About this file
Written by GovTribe AI
· Apr 6, 2026
Summary
Unable to complete the requested summary. The file "4-PRV 2017.pdf" was referenced but its contents were not provided in the materials submitted for review. Only the related state and local contract opportunity information was included, which describes multiple disparate projects (Bay Area Toll Authority FasTrak system modernization, City of Akron water treatment facilities, Metropolitan Transportation Commission sign maintenance, and various Utah infrastructure projects) rather than a single coherent procurement document. To provide an accurate summary of the file's key details, the actual contents of the 4-PRV 2017.pdf document must be supplied.
Other files for this state and local contract opportunity
Other files attached to 2026 Storm Drain Projects, newest first.
File
Type
Posted
2-2026 Storm Drain Projects Bid Package.pdf
PDF
Jun 30, 2026
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf
PDF
Jun 30, 2026
3-Bountiful Landfill Retention Pond Sheet Set.pdf
PDF
Jun 30, 2026
4-2026 Storm Drain Projects Bid Set.pdf
PDF
Jun 30, 2026
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf
PDF
Mar 31, 2026
5-2020 Water Standard Trench Detail.pdf
PDF
Mar 31, 2026
8-2026 Water Line Projects Bid Set.pdf
PDF
Mar 31, 2026
3-2009 NEW water service.pdf
PDF
Mar 31, 2026
2-2009 2 IN water service.pdf
PDF
Mar 31, 2026
7-2009 TRANSFER water service.pdf
PDF
Mar 31, 2026
1-2026 Water Line Projects Bid Package.pdf
PDF
Mar 31, 2026
6-2020 Fire Hydrant Installation.pdf
PDF
Mar 31, 2026
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf
PDF
Feb 13, 2026
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf
PDF
Feb 13, 2026
6-6 USFS Trail Design Parameters Hiking.pdf
PDF
Feb 13, 2026
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf
PDF
Feb 13, 2026
8-Holbrook Trails flagged.txt
TXT text file
Feb 13, 2026
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf
PDF
Feb 13, 2026
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf
PDF
Feb 13, 2026
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf
PDF
Feb 13, 2026
8-Reference A Weed Management Plan 06.15.22.pdf
PDF
Feb 13, 2026
9-Big Rock Trail flagged.txt
TXT text file
Feb 13, 2026
5-5 2026 Holbrook USFS Trail Design Parameters.pdf
PDF
Feb 13, 2026
3-3 2026 Holbrook Trails Project Plans.pdf
PDF
Feb 13, 2026
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf
PDF
Feb 13, 2026
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf
PDF
Feb 13, 2026
3-3 Big Rock Hiking Trail Plans.pdf
PDF
Feb 13, 2026
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf
PDF
Feb 13, 2026
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf
PDF
Feb 13, 2026
5-Type B Drive Approach 8-2017.pdf
PDF
Jan 13, 2026
4-retaining wall 20 inch.pdf
PDF
Jan 13, 2026
2-Dipstone outlet gutter transition.pdf
PDF
Jan 13, 2026
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf
PDF
Jan 13, 2026
8-retaining wall 36 inch.pdf
PDF
Jan 13, 2026
7-Type A Drive Approach 8-2017.pdf
PDF
Jan 13, 2026
1-2026 Misc. Concrete Bid Documents.pdf
PDF
Jan 13, 2026
9-Type C Drive Approach 8-2017.pdf
PDF
Jan 13, 2026
6-Type D Drive Approach 8-2017.pdf
PDF
Jan 13, 2026
10-Type E Drive Approach 8-2017.pdf
PDF
Jan 13, 2026
Show all 39
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated May 1, 2026 .