The document is a Bid Tabulation Summary Report for Project Number 900402, issued by the City of Eugene, Oregon, for the East 24th Avenue, Hilyard Street & Alder Street Paving project. The bid solicitation covers a comprehensive infrastructure improvement project involving street paving, reconstruction, and multiple infrastructure upgrades. The project includes cold plane pavement removal, asphalt paving, roadway reconstruction, full depth reclamation, wastewater and storm water pipe repairs, pedestrian access modifications, and traffic infrastructure upgrades. The bid tabulation includes detailed line items with quantities, unit values, and extended values from three bidders: Wildish Construction Co, RiverBend Construction Inc, and Knife River Corporation - Northwest.

The total engineer's estimate for the project is $3,450,459.67, with bidders submitting proposals ranging from $2,693,850.65 to $2,999,999.99. The bid includes numerous specific line items such as mobilization, traffic control, erosion control, excavation, pipe repairs, concrete work, pavement treatments, signage, and landscaping. The most significant line items include mobilization ($313,677.62), temporary work zone traffic control ($75,000), full depth reclamation base ($64,194.30), and various pavement and concrete work. The project appears to be funded through municipal infrastructure budget and will involve comprehensive street and utility improvements across multiple segments of Eugene's transportation infrastructure.

View the file

Other files

File Type Posted
900402-20250626 Intent to Award.pdf PDF
Trail.jpg JPG image
900402-20250610 Addendum 2.pdf PDF
900402 plans 4.pdf PDF
900402 Specifications.pdf PDF
900402 Bid Forms.pdf PDF
900402-20250530 Addendum 1.pdf PDF
900402 plans 2.pdf PDF
900402 plans 3.pdf PDF
900402 Instructions to Bidders.pdf PDF
900402 first tier.pdf PDF
900402 contract and bonds.pdf PDF
900402 plans 1.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Item No. Quantity Unit Extended Value Unit Value Extended Value Unit Value

2100010 1.00 LS $313,677.62 $215,000.00 $215,000.00 $225,368.09

2250010 1.00 LS $75,000.00 $47,850.00 $47,850.00 $62,000.00

2250630 12.00 EA $6,000.00 $250.00 $3,000.00 $650.00

2250580 1,348.00 HR $101,100.00 $78.00 $105,144.00 $71.00

2250480 1.00 LS $8,000.00 $16,000.00 $16,000.00 $16,000.00

2250020 1.00 LS $50,000.00 $20,000.00 $20,000.00 $77,000.00

2800010 1.00 LS $7,500.00 $6,000.00 $6,000.00 $6,650.00

2800210 50.00 EA $6,250.00 $75.00 $3,750.00 $65.00

2800240 1.00 EA $100.00 $125.00 $125.00 $185.00

2800190 22.00 EA $2,750.00 $65.00 $1,430.00 $57.00

2800180 233.00 FT $1,398.00 $3.00 $699.00 $8.00

2800341 1.00 LS $8,000.00 $3,200.00 $3,200.00 $3,200.00

2900030 1.00 LS $500.00 $250.00 $250.00 $500.00

3100010 1.00 LS $50,000.00 $11,000.00 $11,000.00 $14,000.00

3300010 2,996.10 CY $119,844.00 $29.00 $86,886.90 $38.00

3310010 90.00 CY $18,000.00 $102.00 $9,180.00 $100.00

4450120 53.00 FT $13,250.00 $167.00 $8,851.00 $210.00

4450130 52.00 FT $13,000.00 $126.00 $6,552.00 $104.00

4450030 208.00 FT $52,000.00 $153.00 $31,824.00 $155.00

4450200 7.00 FT $14,000.00 $1,600.00 $11,200.00 $1,300.00

4451030 1.00 EA $400.00 $200.00 $200.00 $408.00

4451470 2.00 EA $1,400.00 $900.00 $1,800.00 $400.00

4700270 2.00 EA $12,000.00 $4,000.00 $8,000.00 $4,300.00

4700360 7.00 EA $31,500.00 $3,800.00 $26,600.00 $4,100.00

4900010 52.00 EA $117,000.00 $1,800.00 $93,600.00 $1,850.00

4900040 82.00 EA $41,000.00 $600.00 $49,200.00 $725.00

4900040 2.00 EA $5,000.00 $2,200.00 $4,400.00 $1,000.00

4900070 8.00 EA $12,000.00 $1,300.00 $10,400.00 $1,450.00 $11,600.0028 CONNECTION TO EXISTING STRUCTURES $1,500.00 $250.00 $2,000.00

$59,450.00

27 ADJUSTING CATCH BASIN $2,500.00 $1,500.00 $3,000.00 $2,000.00

26 ADJUSTING BOXES $500.00 $600.00 $49,200.00

$28,700.00

25 MINOR ADJUSTMENT OF MANHOLES $2,250.00 $1,500.00 $78,000.00 $96,200.00

24 CATCH BASINS $4,500.00 $3,500.00 $24,500.00

$800.00

23 CONCRETE INLETS, TYPE 4A $6,000.00 $4,000.00 $8,000.00 $8,600.00

22 CLEANOUTS $700.00 $500.00 $1,000.00

$9,100.00

21 PIPE WYES, 8 INCH $400.00 $200.00 $200.00 $408.00

20 30 INCH PVC PIPE $2,000.00 $1,500.00 $10,500.00

$5,408.00

19 10 INCH C-900 PVC PIPE $250.00 $155.00 $32,240.00 $32,240.00

18 10 INCH PVC PIPE $250.00 $95.00 $4,940.00

$9,000.00

17 8 INCH PVC PIPE $250.00 $130.00 $6,890.00 $11,130.00

16 SUBGRADE STABILIZATION $200.00 $150.00 $13,500.00

$14,000.00

15 GENERAL EXCAVATION $40.00 $18.00 $53,929.80 $113,851.80

14 REMOVAL OF STRUCTURES AND OBSTRUCTIONS $50,000.00 $200,000.00 $200,000.00

$3,200.00

13 CONSTRUCTION WASTE REUSE AND RECYCLING (CWRR) REPORT $500.00 $200.00 $200.00 $500.00

12 CONCRETE WASHOUT FACILITY $8,000.00 $5,000.00 $5,000.00

$1,254.00

11 SEDIMENT FENCE $6.00 $5.00 $1,165.00 $1,864.00

10 INLET PROTECTION, TYPE 10 $125.00 $100.00 $2,200.00

$3,250.00

9 INLET PROTECTION, TYPE 7 $100.00 $100.00 $100.00 $185.00

8 INLET PROTECTION, TYPE 3 $125.00 $100.00 $5,000.00

$77,000.00

7 EROSION CONTROL $7,500.00 $5,000.00 $5,000.00 $6,650.00

6 TEMPORARY WORK ZONE PEDESTRIAN TRAFFIC CONTROL, COMPLETE $50,000.00 $5,000.00 $5,000.00

$95,708.00

5 STRIPE REMOVAL $8,000.00 $16,000.00 $16,000.00 $16,000.00

4 FLAGGERS $75.00 $70.00 $94,360.00

$62,000.00

3 CITY PROVIDED SPECIAL INFORMATION SIGNS $500.00 $300.00 $3,600.00 $7,800.00

2 TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE $75,000.00 $75,000.00 $75,000.00

Extended Value

1 MOBILIZATION $313,677.62 $255,000.00 $255,000.00 $225,368.09

Line No Description Unit Value Unit Value Extended Value

BID TABULATION SUMMARY REPORT

Project Number 900402 Project Name E 24th Ave, Hilyard St & Alder St Paving

Bidder 1 Bidder 2 Bidder 3

Engineer Estimate Wildish Construction Co RiverBend Construction Inc Knife River Corporation - Northwest

Run Date: 6/18/2025 Page 1 of 4

Value Unit Value Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value

BID TABULATION SUMMARY REPORT

Project Number 900402 Project Name E 24th Ave, Hilyard St & Alder St Paving

Bidder 1 Bidder 2 Bidder 3

Engineer Estimate Wildish Construction Co RiverBend Construction Inc Knife River Corporation - Northwest

4900180 1.00 EA $12,000.00 $1,500.00 $1,500.00 $3,000.00

4900240 1.00 EA $15,000.00 $7,600.00 $7,600.00 $7,700.00

4901850 1.00 EA $800.00 $500.00 $500.00 $550.00

4900090 3.00 EA $2,400.00 $1,500.00 $4,500.00 $500.00

4901830 1.00 EA $750.00 $400.00 $400.00 $530.00

4901930 4.00 EA $6,000.00 $550.00 $2,200.00 $950.00

4900130 12.00 EA $9,000.00 $541.00 $6,492.00 $440.00

4900120 15.00 EA $11,250.00 $541.00 $8,115.00 $440.00

6200190 7,610.70 SY $34,248.15 $3.00 $22,832.10 $5.00

6200200 2,485.00 SY $11,182.50 $4.00 $9,940.00 $7.00

6220010 1.00 SY $500.00 $1,000.00 $1,000.00 $600.00

6410050 270.00 TON $16,200.00 $70.00 $18,900.00 $24.00

6430010 7,132.70 SY $64,194.30 $15.00 $106,990.50 $12.00

6430040 337.00 TON $143,225.00 $405.00 $136,485.00 $340.00

6430050 337.00 TON $6,066.00 $43.00 $14,491.00 $20.00

7440050 900.00 TON $94,500.00 $90.50 $81,450.00 $108.00

7440100 6,600.00 TON $693,000.00 $86.00 $567,600.00 $93.00

7480170 1,526.90 SY $45,807.00 $6.00 $9,161.40 $15.00

7480180 584.80 SY $23,392.00 $26.00 $15,204.80 $29.00

7480180 621.80 SY $24,872.00 $29.00 $18,032.20 $44.00

7490180 5.00 EA $20,000.00 $3,500.00 $17,500.00 $3,200.00

7550190 632.00 SF $25,280.00 $27.50 $17,380.00 $23.00

7560260 20.80 SY $5,720.00 $189.00 $3,931.20 $183.00

7560190 105.60 SY $31,680.00 $171.00 $18,057.60 $165.00

7560280 64.60 SY $19,380.00 $210.00 $13,566.00 $235.00

7590010 2,594.30 FT $246,458.50 $58.00 $150,469.40 $61.00

7590150 13,056.70 SF $261,134.00 $23.50 $306,832.45 $24.00

7590150 463.60 SF $9,272.00 $25.00 $11,590.00 $26.00 $12,053.6056 MONOLITHIC CURB AND SIDEWALKS, RAMPS, 4 INCHES THICK $20.00 $14.00 $6,490.40

$158,252.30

55 CONCRETE WALKS, RAMPS, 4 INCHES THICK $20.00 $10.00 $130,567.00 $313,360.80

54 CONCRETE CURBS, CURB AND GUTTER $95.00 $60.00 $155,658.00

$17,424.00

53 PLAIN CONCRETE PAVEMENT, UNDOWELLED, 9 INCHES THICK $300.00 $165.00 $10,659.00 $15,181.00

52 PLAIN CONCRETE PAVEMENT, UNDOWELLED, 8 INCHES THICK $300.00 $145.00 $15,312.00

$14,536.00

51 PLAIN CONCRETE PAVEMENT, UNDOWELLED, 7 INCHES THICK $275.00 $175.00 $3,640.00 $3,806.40

50 FLEXIBLE TO RIGID PAVEMENT TRANSITIONS $40.00 $23.00 $14,536.00

$27,359.20

49 ASPHALT SPEED CUSHION $4,000.00 $5,000.00 $25,000.00 $16,000.00

48 9" ASPHALT CONCRETE PAVEMENT REPAIR $40.00 $33.00 $20,519.40

$22,903.50

47 8" ASPHALT CONCRETE PAVEMENT REPAIR $40.00 $20.00 $11,696.00 $16,959.20

46 6" ASPHALT CONCRETE PAVEMENT REPAIR $30.00 $6.00 $9,161.40

$97,200.00

45 LEVEL 3, 1/2 INCH ACP MIXTURE $105.00 $90.00 $594,000.00 $613,800.00

44 LEVEL 2, 1/2 INCH ACP MIXTURE $105.00 $100.00 $90,000.00

$114,580.00

43 SSD SAND $18.00 $15.00 $5,055.00 $6,740.00

42 CEMENTIOUS MATERIALS $425.00 $340.00 $114,580.00

$6,480.00

41 FULL DEPTH RECLAMATION BASE, 14 INCHES DEEP $9.00 $10.00 $71,327.00 $85,592.40

40 3/4"-0" AGGREGATE BASE $60.00 $45.00 $12,150.00

$17,395.00

39 GRIND CONCRETE PAVEMENT $500.00 $2,000.00 $2,000.00 $600.00

38 COLD PLANE PAVEMENT REMOVAL, 2.5 INCHES DEEP $4.50 $4.50 $11,182.50

$6,600.00

37 COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP $4.50 $2.50 $19,026.75 $38,053.50

36 MANHOLE FRAME AND COVER-WASTEWATER $750.00 $500.00 $7,500.00

$3,800.00

35 MANHOLE FRAME AND COVER-STORMWATER $750.00 $500.00 $6,000.00 $5,280.00

34 INLET GROUT REPAIR $1,500.00 $500.00 $2,000.00

$1,500.00

33 PLUG EXISTING PIPE $750.00 $500.00 $500.00 $530.00

32 CONNECTION TO EXISTING PIPE $800.00 $400.00 $1,200.00

$7,700.00

31 ABANDON PIPES IN PLACE $800.00 $500.00 $500.00 $550.00

30 30 INCH STORM SEWER PVC PIPE REPAIRS $15,000.00 $13,000.00 $13,000.00

29 10 INCH STORM SEWER PVC PIPE REPAIRS $12,000.00 $13,000.00 $13,000.00 $3,000.00

Run Date: 6/18/2025 Page 2 of 4

Value Unit Value Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value

BID TABULATION SUMMARY REPORT

Project Number 900402 Project Name E 24th Ave, Hilyard St & Alder St Paving

Bidder 1 Bidder 2 Bidder 3

Engineer Estimate Wildish Construction Co RiverBend Construction Inc Knife River Corporation - Northwest

7590390 1,193.00 SF $53,685.00 $44.00 $52,492.00 $53.00

7590200 11,378.80 SF $227,576.00 $16.00 $182,060.80 $15.00

7590110 82.60 SF $2,478.00 $12.00 $991.20 $21.00

7590120 404.00 SF $12,120.00 $22.00 $8,888.00 $21.00

7590380 1,080.00 FT $21,600.00 $3.00 $3,240.00 $3.00

7590075 2.00 EA $300.00 $100.00 $200.00 $150.00

8550020 8.00 EA $96.00 $9.00 $72.00 $9.00

8550040 157.00 EA $1,884.00 $9.00 $1,413.00 $9.00

8550090 11.00 EA $275.00 $15.00 $165.00 $16.00

8650040 1.00 LS $40,000.00 $57,275.00 $57,275.00 $63,000.00

8670020 1.00 EA $350.00 $400.00 $400.00 $400.00

8670140 16.00 EA $6,400.00 $400.00 $6,400.00 $400.00

8670210 12.00 EA $9,000.00 $400.00 $4,800.00 $450.00

8670180 6.00 EA $2,400.00 $500.00 $3,000.00 $500.00

8670010 1,259.00 SF $18,885.00 $18.00 $22,662.00 $19.00

8680010 308.00 SF $4,620.00 $20.00 $6,160.00 $21.00

8600020 98.00 FT $490.00 $5.00 $490.00 $5.00

9050040 9.00 EA $9,900.00 $95.00 $855.00 $560.00

9200010 1.00 LS $7,000.00 $13,500.00 $13,500.00 $4,200.00

9300020 1.00 LS $7,000.00 $4,000.00 $4,000.00 $5,000.00

9400002 161.20 SF $14,508.00 $28.00 $4,513.60 $17.00

9700060 1.00 LS $11,000.00 $9,300.00 $9,300.00 $10,152.00

9900020 1.00 LS $15,000.00 $35,800.00 $35,800.00 $39,000.00

9900020 1.00 LS $3,000.00 $12,900.00 $12,900.00 $14,000.00

9900020 1.00 LS $10,000.00 $8,800.00 $8,800.00 $9,700.00

10200010 400.00 FT $4,000.00 $5.50 $2,200.00 $5.00

10300090 4,883.80 SF $39,070.40 $1.00 $4,883.80 $1.00

10400190 811.20 SF $811.20 $2.00 $1,622.40 $2.00 $1,622.4084 BARK MULCH $1.00 $2.00 $1,622.40

$2,000.00

83 LAWN SEEDING $8.00 $1.00 $4,883.80 $4,883.80

82 TREE PROTECTION FENCING $10.00 $5.00 $2,000.00

$14,000.00

81 TRAFFIC SIGNAL MODIFICATION, 30TH AVE & ALDER ST $10,000.00 $9,000.00 $9,000.00 $9,700.00

80 TRAFFIC SIGNAL MODIFICATION, 37TH AVE & HILYARD ST $3,000.00 $13,000.00 $13,000.00

$10,152.00

79 TRAFFIC SIGNAL MODIFICATION, 34TH AVE & HILYARD ST $15,000.00 $36,500.00 $36,500.00 $39,000.00

78 ILLUMINATION, COMPLETE $11,000.00 $9,500.00 $9,500.00

$5,000.00

77 SIGNS, STANDARD SHEETING, SHEET ALUMINUM $90.00 $30.00 $4,836.00 $2,740.40

76 PERFORATED STEEL SQUARE TUBE SIGN SUPPORTS $7,000.00 $4,000.00 $4,000.00

$5,040.00

75 SIGN SUPPORT FOOTINGS $7,000.00 $13,000.00 $13,000.00 $4,200.00

74 REMOVE AND REINSTALL EXISTING SIGNS $1,100.00 $100.00 $900.00

$6,468.00

73 CURB MARKING, PAINT $5.00 $5.00 $490.00 $490.00

72 GREEN BICYCLE LANE, PREFORMED THERMOPLASTIC FILM $15.00 $19.00 $5,852.00

$3,000.00

71 PAVEMENT BAR, TYPE B-HS $15.00 $18.00 $22,662.00 $23,921.00

70 PAVEMENT LEGEND, TYPE B-HS: SHARED LANE MARKING $400.00 $500.00 $3,000.00

$6,400.00

69 PAVEMENT LEGEND, TYPE B-HS: SPEED HUMP MARKING $750.00 $400.00 $4,800.00 $5,400.00

68 PAVEMENT LEGEND, TYPE B-HS: BICYCLE LANE STENCIL $400.00 $400.00 $6,400.00

$63,000.00

67 PAVEMENT LEGEND, TYPE B-HS: ARROWS $350.00 $400.00 $400.00 $400.00

66 THERMOPLASTIC, EXTRUDED, SURFACE, NON-PROFILED $40,000.00 $58,000.00 $58,000.00

$1,413.00

65 BI-DIRECTIONAL BLUE TYPE IAR MARKERS $25.00 $15.00 $165.00 $176.00

64 BI-DIRECTIONAL YELLOW TYPE IAR MARKERS $12.00 $9.00 $1,413.00

$300.00

63 MONO-DIRECTIONAL WHITE TYPE IAR MARKERS $12.00 $9.00 $72.00 $72.00

62 RECONNECT EXISTING WEEP HOLE $150.00 $100.00 $200.00

$8,484.00

61 SAW CUTTING JOINTS $20.00 $5.00 $5,400.00 $3,240.00

60 CONCRETE DRIVEWAYS, 7" THICK $30.00 $16.00 $6,464.00

$170,682.00

59 CONCRETE DRIVEWAYS, 5" THICK $30.00 $10.00 $826.00 $1,734.60

58 FIBER REINFORCED CONCRETE, 7 INCHES THICK $20.00 $9.00 $102,409.20

57 TRUNCATED DOMES ON NEW SURFACES $45.00 $30.00 $35,790.00 $63,229.00

Run Date: 6/18/2025 Page 3 of 4

Value Unit Value Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value

BID TABULATION SUMMARY REPORT

Project Number 900402 Project Name E 24th Ave, Hilyard St & Alder St Paving

Bidder 1 Bidder 2 Bidder 3

Engineer Estimate Wildish Construction Co RiverBend Construction Inc Knife River Corporation - Northwest

10400020 7.00 CY $420.00 $115.00 $805.00 $115.00

10500020 29.00 FT $2,610.00 $100.00 $2,900.00 $67.00

11200020 10,000.00 FA $10,000.00 $1.00 $10,000.00 $1.00

$3,450,459.67 $2,817,651.35GRAND TOTAL: $2,693,850.65 $2,999,999.99

$1,943.00

87 IRRIGATION REPAIR/RELOCATION $1.00 $1.00 $10,000.00 $10,000.00

86 REMOVING AND REBUILDING FENCE $90.00 $220.00 $6,380.00

85 TOPSOIL $60.00 $300.00 $2,100.00 $805.00

Run Date: 6/18/2025 Page 4 of 4