About this file

This is a technical specification document for Type A Drive Approach construction standards prepared by Bountiful City, Utah, in conjunction with a broader street improvement project involving sidewalk, curb and gutter, drive approaches, waterways, and storm drain facilities at random locations throughout the city. The specification establishes detailed requirements for drive approach construction, including concrete specifications (Class 4000 per APWA standards), dimensional requirements (12 feet minimum to 30 feet maximum length, 6 inches minimum thickness), reinforcement specifications (2 #4 continuous bars), and base preparation requirements (6 inches road base minimum with 95 percent compaction of existing subgrade). The document includes sectional and plan view diagrams illustrating both radial and California flare options for curb transitions, with specific notes regarding expansion and contraction joints, asphalt saw-cutting requirements, and curing procedures.

The specification requires epoxy-coated rebar, straight metal forms for tangent sections or curb radii exceeding 150 feet, and full-depth saw-cutting of existing concrete or asphalt materials to be removed with a minimum 3-foot width of asphalt removal in front of drive approaches. Concrete placement and curing must comply with current APWA (American Public Works Association) specifications, with curing achieved through application of curing compound per current standards. The document was revised in August 2017 and serves as the standard template for all Type A drive approach construction work within Bountiful City, ensuring consistency and quality across the random location improvement project.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
4-2026 Storm Drain Projects Bid Set.pdf PDF
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
2-2026 Storm Drain Projects Bid Package.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
1-2026 Misc. Concrete Bid Documents.pdf PDF
9-Type C Drive Approach 8-2017.pdf PDF
6-Type D Drive Approach 8-2017.pdf PDF
10-Type E Drive Approach 8-2017.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
5-Type B Drive Approach 8-2017.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4' WALKVARIESC & G

6" MAXIMUM

1 12" RAISE

AT FLOW LINE

6" MINIMUM

THROUGHOUT

6" ROAD BASE

MINIMUM

2 #4 BARS

CONTINUOUS

4' WALK

C & G

CURB

TRANSITION

4'-6"MINIMUM

CALIFORNIA

OPTION

LENGTH TO BE MEASURED FOR

DRIVE APPROACH PAYMENT

12' MINIMUM / 30' MAXIMUM

MINIMUM 6" THICK CONCRETE WALK

THROUGH DRIVEWAY

BOUNTIFUL STANDARD

TYPE A DRIVE APPROACH

SHOWS RADIAL AND CALIFORNIA FLARE OPTIONS

SECTION A-A

PLAN VIEW

NOTES

A

A

CONTINUOUS

2 #4 BARS

1 1/2" RAISE

AT FLOW LINE

CONTRACTION

JOINT REQUIRED

WHEN DRIVEWAY

WIDTH EXCEEDS

14'

1/2" EXPANSION

JOINT MATERIAL

SAW CUT 36" BACK AS REQUIRED

36"

SAW CUT

ASPHALT

48" RADIUS

(TYP. 4')

PARK

STRIP

VARIES

6" 6"

1. CONCRETE: CLASS 4000 PER APWA SECTION 03304. PLACE PER APWA SECTION 02770. CURE PER APWA SECTION 03390

2. COMPACT EXISTING SUBGRADE 95% MINIMUM (MODIFIED PROCTOR).

3. CURING BY APPLICATION OF CURING COMPOUND PER CURRENT APWA SPECIFICATIONS.

4. WHERE CONCRETE, OR ASPHALT IS TO BE REMOVED, THE MATERIAL MUST BE SAWCUT TO FULL DEPTH WITH STRAIGHT LINES.

MINIMUM WIDTH OF ASPHALT REMOVAL IN FRONT OF A DRIVE APPROACH IS 3 FT- 0 INCHES.

5. 6" ROAD BASE MINIMUM UNDER ALL NEW CONCRETE.

6. EPOXY COATED REBAR REQUIRED.

7. STRAIGHT METAL FORMS REQUIRED FOR ALL TANGENT SECTIONS OR WHERE THE CURB RADIUS IS NOT LESS THAN 150 FT.