1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf

PDF 150 KB Posted

Attached to
2026 Storm Drain Projects State and local contract opportunity
Solicitation number
Not on record
Issued by
Utah

About this file

This is a Notice to Contractors issued by the City of Bountiful, Utah's City Engineer's office regarding the 2026 Storm Drain Projects. The City is soliciting sealed proposals for three major construction initiatives: the 2026 Miscellaneous Concrete project (estimated cost $1,008,811.35), the 2026 Big Rock Hiking Trail Project with two separate schedules (estimated costs of $43,000 and $64,000 respectively), and the 2026 Water Line Projects divided into four schedules (estimated total cost $1,967,564.00). Proposals must be submitted to the City Engineer's office at 795 South Main Street, Bountiful, Utah, or through the U3P Bonfire eProcurement website at https://utah.bonfirehub.com. Sealed bids were received until 2:00 p.m. on July 21, 2026, at which time they were opened and read aloud. The Miscellaneous Concrete project involves removal and replacement of street improvements including sidewalks, curbs, gutters, drive approaches, waterways, and storm drain facilities at random locations throughout the city, with substantial completion required by March 15, 2027. The Hiking Trail Project encompasses construction of two Class 3 trail segments on United States Forest Service-managed public lands in the Mueller Park area, with substantial completion by October 31, 2026, and bidders may respond for either or both schedules. The Water Line Projects involve replacement of culinary water facilities in residential neighborhoods with substantial completion by October 15, 2026. Award decisions will be made within seven days after bids are opened.

Each bid must be accompanied by a certified check, cashier's check, or bid bond from an acceptable surety company in an amount equal to at least five percent (5%) of the bid, payable to the City of Bountiful. Successful bidders must furnish performance and payment bonds equal to 100 percent of the contract price and maintain specified insurance coverage including general liability ($3,000,000 minimum per occurrence), workers' compensation, automobile liability ($3,000,000 minimum), and environmental liability ($2,000,000 per claim). The City of Bountiful has not designated any set-asides for disadvantaged enterprises, small businesses, or other restricted categories. All qualified contractors holding appropriate Utah State licensing are eligible to respond; the projects are not federally funded and do not require prevailing wage compliance. For the hiking trail projects, contractors must coordinate with the United States Forest Service, and work cannot commence until USFS and Bountiful City execute an agreement granting construction approval. No work may be performed while snow covers the ground due to wildlife habitat protection requirements, and archaeological findings on Forest Service property require work cessation until USFS approval is obtained. For water line projects, the contractor is responsible for materials testing coordination with the City Engineering Department and scheduling shutdowns with the Water Department, while asphalt patching will be performed by the City's Street Department. Liquidated damages apply at varying rates by project type ($50-$200 per day for late completion and $100-$200 per day for utility interruptions), and the City reserves the right to reject any or all bids and waive any informality in bidding.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
2-2026 Storm Drain Projects Bid Package.pdf PDF
4-2026 Storm Drain Projects Bid Set.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
5-Type B Drive Approach 8-2017.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
7-Type A Drive Approach 8-2017.pdf PDF
1-2026 Misc. Concrete Bid Documents.pdf PDF
9-Type C Drive Approach 8-2017.pdf PDF
6-Type D Drive Approach 8-2017.pdf PDF
10-Type E Drive Approach 8-2017.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO CONTRACTORS

Sealed proposals will be received at the office of the City Engineer, 795 South Main St., Bountiful, Utah or through the U3P Bonfire eProcurement website: https://utah.bonfirehub.com for:

2026 STORM DRAIN PROJECTS

Bids will be received until the hour of 2:00 pm Tuesday July 21, 2026 at which time they will be opened and read aloud in the office of the City Engineer at 795 South Main St., Bountiful, Utah.

Proposals will be in accordance with drawings and specifications prepared by the City of Bountiful

Engineering Department. Project documents will be made available via email distribution from the

Bountiful City Engineering Department and through the U3P Bonfire eProcurement website:

https://utah.bonfirehub.com

Each bid must be submitted on the form provided as a part of the Contract Documents and shall be accompanied by a certified check, cashier's check or bid bond from a surety company, acceptable to Bountiful City Council, all made payable to City of Bountiful in an amount equal to at least five percent (5%) of the bid. Said check or bid bond shall be given as a guarantee that the bidder will execute the contract in conformity with the form of contract included in the Contract

Documents, and furnish a performance bond within fifteen (15) days after notification of the award of the contract to the successful bidder.

Bountiful reserves the right to reject any or all bids, or any part of any bid or to waive any informality in any bid as its best interests may appear. A decision on the rejection of any or all bids or the award of a contract will be made within seven (7) days after the bids are opened.

LLOYD N. CHENEY

City Engineer

File details come from the government source that posted it. Updated .