This is a technical specification document for Type D Drive Approach construction standards issued by Bountiful City, Utah for street improvement projects. The specification details the design and construction requirements for driveway approaches, including concrete walk specifications, curb and gutter installation, and structural reinforcement standards. The document establishes minimum and maximum dimensions for drive approach construction, with concrete walk lengths ranging from 12 feet minimum to 30 feet maximum, and specifies a minimum 6-inch thickness concrete walk throughout the driveway. The project involves removal of existing curb and gutter to construct wing walls, with authorization from the Bountiful City Engineer required prior to construction. All concrete must meet Class 4000 specifications per APWA standards, with specific requirements for placement, curing, and compaction of subgrade materials to 95 percent minimum density using modified Proctor testing methods.

The specification mandates epoxy-coated rebar for reinforcement, with 6 inches of road base minimum under all new concrete, and requires straight metal forms for all tangent sections and curb radii of 150 feet or greater. Concrete removal and asphalt cutting must be sawcut to full depth with straight lines, with a minimum 3-foot width of asphalt removal in front of each drive approach. Curing shall be achieved through application of curing compound per current APWA specifications. The specification was revised in August 2017 and serves as the standard for Type D drive approach construction within Bountiful City's street improvement program, applicable to the 2026 replacement and new construction of sidewalk, curb and gutter, and storm drain facilities at random locations throughout the city.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
4-2026 Storm Drain Projects Bid Set.pdf PDF
2-2026 Storm Drain Projects Bid Package.pdf PDF
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
7-Type A Drive Approach 8-2017.pdf PDF
1-2026 Misc. Concrete Bid Documents.pdf PDF
9-Type C Drive Approach 8-2017.pdf PDF
10-Type E Drive Approach 8-2017.pdf PDF
5-Type B Drive Approach 8-2017.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 #4 BARS

CONTINUOUS

4' WALK

C & G

3'-0"

LENGTH TO BE MEASURED FOR

DRIVE APPROACH PAYMENT

12' MINIMUM / 30' MAXIMUM

MINIMUM 6" THICK CONCRETE WALK

THROUGH DRIVEWAY

BOUNTIFUL STANDARD

TYPE D DRIVE APPROACH

OVER-PASS TYPE DRIVE APPROACH

SECTION A-A

PLAN VIEW

NOTES

A

A

1/2" EXPANSION

JOINT MATERIAL

(TYP. 4')

PARK

STRIP

VARIES

2 #4 BAR CONTINUOUS

3'-0"

6"

18' MINIMUM3'-0" 3'-0"

INCLUDE AS PART OF DRIVE APPROACH PAYMENT

ARMCO 14 GAUGE TYPE D

CURB & GUTTER

PAN SECTION

4' WALKVARIES

7"

18"

6"

3.5" MINIMUM

COVER

6" MINIMUM

CLEARANCE

6" MINIMUM

THROUGHOUT

6" MAXIMUM

FALL

FIRST POUR

SECOND POUR

6" ROAD

BASE

ARMCO 14" GAUGE TYPE D

CURB & GUTTER PAN SECTION

6" MIN. CLEARANCE

AUTHORIZATION OF BOUNTIFUL CITY ENGINEER REQUIRED FOR USE

REMOVE EXISTING

CURB & GUTTER TO

CONSTRUCT WING WALLS

1. CONCRETE: CLASS 4000 PER APWA SECTION 03304. PLACE PER APWA SECTION 02770. CURE PER APWA SECTION 03390

2. COMPACT EXISTING SUBGRADE 95% MINIMUM (MODIFIED PROCTOR).

3. CURING BY APPLICATION OF CURING COMPOUND PER CURRENT APWA SPECIFICATIONS.

4. WHERE CONCRETE, OR ASPHALT IS TO BE REMOVED, THE MATERIAL MUST BE SAWCUT TO FULL DEPTH WITH STRAIGHT LINES.

MINIMUM WIDTH OF ASPHALT REMOVAL IN FRONT OF A DRIVE APPROACH IS 3 FT- 0 INCHES.

5. 6" ROAD BASE MINIMUM UNDER ALL NEW CONCRETE.

6. EPOXY COATED REBAR REQUIRED.

7. STRAIGHT METAL FORMS REQUIRED FOR ALL TANGENT SECTIONS OR WHERE THE CURB RADIUS IS NOT LESS THAN 150 FT.

REVISED 8/2017