This technical specifications document outlines the standard design requirements for Type B Drive Approach construction in Bountiful City, Utah, applicable to the city's 2026 replacement and new construction project for sidewalk, curb and gutter, and storm drain facilities at random locations. The specifications detail concrete driveway construction standards including dimensions ranging from 6 feet to 7 feet in width with associated 4-foot, 8-foot, or 11-foot sidewalk options, with driveways measuring between 12 feet minimum and 30 feet maximum in length. All measurements for drive approach payment include the walk, curb, and gutter components. The document mandates 6-inch thick concrete minimum throughout the driveway to expansion joints, with 6-inch road base minimum under all new concrete, and requires Class 4000 concrete per APWA Section 03304 specifications placed and cured according to APWA Sections 02770 and 03390 respectively.

The specifications require compaction of existing subgrade to 95 percent minimum (Modified Proctor), epoxy-coated rebar with continuous 2 number 4 bars, and a 36-inch saw cut asphalt control joint when driveway width exceeds 14 feet. Additional requirements include straight metal forms for all tangent sections or where curb radius is not less than 150 feet, 1/2-inch expansion joint material at curb and gutter, and a 1 1/2-inch raise at flow line. Where concrete or asphalt removal is necessary, materials must be saw-cut to full depth with straight lines, with minimum 3-foot asphalt removal width in front of drive approaches. Curing shall be accomplished through application of curing compound per current APWA specifications. These standards were revised as of August 2017 and establish the baseline design parameters for Type B drive approach construction when sidewalk is positioned against the curb.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
2-2026 Storm Drain Projects Bid Package.pdf PDF
4-2026 Storm Drain Projects Bid Set.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
7-Type A Drive Approach 8-2017.pdf PDF
1-2026 Misc. Concrete Bid Documents.pdf PDF
9-Type C Drive Approach 8-2017.pdf PDF
6-Type D Drive Approach 8-2017.pdf PDF
10-Type E Drive Approach 8-2017.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1/2" RAISE

AT FLOW LINE

A

A

6'-0"

W/4' WALK

7'-0"

W/8' WALK

OR 11' WALK

12' MINIMUM / 30' MAXIMUM

6'-0''

W/4' WALK

7'-0"

W/8' WALK

OR 11' WALK

6" THICK CONCRETE MINIMUM THROUGHOUT DRIVEWAY TO EXPANSION JOINTS.

LENGTH TO BE MEASURED FOR DRIVE APPROACH PAYMENT

WHICH INCLUDES WALK AND CURB AND GUTTER.

24" C&G

4'

WALK

6" 6"

SAW CUT 36" BACK AS REQUIRED

4', 8' OR 11'

WALK

6" MAXIMUM

1 12" RAISE

AT FLOW LINE

6" MINIMUM

THROUGHOUT

6" ROAD BASE

MINIMUM

2 #4 BARS

CONTINUOUS

BOUNTIFUL STANDARD

TYPE B DRIVE APPROACH

TO BE USED WHEN WALK IS AGAINST CURB

SECTION A-A

PLAN VIEW

NOTES

CONTINUOUS

2 #4 BARS

36"

SAW CUT

ASPHALT

CONTROL JOINT

REQUIRED WHEN

DRIVEWAY WIDTH

EXCEEDS 14'

1/2" EXPANSION

JOINT MATERIAL

C & G

1. CONCRETE: CLASS 4000 PER APWA SECTION 03304. PLACE PER APWA SECTION 02770. CURE PER APWA SECTION 03390

2. COMPACT EXISTING SUBGRADE 95% MINIMUM (MODIFIED PROCTOR).

3. CURING BY APPLICATION OF CURING COMPOUND PER CURRENT APWA SPECIFICATIONS.

4. WHERE CONCRETE, OR ASPHALT IS TO BE REMOVED, THE MATERIAL MUST BE SAWCUT TO FULL DEPTH WITH STRAIGHT LINES.

MINIMUM WIDTH OF ASPHALT REMOVAL IN FRONT OF A DRIVE APPROACH IS 3 FT- 0 INCHES.

5. 6" ROAD BASE MINIMUM UNDER ALL NEW CONCRETE.

6. EPOXY COATED REBAR REQUIRED.

7. STRAIGHT METAL FORMS REQUIRED FOR ALL TANGENT SECTIONS OR WHERE THE CURB RADIUS IS NOT LESS THAN 150 FT.