3-Bountiful Landfill Retention Pond Sheet Set.pdf
PDF 6 MB Posted
- Attached to
- 2026 Storm Drain Projects State and local contract opportunity
- Solicitation number
- Not on record
- Issued by
- Utah
About this file
This is a set of construction plan sheets for the City of Bountiful Landfill Retention Pond Addition project, prepared by Equinox Engineering for the City of Bountiful, Utah, located at 795 South Main Street. The project involves construction of a retention pond addition with associated infrastructure improvements including a proposed levee ("Alpha") with uniform top elevation 4220 feet, 14-foot top width, and 3H:1V side slopes spanning approximately 1,467 linear feet; an access road ("Bravo") approximately 326 linear feet; improvements to an existing dirt road; and installation of water control structures, outlet pipes, and drainage systems. The sheet set contains 24 detailed construction drawings including general notes for concrete and earthwork, civil plan views at multiple scales, cut section details for typical levee cross-sections and pipe installations, long profile sections, water control structure details with rebar specifications, safety grating configurations, and canal gate details. Key project features include one water control structure (WCS01) with 12-inch diameter canal gate, two outlet pipe systems totaling 684 linear feet with 0.30% slope, one concrete manhole (MH01), erosion control rock aprons with specific gradation requirements, and compacted fill placed in 12-inch lifts to 95% modified Proctor density. The project encompasses basin excavation to uniform bottom elevation 4214 feet creating approximately 2.376 acres of water surface area with 12.68 acre-feet storage capacity at full pool elevation 4219 feet.
Construction specifications require concrete compressive strength of 4,000 PSI at 28 days with Type II or IIA low-alkali Portland cement and 6-8% air entrainment; reinforcement steel Grade 60 conforming to ASTM A-615; ADS Sanitite HP dual-wall polypropylene pipe with bell-and-spigot or approved snap coupler connections; and 3/4-inch minus imported aggregate base for select fill material under structures. The contractor must contact Blue Stakes prior to excavation, obtain all necessary permits at least 48 hours before construction, maintain compaction documentation through independent testing to ASTM D2922/D3017 standards, and submit shop drawings for concrete reinforcement and gate steel prior to fabrication. Borrow material shall be sourced from approved on-site locations within the Bountiful City Landfill with preference for material with high clay content meeting transmissivity requirements; excavation below levee, dike, and embankment footprints must remain at least one foot above water control structure elevations. Environmental protections include strict no-disturbance zones extending 25 linear feet from wetland boundaries with no equipment operation permitted on exterior levee slopes, preservation of native vegetation and seed banks through loose placement of grubbed material on interior slopes at minimum 3-inch depth, and restrictions on invasive species removal conducted on-site. The engineer reserves right to require additional concrete strength testing at 150-cubic-yard intervals and may demand concrete removal and replacement if defects affect structural integrity, with all repairs requiring prior engineer approval categorized as surface, severe, major, or crack repairs per specified standards.
View the file
Other files for this state and local contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF BOUNTIFUL
LANDFILL RETENTION POND
SHEET SET ASSEMBLY ORDER
SHEET DESIGNATOR SHEET TITLEBINDING ORDER
COVER SHEET 1 CV01
GENERAL NOTES 01 - GENERAL CONCRETE NOTES 2 GN01
GENERAL NOTES 02 - GENERAL EARTHWORK / GRADING NOTES 3 GN02
GENERAL NOTES 03 - PROJECT SPECIFIC GENERAL NOTES 4 GN03
CIVIL PLAN VIEW - SHEET LAYOUT - 1440 SCALE (1" = 10') 5 PV01
CIVIL PLAN VIEW - 288 SCALE (1" = 2') 6 - 12 PV02 - PV08
CUT SECTION VIEW - TYPICAL LEVEE SECTION / PIPE INSTALL DETAILS 13 DT01
CUT SECTION VIEW - SECTION R/R INLET /OUTLET 14 DT02
LONG PROFILE - SECTION R/R 15 LP01
WATER CONTROL STRUCTURE CUT SECTION DETAILS 16 - 19 DTWCS A12-1 / DTWCS A12-4
WATER CONTROL STRUCTURE REBAR CUT SECTION DETAILS 20 - 22 DTWCS A12-5 / DTWCS A12-7
WATER CONTROL STRUCTURE SAFETY GRATING / STOP LOG DETAILS 23 DTWCS A12-8
WATER CONTROL STRUCTURE CANAL GATE CUT SECTION DETAILS 24 DTWCS A12-9
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE AND/OR LIABLE
FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES MUST
BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
BINDING
ORDER
SHEET TITLE:
SHEET IDENTIFIER:
PROJECT OWNER:
MARK DATE DESCRIPTION
PREPARER:
PROFESSIONAL SEAL:
ENGINEERING
EQUINOX
PROJECT IDENTIFICATION:
PROJECT SPONSOR:
www.equinoxengineering.us
DRAWING BY:
SUBMITTAL #:
CHECKED BY:
DATE:
EQUINOX PROJECT: UT-123-01
CONTRACT #: N/A
SMC
WEC
01/31/2025
AERIAL IMAGE FROM
GOOGLE EARTH
JUNE 16, 2022
BOUNTIFUL CITY
LANDFILL
RETENTION POND
ADDITION
BOUNTIFUL CITY
795 SOUTH MAIN
STREET
BOUNTIFUL, UTAH
84010
S100
CV01
COVER SHEET
LOCATION
1" = 40 MILE
AREA MAP
1" = 10,000 FEET
VICINITY MAP
1" = ±162 Miles
UTAH MAP
A REPRESENTATIVE LOCATION FOR PROJECT IS LOCATED AT
LATITUDE/LONGITUDE 40° 54' 33.08" NORTH X 111° 55' 21.12" WEST
1" = ±72 Miles
REGION MAP
REGION MAP INSET
1" = 1000 FEET
SITE MAP
AREA MAP INSET
SITE MAP INSET
VICINITY MAP INSET
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE AND/OR LIABLE
FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES MUST
BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
GN01
ABBREVIATIONS / LEGEND
NOT ALL ABBREVIATIONS WILL APPLY TO THIS
PROJECT
AB ANCHOR BOLT
ADDL ADDITIONAL
AL ALUMINUM
APPROX APPROXIMATE
B BOTTOM
BTWN BETWEEN
CL CENTERLINE
CJ CONSTRUCTION JOINT
CLR CLEAR
CONC CONCRETE
CONT CONTINUED / CONTINUOUS
CMP CORRUGATED METAL PIPE
CNTR CENTER
CP CONTROL POINT
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DWG DRAWING
DWLS DOWELS
EA EACH
EF EACH FACE
EW EACH WAY
EL ELEVATION
EQ SP EQUAL SPACE / EQUALLY SPACED
EXIST EXISTING
EXP JNT EXPANSION JOINT
FL FLOWLINE
GAVL GALVANIZED
GR GRADE
HDPE HIGH DENSITY POLYETHYLENE PIPE
ID INSIDE DIAMETER
IE INVERT ELEVATION
JTS JOINTS
MAX MAXIMUM
MIN MINIMUM
NO. NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
PL PLATE
PROJ PROJECTION
PLCS PLACES
PS PIPE STEEL
PSI POUNDS PER SQUARE INCH
RAD RADIUS
RCP REINFORCED CONCRETE PIPE
REINF REINFORCEMENT
REQD REQUIRED
SB STEEL BENT
SCH SCHEDULE
SECT SECTION
SIM SIMILAR
SQ SQUARE
SR SUPPORT RING
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
SYM SYMMETRICAL
T TOP
T&B TOP AND BOTTOM
TH THICKNESS
THRD THREADED
TYP TYPICAL
VERT VERTICAL
WS WATERSTOP
WCS WATER CONTROL STRUCTURE
W/ WITH
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BLUE STAKES
PRIOR TO ANY EXCAVATION WITH SUFFICIENT LEAD TIME AS REQUIRED
BY BLUE STAKES. BLUE STAKES UTAH 800.662.4111
2. UNLESS SPECIFICALLY STATED OTHERWISE IN THE PLANS,
SPECIFICATIONS AND/OR CONTRACT DOCUMENTS, THE CONTRACTOR
SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS FROM
ANY REGULATORY AGENCY THAT HAS JURISDICTION OVER THE
PROJECT SITE AS NEEDED TO COMMENCE CONSTRUCTION ACTIVITY.
ALL PERMITS SHALL BE APPROVED, ISSUED AND IN HAND A MINIMUM
OF 48 HOURS PRIOR TO THE START OF ANY CONSTRUCTION WORK.
3. THE CONTRACTOR SHALL NOT SCALE DRAWINGS FOR CONSTRUCTION
PURPOSES. ANY MISSING DIMENSIONS OR DISCREPANCIES IN THE
DRAWINGS OR PHYSICAL FEATURES SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER FOR RESOLUTION. IF THE CONTRACTOR
PROCEEDS PRIOR TO OBTAINING THE ENGINEERS RESOLUTION THE
CONTRACTOR DOES SO AT THEIR OWN RISK
4. OBSERVATIONS OF THE WORK IN PROGRESS AND ON-SITE VISITS BY
THE ENGINEER OR OWNER ARE NOT TO BE CONSTRUED AS
ACCEPTANCE OR WARRANTIES OF THE CONTRACTOR'S CONTRACTUAL
OBLIGATION.
5. CONSTRUCTION SAFETY IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. THE ENGINEER IS NOT RESPONSIBLE FOR SAFETY IN
OR OR ABOUT THE PROJECT SITE, NOR FOR THE COMPLIANCE BY THE
APPROPRIATE PARTY WITH ANY REGULATIONS RELATING THERETO.
6. THE CONTRACTOR SHALL MAINTAIN A SET OF THE CONSTRUCTION
DRAWINGS AND SPECIFICATIONS ON SITE AT ALL TIMES. ONE SET OF
THE CONSTRUCTION DRAWINGS SHALL BE MAINTAINED SOLELY TO
DOCUMENT ANY CHANGES IN THE WORK AS A RESULT OF CHANGE
ORDERS OR FIELD CONDITIONS THAT MAY REQUIRE ALTERNATIVE
CONSTRUCTION DETAILS. ALL SUCH CHANGES SHALL BE MARKED ON
THE RECORD SET OF DRAWINGS IN PERMANENT INK.
7. THE ENGINEER MAY PROVIDE QUANTITIES AND/OR SURVEY DATA FOR
USE BY THE CONTRACTOR. INFORMATION PROVIDED BY THE
ENGINEER IN GOOD FAITH IS ASSUMED TO BE ACCURATE, HOWEVER
THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF QUANTITIES
AS REPORTED ON THE UNIT PRICE BID TABULATION AND SHALL BE
RESPONSIBLE TO LAYOUT AND CONSTRUCT THE WORK TO MEET THE
INTENT OF THE DESIGN.
8. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE MOST
CURRENT INTERNATIONAL BUILDING CODE (I.B.C.) AS AMENDED BY
THE STATE IN WHICH THE PROJECT IS LOCATED AND LOCAL AGENCIES
AS NEEDED AND AS APPROPRIATE FOR THE PROJECT WORKS.
9. THE STRUCTURES SHOWN ON THE DRAWINGS HAVE BEEN DESIGNED
FOR STABILITY UNDER FINAL CONDITIONS ONLY. THESE PLANS DO
NOT INCLUDE THE NECESSARY COMPONENTS FOR EQUIPMENT OR
EQUIPMENT FOR THE STRUCTURES DURING CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR ALL WORK RELATING TO
CONSTRUCTION ERECTION METHODS. BRACING, SHORING, RIGGING,
GUYS, SCAFFOLDING, FORM WORK, AND OTHER WORK AIDS REQUIRED
TO SAFELY PERFORM THE WORK SHOWN.
10. EXCAVATIONS SHALL BE SHORED AS REQUIRED TO PREVENT
SUBSIDENCE OR DAMAGE TO ADJACENT EXISTING STRUCTURES,
UTILITIES OR OTHER EXISTING INFRASTRUCTURE.
GENERAL CONCRETE NOTES CONTINUED
1. ALL CONCRETE IS DESIGNED IN ACCORDANCE WITH AMERICAN
CONCRETE INSTITUTE ACE 350 AND SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THESE PLANS.
2. CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH OF 4000
PSI UNLESS OTHERWISE NOTED.
3. CONCRETE WORK SHALL CONFORM TO ACI 301
4. REINFORCEMENT STEEL SHALL BE DEFORMED BARS CONFORMING IN
QUALITY TO THE REQUIREMENTS OF ASTM A-615. "SPECIFICATIONS
FOR DEFORMED AND PLAIN CARBON-STEEL BARS FOR CONCRETE
REINFORCEMENT". GRADE 60.
5. ALL DETAILING, FABRICATION AND PLACING OF REINFORCING BARS,
UNLESS OTHERWISE INDICATED SHALL BE IN ACCORDANCE ACI-315.
"MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED
CONCRETE STRUCTURES". MOST CURRENT EDITION.
6. CONSTRUCTION TOLERANCES SHALL BE IN ACCORDANCE WITH ACI
347.
7. METAL CLIPS OR SUPPORTS SHALL NOT BE PLACED IN
CONTACT WITH
THE FORMS OR THE SUBGRADE. CONCRETE BLOCKS (ADOBE)
SUPPORTING BARS ON SUBGRADE SHALL BE IN SUFFICIENT NUMBERS
TO SUPPORT THE BARS WITHOUT SETTLEMENT, BUT IN NO CASE
SHALL SUPPORT BE CONTINUOUS.
8. REINFORCEMENT BARS AND ACCESSORIES SHALL NOT BE IN CONTACT
WITH PIPE, PIPE FLANGE, OR METAL PARTS EMBEDDED IN CONCRETE.
A MINIMUM OF 2 INCHES CLEARANCE SHALL BE PROVIDE AT ALL TIMES
UNLESS SPECIFICALLY OTHERWISE SPECIFIED.
9. COVER FOR REINFORCEMENT BARS, UNLESS OTHERWISE
SPECIFICALLY NOTED SHALL BE AS FOLLOWS:
A) CONCRETE PLACED AGAINST EARTH - 3 INCHES MINIMUM
B) CONCRETE FORMED BUT EXPOSED TO EARTH, WATER OR WEATHER -
2" MINIMUM
10. UNLESS OTHERWISE NOTED, WALLS AND SLABS SHOWN WITH SINGLE
LAYER OF REINFORCEMENT SHALL HAVE THAT REINFORCEMENT
CENTERED.
11. PLACING OF CONCRETE SHALL CONFORM TO ACI 304R. HOT WEATHER
CONCRETE SHALL BE PLACED PER ACI 305R. COLD WEATHER
CONCRETE SHALL BE PLACED PER ACI 306R.
12. ALL DIMENSIONS TO A JOINT ARE TO THE CENTERLINE OF THE JOINT.
13. DIMENSIONS NOT SHOWN ARE THE SAME AS DIMENSIONS FOR
IDENTICAL DETAILS SHOWN ELSEWHERE.
14. BEFORE PLACING CONCRETE ON GRADE, CARE SHALL BE TAKEN THAT
ALL BURIED MATERIALS BELOW GRADE ARE IN PLACE.
41. REINFORCING STEEL BARS SHALL MEET THE REQUIREMENTS OF
ASTM A615. ALL REINFORCEMENT SHALL BE FREE FROM RUST, OIL,
GREASE, PAINT OR OTHER DELETERIOUS MATTER
42. ITEMS TO BE EMBEDDED IN THE CONCRETE SHALL BE POSITIONED
ACCURATELY AND FIRMLY ANCHORED TO PREVENT DISPLACEMENT
DURING PLACEMENT OF CONCRETE.
43. THE MINIMUM SPLICE LENGTH FOR DEFORMED BARS IS 30 BAR
DIAMETERS OR AS NOTED ON PLANS.
44. UNLESS OTHERWISE SPECIFIED THE MINIMUM REINFORCEMENT FOR
SHRINKAGE AND TEMPERATURE IN MEMBERS SHALL BE ONE HALF
(½) INCH DIAMETER STEEL REINFORCING BARS LOCATED ON TWELVE
(12) INCH CENTERS EACH WAY.
45. FORMS SHALL CONFORM TO THE SHAPES, LINES AND DIMENSIONS AS
SHOWN ON THE DRAWINGS. THEY SHALL BE BRACED AND/OR TIED
TOGETHER TO MAINTAIN POSITION AND SHAPE AND BE SUFFICIENTLY
TIGHT TO PREVENT LEAKAGE. FORMS SHALL BE THOROUGHLY OILED
OR WETTED AND CLEANED OF DEBRIS PRIOR TO PLACEMENT OF
CONCRETE.
46. CONCRETE SHALL BE PLACED OR DEPOSITED AS CLOSELY AS
POSSIBLE TO ITS FINAL POSITION AND WORKED INTO THE CORNERS
AND ANGLES OF THE FORMS AND AROUND ALL REINFORCEMENT AND
EMBEDDED ITEMS IN A MANNER TO PREVENT SEGREGATION OR
AGGREGATES OR EXCESSIVE LAITANCE. CONSOLIDATION OF
CONCRETE SHALL BE ACCOMPLISHED BY MEANS OF INTERNAL TYPE
MECHANICAL VIBRATORS, RODDING, SPACING, OR HAND TAMPING
47. CONCRETE SHALL BE PREVENTED FROM DRYING FOR A CURING
PERIOD OF AT LEAST ONE (1) DAYS AFTER IT IS PLACED. EXPOSED
SURFACES SHALL BE KEPT CONTINUOUSLY MOIST FOR THE ENTIRE
PERIOD. FOR FORMED SURFACES, THE CURING MAY BE LEAVING THE
FORMS IN PLACE AND KEEPING THEM WET FOR THE ENTIRE CURING
PERIOD. MOISTURE SHALL BE MAINTAINED BY SPRINKLING,
FLOODING, OR FOG SPRAYING OR BY COVERING WITH
CONTINUOUSLY MOISTENED CANVAS CLOTH MATS, STRAW, EARTH
OR OTHER APPROVED MATERIAL. IN LIEU OF WATER CURING THE
CONCRETE SHALL BE CURED BY SPRAYING WITH AN APPROVED
SEALING COMPOUND. THE SEALING COMPOUND SHALL BE APPLIED
AS SOON AS PRACTICAL AFTER THE CONCRETE HAS BEEN FINISHED.
THE SEALING COMPOUND SHALL MEET OR EXCEED THE
REQUIREMENTS OF ASTM C309. ALL SURFACES SHALL BE KEPT
MOIST UNTIL THE COMPOUND IS APPLIED.
48. CONCRETE SHALL BE PREVENTED FROM DRYING FOR A CURING
PERIOD OF AT LEAST ONE (1) DAYS AFTER IT IS PLACED. EXPOSED
SURFACES SHALL BE KEPT CONTINUOUSLY MOIST FOR THE ENTIRE
PERIOD. FOR FORMED SURFACES, THE CURING MAY BE LEAVING THE
FORMS IN PLACE AND KEEPING THEM WET FOR THE ENTIRE CURING
PERIOD. MOISTURE SHALL BE MAINTAINED BY SPRINKLING,
FLOODING, OR FOG SPRAYING OR BY COVERING WITH
CONTINUOUSLY MOISTENED CANVAS CLOTH MATS, STRAW, EARTH
OR OTHER APPROVED MATERIAL. IN LIEU OF WATER CURING THE
CONCRETE SHALL BE CURED BY SPRAYING WITH AN APPROVED
SEALING COMPOUND. THE SEALING COMPOUND SHALL BE APPLIED
AS SOON AS PRACTICAL AFTER THE CONCRETE HAS BEEN FINISHED.
THE SEALING COMPOUND SHALL MEET OR EXCEED THE
REQUIREMENTS OF ASTM C309. ALL SURFACES SHALL BE KEPT
MOIST UNTIL THE COMPOUND IS APPLIED.
49. IF THE ENGINEER DETERMINES OR HAS CAUSE TO BELIEVE THAT THE
CONCRETE DOES NOT MEET THE SPECIFICATION THE ENGINEER AT
HIS/HER SOLE DISCRETION MAY REQUIRE THE CONTRACTOR TO
PROVIDE TESTING UP TO AND INCLUDING THE FOLLOWING
SPECIFICATIONS. UTILIZING AN INDIVIDUAL OR COMPANY LICENSED
TO PERFORM CONCRETE TESTING IN THE STATE WHERE THE
PROJECT IS LOCATED, THE CONTRACTOR SHALL PROVIDE AT A
MINIMUM FOR EACH ONE-HUNDRED FIFTY (150) CUBIC YARDS OF
PLACED CONCRETE OR DAILY, WHICHEVER IS LESS, THE
FOLLOWING:
A) SLUMP OR CONSISTENCY TESTING AND MEASUREMENT
IN ACCORDANCE WITH ASTM C143
B) TEMPERATURE TESTING MEASUREMENT IN ACCORDANCE WITH
ASTM C1064
C) AIR CONTENT TESTING MEASUREMENT IN ACCORDANCE
WITH EITHER ASTM C231 (PRESSURE METHOD), ASTM
C173 (VOLUMETRIC METHOD) OR ASTM C138
(GRAVIMETRIC METHOD). THE METHOD CHOSEN BY THE
TESTING FIRM OR COMPANY SHALL BE JUSTIFIED AS
APPLICABLE TO THE RESPECTIVE CONCRETE MIXTURE.
D) STRENGTH SPECIMENS TESTING AND MEASUREMENT IN
ACCORDANCE WITH ASTM C31. A MINIMUM OF FOUR (4)
CYLINDER CONCRETE BREAK SAMPLES SHALL BE
TAKEN AND THE AVERAGE OF THE TWO SEVEN (7) DAY
AND TWO TWENTY-EIGHT (28) DAY RESULTS REPORTED.
E) ALL TESTS PERFORMED SHALL BE IN ACCORDANCE WITH
ASTM C172 EXCEPT FOR ROUTINE SLUMP AND AIR-CONTENT TESTS
F) THE ENGINEER SHALL BE SPECIFICALLY NAMED ON THE
DISTRIBUTION LIST TO RECEIVE ORIGINAL CONCRETE
TESTING REPORTS FROM THE RESPECTIVE FIRM OR COMPANY
PROVIDING TESTING AND CERTIFIED RESULTS.
GENERAL CONCRETE NOTES CONTINUED
50. BEFORE ANY CONCRETE IS PLACED, ALL ICE, SNOW AND FROST
SHALL BE COMPLETELY REMOVED FROM ALL SURFACES TO BE IN
CONTACT WITH THE NEW CONCRETE AND THE TEMPERATURE OF
THESE SURFACES SHALL BE RAISED TO AS CLOSE AS MAY BE
PRACTICAL TO THE TEMPERATURE OF THE NEW CONCRETE THAT IS
TO BE PLACED THEREON. NO CONCRETE SHALL BE PLACED ON A
FROZEN SUB GRADE OR ON ONE THAT CONTAINS FROZEN
MATERIALS. CONCRETE SHALL NOT BE MIXED OR PLACED WHEN
DAILY MINIMUM ATMOSPHERIC TEMPERATURE IS LESS THAN FORTY
(40) DEGREES F., UNLESS FACILITIES ARE PROVIDED TO ENSURE THE
ADEQUATE PROTECTION OF THE CONCRETE.
TEMPERATURE OF THE CONCRETE AT THE TIME OF PLACEMENT
SHALL NOT BE LESS THAN FIFTY (50) DEGREES F. NOR MORE THAN
NINETY (90) DEGREES F. THE USE OF ACCELERATORS OR ANTIFREEZE
COMPOUNDS WILL NOT BE ALLOWED.
51. NO REPAIRS SHALL BE MADE UNTIL THE CONCRETE HAS BEEN
REVIEWED BY THE ENGINEER OR AUTHORIZED REPRESENTATIVE.
52. REPAIRS SHALL BE CATEGORIZED AND REPAIRED AS FOLLOWS:
A) SURFACE DEFECTS
REPAIR SURFACE DEFECTS THAT ARE SMALLER THAN ONE (1)
FOOT ACROSS IN ANY DIRECTION AND ARE LESS THAN ONE (1) INCH
IN DEPTH. REPAIR BY REMOVING THE HONEYCOMBED AND OTHER
DEFECTIVE CONCRETE DOWN TO SOUND CONCRETE, MAKE THE
EDGES PERPENDICULAR TO THE SURFACE AND AT LEAST
THREE-EIGHTHS (3/8) INCH DEEP, THOROUGHLY DAMPEN THE
SURFACE, WORK INTO THE SURFACE A BONDING GROUT (ONE PART
CEMENT TO ONE PART FINE SAND), FILL THE HOLE WITH
MORTAR, MATCH THE FINISH ON THE ADJACENT CONCRETE AND
CURE AS SPECIFIED.
B) SEVERE DEFECTS
REPAIR SEVERE DEFECTS THAT ARE LARGER THAN SURFACE
DEFECTS BUT DO NOT APPEAR TO AFFECT THE STRUCTURAL
INTEGRITY. REPAIR BY REMOVING THE HONEYCOMBED AND OTHER
DEFECTIVE CONCRETE DOWN TO SOUND CONCRETE, MAKE THE
EDGES OF THE HOLE PERPENDICULAR TO THE SURFACE, SANDBLAST
THE SURFACE, COAT THE SANDBLASTED SURFACE WITH EPOXY
BONDING COMPOUND, PLACE NON-SHRINK GROUT, MATCH THE FINISH
ON ADJACENT CONCRETE, AND CURE AS SPECIFIED.
C) MAJOR DEFECTS
IF THE DEFECTS ARE SERIOUS OR AFFECT THE STRUCTURAL
INTEGRITY OR IF PATCHING DOES NOT SATISFACTORILY RESTORE
THE QUALITY AND APPEARANCE TO THE SURFACE, THE ENGINEER
MAY REQUIRE THE CONCRETE TO BE REMOVED AND REPLACED,
COMPLETE, IN ACCORDANCE WITH THE PROVISIONS OF THIS
SECTION.
D) CRACKS
REPAIR CRACKS IN CONCRETE STRUCTURES THAT ARE WIDER THAN
ONE TENTH (1/10) OF AN INCH IN WIDTH BY CUTTING OUT A SQUARE
EDGED AND UNIFORMLY ALIGNED JOINT THREE EIGHTHS (3/8) INCH
WIDE BY THREE QUARTERS (¾) INCH DEEP, PREPARING EXPOSED
SURFACES OF THE JOINT, PRIMING THE JOINT, AND APPLYING
POLYURETHANE JOINT SEALANT. IF THE CRACKS ARE SERIOUS OR
AFFECT THE STRUCTURAL INTEGRITY OR FUNCTION OF THE ELEMENT,
THE ENGINEER MAY REQUIRE THE CONCRETE TO BE REMOVED AND
REPLACED, COMPLETE, IN ACCORDANCE WITH THE PROVISIONS OF
THIS SECTION.
GENERAL CONCRETE NOTES
15. CHAMFER EDGES OF PERMANENTLY EXPOSED CONCRETE SURFACES
WITH A 45° BEVEL (
" X
16. DRAWINGS ARE NOT TO BE SCALED FOR ESTIMATING OR ANY OTHER
PURPOSE.
17. ALL REINFORCEMENT BENDS AND LAPS, UNLESS OTHERWISE NOTED
SHALL PROVIDE A MINIMUM SPLICE OR LAP LENGTH OF 30 BAR
DIAMETERS. WHEN TWO DIFFERENT SIZED BARS ARE LAPPED THE
LARGER BAR DIAMETER SHALL GOVERN THE SPLICE OR LAP LENGTH.
18. SPLICES SHALL BE INSTALLED AS NEEDED TO ALLOW FOR MINIMUM
COVER REQUIREMENTS BETWEEN BARS AND ANY ADJACENT
CONCRETE FACE.
19. DIMENSIONS ARE TO THE CENTERLINE OF THE BAR UNLESS
OTHERWISE NOTED.
20. REINFORCEMENT PARALLELING ANY CONSTRUCTION JOINT SHALL
PROVIDE A MINIMUM OF 2" CLEAR COVER.
21. REINFORCEMENT AT SMALL OPENINGS (MAX 18" OPENING) IN WALLS
AND SLABS MAYBE SPREAD APART NOT MORE THAN 1.5 TIMES THE
BAR SPACING. ALL OPENINGS 12" OR LARGER SHALL INCORPORATE
AN ANNULAR RING OF REINFORCEMENT AROUND THE OPENING WITH
A MINIMUM OF 2" CLEARANCE FROM THE PENETRATION OPENING.
22. THE FIRST AND LAST BARS IN WALLS AND SLABS, STIRRUPS IN
BEAMS, AND TIES IN COLUMNS ARE TO START AND END AT A MINIMUM
OF ONE HALF OF THE ADJACENT BAR SPACING.
23. UNLESS OTHERWISE NOTED DOWELS INDICATED ON THE DRAWINGS
SUCH AS #5 (DWL) SHALL HAVE AN EMBEDMENT EQUAL TO THE
DEVELOPMENT LENGTH FOR TENSION REQUIRED BY ACI 318 AND A
PROJECTION EQUAL TO THAT REQUIRED FOR LAP SPLICING A BAR OF
THE SAME DIAMETER.
24. TWO PART EPOXY DOWELS SHALL BE HILTI HIT-RE 500 V3 OR
APPROVED EQUAL.
25. AT LOCATIONS WHERE NEW CONCRETE IS PLACED AGAINST EXISTING
CONCRETE, EXISTING SURFACES SHALL BE CLEAN, FREE OF LOOSE
CONCRETE AND ROUGHENED TO A
" AMPLITUDE UNLESS OTHERWISE
NOTED.
26. DOWELS SHALL BE WIRED OR OTHERWISE HELD IN POSITION.
DOWELS SHALL NOT BE SHOVED INTO FRESH CONCRETE.
27. THE CONTRACTOR SHALL PROVIDE NOTICE TO THE ENGINEER A
MINIMUM OF 48 HOURS IN ADVANCE OF ANY CONCRETE PLACEMENT.
28. CONCRETE TESTING FOR ANY CONCRETE DELIVERED TO THE SITE
SHALL BE PROVIDED TO THE ENGINEER BY THE CONTRACTOR.
29. ALL FOUNDATION SURFACES SHALL BE INSPECTED BY A THE DESIGN
ENGINEER OR AN INDEPENDENT SOILS ENGINEER PRIOR TO
PLACEMENT OF ANY REINFORCEMENT STEEL OR FORM WORKS.
CONTRACTOR SHALL PROVIDE A MINIMUM OF 48 HOURS NOTICE TO
THE ENGINEER.
30. CONSTRUCTION SHORING AND BRACING OF FORM WORK SHALL BE IN
ACCORDANCE WITH ACI 301 "SPECIFICATIONS FOR STRUCTURAL
CONCRETE" AND ACI 347R "GUIDE TO FORM WORK FOR CONCRETE".
31. THE STRUCTURES SHOWN ON THE DRAWINGS HAVE BEEN
DESIGNED FOR STABILITY UNDER FINAL CONDITIONS
ONLY. THESE PLANS DO NOT INCLUDE THE NECESSARY
COMPONENTS FOR EQUIPMENT OR EQUIPMENT FOR THE
STRUCTURES DURING CONSTRUCTION. THE CONTRACTOR IS
RESPONSIBLE FOR ALL WORK RELATING TO CONSTRUCTION
ERECTION METHODS. BRACING, SHORING, RIGGING, GUYS,
SCAFFOLDING, FORM WORK, AND OTHER WORK AIDS
REQUIRED TO SAFELY PERFORM THE WORK SHOWN.
32. EXCAVATIONS SHALL BE SHORED AS REQUIRED TO PREVENT
SUBSIDENCE OR DAMAGE TO ADJACENT EXISTING
STRUCTURES, UTILITIES ORE OTHER EXISTING
INFRASTRUCTURE.
33. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR
CONCRETE REINFORCEMENT, GATE STEEL AND/OR
MISCELLANEOUS STEEL PRIOR TO FABRICATION.
34. CONCRETE SHALL BE AT LEAST FOUR-THOUSAND (4000) PSI
COMPRESSIVE STRENGTH AT TWENTY-EIGHT (28) DAYS, WHEN
TESTED IN ACCORDANCE WITH ASTM C39 AND MIX DESIGN
SHALL BE IN ACCORDANCE WITH ASTM C94 AND/OR THIS
SPECIFICATION WHICHEVER IS MORE STRINGENT.
35. READY-MIX CONCRETE SUPPLIERS CAN PRE-CERTIFY THEIR
CONCRETE MIX. WHEN A PRE-CERTIFIED MIX IS USED THE MIX
NUMBER WILL BE SHOWN ON THE CONCRETE DELIVERY
TICKET. NON-CERTIFIED READY-MIX SUPPLIERS SHALL
FURNISH DESIGN AND CONCRETE CYLINDER TEST BREAK DATA
FOR APPROVAL BY THE ENGINEER PRIOR TO PLACEMENT.
36. CONCRETE MIX DESIGN SHALL INCLUDE NOT LESS THAN SIX (6)
SACKS CEMENT PER CUBIC YARD OF CONCRETE, EXCEPT FLY
ASH MAY BE USED AS SUBSTITUTION FOR UP TO TWENTY (20)
PERCENT OF THE PORTLAND CEMENT. FLY ASH SHALL
CONFORM TO REQUIREMENTS OF ASTM C618 AS APPLICABLE.
37. CEMENT SHALL BE TYPE II OR IIA LOW ALKALI PORTLAND
CEMENT CLASS C OR F.
38. COARSE AGGREGATE SHALL BE MAXIMUM SIZE OF ONE (1.0)
INCH PER DESIGNATIONS OF ASTM C33
39. AIR ENTRAINMENT SHALL CONFORM TO ASTM C260. THE AIR
ENTRAINMENT SHALL BE FIVE (5) TO SEVEN (7) PERCENT.
40. SLUMP SHALL BE IN THE RANGE OF THREE (3) INCHES PLUS OR
MINUS ONE (1) INCH; UNLESS CYLINDER TEST BREAK DATA IS
SUBMITTED SHOWING THAT COMPRESSIVE STRENGTH IS
ACHIEVED WITH THE HIGHER SLUMP.
GENERAL CONCRETE NOTES CONTINUED
GENERAL NOTES
GENERAL CONCRETE
NOTES
BINDING
ORDER
SHEET TITLE:
SHEET IDENTIFIER:
PROJECT OWNER:
MARK DATE DESCRIPTION
PREPARER:
PROFESSIONAL SEAL:
ENGINEERING
EQUINOX
PROJECT IDENTIFICATION:
PROJECT SPONSOR:
www.equinoxengineering.us
DRAWING BY:
SUBMITTAL #:
CHECKED BY:
DATE:
EQUINOX PROJECT: UT-123-01
CONTRACT #: N/A
SMC
WEC
01/31/2025
AERIAL IMAGE FROM
GOOGLE EARTH
JUNE 16, 2022
BOUNTIFUL CITY
LANDFILL
RETENTION POND
ADDITION
BOUNTIFUL CITY
795 SOUTH MAIN
STREET
BOUNTIFUL, UTAH
84010
S100
BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
ABBREVIATIONS / LEGEND
NOT ALL ABBREVIATIONS WILL APPLY TO THIS
PROJECT
AB ANCHOR BOLT
ADDL ADDITIONAL
AL ALUMINUM
APPROX APPROXIMATE
B BOTTOM
BTWN BETWEEN
CL CENTERLINE
CJ CONSTRUCTION JOINT
CLR CLEAR
CONC CONCRETE
CONT CONTINUED / CONTINUOUS
CMP CORRUGATED METAL PIPE
CNTR CENTER
CP CONTROL POINT
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DWG DRAWING
DWLS DOWELS
EA EACH
EF EACH FACE
EW EACH WAY
EL ELEVATION
EQ SP EQUAL SPACE / EQUALLY SPACED
EXIST EXISTING
EXP JNT EXPANSION JOINT
FL FLOWLINE
GAVL GALVANIZED
GR GRADE
HDPE HIGH DENSITY POLYETHYLENE PIPE
ID INSIDE DIAMETER
IE INVERT ELEVATION
JTS JOINTS
MAX MAXIMUM
MIN MINIMUM
NO. NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
PL PLATE
PROJ PROJECTION
PLCS PLACES
PS PIPE STEEL
PSI POUNDS PER SQUARE INCH
RAD RADIUS
RCP REINFORCED CONCRETE PIPE
REINF REINFORCEMENT
REQD REQUIRED
SB STEEL BENT
SCH SCHEDULE
SECT SECTION
SIM SIMILAR
SQ SQUARE
SR SUPPORT RING
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
SYM SYMMETRICAL
T TOP
T&B TOP AND BOTTOM
TH THICKNESS
THRD THREADED
TYP TYPICAL
VERT VERTICAL
WS WATERSTOP
WCS WATER CONTROL STRUCTURE
W/ WITH
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BLUE STAKES
PRIOR TO ANY EXCAVATION WITH SUFFICIENT LEAD TIME AS REQUIRED
BY BLUE STAKES. BLUE STAKES UTAH 800.662.4111
2. UNLESS SPECIFICALLY STATED OTHERWISE IN THE PLANS,
SPECIFICATIONS AND/OR CONTRACT DOCUMENTS, THE CONTRACTOR
SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS FROM
ANY REGULATORY AGENCY THAT HAS JURISDICTION OVER THE
PROJECT SITE AS NEEDED TO COMMENCE CONSTRUCTION ACTIVITY.
ALL PERMITS SHALL BE APPROVED, ISSUED AND IN HAND A MINIMUM
OF 48 HOURS PRIOR TO THE START OF ANY CONSTRUCTION WORK.
3. THE CONTRACTOR SHALL NOT SCALE DRAWINGS FOR CONSTRUCTION
PURPOSES. ANY MISSING DIMENSIONS OR DISCREPANCIES IN THE
DRAWINGS OR PHYSICAL FEATURES SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER FOR RESOLUTION. IF THE CONTRACTOR
PROCEEDS PRIOR TO OBTAINING THE ENGINEERS RESOLUTION THE
CONTRACTOR DOES SO AT THEIR OWN RISK
4. OBSERVATIONS OF THE WORK IN PROGRESS AND ON-SITE VISITS BY
THE ENGINEER OR OWNER ARE NOT TO BE CONSTRUED AS
ACCEPTANCE OR WARRANTIES OF THE CONTRACTOR'S CONTRACTUAL
OBLIGATION.
5. CONSTRUCTION SAFETY IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. THE ENGINEER IS NOT RESPONSIBLE FOR SAFETY IN
OR OR ABOUT HE PROJECT SITE, NOR FOR THE COMPLIANCE BY THE
APPROPRIATE PARTY WITH ANY REGULATIONS RELATING THERETO.
6. THE CONTRACTOR SHALL MAINTAIN A SET OF THE CONSTRUCTION
DRAWINGS AND SPECIFICATIONS ON SITE AT ALL TIMES. ONE SET OF
THE CONSTRUCTION DRAWINGS SHALL BE MAINTAINED SOLELY TO
DOCUMENT ANY CHANGES IN THE WORK AS A RESULT OF CHANGE
ORDERS OR FIELD CONDITIONS THAT MAY REQUIRE ALTERNATIVE
CONSTRUCTION DETAILS. ALL SUCH CHANGES SHALL BE MARKED ON
THE RECORD SET OF DRAWINGS IN PERMANENT INK.
7. THE ENGINEER MAY PROVIDE QUANTITIES AND/OR SURVEY DATA FOR
USE BY THE CONTRACTOR. INFORMATION PROVIDED BY THE
ENGINEER IN GOOD FAITH IS ASSUMED TO BE ACCURATE, HOWEVER
THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF QUANTITIES
AS REPORTED ON THE UNIT PRICE BID TABULATION AND SHALL BE
RESPONSIBLE TO LAYOUT AND CONSTRUCT THE WORK TO MEET THE
INTENT OF THE DESIGN.
8. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE MOST
CURRENT INTERNATIONAL BUILDING CODE (I.B.C.) AS AMENDED BY
THE STATE IN WHICH THE PROJECT IS LOCATED AND LOCAL AGENCIES
AS NEEDED AND AS APPROPRIATE FOR THE PROJECT WORKS.
9. THE STRUCTURES SHOWN ON THE DRAWINGS HAVE BEEN DESIGNED
FOR STABILITY UNDER FINAL CONDITIONS ONLY. THESE PLANS DO
NOT INCLUDE THE NECESSARY COMPONENTS FOR EQUIPMENT OR
EQUIPMENT FOR THE STRUCTURES DURING CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR ALL WORK RELATING TO
CONSTRUCTION ERECTION METHODS. BRACING, SHORING, RIGGING,
GUYS, SCAFFOLDING, FORM WORK, AND OTHER WORK AIDS REQUIRED
TO SAFELY PERFORM THE WORK SHOWN.
10. EXCAVATIONS SHALL BE SHORED AS REQUIRED TO PREVENT
SUBSIDENCE OR DAMAGE TO ADJACENT EXISTING STRUCTURES,
UTILITIES OR OTHER EXISTING INFRASTRUCTURE.
GENERAL EARTHWORK/GRADING NOTES CONTINUED
GENERAL NOTES
GENERAL
EARTHWORK/GRADING
NOTES
10. CONTINUED - EQUIPMENT SHALL BE CUT OR REDUCED IN SIZE SUCH
THAT THEY MAY BE CHIPPED ON SITE. INVASIVE TREES AND INVASIVE
WOODY MATERIAL THAT CONTAINS SEEDS SHALL BE REMOVED FROM
THE SITE UNLESS SPECIFICALLY DIRECTED BY THE OWNER,
ENGINEER, OR THE OWNERS DESIGNATED REPRESENTATIVE.
11. AS AN ALTERNATIVE TO CHIPPING AND ONLY AS DIRECTED BY THE
OWNER, THE ENGINEER OR THE OWNERS REPRESENTATIVE, NATIVE
TREE SPECIES AND NATIVE WOODY SPECIES MATERIAL MAY ALSO BE
PLACED INTO SMALL PILES NOT TO EXCEED 15 FEET IN DIAMETER AT
THE BASE AND 6 FEET IN HEIGHT TO SERVE AS HABITAT STRUCTURES
AT SELECT LOCATIONS TO BE DETERMINED ON SITE AS
APPROPRIATE. THIS ALTERNATIVE DOES NOT APPLY TO INVASIVE
SPECIES.
12. THE CONTRACTOR SHALL STOP WORK AND CALL FOR INSPECTION AT
THE FOLLOWING POINTS OF CONSTRUCTION:
A) UPON DISCOVERY OF MAJOR CHANGES IN SOIL COMPOSITION DURING
BORROW AND EXCAVATION OPERATIONS
B) AFTER REACHING FINAL GRADE ON ALL EXCAVATION LOCATIONS
INCLUDING BUT NOT LIMITED TO SOIL LIFTS, DIKES, LEVEES, AND
EMBANKMENT GRADING.
C) BEFORE FILL IS PLACED OVER NEWLY INSTALLED PIPE OR
ANTI-SEEPAGE COLLARS (IF REQUIRED).
D) AS NEEDED TO PROVIDE DOCUMENTATION FOR COMPACTION.
13. COMPACTED FILL SHALL BE MINED FROM BORROW AREAS ON SITE
WITHIN AN APPROVED BORROW AREA. COMPACTED FILL SHALL BE
FREE OF ORGANIC MATERIAL (> 95% ORGANICS) AND LARGE ROCKS
OVER FOUR (4) INCH IN DIAMETER AND SHALL CONSIST OF NATIVE
SOILS. BORROW MATERIAL TO BE USED AS COMPACTED FILL SHALL
BE SUITABLE FOR USE AS COMPACTED FILL AND SHALL NOT BE
SAND, FLOUR LIKE MATERIAL, OVERLY SATURATED OR MATERIAL
THAT EXHIBITS A SOUPY LIKE CONSISTENCY. ANY BORROW
MATERIAL MINED ON SITE IS SUBJECT TO REJECTION BY THE
ENGINEER UPON INSPECTION WHEN MATERIAL IS EXPOSED AND/OR
UNCOVERED IF THE MATERIAL DOES NOT MEET THE MINIMUM
CRITERIA TO BE SUITABLE FOR USE AS COMPACTED FILL.
14. NON COMPACTED FILL SHALL BE MINED FROM BORROW AREAS ON
SITE WITHIN AN APPROVED BORROW AREA. NON COMPACTED FILL
SHALL BE ANY MATERIAL THAT IS NOT SUITABLE FOR USE AS
COMPACTED FILL (SAND, FLOUR LIKE MATERIAL, OVERLY SATURATED
OR MATERIAL THAT EXHIBITS A SOUPY LIKE CONSISTENCY). NON
COMPACTED FILL MATERIAL MAY CONTAIN A HIGH OR SIGNIFICANT
AMOUNT OF ORGANICS WITH THE INTENT TO PROVIDE A ROBUST
SEED BANK TO PROMOTE VEGETATION GROWTH. GRUBBINGS
REMOVED BORROW AREAS OR ANY AREA REQUIRED TO BE CLEARED,
GRUBBED OR STRIPPED MAY BE USED AS NON-COMPACTED FILL
MATERIAL.
15. BORROW AREAS SHALL BE MAINTAINED DURING CONSTRUCTION IN A
GRADED CONDITION SUCH THAT DRAINAGE IS ASSURED AND THAT
OPERATIONS CAN RESUME QUICKLY AFTER PRECIPITATION PERIODS.
FOLLOWING COMPLETION OF THE WORK, BORROW AREAS ARE TO BE
LEFT IN A GRADED CONDITION ACCEPTABLE TO THE ENGINEER AND
ALL HAUL ROADS, ACCESS ROADS, AND TEMPORARY CROSSINGS
ARE TO BE REMOVED. MATERIAL MAY DIFFER FROM LOCATION TO
LOCATION WITH RESPECT TO SUITABILITY OF USE. THE
CONTRACTOR SHOULD BE READY TO BORROW AND TRANSPORT
MATERIAL FROM ANY LOCATION WITHIN THE PROJECT SITE THAT
WILL BE USED AS A BORROW AREA.
UNLESS APPROVED BY THE ENGINEER OR OTHERWISE SPECIFIED,
BORROW OF LEVEE, DIKE OR BERM MATERIAL MUST BE MORE THAN
ONE HUNDRED (100) LINEAR FEET FROM THE FILL LOCATION IN ANY
DIRECTION. THE INTENT OF THIS DIRECTION IS TO ALLEVIATE THE
“MOAT” CONFIGURATION NEXT TO A LEVEE, DIKE OR BERM.
UNLESS SPECIFICALLY DESIGNATED ON THE PLANS OR APPROVED
BY THE ENGINEER, NO BORROW MATERIAL MAY BE TAKEN FROM ANY
AREA THAT WILL BE HIGHER IN ELEVATION THAN ONE (1) FOOT
BELOW THAT OF THE TOP OF THE LEVEE, DIKE OR BERM OR SOIL LIFT.
THE INTENT OF THIS DIRECTION IS TO ALLEVIATE ANY DISTURBED OR
SCARED AREAS THAT ARE ABOVE THE FULL POOL FLOOD ELEVATION.
16. ALL LEVEE, DIKE AND EMBANKMENT FILLS SHALL BE FREE OF
ORGANIC MATERIAL AND LARGE ROCKS OVER FOUR (4) INCH IN
DIAMETER AND SHALL CONSIST OF NATIVE SOILS. UNLESS
OTHERWISE SPECIFIED, ALL MATERIAL SHALL BE PLACED IN LOOSE
LIFTS NOT TO EXCEED EIGHT (8) INCHES IN THICKNESS AND SHALL BE
COMPACTED BY SUITABLE COMPACTION EQUIPMENT TO COMPLY
WITH THE SPECIFIED COMPACTION REQUIREMENTS AS OUTLINED
FOR THE RESPECTIVE AREAS OR LOCATION OF FILL. MAXIMUM
DENSITY SHALL BE AS DETERMINED BY THE STANDARD PROCTOR
METHOD ASTM D698.
17. THE CONTRACTOR SHALL PROVIDE LABOR AND EQUIPMENT. TO
ENSURE THAT SOIL MOISTURE IS WITHIN TWO (2) PERCENT OPTIMUM
MOISTURE. SHAPING OF THE LEVEE, DIKE OR EMBANKMENT SHALL
BREAK UP LUMPS AND CLODS AND YIELD A SMOOTH SURFACE AND
OBTAIN A FINISH TO THE LINES AND GRADES SHOWN ON THE
DRAWING. LEVEE TOPS SHALL BE DRIVABLE BY MAINTENANCE
VEHICLES.
18. LEVEE, DIKE, BERM OR EMBANKMENT MATERIAL EXCAVATED FROM
DITCHES/BORROWS WITH TRACTOR-SCRAPER UNITS SHALL BE
PLACED IN SUCCESSIVE LAYERS ACROSS THE ENTIRE WIDTH OF THE
LEVEE, DIKE OR EMBANKMENT. EACH LAYER MUST BE SPREAD AS
DEPOSITED LONGITUDINALLY ALONG THE LEVEE, DIKE OR
EMBANKMENT WITH EACH LAYER NOT EXCEEDING EIGHT (8) INCHES
IN THICKNESS. THE INITIAL LIFT SHALL BE PLACED ON UNDISTURBED
SOIL AFTER STRIPPING IS COMPLETED. WITH THE ENGINEERS
APPROVAL THE INITIAL LAYER MAY BE INCREASED IN THICKNESS IN
WET AREAS TO PROVIDE A WORKING PAD CAPABLE OF SUPPORTING
THE HAULING EQUIPMENT. THE LEVEE, DIKE OR EMBANKMENT AT
ALL TIMES MUST BE MAINTAINED IN A REASONABLE LEVEL
18. - CONTINUED - CONDITION AND HAULING EQUIPMENT SHALL BE
DIRECTED OVER THE FULL WIDTH OF EACH LAYER TO FACILITATE
UNIFORM COMPACTION.
19. LEVEE, DIKE OR EMBANKMENT MATERIAL EXCAVATED WITH BUCKET
EQUIPMENT SHALL BE DEPOSITED INTO THE LEVEE, DIKE OR
EMBANKMENT WITHIN REACH OF THE EQUIPMENT OR HAULED
DIRECTLY TO THE LEVEE, DIKE OR EMBANKMENT SITE. TO PREVENT
LEVEE, DIKE OR EMBANKMENT FAILURE, STOCK PILING ON LEVEES,
DIKES, EMBANKMENT OR BERMS WILL NOT BE PERMITTED.
MATERIALS SHALL BE PLACED AND SPREAD IN LAYERS WITH EACH
LAYER AFTER SPREADING NOT TO EXCEED EIGHT (8) INCHES IN
THICKNESS.
20. ALL LEVEE, DIKE OR EMBANKMENT CONSTRUCTION MUST BE AS
CONTINUOUS AS POSSIBLE AND THE FILL MAINTAINED SUCH THAT
DRAINAGE IS ASSURED AT ALL TIMES.
21. HAND COMPACTORS SHALL BE USED WHEN COMPACTING ANY FILL
MATERIAL WITHIN TWO (2) FEET OF ANY WATER CONTROL
STRUCTURE OR PIPE.
22. THE INTERSECTION BETWEEN EMBANKMENTS SHALL BE
CONSTRUCTED WITH A MINIMUM RADIUS OF SIXTEEN (16) FEET.
23. WHEN TRENCHING THE CONTRACTOR WILL BE REQUIRED TO
EXCAVATE TO THE LINES AND GRADES SHOWN ON THE PLANS. ALL
PIPE SHALL BE INSTALLED WITH A MINIMUM COVER AS SHOWN ON
THE PLANS. THE LENGTH OF TRENCH EXCAVATION IN ADVANCE OF
THE PIPE LAYING SHALL BE KEPT TO A MINIMUM AND SHALL NOT
EXCEED ONE-HUNDRED FIFTY (150) FEET, UNLESS AUTHORIZED BY
THE ENGINEER. TRENCHES SHALL BE OF SUFFICIENT WIDTH IN THE
PIPE ZONE TO PERMIT THE PROPER INSTALLATION AND BEDDING,
AND TO PROVIDE PROPER COMPACTION OF BACKFILL OF MATERIALS.
THE CONTRACTOR SHALL NOT OVER EXCAVATE BY DIGGING BELOW
SPECIFIED LINES AND GRADES. IF, IN THE OPINION OF THE ENGINEER,
THE CONTRACTOR OVER EXCAVATES MATERIAL IN AN AREA, HE
SHALL REPLACE AT HIS EXPENSE THE OVER EXCAVATED MATERIAL
WITH SUITABLE SITE MATERIAL AND COMPACT THAT MATERIAL TO A
DENSITY EQUAL TO THE SURROUNDING IN-SITU MATERIAL.
24. PLACEMENT OF BEDDING SHALL PRECEDE THE INSTALLATION OF
PIPE. BEDDING SHALL PROVIDE UNIFORM SUPPORT ALONG THE
ENTIRE LENGTH OF THE PIPE BARREL, WITHOUT LOAD
CONCENTRATION AT JOINTS, FITTINGS, ETC. ALL ADJUSTMENTS TO
THE LINE AND GRADE SHALL BE MADE BY SCRAPING OR FILLING WITH
BEDDING MATERIAL UNDER THE PIPE, AND NOT BY BLOCKING OR
WEDGING. BEDDING SHALL BE PLACED IN UNIFORM LOOSE LAYERS
OF NOT MORE THAN EIGHT (8) INCHES IN DEPTH, AND COMPACTED TO
NINETY (90) PERCENT MAXIMUM DENSITY AS DETERMINED BY THE
STANDARD PROCTOR METHOD ASTM D698. MATERIAL SHALL BE
COMPACTED ALONG THE SIDES OF PIPE TO THE DEPTH SHOWN ON
THE PLAN, AND WORKED CAREFULLY UNDER THE PIPE HAUNCHES.
25. THE CONTRACTOR SHALL FURNISH, INSTALL AND OPERATE ALL
NECESSARY EQUIPMENT TO KEEP THE EXCAVATIONS ABOVE THE
FOUNDATION (SUB GRADE) LEVEL FREE FROM WATER DURING
CONSTRUCTION, AND SHALL DEWATER AND DISPOSE OF THE WATER
SO AS NOT TO CAUSE INJURY TO PUBLIC OR PRIVATE PROPERTY OR
NUISANCE TO PUBLIC. DEWATERING EQUIPMENT SHALL BE IN GOOD
WORKING CONDITION AND SHALL BE AVAILABLE THROUGHOUT THE
CONSTRUCTION. THE CONTRACTOR SHALL ALSO PROVIDE
COMPETENT WORKERS FOR THE OPERATION AND MAINTENANCE OF
THE PUMPING EQUIPMENT.
26. COMPACTION WILL BE EVALUATED USING VISUAL INSPECTION AND
TESTING WILL BE PERFORMED BY THE ENGINEER OR AN AUTHORIZED
REPRESENTATIVE, ON THE WORK AT THE ENGINEERS DISCRETION.
SOIL AND FILL COMPACTION TESTING WILL BE CONDUCTED IN
ACCORDANCE WITH ASTM D2922/D3017, AND MAXIMUM DENSITY WILL
BE DETERMINED BY THE STANDARD PROCTOR METHOD ASTM D698,
FOR ALL COMPACTED FILL MATERIAL IN ANY NON-LINEAR
VOLUMETRIC PLACEMENT, DIKES OR LEVEES, SELECT FILL MATERIAL
UNDER ANY STRUCTURE, SELECT FILL MATERIAL BEDDING FOR ANY
PIPE OR ANY OTHER AREA REQUIRING COMPACTION.
27. COMPACTION TESTING SHALL BE ASCERTAINED AND CERTIFIED,
UNLESS SPECIFICALLY NOTED AS DIFFERENT ON RESPECTIVE DETAIL,
TO A MINIMUM LEVEL OF NINETY (90) PERCENT MAXIMUM DENSITY AS
DETERMINED BY THE STANDARD PROCTOR METHOD ASTM D698.
28. THE CONTRACTOR SHALL DEMONSTRATE TO THE ENGINEERS
SATISFACTION THAT THE COMPACTION DENSITY HAS BEEN
ACHIEVED. IF THE COMPACTION IS NOT ACHIEVED OR THE
CONTRACTOR CANNOT DEMONSTRATE THAT THE MEANS AND
METHODS BEING UTILIZED ARE SUFFICIENT TO MEET THE
SPECIFICATION THEN THE ENGINEER MAY REQUIRE ADDITIONAL
TESTING AT AN INTERVAL TO BE DETERMINED AS SITE CONDITIONS
WARRANT OR AS REQUIRED BY THE ENGINEER, AT THE
CONTRACTORS' EXPENSE. THE ENGINEER MAY EMPLOY OR REQUIRE
THE CONTRACTOR TO UTILIZE THE SERVICES OF AN INDEPENDENT
THIRD-PARTY FIRM OR INDIVIDUAL TO PROVIDE CERTIFIED
VERIFICATION OF SOIL COMPACTION. THE INDIVIDUAL OR FIRM
SHALL BE LICENSED AND APPROPRIATELY REGISTERED WITH THE
STATE IN WHICH THE PROJECT IS LOCATED.
29. WHEN THE CONTRACTOR HAS REACHED A POINT IN CONSTRUCTION
WHERE INSPECTION IS REQUIRED TO PROCEED (BASED ON THESE
SPECIFICATIONS OR VERBAL INSTRUCTIONS FROM THE ENGINEER),
CONTRACTOR SHALL PROVIDE A MINIMUM OF FORTY-EIGHT (48)
HOURS NOTICE TO THE ENGINEER BEFORE DEMOBILIZING EQUIPMENT
THAT MAY BE NECESSARY TO ADJUST OR MODIFY THE WORK IN
QUESTION. THE ENGINEER WILL MAKE EVERY EFFORT TO PROVIDE
INSPECTION ON SHORTER NOTICES.
30. NO COMPACTION TESTING SHALL TAKE PLACE WITHOUT APPROVAL
OR THE PRESENCE OF THE ENGINEER OR HIS REPRESENTATIVE. THE
ENGINEER OR HIS REPRESENTATIVE RESERVES THE RIGHT TO
CHOOSE THE LOCATIONS OR SITE OF INDIVIDUAL TESTS.
4. CONTINUED - MATERIALS FROM ANY BORROW SITE OR EXCAVATION
REGARDLESS OF THE DEPTH OF MATERIAL ENCOUNTERED TO THE
SATISFACTION OF THE ENGINEER BEFORE USING THAT MATERIAL FOR
COMPACTED FILL. ADDITIONALLY, STRIPPING SHALL BE DONE TO
REMOVE SOIL UNSUITABLE FOR LEVEE, DIKE OR EMBANKMENT
CONSTRUCTION. UNSUITABLE MATERIAL MAY CONSIST OF
FLOUR-LIKE SAND OR OTHER HIGHLY ERODIBLE SOILS. STRIPPING
SHALL BE DONE BELOW EACH LEVEE, DIKE OR EMBANKMENT
FOOTPRINT AS NECESSARY, AND AS REQUIRED IN ALL BORROW
AREAS THAT WILL SUBSEQUENTLY BE USED FOR MATERIAL
EXCAVATION. THE INTENT OF STRIPPING IS TO ELIMINATE ORGANIC
MATERIALS AND UNSUITABLE SOILS FROM BORROW MATERIALS FOR
SUBSEQUENT LEVEE, DIKE OR EMBANKMENT FILL.
ALL STRIPPED OR GRUBBED MATERIALS SUITABLE AS TOPSOIL OR
USE AS NON-COMPACTED FILL SHALL BE FIRST STOCKPILED AND
RESERVED FOR PLACEMENT OVER DISTURBED AREAS WITH THE
INTENT TO PROMOTE NATIVE PLANT REGENERATION FROM THE SEED
BANK. STRIPPED AND STOCKPILED MATERIAL SHALL BE USED FOR
SLOPE TOE PROTECTION MATERIAL, FETCH INTERCEPT BERMS OR
GRUBBING ISLANDS IN THAT ORDER. IF EXCESS Stripped OR
GRUBBED MATERIAL REMAINS UNUSED AFTER ALL NON-COMPACTED
FILL COMPONENTS OF THE PROJECT HAVE BEEN COMPLETED THEN
THE REMAINING STRIPPED MATERIAL MAY BE RE-SPREAD IN FOUR TO
SIX (4-6) INCH LIFTS AS DIRECTED BY THE ENGINEER.
STRIPPING MATERIALS FROM LEVEE, DIKE OR EMBANKMENT
FOOTPRINTS MAY BE STOCKPILED ALONGSIDE THE LEVEE, DIKE OR
EMBANKMENT PROVIDED THAT SUFFICIENT SPACE IS AVAILABLE TO
PREVENT ACCIDENTAL INCORPORATION OF THE MATERIALS INTO
COMPACTED FILL DURING TRIM WORK ON THE LEVEE, DIKE OR
EMBANKMENT SIDE SLOPES. PLACEMENT OF STRIPPED MATERIAL
SHALL BE AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL
COORDINATE STOCKPILES AND RE-SPREADING ACTIVITIES ON THE
PROJECT SITE AS DIRECTED BY THE ENGINEER.
5. STRIPPING TO A DEPTH OF SIX (6) INCHES IS ASSUMED FOR
ESTIMATES AND AS THE PAY QUANTITY REGARDLESS OF THE DEPTH
OF MATERIAL ACTUALLY STRIPPED
6. THE CONTRACTOR SHALL COMPLY WITH ALL REGULATORY
REQUIREMENTS FOR DUST CONTROL ON THE PROJECT SITE.
7. THE CONTRACTOR SHALL STOP WORK AND CALL FOR INSPECTION AT
THE FOLLOWING POINTS OF CONSTRUCTION:
A) UPON DISCOVERY OF MAJOR CHANGES IN SOIL COMPOSITION DURING
BORROW AND EXCAVATION OPERATIONS
B) AFTER REACHING FINAL GRADE ON ALL EXCAVATION LOCATIONS
INCLUDING BUT NOT LIMITED TO SOIL LIFTS, DIKES, LEVEES AND
EMBANKMENT GRADING.
C) BEFORE FILL IS PLACED OVER NEWLY INSTALLED PIPE OR
ANTI-SEEPAGE COLLARS (IF REQUIRED).
D) AS NEEDED TO PROVIDE DOCUMENTATION FOR COMPACTION.
8. DEMOLITION CONSISTS OF REMOVAL OR NON-NATIVE MATERIALS
SUCH AS EXISTING CULVERTS AND ANY OTHER STRUCTURES FOUND
ON THE JOBSITE AS SHOWN ON THE PLANS OR AS DIRECTED IN THE
FIELD. DEMOLITION MAY INCLUDE THE REMOVAL OF CULVERT PIPE,
STEEL PIPE, CONCRETE ITEMS, WATER CONTROL GATES, OLD
AUTOMOBILES, DISCARDED APPLIANCES, TRASH OR OTHER MAN
MADE MATERIALS FOUND DURING CONSTRUCTION AND NOT
NECESSARILY SHOWN ON THE PLANS. THE CONTRACTOR MAY BE
ELIGIBLE FOR ADDITIONAL COMPENSATION FOR DEMOLITION ONLY IF
THE MATERIALS DISCOVERED ARE LARGER THAN FORTY-EIGHT (48)
INCHES IN DIAMETER AND/OR ARE LARGER THAN SIXTY (60) FEET IN
LENGTH AND CANNOT BE BROKEN INTO SMALLER PIECES WITH
EQUIPMENT EQUIVALENT TO A BACKHOE. ALL MATERIALS REMOVED
SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND BE
REMOVED FROM THE SITE UNLESS OTHERWISE SPECIFIED BY THE
ENGINEER. CONCRETE AND BRICK STRUCTURES MAY BE BROKEN UP
AND USED FOR RIP RAP, UPON APPROVAL BY THE ENGINEER.
9. DEMOLITION OF NATIVE SPECIES WOODY MATERIALS INCLUDING
REMOVAL OF TREES AND STUMPS AND ANY WOODY VEGETATION
ASSOCIATED WITH CLEARING THE SITE TO RECEIVE SOIL LIFTS. THE
TREES AND WOODY MATERIAL SHALL BE MECHANICALLY CHIPPED OR
GROUND ON SITE AND THE REMAINS SPREAD EVENLY OVER THE
AREA. IF THE WORK REQUIRES SEEDING, THEN THE CHIPPINGS SHALL
BE SPREAD LOOSELY OVER THE SEEDED AREA AS MULCH TO A DEPTH
OF NO MORE THAN 1 INCH, OR SPREAD EVENLY IN OPEN AREAS TO
FACILITATE THE RETENTION OF CARBON IN THE PROJECT SITE.
TREES AND WOODY MATERIAL THAT ARE TOO LARGE TO BE CHIPPED
BY MECHANICAL EQUIPMENT SHALL BE CUT OR REDUCED IN SIZE
SUCH THAT THEY MAY BE CHIPPED ON SITE. NATIVE TREE SPECIES
AND NATIVE SPECIES WOODY MATERIAL ARE NOT TO BE
REMOVED FROM THE SIT UNLESS SPECIFICALLY DIRECTED BY THE
OWNER, ENGINEER, OR THE OWNERS DESIGNATED REPRESENTATIVE.
THE INTENT OF THIS SPECIFICATION IS TO ALLOW FOR ORGANIC
MATERIAL TO REMAIN ON SITE.
10. DEMOLITION OF TREES IDENTIFIED BY THE OWNER, ENGINEER OR THE
OWNERS REPRESENTATIVE AS INVASIVE SPECIES, INCLUDING BUT
NOT LIMITED TO RUSSIAN OLIVE OR SIBERIAN ELM SHALL BE
REMOVED IN WHOLE OR IN PART AS PART OF THE DEMOLITION
PROCESS. TREES WILL BE COMPLETELY REMOVED FROM THE
GROUND INCLUDING THE STUMP. WOODY MATERIAL NOT CONTAINING
SEEDS MAY BE REQUIRED TO BE MECHANICALLY CHIPPED ON SITE,
AND THE REMAINS SPREAD EVENLY OVER THE AREA TO RECEIVE
SEEDING AS MULCH TO A DEPTH OF NO MORE THAN 1 INCH, OR
SPREAD EVENLY IN OPEN AREAS TO FACILITATE THE RETENTION OF
CARBON IN THE PROJECT SITE. INVASIVE TREES AND WOODY
MATERIAL THAT ARE TOO LARGE TO BE CHIPPED BY MECHANICAL
GENERAL EARTHWORK/GRADING NOTES CONTINUED
1. THE CONTRACTOR SHALL MINIMIZE DISTURBANCE OUTSIDE THE
CONSTRUCTION LIMITS, AND NOT UNNECESSARILY DISTURB LANDS ON
OR ADJACENT TO THE SITE. DAMAGE TO ANY EXISTING EQUIPMENT OR
STRUCTURES DUE TO THE CONTRACTORS WORK OR ACTIVITIES SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR
TO THE OWNERS SATISFACTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR IDENTIFICATION AND PROTECTION OF ALL UTILITIES
THAT MAY BE AFFECTED BY THE WORK. THE CONTRACTOR SHALL NOT
BE ENTITLED TO ADDITIONAL COMPENSATION FOR PROTECTION OR
AVOIDANCE OF UTILITIES DISCOVERED IN THE COURSE OF THE WORK
UNLESS THE UTILITIES REQUIRE A SUBSTANTIAL REDESIGN OF
IMPROVEMENTS.
2. A PORTION OR ALL OF THE WORK DESCRIBED WITHIN OR OTHERWISE
ASSOCIATED WITH THIS PROJECT MAY BE CONSTRUCTED UNDER
SATURATED CONDITIONS AND THE CONTRACTOR WILL BE
RESPONSIBLE TO DEWATER AS NEEDED TO FACILITATE THE REQUIRED
CONSTRUCTION COMPONENTS. BY SUBMISSION OF A BID THE
CONTRACTOR ACKNOWLEDGES THAT THEY ARE AWARE THAT THE
SITE CONTAINS WETLANDS AND ARE PREPARED TO WORK UNDER
THESE CONDITIONS.
3. CLEARING SHALL CONSIST OF THE CUTTING, REMOVING, AND
DISPOSAL OF ALL NATIVE BRUSH, TREES, LOGS, STUMPS, ROOTS,
HEAVY SOD, VEGETATION, ROCKS, AND STONES LARGER THAN FOUR
(4) INCHES IN ANY DIMENSION, AND RUBBISH WITHIN DESIGNATED
WORK AREAS. ITEMS OR MATERIAL SMALLER THAN FOUR (4) INCHES
IN ANY DIRECTION CLEARED FROM THE SITE AND SUITABLE AS FILL
MATERIAL SHALL BE FIRST, UTILIZED IN ANY AREAS AS IDENTIFIED AS
REQUIRING FILL. MATERIAL SUITABLE FOR TOPSOIL SHALL BE
RESERVED FOR PLACEMENT WITHIN, OVER OR ON TOP OF THE NEWLY
CONSTRUCTED LEVEE TO PROMOTE RE-VEGETATION. EXCESS FILL
MATERIAL SHALL BE MOVED AND/OR TRANSPORTED TO A DESIGNATED
LOCATION ON SITE. EXCESS FILL MATERIAL SHALL BE DEPOSITED AS
SPREAD IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS OR AS
DIRECTED IN THE FIELD BY THE OWNER OR ENGINEER WITH THE
INTENT TO CREATE AN ENVIRONMENT CONDUCIVE FOR PLANT
GROWTH OR RE-VEGETATION OF DISTURBED AREAS. PLACEMENT OF
CLEARED MATERIAL SHALL BE AS DIRECTED BY THE ENGINEER OR IN
ACCORDANCE WITH THE PROVIDED DETAILS LOCATED IN THE PLANS.
4. STRIPPING (OR GRUBBING) SHALL CONSIST OF THE COMPLETE
REMOVAL OF ALL EARTH MATERIALS CONTAMINATED BY ORGANICS
TO PREVENT THOSE ORGANICS FROM BEING INCORPORATED INTO
COMPACTED FILLS. THE CONTRACTOR SHALL STRIP ALL ORGANIC
GENERAL EARTHWORK/GRADING NOTES
GENERAL EARTHWORK/GRADING NOTES CONTINUED
GN02
BINDING
ORDER
SHEET TITLE:
SHEET IDENTIFIER:
PROJECT OWNER:
MARK DATE DESCRIPTION
PREPARER:
PROFESSIONAL SEAL:
ENGINEERING
EQUINOX
PROJECT IDENTIFICATION:
PROJECT SPONSOR:
www.equinoxengineering.us
DRAWING BY:
SUBMITTAL #:
CHECKED BY:
DATE:
EQUINOX PROJECT: UT-123-01
CONTRACT #: N/A
SMC
WEC
01/31/2025
AERIAL IMAGE FROM
GOOGLE EARTH
JUNE 16, 2022
BOUNTIFUL CITY
LANDFILL
RETENTION POND
ADDITION
BOUNTIFUL CITY
795 SOUTH MAIN
STREET
BOUNTIFUL, UTAH
84010
S100
GN03
BINDING
ORDER
SHEET TITLE:
SHEET IDENTIFIER:
PROJECT OWNER:
MARK DATE DESCRIPTION
PREPARER:
PROFESSIONAL SEAL:
ENGINEERING
EQUINOX
PROJECT IDENTIFICATION:
PROJECT SPONSOR:
www.equinoxengineering.us
DRAWING BY:
SUBMITTAL #:
CHECKED BY:
DATE:
EQUINOX PROJECT: UT-123-01
CONTRACT #: N/A
SMC
WEC
01/31/2025
AERIAL IMAGE FROM
GOOGLE EARTH
JUNE 16, 2022
BOUNTIFUL CITY
LANDFILL
RETENTION POND
ADDITION
BOUNTIFUL CITY
795 SOUTH MAIN
STREET
BOUNTIFUL, UTAH
84010
S100
GENERAL NOTES
PROJECT SPECIFIC
NOTES
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE AND/OR LIABLE
FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES MUST
BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
NOTES / SHEET CALLOUTS
CC
ND NO DISTURBANCE AREA
EXTERIOR SIDE OF CELL - NO SIGNIFICANT
DISTURBANCE BELOW OR BEYOND THE DAYLIGHT
LINE. ALL MOVEMENT OF EQUIPMENT AND
MATERIALS SHALL BE INSIDE THE WETLAND CELL
AND AT A LOCATION THAT IS 12 INCHES BELOW THE
TOP OF THE LEVEE ELEVATION OR FULL POOL
ELEVATION.
*** DO NOT OPERATE HEAVY EQUIPMENT ON THE
EXTERIOR SIDE OF THE LEVEE AND/OR IN A
NO DISTURBANCE ZONE.
*** DO NOT USE THE TOE OF THE EXTERIOR SIDE
OF A LEVEE AS A TEMPORARY ROADWAY.
*** DO NOT PLACE GRUBBED MATERIAL ON THE
EXTERIOR SIDE OF A LEVEE.
INTERIOR SIDE - NO SIGNIFICANT DISTURBANCE
ABOVE THE FULL POOL ELEVATION.
THE INTENT OF THIS DIRECTION IS TO LIMIT THE
AMOUNT OF DISTURBANCE OUTSIDE OF THE
FLOODABLE AREA AS DISTURBED AREAS THAT CAN
NOT BE FLOODED HAVE A MUCH HIGHER
PROPENSITY TO ALLOW FOR INVASIVE VEGETATION
TO BECOME ESTABLISHED.
GRUBBED MATERIAL MUST ONLY BE PLACED ON THE
INTERIOR OR WATER SIDE OF THE LEVEE FAR
ENOUGH AWAY FROM THE LEVEE TO PREVENT
INCORPORATION INTO THE COMPACTED FILL BUT
CLOSE ENOUGH TO LIMIT HAUL DISTANCE WITH THE
NON-INCORPORTION DISTANCE GOVERNING.
COMPACTION IS NOT REQUIRED - MATERIAL IS
INTENDED TO BE LOOSELY PLACED. THIS DETAIL HAS
A BIOLOGICAL FUNCTION THAT IS INTENDED TO
LIMIT DISTURBANCE THAT WILL PROMOTE INVASIVE
VEGETATION AND/OR NOXIOUS WEED GROWTH. ANY
ACTIVITY IN A NO DISTURBANCE ZONE SHALL BE
LIMITED TO THE BAREST MINIMUM NECESSARY TO
COMPLETE THE PROJECT. ALL WORK SHALL BE
CONSTRUCTED AS SHOWN AND/OR OUTLINED OR AS
DIRECTED IN THE FIELD.
DAY DAYLIGHT LINE
DAYLIGHT LINE SHOW FOR REFERENCE PURPOSES
ONLY. APPROXIMATE DAYLIGHT LINE CALCULATED
AND DRAWN BY CIVIL 3D MODELING SOFTWARE AS
BASED ON PROJECT TOPOGRAPHICAL SURFACE
DATA. ACTUAL DAYLIGHT LINE LOCATION WILL BE
ESTABLISHED IN THE FIELD BY THE CONSTRUCTION
OF THE SIDE SLOPE OF THE LEVEE AS PER THE
SPECIFIED TOP WIDTH AND SLOPE. EXISTING
NATURAL GROUND ELEVATION WILL GOVERN AND
DICTATE THE ACTUAL DAYLIGHT LINE. TYPICAL
1. MINIMUM CONCRETE COMPRESSIVE STRENGTH
AT 28 DAYS IS 4000 PSI PER ASTM C39 WITH
MIX DESIGN IN ACCORDANCE WITH ASTM C94
2. MIX DESIGN SHALL INCLUDE NOT LESS THAN 6
SACKS OF CEMENT PER CUBIC YARD OR CONCRETE,
EXCEPT FLY ASH MAY BE USED AS A SUBSTITUTION FOR
UP TO 20% OF THE PORTLAND CEMENT.
3. CEMENT SHALL BE TYPE II OR IIA LOW ALKALI
PORTLAND CEMENT CLASS C OR F .
4. FLY ASH SHALL CONFORM TO ASTM C618 AS
APPLICABLE.
5. COURSE AGGREGATE SHALL BE MAXIMUM SIZE OF ONE
AND ONE HALF (1 1/2) INCHES PER ASTM C33.
6. 6% AIR ENTRAINMENT IN CONCRETE MIX.
7. SLUMP SHALL BE IN THE RANGE OF 3 INCHES (±1
INCH) UNLESS CYLINDER TEST BREAK DATA IS
SUBMITTED SHOWING THAT COMPRESSIVE STRENGTH
IS ACHIEVED WITH A HIGHER SLUMP.
8. CONCRETE SHALL BE VIBRATED SUFFICIENTLY TO
REMOVE HONEYCOMBING BUT LIMITED IN DURATION
TO MAINTAIN AGGREGATE INCORPORATION - DO NOT
OVER VIBRATE.
9. REBAR SHALL BE 60K PSI STEEL AND SHALL BE FREE
FROM RUST, OIL, GREASE, PAINT OR OTHER
DELETERIOUS MATTER.
NO BORROW AREA
DUE TO THE VERY LOW SLOPE ACROSS THE PROJECT SITE
NO BORROW IS ALLOWED WITHIN THE WETLAND CELL THAT
DOES NOT ALLOW FOR A MINIMUM OF 0.25' OF MATERIAL
TO REMAIN ABOVE THE WATER CONTROL STRUCTURE THAT
CONTROL DRAINAGE FROM THE CELL. NO BORROW
ALLOWED IN AREAS THAT DO NOT CONTAIN EXISTING
VEGETATION - TYPICAL
BORa
COMPACTED FILL
COMPACTED FILL SHALL BE PLACED IN LIFTS NOT TO
EXCEED 12 INCHES. MATERIAL SHALL BE
COMPACTED TO MEET OR EXCEED THE PROJECT
COMPACTION STANDARDS. SEE NOTE CS.
95% MAXIMUM STANDARD PROCTOR AS PER ASTM
698. CONTRACTOR SHALL PROVIDE WATER AS
NEEDED TO ALLOW MATERIAL TO BE WITHIN 2% OF
OPTIMUM MOISTURE CONTENT TO ALLOW FOR
EFFECTIVE COMPACTIVE EFFORT.
CONTROL POINT
SURVEY AND CONTROL PROVIDED BY BOUNTIFUL CITY
PROJECT VERTICAL AND HORIZONTAL CONTROL REBAR
WITH CAP - TOP OF REBAR IS REFERENCE ELEVATION.
PRESERVE AND PROTECT - CONTRACTOR SHALL BE
RESPONSIBLE TO REPLACE AT THEIR EXPENSE ANY
DISTURBED OR DESTROYED CONTROL POINTS.
CP
CONCRETE WATER CONTROL STRUCTURE -
CONFIGURATION (HEIGHT AND WIDTH) DEPENDS ON
SPECIFIC LOCATION. WCS SHALL BE INSTALLED TO
ALLOW FOR PIPE FLOWLINE TO BE AT OR BELOW THE
ADJACENT IN CELL ELEVATION TO ALLOW FOR
POSITIVE DRAINAGE. WCS SHALL BE LEVEL SIDE TO
SIDE AND BACK TO FRONT. SELECT FILL SHALL BE
PLACED UNDER WCS TO PROVIDE SUPPORT - SEE
NOTE SF1 FOR SELECT FILL MATERIAL
SPECIFICATION. WCS SHALL BE SINGLE PIECE
CONSTRUCTION UNLESS SPECIFICALLY NOTED AND
PIPE STUB SHALL BE PRE-CAST INTO STRUCTURE
AND A PROVIDE A WATERTIGHT SEAL. NO LIFTING
HOOKS SHALL BE PLACED IN THE FLOOR OF THE
STRUCTURE. FINAL VERTICAL ELEVATION SHALL BE
WITHIN A ± 0.1 FOOT TOLERANCE (0.05 FOOT
ABOVE OR BELOW THE DESIGN ELEVATION). THE
FLOWLINE OF THE INLET PIPE SHALL GOVERN THE
VERTICAL ELEVATION. SEE NOTE CC FOR CONCRETE
MIX AND CONSTRUCTION INFORMATION.
DEMOLITION
CONTRACTOR TO DEMOLITION ALL ABANDONED MAN MADE
NON-NATIVE MATERIALS FOUND ON THE PROJECT SITE AS
SHOWN ON THE PLANS OR AS DIRECTED IN THE FIELD. IF
ANY MAN MADE ITEM IS DISCOVERED THAT IS NOT SHOWN
ON THE PLANS THE CONTRACTOR SHALL CONTACT THE
ENGINEER PRIOR TO DISTURBANCE FOR DIRECTIONS
REGARDING THE DEMOLITION OF SAID DISCOVERED ITEM.
DO NOT DEMOLITION ANY UN-MARKED ITEM WITH OUT
PRIOR PERMISSION. DEMOLITION MAY INCLUDE BUT NOT
BE LIMITED TO THE REMOVAL OF CULVERT PIPES, STEEL
PIPE, CONCRETE ITEMS, WATER CONTROL GATES, OLD
AUTOMOBILES, DISCARDED APPLIANCES, TRASH OR OTHER
MAN MADE MATERIALS.
DEMO
DIAMETER OF PIPE
DISTANCE VARIES WITH SIZE OF PIPE.
F
EROSION CONTROL ROCK - RIP RAP
TYPICAL RIP RAP FOR ALL LOCATIONS TO RECEIVE
EROSION CONTROL ROCK SHALL BE WELL GRADED AND
RANGE IN SIZE FROM 3" TO 12" DIAMETER WITH NOT MORE
THAN 15% GREATER THAN 9" DIAMETER AND NOT LESS
THAN 15% SMALLER THAN 4" DIAMETER. ALL ROCK SHALL
BE HARD DURABLE SOUND PIECES HAVING A SPECIFIC
GRAVITY OF NOT LESS THAN 2.5. ROCK SHALL HAVE
ANGULAR FACES - RIVER ROCK WITH SMOOTH OR
ROUNDED SURFACES IS NOT SPECIFIED. ANY MATERIAL
CONTAINING ASPHALT IS PROHIBITED. DEPTH OF ROCK
APRON SHALL BE 12" MINIMUM. FILTER FABRIC SHALL BE
INSTALLED UNDER ALL EROSION CONTROL ROCK.
FILTER FABRIC SHALL BE INSTALLED UNDER ALL SELECT
FILL, AND UNDER ANY INLET/OUTLET EROSION CONTROL
ROCK AND ALONG THE BACK VERTICAL WALL FACES OF
ANY ROCK WALLS THE ARE NOT SCOUR CURTAINS -TYPICAL
OVERLAP CLOSURE SEAM SHALL BE 24" MINIMUM LENGTH.
FABRIC SHALL BE A NON-WOVEN POLYESTER OR
POLYPROPYLENE GEOTEXTILE. THE GEOTEXTILE FABRIC
SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF ONE
HUNDRED FIFTY (150) POUNDS AS DETERMINED BY ASTM
D-1682. THE GEOTEXTILE FABRIC SHALL HAVE A
MAXIMUM EQUIVALENT OPENING SIZE (E.O.S.) OF A
NUMBER SEVENTY (70) U.S. STANDARD SIEVE. FABRIC
SHALL BE TENCATE MIRAFI N-SERIES 160N OR APPROVED
EQUAL.
FF
LEVEE SIDE SLOPE TO DAYLIGHT - SLOPE SHALL BE 3H:1V
OR SHALLOWER UNLESS SPECIFICALLY NOTED.
LS3
LEVEE TOP SURFACE
LEVEE TOP SURFACE SHALL BE GRADED TO MATCH THE
DESIGN ELEVATION WITH A TOLERANCE OF 0.1 FOOT (±
0.05 FOOT ABOVE OR BELOW THE DESIGN ELEVATION) TOP
SURFACE SHALL PROVIDE THE MINIMUM TOP WIDTH
CALLED FOR ON THE DETAILS AND/OR PLAN VIEW NOTES AS
MEASURED FROM THE LEFT TOP EDGE TO THE RIGHT TOP
EDGE UNLESS OTHERWISE SPECIFICALLY NOTED.
TOP SURFACE SHALL BE COMPACTED FILL MATERIAL
UNLESS SPECIFICALLY NOTED TO RECEIVE GRAVEL
SURFACING OR OTHER SURFACE TREATMENT. SURFACE
SHALL BE DRIVABLE IN A PICKUP TRUCK. IF ELEVATION
TRANSITIONS ARE NEEDED BETWEEN TWO DIFFERENT TOP
ELEVATIONS THEN THE TOP SURFACE SHALL BE GRADE TO
PROVIDE A 10H:1V SLOPE OR SHALLOWER TRANSITION
SLOPE ALONG THE LEVEE TOP TO ALLOW LEVEE TO BE
DRIVABLE.
EARTHEN MATERIAL MAY BE MOUNDED OVER PIPE BEHIND
WCS AS NEEDED TO PROVIDE A LEVEL SURFACE SUITABLE
FOR FOOT TRAFFIC.
LTS
LEVEE TOP WIDTH
LEVEE TOP SURFACE SHALL PROVIDE THE MINIMUM TOP
WIDTH CALLED FOR ON THE DETAILS AND/OR PLAN VIEW
NOTES AS MEASURED FROM THE LEFT TOP EDGE TO THE
RIGHT TOP…
This is the start of the file's text. The full file is on GovTribe.