoff information including all loan verification detail, loan summary statements, initial payoff information (including all financial and non-financial transactions), and under and over payment detail. Solution shall be able to process all under and over payment adjustments regardless of performing the actual origination of the consolidation loan.
─ Solution shall also demonstrate the capability to eventually effectively and efficiently migrate customer accounts to the Optimal Processing Solution, should FSA so determine.
b. Student financing servicing platform: Solution shall execute the full range of “life of the loan” servicing functions, including consolidation origination and default support. Solution shall provide these functions across FSA’s full student financing portfolio, including for specialty programs (e.g., PSLF, TEACH, TPD, grant overpayments, Perkins) and specialty claims (e.g., discharge, forgiveness). Solution shall also provide relevant reconciliation, reporting, and audit support functions for all of FSA’s current portfolio, ensuring accuracy, timeliness, and cost-effectiveness.
─ Solution shall execute relevant functions for the full FSA student financing portfolio which includes, but is not limited to, varying:
□ Loan statuses (e.g., In school, grace, repayment, delinquency, default, suspense, forbearance, deferment);
□ Customer segments (e.g., military customers);
□ Traditional repayment plans (e.g., Standard, Graduated, and Extended) across FFEL, Direct, and Perkins loans;
□ Income-driven repayment plans (e.g., Income-Contingent, Income-Based, Pay-As-You-Earn, and Revised-Pay-As-You-Earn);
□ Grant programs (e.g., TEACH, Pell); and,
□ Outreach and collection on any grant overpayments that have been have been referred to the Department for collection. The system shall have the ability to track grant overpayments that has been reported and ongoing progress of its collection, whether it is being collected by the school, or whether it has been formally referred to the Department for collect;
□ Loan forgiveness and discharge programs (e.g., PSLF, TPD).
─ Solution shall execute student financing servicing functions, including, but not limited to:
□ Loan status tracking;
PAGE 10 OF 66 91003119R00050005
□ Eligibility requirement assessment and annual recertification, and payment recalculation for income-driven plans tied to a customer’s income, family situation, and other characteristics that may fluctuate;
□ Loan consolidation origination, including application, pay off, booking new loans, maintaining account histories, performing all reconciliation and financial reporting, among other activities;
□ Switching between repayment plans; and,
□ Retroactive processing (e.g., retroactive application of deferments, forbearances, payments).
─ Solution shall perform financial and portfolio level functions, including manual intervention if necessary.
This includes, but is not limited to:
□ Payment processing, including, receipt and applications of cash and non-cash payments accounts as well as research and resolution of lost or misapplied payments;
□ Interface support, including tracking Work in Process (WIP) and resolving rejected transactions from other FSA systems (e.g. NSLDS, FMS, origination system);
□ Financial reporting, reconciliation, and variance research;
□ As needed support of audits (e.g., annual audit reports such as the Service Organization Controls Type II Statements on Standards for Attestation Engagements (SSAE18));
□ Research and resolution of treasury issues;
□ Loan consolidation origination applications and request processing;
□ Comprehensive cash management;
□ Dynamic loan portfolio management;
□ Effective internal financial controls; and,
□ Credit bureau research resolution, including direct and indirect credit bureau disputes filed by customers or initiated by the credit bureaus.
– Solution shall conduct error and dispute resolution investigation and processing, including, but not limited to:
□ Account maintenance, including manual correction of errors identified through data integrity scans;
and,
□ Payment processing, including researching lost or misapplied payments and payment reapplication at the request of customers or FSA.
─ Solution shall track, project/forecast, and provide servicing functions for delinquent and defaulted customer accounts. Solution shall collaborate with the Digital Customer Care Platform, Business Process Operations, and other relevant solutions to enable more tailored customer assistance and improved repayment outcomes. Activities include, but are not limited to:
□ Executing rehabilitation processes;
□ Reporting statuses and other data to credit bureaus;
□ Processing Administrative Wage Garnishment (AWG) and Treasury Offset Program (TOP) initiation, tracking and reporting, and research (e.g., processing customer payments to reflect offsets, initiating transmission of required customer due process notices); and,
□ Identifying defaulted accounts for litigation referral, as required by law, and working with Business Process Operations to prepare litigation packets and Certificates of Indebtedness (COI).
─ Solution shall automate all possible functions to minimize manual processing. Solution may only rely on streamlined manual processing by the separately provided Business Process Operations in the cases where automation is not feasible. However, Solution shall provide personnel to do manual processing related to financial functions, interface support, and error/dispute investigation and processing to be performed at the portfolio level.
─ Solution shall provide personnel (“trainers”) to be trained by the Command Center. These trainers shall then coordinate onboarding and refresher training for respective solution’s other personnel.
─ Solution shall regularly contribute to the development and maintenance of contact scripts, training materials, and training curriculum as coordinated by the Command Center, and provide proactive feedback relating to insights generated from customer contacts.
PAGE 11 OF 66 91003119R00050005
─ Solution shall maintain a robust data history, including retroactive processing (e.g., “as-was” vs “as-is”), and tracing loans through consolidation transactions. This data shall be available and shared with other solutions and systems as directed by FSA.
─ Solution shall provide real-time data and business rules required to establish enterprise-wide workflows as related to the execution of servicing functions. Solution shall also work with the Command Center, Workflow Management, and Business Process Operations solutions to test, monitor, and continuously improve relevant workflows.
c. Imaging, printing, and mailing: Solution shall have the capability to provide these functions as determined necessary by FSA. This is an optional task, which may be exercised at FSA’s discretion. Solution shall receive, image, and route physical mail to the appropriate destination and be responsible for all printing and outbound mail needs, enterprise-wide, across the full life cycle of student financing (from application through pay-off or default). Solution shall also provide tracking of and reporting on outbound mail items. Solution shall identify cost efficiency opportunities and work with FSA to implement changes to processes and practices (e.g., statement or envelope design).
─ Solution shall enable other solutions, FSA staff, and designated third-parties to submit and track outbound print and mail requests real-time. Other solutions include, but are not limited to, Customer Outreach and Communications, Business Process Operations, Student Financing Eligibility Processing, and Origination and Disbursement Processing.
─ Solution shall image and index inbound mail, including physical checks, and provide access or visibility to the images and metadata to other solutions real-time. The solution shall ensure this information is captured for skip tracing purposes, should mail be returned to sender.
─ Solution shall include functionalities to print in alternative formats (e.g., Braille, large print) to enable accessibility to all customers.
─ Solution shall enable customers, partners, and other relevant third parties to be able to fax materials to FSA, and tag the faxes upon receipt for tracking before routing them to the appropriate solutions to address the inquiry. Solution shall be integrated with Workflow Management, Digital Platform, CRM, among other solutions.
─ Solution shall image and index inbound mail, including physical checks, as well as materials received via fax.
Solution shall then provide access or visibility to the images and metadata to other solutions real-time. Such solutions will include, but not limited to, the Workflow Management, Digital Platform, CRM, Eligibility Processing, Origination and Disbursement Processing, and Business Process Operations.
d. Digital engagement layer: This is an optional task. This optional task may be exercised, at FSA’s discretion, to enable an orderly transition between existing solutions to Next Gen solutions, so that there is minimal disruption to customers. Solution shall provide the temporary digital engagement solution for customers and partners to be able to interact with FSA and complete customer (e.g., view statements, make payments) and partner tasks (e.g., view student loan history, download resources for students) currently provided by existing servicers. Solution shall remain in place until the future state Digital Platform solution is fully implemented or as otherwise determined by FSA. In proposing enhancements, solution shall take into consideration customer pain points (see “07 – Top Customer Pain Points” attachment), customer and partner tasks (see “05 – Current State Customer Tasks,” “06 – Current State Partner Tasks” attachments).
─ Solution shall ensure a seamless transition of customers and partners to digital engagement layer (e.g., customer payment and communication channel preferences).
─ Solution shall present to customers and partners solely under the FSA brand, adhering to FSA’s brand guidelines. Current brand guidelines are detailed in Attachment “08 - FSA Brand Guidelines” – these may change over time at FSA’s discretion, requiring updates to be made to the Digital Engagement Layer.
─ Solution shall implement and use FSA’s chosen identity and access management (IAM) solutions for authorization, authentication, single-sign-on (SSO) via standards-based federation, self-services, and identity management of customer and partner online profiles.
□ Vendor shall not utilize FSA’s IAM solutions for non-FSA approved purposes (e.g., authentication for private/commercial products).
□ Further details are included in the “10 – FSA Identity & Access Management Solution Overview” attachment. FSA’s IAM solutions include: FSA ID/Person Authentication Service (PAS), Access and Identity Management System (AIMS), Two-Factor Authentication (TFA); and Privileged Access Management (PAM/CyberArk/ezPIV).
PAGE 12 OF 66 91003119R00050005
─ Solution shall provide Skip Tracing tools to identify updated contact information for bad postal mail and bad phone numbers until another solution is capable of such needs.
C.3.4 Deliverables
C.3.4.1
Deliverables shall be provided electronically whenever possible, via email, in both Acrobat.pdf and a current Microsoft Office format suitable for the report (Word or Excel), unless FSA requests a different format.
Deliverables shall be submitted to the Contracting Officer, COR, and Program Manager.
C.3.4.2 The Contractor shall furnish deliverables specified herein in accordance with the delivery schedule and requirements, to the delivery point(s) specified in the table below:
FSA Deliverable Table Deliverable Description Due Date and
Frequency Acceptance Criteria
Project Kick-Off Meeting Kick-off meeting to begin discussions on detailed requirements and the project schedule.
• Presentation
• Meeting Minutes
Within five business days of award
Project Management Plan
Detailed project management plan and project schedule for the complete contract scope. Includes Scope Management Plan, Cost Management Plan, Risk Management Plan, Quality Management Plan, Resource Management Plan, Schedule Management Plan, Communication Management Plan, Performance Management Plan, and Performance Monitoring Plan.
Three weeks after award
Status Meetings and Status Reports
Status report on progress, performance metrics, schedule, incidents, action and issue log, and risk log/risk register.
Weekly
Integrated Master Project Schedule
Planned dates to start and complete tasks and milestones, including work to be done by FSA as well as any vendors participating in the project.
Updated weekly
Requirements Management Plan
Defines how requirements will be elicited, structured, and prioritized;
how requirements will be recorded;
how requirements will be modified;
and how requirements will be traced and reconciled.
• Initial plan to cover all system functionality at least five days prior to Requirements Stage gate and annually thereafter
• Updated for each release; Final version for each release delivered prior to Requirements Stage Gate
Requirements Documents
• High Level Requirements
• Product backlog
• Requirements Traceability Matrix
(RTM) – requirements mapped to test cases
• Initial documents to cover full system functionality at least five days prior to Requirements Stage gate and annually thereafter Final version for each release delivered prior to
PAGE 13 OF 66 91003119R00050005
FSA Deliverable Table Deliverable Description Due Date and
Frequency Acceptance Criteria
Requirements Stage Gate Data Migration Plan (Does not apply to Initial Conversion/Migration)
Defines processes associated with completion of data migration effort, including conversion/migration strategies, data mapping requirements, data clean up, and testing.
Updated for each release; Final version for each release delivered prior to Requirements Stage Gate
Conversion Plan Defines processes associated with completion of data migration efforts, including conversion strategies, data mapping requirements, data clean-up, and testing.
Within thirty days of award
Solution Architecture and Detailed Design Document
Combines both a high-level and detailed view of the solution architecture
• Includes description and diagrams of infrastructure, network, security, data, and application architectures
• Addresses all Technical Quality Control (TQC) factors and sub-factors identified as applicable and in scope
• Includes mitigation strategies for all risks identified in the Technical Quality Control reviews
• Includes Interface Control Documents (ICDs) to document all interfaces between systems and subsystems, including APIs, data required, data returned, error handling, and communications, etc.
• Conveys detail necessary to allow coders to develop the system, and to support critical design reviews before beginning development
• Initial documents to cover full days prior to Design Stage gate and annually thereafter
• Final version for each release delivered at least five days prior to Design Stage Gate
Developers’ Integration Guide
Documents how internal and external parties will integrate with and consume the APIs/services that are exposed.
• Initial document to cover full integrations at least five days prior to Design Stage Gate and annually thereafter
• Final version for each release delivered at least five days prior to Design Stage Gate
Configuration Management Plan
An overview of the organization, activities, overall tasks, and objectives of configuration management;
addresses: baseline work products, describes the mechanism to track and control changes/change requests, and the mechanism to establish and maintain baseline integrity
• Initial plan to cover full system functionality at least five days prior to Test Readiness Review and annually thereafter.
• Final version for each release delivered prior to Test Readiness Review
PAGE 14 OF 66 91003119R00050005
Frequency Acceptance Criteria
Master Test Plan Details high level and overall test planning and test management
• Includes System, User
Acceptance, Performance, Inter-system, etc. Test Plans
• Master Test Plan includes objectives for the security control assessment and procedures for testing each security control
• Initial test plan to cover full days prior to Test Readiness Review
• Final version for each release
Testing Documentation • Test Suites - test scenarios, test cases and test scripts for a component or system under test
• User Acceptance Test Summary Report
• System Test Summary Report
• Defect Management Report
• QA and QC records
• Initial testing documentation to cover full system functionality at least five days prior to Test Readiness Review
• Final version for each release
Solution Source Code
• Provided in a usable/human readable format as approved/agreed to by FSA
• Initial Source code to cover full days prior to Test Readiness Review
• Prior to each release and available upon request
Database detail • Data Dictionary: Field name, field definition (in simple to understand terms), valid values for the content, field format/length for data stored in the servicing system (i.e.
databases, access databases, tables, and spreadsheets).
• Dictionary includes: Historical transactional data for all actions (financial and non-financial) taken on an account including but not limited to payments, refunds, schedule histories, credit reporting, and communication (Paper, email, fax, etc.) data
• Volume of Data
• Procedures and Training
Materials (Catalog and actual documents.
• Data Dictionary/documentation thirty days after award and yearly thereafter to include volume of data or Upon Request
• Procedures and training materials prior to o Initial Test Readiness Review, prior to each o release Test readiness review, o annually thereafter
Implementation Documentation
• Release Version Description Document
• Solution User Manual
• Implementation Plan
• Transition Management Plan
• Training Plan
• Operations and Maintenance Plan
Prior to receiving Authorization to Operate
PAGE 15 OF 66 91003119R00050005
Frequency Acceptance Criteria
• Standard Operating Procedures
• Production Readiness Review
(PRR)
• Implementation Plan (Hour x
Hour)
Lessons Learned Reports All aspects of the project or project stage are analyzed, and results and opportunities for improvement are documented
Within two weeks after each release
System Security and Privacy Documentation
Privacy Artifacts:
• Privacy Threshold Analysis (PTA)
• Privacy Impact Assessment (PIA)
• System of Records Notice (SORN)
External Data Exchange Artifacts:
• Memorandum(s) of
Understanding (MOUs)
• Computer Matching
Agreement(s)
• Interconnection Security
Agreement(s) (ISA)
Continuity of Services Artifacts:
• Business Impact Assessment (BIA)
• IT Contingency Plan (Includes Test
Plan)
• Disaster Recovery Plan
System Security Documentation Artifacts:
• Data Sensitivity Worksheet
• System Authorization Boundary
• System Security Plan (SSP)
• Incident Response Plan (IRP)
• Breach Notification Policy and
Response Plan
Security Risk Assessment Artifacts:
• Security Assessment Plan
• System Security Documentation
Checklists
• Security Assessment Report
• Plans of Actions and Milestones
(POAMs)
• Data…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.