Summary

This is a Notice to Contractors issued by the City of Bountiful, Utah for the 2026 Big Rock Hiking Trail Construction Project. The City of Bountiful Engineering Department is soliciting sealed proposals for construction of two separate hiking trail segments on public lands managed by the United States Forest Service in the Mueller Park area. Schedule 1 consists of approximately 250 feet of trail featuring significant rock retaining and tread armoring work, while Schedule 2 encompasses approximately 1.1 miles of trail with limited rock work. Both segments are to be constructed as Class 3 trails according to US Forest Service Trail Classifications and built to hiking parameters. Bidders may submit proposals for either or both schedules, and the City reserves the right to award each schedule as separate contracts to different contractors or as a single contract to one contractor. Sealed bids will be received until 2:00 pm on Tuesday, March 3, 2026, at the City Engineer's office located at 795 S. Main St., Bountiful, Utah. An optional pre-bid conference and site tour for Schedule 1 will be held on Wednesday, February 25th at 9:00 am at Bountiful City Hall Engineering Office, with a caravan to Mueller Park. Project documents are available through email distribution from the Bountiful City Engineering Department and via the U3P Bonfire eProcurement website.

Each bid must be accompanied by a certified check, cashier's check, or bid bond from an acceptable surety company payable to the City of Bountiful in an amount equal to at least five percent (5%) of the bid, serving as a guarantee that the successful bidder will execute the contract and furnish a performance bond within fifteen (15) days of award notification. The City reserves the right to reject any or all bids, any part of any bid, or waive any informality as deemed in its best interests. A decision regarding bid rejection or contract award will be made within seven (7) days after bids are opened. No specific budget amounts, set-asides, or incumbent information is provided in the notice.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
4-2026 Storm Drain Projects Bid Set.pdf PDF
2-2026 Storm Drain Projects Bid Package.pdf PDF
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
7-Type A Drive Approach 8-2017.pdf PDF
1-2026 Misc. Concrete Bid Documents.pdf PDF
9-Type C Drive Approach 8-2017.pdf PDF
6-Type D Drive Approach 8-2017.pdf PDF
10-Type E Drive Approach 8-2017.pdf PDF
5-Type B Drive Approach 8-2017.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO CONTRACTORS

Sealed proposals will be received at the office of the City Engineer, 795 S. Main St., Bountiful, Utah for:

2026 BIG ROCK HIKING TRAIL CONSTRUCTION PROJECT

Bids will be received until the hour of 2:00 pm Tuesday, March 3, 2026 at which time they will be opened and read aloud in the office of the City Engineer at 795 S. Main St., Bountiful, Utah.

Proposals will be in accordance with drawings and specifications prepared by the City of Bountiful

Engineering Department. Project documents will be made available via email distribution from the

Bountiful City Engineering Department and through the U3P Bonfire eProcurement website:

https://utah.bonfirehub.com

An Optional Pre-Bid Conference will be held on Wednesday, February 25th at 9:00 am, specifically for the portion of project identified as SCHEDULE 1.

Meet at:

Bountiful City Hall Engineering Office

795 South Main St.

Bountiful, UT 84040.

The pre-bid conference will include a site tour of Schedule 1 after a caravan from Bountiful City

Hall to Mueller Park.

Each bid must be submitted on the form provided as a part of the Contract Documents and shall be accompanied by a certified check, cashier's check or bid bond from a surety company, acceptable to Bountiful City Council, all made payable to City of Bountiful in an amount equal to at least five percent (5%) of the bid. Said check or bid bond shall be given as a guarantee that the bidder will execute the contract in conformity with the form of contract included in the Contract

Documents, and furnish a performance bond within fifteen (15) days after notification of the award of the contract to the successful bidder.

Bountiful reserves the right to reject any or all bids, or any part of any bid or to waive any informality in any bid as its best interests may appear. A decision on the rejection of any or all bids or the award of a contract will be made within seven (7) days after the bids are opened.

LLOYD N. CHENEY

City Engineer