This is a technical specification document for Type C Drive Approach construction standards established by Bountiful City, Utah, for use in street improvement projects involving sidewalk, curb and gutter, and storm drain facility work. The specification details the design and construction requirements for saw-cut curb drive approaches, including dimensional standards such as a 12-foot minimum to 30-foot maximum approach length, 6-inch minimum concrete thickness throughout, and 4-foot walkway widths with variable configurations. The document specifies material requirements including Class 4000 concrete per APWA Section 03304, 6-inch road base minimum, epoxy-coated rebar with #4 bars installed at specified spacing, 1/2-inch expansion joints at 4-foot intervals, and control joints required when driveway width exceeds 14 feet. Construction methodology requirements include compaction of existing subgrade to 95 percent minimum per Modified Proctor standards, curing via curing compound application per current APWA specifications, and saw-cutting of existing concrete or asphalt to full depth with straight lines and a minimum 3-foot width removal in front of drive approaches.

The specification mandates use of straight metal forms for all tangent sections or where curb radius is not less than 150 feet, reflecting standard municipal construction practices for consistent and durable drive approach installation. This technical standard was revised in August 2017 and serves as the governing specification for drive approach construction within the City of Bountiful's random-location street improvement projects, ensuring consistency and quality across multiple construction sites throughout the municipality.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
2-2026 Storm Drain Projects Bid Package.pdf PDF
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
4-2026 Storm Drain Projects Bid Set.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
5-Type B Drive Approach 8-2017.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
7-Type A Drive Approach 8-2017.pdf PDF
1-2026 Misc. Concrete Bid Documents.pdf PDF
6-Type D Drive Approach 8-2017.pdf PDF
10-Type E Drive Approach 8-2017.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4' WALKVARIESC & G

6" MAXIMUM

1 12" RAISE

AT FLOW LINE

6" MINIMUM

THROUGHOUT

6" ROAD BASE

MINIMUM

#4 BAR

CONTINUOUS

4' WALK

C & G

CURB

TRANSITION

4'-6"MINIMUM

CALIFORNIA

OPTION

LENGTH TO BE MEASURED FOR

DRIVE APPROACH PAYMENT

12' MINIMUM / 30' MAXIMUM

MINIMUM 6" THICK CONCRETE WALK

THROUGH DRIVEWAY

BOUNTIFUL STANDARD

TYPE C DRIVE APPROACH

FOR SAW CUT CURB

SECTION A-A

PLAN VIEW

NOTES

A

A

1/2" EXPANSION

JOINT MATERIAL

(TYP. 4')

PARK

STRIP

VARIES

#4 BARS, 24" LONG

@ 24" OC DRILLED

INTO C&G. DOWELL

INTO APPROACH

#4 BARS, 24" LONG

@ 24" OC DRILLED

INTO C&G. DOWELL

INTO APPROACH

CONTROL JOINT

REQUIRED WHEN

DRIVEWAY WIDTH

EXCEEDS 14'

1. CONCRETE: CLASS 4000 PER APWA SECTION 03304. PLACE PER APWA SECTION 02770. CURE PER APWA SECTION 03390

2. COMPACT EXISTING SUBGRADE 95% MINIMUM (MODIFIED PROCTOR).

3. CURING BY APPLICATION OF CURING COMPOUND PER CURRENT APWA SPECIFICATIONS.

4. WHERE CONCRETE, OR ASPHALT IS TO BE REMOVED, THE MATERIAL MUST BE SAWCUT TO FULL DEPTH WITH STRAIGHT LINES.

MINIMUM WIDTH OF ASPHALT REMOVAL IN FRONT OF A DRIVE APPROACH IS 3 FT- 0 INCHES.

5. 6" ROAD BASE MINIMUM UNDER ALL NEW CONCRETE.

6. EPOXY COATED REBAR REQUIRED.

7. STRAIGHT METAL FORMS REQUIRED FOR ALL TANGENT SECTIONS OR WHERE THE CURB RADIUS IS NOT LESS THAN 150 FT.