This is a project manual and bid solicitation for the City of Bountiful, Utah, comprising replacement and new construction of sidewalk, curb and gutter, and storm drain facilities at random locations throughout the city. The project involves removal of existing damaged improvements and installation of new curb, gutter, sidewalk, drive approaches, ADA ramps, inlet boxes, manholes, and other storm drain-related facilities. Sealed bids were due on February 10, 2026, at 2:00 p.m., with the bid opening and public reading occurring at the same time at the Bountiful City Engineering Department offices located at 795 South Main Street, Bountiful, Utah. The estimated project cost is $1,008,811.35. Substantial completion is required by March 15, 2027, with an anticipated Notice to Proceed on April 6, 2026, and a required start of construction by April 20, 2026. A pre-bid conference was not held. Bids remain valid for 45 days following the bid opening date. The contract will be awarded to the most responsive, qualified, and responsible bidder as determined by the City, with the City reserving the right to reject any or all bids.
Bidders must submit bids on a unit price basis with quantities as estimates only; actual quantities will vary and the City may deviate in either direction without claim from the contractor. Bid security of five percent of the bid amount is required and will be returned within seven days after contract award. Performance bonds and payment bonds equal to 100 percent of the contract price are required prior to contract execution. The contractor must maintain general liability insurance with a minimum of $3,000,000 per occurrence, automobile liability insurance with $3,000,000 per accident, workers' compensation insurance, and environmental liability insurance of $2,000,000 each claim. The contract is not federally funded and does not require prevailing wage rates or payroll submittal. Liquidated damages are assessed at $200 per day for late completion after the contract time and $200 per day for unauthorized utility interruptions. The contractor must provide a minimum of one crew at all times during contract duration and furnish additional crews if work exceeds three weeks backlog. The contract includes a two-year extension option available, with price adjustments to be indicated by the bidder as a percentage applied to unit prices. The bid documents are available through the U3P Bonfire eProcurement website and the Engineering Department.
View the file
Other files for this state and local contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Page 00 00 01 - 1
CITY OF BOUNTIFUL
Bountiful, Utah
PROJECT MANUAL FOR THE
2026 REPLACEMENT AND NEW CONSTRUCTION OF
SIDEWALK, CURB & GUTTER AND STORM DRAIN FACILITIES
AT RANDOM LOCATIONS
KATE BRADSHAW
MAYOR
CITY COUNCIL
DAN BELL
BETH CHILD
RICHARD HIGGINSON
MATT MURI
Prepared by
City of Bountiful Engineering Department
Lloyd N. Cheney, City Engineer
January, 2026
Title Page 00 00 01 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
Table of Contents 00 00 03 - 3
T A B L E O F C O N T E N T S
Reference Number Title Page 00 00 01 Title Page 1 00 00 03 Table of Contents 3 00 00 04 List of Drawings 5
INTRODUCTORY INFORMATION
BID SOLICITATION
00 10 00 Invitation to Bid 7
INSTRUCTIONS TO BIDDERS
00 20 00 Instructions to Bidders 9 00 22 00 Modifications to Instructions to Bidders 23
BID FORMS
00 40 00 Bid 25 00 41 00 Bid Schedule 27
SUPPLEMENTS TO BID FORMS
00 45 02 Bidder Status Report 39 00 45 03 Subcontractor and Supplier Report 41 00 45 04 Status Verification System Affidavit 43
CONTRACTING REQUIREMENTS
AGREEMENT FORMS
00 50 00 Agreement 45
BONDS AND CERTIFICATES
00 61 00 Performance Bond 51 00 62 00 Payment Bond 57 00 65 00 Certificate of Insurance 63
Table of Contents 00 00 03 - 4
SUPPLEMENTARY CONDITIONS
00 81 00 Modifications to the General Conditions 65 00 85 50 Project Construction Drawings 69 00 87 50 Standard Operating Procedures for Storm Water Controls 71
ADDENDA AND MODIFICATIONS
00 90 00 Addenda and Modifications 117
SUPPLEMENTARY SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 119 01 71 24-S Construction Surveying 123
DIVISION 02 - EXISTING CONDITIONS
None
DIVISION 03 – CONCRETE
03 30 04-S Concrete 125 03 30 05-S Concrete Testing 127
DIVISION 04 - MASONRY
None
DIVISION 05 - METALS
None
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
None
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
None
DIVISION 08 – DOORS AND WINDOWS
None
DIVISION 09 - FINISHES
None
DIVISION 13 - SPECIAL CONSTRUCTION
None
DIVISION 15 - MECHANICAL
None
DIVISION 22 - PLUMBING
None
DIVISION 26 - ELECTRICAL
None
DIVISION 31 - EARTHWORK
None
DIVISION 32 - EXTERIOR IMPROVEMENTS
None
DIVISION 33 - UTILITIES
33 05 20-S Backfilling Trenches 129
END OF TABLE OF CONTENTS
List of Drawings 00 00 04 - 5
DOCUMENT 00 00 04
LIST OF DRAWINGS
PROJECT CONSTRUCTION DRAWINGS
8 1/2” x 11” (NOT INCLUDED IN THIS MANUAL)
SHEET 1 Bountiful Standard 20 inch Retaining Wall SHEET 2 Bountiful Standard 36 inch Retaining Wall SHEET 3 Bountiful Standard Type A Drive Approach SHEET 4 Bountiful Standard Type B Drive Approach SHEET 5 Bountiful Standard Type C Drive Approach SHEET 6 Bountiful Standard Type D Drive Approach SHEET 7 Bountiful Standard Type E Drive Approach SHEET 8 Bountiful Standard Outlet Gutter Transition (Dipstone Outlet)
REFERENCE DRAWINGS
1. Manual of Standard Plans published by the Utah Chapter of the American Public Works
Association, 2025 Edition.
2. Standard BMPs prepared by the Davis County Storm Water Coalition.
BMP’s are available for download at:
https://www.bountifulutah.gov/file/e3e2f6a3-fc13-4942-8337-5fa8f0985b1a
Additional information is also available from Todd Christensen, at (801) 298-6125 (Bountiful City Engineering Dept.).
END OF SECTION
List of Drawings 00 00 04 - 6
Invitation to Bid 00 10 00 - 7
DOCUMENT 00 10 00
INVITATION TO BID
PART 1 GENERAL
1.1 CONSTRUCTION CONTRACT
A. Bidders are invited to bid on Construction Contract known as:
2026 REPLACEMENT AND NEW CONTRUCTION OF
B. This contract consists of construction of installing street and storm drain related improvements. A description of the work anticipated is included in
Section 01 11 00, Summary of Work.
C. The work to be performed generally consists of removal of existing damaged improvements and construction of new curb, gutter, sidewalk drive approaches, ADA ramps within the Public Right-of-Way. Construction of new or replacement inlet boxes, manholes, waterways or other storm drain related facilities is also included in the Contract.
D. The estimated cost of the work is: $1,008,811.35 E. For information about the award of this Construction Contract, contact:
Reed Bangerter or Lloyd Cheney at the Bountiful City Engineering Department,
(801) 298-6125
1.2 BID LOCATION AND OPENING
A. Sealed bids will be received until 2:00 P.M. at the offices of the Bountiful City
Engineer, 795 South Main St., Bountiful, Utah or through the U3P Bonfire eProcurement website: https://utah.bonfirehub.com on Tuesday, February 10th, 2026 . Bids received after 2:00 p.m. will not be accepted. Bids will be publicly opened and read about 2:00 p.m. by the Bountiful City Engineering Department.
B. On the outside of the envelope, the bidder shall indicate the Construction Contract title, the name and address of the Bidder, and the date and time of Bid opening and the Bidder's return mailing address.
1.3 BID SECURITY
A. Bid security in the amount of five percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract.
1.4 PRE-BID CONFERENCE A Pre-Bid Conference will not be held.
Invitation to Bid 00 10 00 - 8
1.5 BASIS OF BIDS
A. Bids shall be on a unit price basis. Unsealed or segregated Bids will not be accepted.
1.6 CONTRACT TIME
A. The Work will be Substantially Complete by March 15th, 2027. Please refer to the schedule in Section 01 11 00.
1.7 EXAMINATION AND PROCUREMENT OF DOCUMENTS
A. Complete sets of Contract Documents may be examined and obtained from the
ENGINEER at 795 South Main St., Bountiful, Utah after 9:00 A.M., on the 13th day of January, 2026.
B. Electronic copies of the Bid Documents and project plans will be made available at no charge through the Engineering Department by email distribution or through the U3P Bonfire eProcurement website: https://utah.bonfirehub.com
1.8 RIGHT TO REJECT BIDS
A. The OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of the OWNER.
1.9 VALIDITY PERIOD FOR BIDS
A. Bids shall remain valid for [45] days after the day of Bid opening. Bidders who withdraw their bid after Bid opening, but before expiration of said period, shall forfeit their bid security if Notice of Intent to Award to the successful Bidder is made by
OWNER.
1.10 GOVERNING LAWS AND REGULATIONS
A. This project is not federally funded and does not require the payment of specific wage rates. Payroll submittal will not be required.
B. Bidders on this Work will be subject to the applicable provisions of all federal rules, laws and regulations or orders.
END OF DOCUMENT
Instructions to Bidders 00 20 00 - 9
DOCUMENT 00 20 00
INSTRUCTIONS TO BIDDERS
1.1 DESCRIPTION OF THE WORK
A. The Work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances thereto as included in the Contract Documents. A general description of the Work is set forth in the Invitation to Bid (Document 00 10 00).
1.2 COPIES OF BID DOCUMENTS
A. Bidders must use complete sets of Bid Documents in preparing Bids. OWNER maintains a complete set on file at the address set forth in the Notice to Bidders, and bidders may review the file copy upon request during regular business hours. Bidders are solely responsible to verify whether their sets of Bid Documents are complete.
B. Bid Documents are made available to bidders only for the purpose of obtaining Bids on the
Work. No license or grant for any other use is given.
C. Bidding Document copyrights shall remain with the OWNER.
1.3 PRE-BID CONFERENCE
A. A Pre-Bid Conference will not be held.
If a pre-bid conference is held, the time, place and nature of the conference will be stated in the Notice to Bidders. Representatives of OWNER and ENGINEER will be present to discuss the Project. The OWNER shall not be bound by any statements, representations, conclusions, or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum by the ENGINEER to all prospective bidders.
1.4 PHYSICAL CONDITIONS
A. In General: Prior to submitting a Bid, each Bidder is responsible to review all available explorations, tests and data concerning surface conditions, subsurface conditions and Underground Facilities at or contiguous to the site, or otherwise, which may affect cost, progress, performance or furnishing of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
B. Surface and Subsurface Conditions: Provisions concerning surface and subsurface conditions, if any, are set forth in a document titled Geotechnical Data (Document 00 32 00). The document provides the identification of:
1. those reports of explorations and tests of subsurface conditions at the site which have been utilized in preparing the Contract Documents; and
00 20 00 - 10
2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site which have been utilized in preparing the Contract Documents.
C. Underground Facilities: Information and data indicated in the Contract Documents regarding Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities.
The OWNER does not assume responsibility for the accuracy or completeness thereof other than as provided in paragraph 4.3A.2 of the General Conditions or unless expressly provided in the Modifications to General Conditions (Document 00 81 00).
D. Additional Explorations and Tests: If feasible as determined by OWNER, the OWNER will provide each Bidder access to the site to conduct any explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall obtain permits, fill all holes, clean up and restore the site to its former condition upon completion of such explorations.
by requesting such an exploration or test, Bidder agrees to release, indemnify, defend, and save the OWNER harmless from all costs damages and liabilities an any kind whatsoever, including reasonable attorneys' fees, that may arise in connection with or as a result of the performance of such explorations or tests.
1.5 COMPENSATION AND QUANTITIES
A. In General: The bid price for any lump sum or unit price contract includes all labor, materials, and incidental work to fully complete the Work in a satisfactory manner under the terms of the Contract Documents. Bidders are responsible to inform themselves of the character of the Work to be performed.
B Lump Sum Work: If the Work is to be paid for on a lump sum basis, the lump sum will be the only sum paid.
C. Unit Price Work: If any portion of the Work is to be paid for on a unit price basis, payment will cover only work actually performed and materials actually supplied at the unit prices bid and on the terms set forth in the Contract Documents, irrespective of any quantity approximations in the Bid Documents. Any quantity approximations in the Bid Documents are stated as a basis for determining bids, and the do not fix the amount of Work to be done or materials to be furnished. Stated quantities are estimates for the purpose of doing the class of work required. Actual quantities will vary. The OWNER may deviate in either direction from any indicated quantities. The Bidder shall have no claim for any variation in quantity, except to the extent permitted in the General Conditions.
1.6 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A. In General: The OWNER shall not be bound by any statements, representations, conclusions, or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum.
00 20 00 - 11
B. Access: The Contract Documents designate the site for performance of the Work. Bidder is responsible to investigate the site and understand all access requirements. All additional off site lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Bidder.
C. Bidder's Obligations: In addition to Bidder's other responsibilities and obligations in connection with submitting a Bid, it is the responsibility of the Bidder before submitting a Bid, to:
1. Examine the Contract Documents thoroughly;
2. Visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work;
3. Investigate all applicable construction and labor conditions, quantities, and the character of the Work as they affect cost, progress, performance, or furnishing of the Work;
4. Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;
5. Study and carefully correlate Bidder's observations with the Contract Documents;
6. Attend any pre-bid conference, which shall be mandatory if so designated in the Notice to Bidders;
7. Review all available explorations and data concerning surface and subsurface conditions as set forth in Section 1.4 above; and
8. Identify and notify ENGINEER in writing in the manner set forth in article 2.1 below of all specific conflicts, omissions, errors, or discrepancies in the Contract Documents, or if Bidder doubts their meanings.
The failure or omission of any Bidder to take any of the foregoing actions shall not in any way relieve Bidder of its Bid, or its obligation to furnish all material, equipment, labor and services necessary to carry out the provisions of the Contract Documents and to complete the contemplated Work for the consideration set forth in its Bid. Submission of a Bid shall constitute prima facie evidence of compliance with these instructions.
D. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement and the Contract Documents, except by Addendum or Change Order.
1.7 EFFECT OF SUBMITTING A BID
A. Bidders are responsible to carefully examine the Contract Documents, visit the site, and fully inform themselves so as to include in the Bid a sum to cover the cost of all items.
00 20 00 - 12
Bidder’s failure or omission to receive or examine any form, instrument, addendum or other document, visit the site and become acquainted with existing conditions, or attend any pre-Bid Conference, shall in no way relieve Bidder from any obligations with respect to Bidder’s Bid or the Construction Contract.
B. By submitting a Bid, Bidder represents that Bidder has complied with all requirements of the Bid Documents; that the Bid is premised on properly performing and furnishing the Work required by the Contract Documents within the times specified; that the Bidder is informed of the conditions to be encountered and the character, quality and quantities of the Work; and that the Bidder believes the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
C. Submission of a Bid constitutes a promise that the Bidder will enter the Contract
Documents in the form presented in the Contract Documents. Bidders should carefully examine all Contract Documents, including the required Bonds and insurance to be provided by the Bidder.
1. The Performance Bond is a guarantee of faithful performance of the requirements of the Contract Documents, including all applicable warranties. The Payment Bond is a guarantee of payment of all labor, materials, or supplies used directly or indirectly in the prosecution of the Work provided in the Construction Documents.
2. The sum of the Performance Bond and the Payment Bond shall be increased or decreased during the course of the Work in the event that Contract Modifications, Change Orders or Addenda increase or decrease the total contract price. The sum of each bond shall be in an amount equal to the completed contract price at the completion of the Work.
3. OWNER does not provide any release of Performance Bonds or Payment Bonds.
The bonds are in effect throughout all periods during which a suit may be brought under the provisions of applicable law.
D. By submitting a Bid, Bidder represents that the matters stated therein are true and correct.
PART 2 BIDDING PROCEDURES
2.1 INTERPRETATIONS AND ADDENDA
A. All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER no later than seven (7) calendar days prior to opening of Bids.
In the ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents.
00 20 00 - 13
B. No oral interpretations shall be made to any Bidder. The OWNER shall not be responsible for or bound by any statements, interpretations, explanations, representations, conclusions or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum by the ENGINEER to all prospective bidders.
C. Each statement made in an Addendum is part of the Contract Documents at the location designated in the Addendum. A statement issued in an Addendum shall have the effect of modifying a portion of the Bid Documents when the statement in the Addendum specifies a particular section, paragraph or text and states that it is to be so modified. Only the specified section, paragraph or text shall be so modified, and all other portions of the Bid Documents shall remain in effect.
D. Bidders shall acknowledge receipt of all Addenda in the space provided in Section 00 40 00 Bid, item 2.1 C.
E. Except to postpone the Bid opening, no Addenda shall be issued within 48 hours of the Bid opening.
F. It is the responsibility of the Bidder or Supplier to investigate the issuance of Addenda by the ENGINEER prior to submitting a proposal.
2.2 EQUIPMENT AND MATERIAL OPTIONS PRIOR TO BID OPENING
A. If a Bidder or Supplier wishes to supply a product other than that identified in the Contract
Documents, said Bidder or Supplier shall submit a written request for approval to the ENGINEER at least ten (10) calendar days prior to the date set for opening of bids.
B. The procedure for submission of any such product option shall be as set forth in Article 6.4 of the General Conditions. It is the sole responsibility of the Bidder or Supplier to submit complete descriptive and technical information so that ENGINEER can make a proper appraisal.
C. ENGINEER's failure to act upon such a request within five (5) days after receipt shall be deemed a denial thereof.
D. Any such approval is at the sole discretion of the ENGINEER and will be in the form of an
Addendum issued to all Bidder's holding Bid Documents indicating that the additional equipment or materials are approved as equal to those specified for the Project.
E. The Construction Contract, if awarded, will be on the basis of materials and equipment specified in the Drawings and Specifications and any changes permitted in any Addenda.
2.3 BID SECURITY
A. Amount of Bid Security: A Bid Security must accompany each Bid. The total amount of the Bid on which Bid security is to be based shall be the sum of all items of the Bid constituting the maximum amount of the possible award to the Bidder. The Bid Security amount must equal at least five (5) percent of the total amount of the Bid.
B. Form of Bid Security: The Bid Security may be in the form of a certified check, cashier's check, cash, or Bid Bond. No other form of Bid Security will be accepted. A Bid Bond
00 20 00 - 14 must be issued by a licensed Utah agency on behalf of a surety company licensed to do business in the State of Utah. A cashier’s check must be drawn on a bank doing business in the State of Utah and made payable to OWNER. If a cashier’s check is used in lieu of a Bid Bond, or if the Bid Bond does not specifically so provide, a certificate from an approved surety company guaranteeing execution of performance and payment bonds in the full amount of the bid must accompany the bid.
C. Purpose of Submission. By submitting a Bid Bond Bidder assures OWNER it will take all steps necessary to properly execute the Contract Documents.
D. Return of Bid Security: OWNER will return Bid securities to Bidder within 7 days after award of the Construction Contract. Bid Bonds and cashier’s checks of all Bidders will be held until the Construction Contract is awarded or all bids have been rejected.
The liability of OWNER in regards to the checks shall be limited only to the return of the checks.
E. Default: In the event of failure or refusal of the Bidder to enter into the Construction Contract and the delivery to the OWNER a Performance Bond, Payment Bond and any other Bonds or documents required by the Contract Documents after Notice of Intent to Award by the OWNER, the Bidder forfeits the sum of the Bid Bond or cashier’s check as liquidated damages to the OWNER.
2.4 COMPLETING BID DOCUMENTS
A. The General Conditions identify all forms comprising the Bid Documents. Additional copies may be obtained from the ENGINEER. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use and execute only the Bid form and Bid Schedules bound in the Contract Documents. The complete Contract Documents (excluding the Drawings) should be submitted as the Bidder's Bid, and Bidder shall complete and submit all forms included in the Bid Form, Document No. 00 40 00.
B. The Bidder must fill in all items in the Bid form by longhand (in ink), by typewriter, or completed electronically. If applicable, furnish both the unit and total costs for each item. The total Bid price is the full price for the performance of all Work under the Contract Documents. Bidder shall initial in ink any corrections, interlineations, alterations, or erasures made by the Bidder on Bidder’s entries in the Bid Documents.
C. Any work or material which is specified in the Contract Documents or which is necessary because of the nature of the Work, but which is not listed separately in the Bid Schedule shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price.
D. Bids by corporations must be executed in the corporate name by a corporate officer authorized to sign, and must be properly attested to as an official act of the corporation. At the OWNER's request, authority to sign shall be submitted.
E. Bids by partnerships or joint ventures must be executed in the partnership or joint venture name and signed by a partner or joint venture whose title and official address must be
00 20 00 - 15 shown. If a partnership or joint venture is the low bidder, the partnership or joint venture must also submit evidence to the OWNER of the responsibility of the partnership or joint venture as a bidder in the manner directed by the ENGINEER.
F. Where the Bidder is wholly owned subsidiary of another company, the Bid must so state, and the owner or parent corporation also must agree to sign and be bound with the Bidder.
G. All names must be typed or printed under or near the signature. Signatures shall be in longhand.
H. The Bid shall contain an acknowledgment of receipt of all Addenda. The Addenda numbers must be filled in on the Bid form.
I. The Bidder's address, telephone number, and facsimile number for communications regarding the Bid must be shown on the first page of the Bid form.
J. The divisions and sections of the specifications, and the identifications of any Drawings, shall not control Bidder in dividing the Work among subcontractors or suppliers, or delineating the Work to be performed by any specific trade.
K. The Base Bid and alternates shall include all Work required to be performed by the
Contract Documents.
2.5 CONFLICT OF INTEREST, SUBCONTRACTORS
A. Conflict of interest pertaining to Subcontractors is described in paragraph 6.5H of the
General Conditions.
B. Bidder shall not subcontract more than 50 percent of the dollar value of the total contemplated Work (exclusive of the supply of materials and equipment to be incorporated in the Work) without OWNER's prior written approval.
2.6 SUBMISSION OF BIDS
A. Bids shall be submitted at the time and place indicated in the Invitation to Bid and should be enclosed in an opaque sealed envelope, marked with the Construction Contract name and number, the name and address of the Bidder, and the date and the opening time for Bids. If the Bid is sent through the mail or other delivery system the sealed envelope should be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. It is the sole responsibility of the Bidder to deliver the Bid before the scheduled time.
B. The complete Contract Documents must be submitted with the Bid. Bidder will make no recapitulations, stipulations, alterations, alternate submissions, or modifications in any manner to any of the Contract Documents.
C. Bidder must submit a Bid by completing all of the Bid Form documents, which are:
00 20 00 - 16
1. The Bid portion of the Bid Form which is included in these Contract Documents, which shall be in the form of a lump sum, or in the form of unit pricing pursuant to the Bid Schedule, as called for in the Bid Form.
2. The Bid Security.
D. Alternate bids, other than those called for in the Bid form, will not be considered.
E. No oral, telegraphic, telephonic, facsimile or modified bids will be considered.
2.7 MODIFICATION AND WITHDRAWAL OF BIDS
A. At any time prior to the opening of Bids, Bids may be modified or withdrawn if a written notice of modification or withdrawal is signed by Bidder and delivered to the place where Bids are to be submitted. Bid Security will be returned upon proper withdrawal of a Bid prior to the time for Bid opening.
B. Within 24 hours after Bids are opened, any Bidder may file written notice with OWNER that there was a substantial mistake made in the preparation of its Bid. Bidder must thereafter promptly demonstrate Bidder's mistake. The OWNER has sole discretion to determine whether to permit any modification or withdrawal or the return of any Bid Security.
C. When it appears a mistake has been made, or when the OWNER desires an assurance of any matter, the OWNER may request a Bidder to confirm the Bid in writing.
2.8 OPENING OF BIDS
A. Bids will be opened and read aloud publicly unless obviously non-responsive. An abstract of the amounts of the base schedule of prices and any alternate schedules will be made available for review after the opening of Bids.
B. Any Bids received after the time specified in the Invitation to Bid will be marked
“LATE” (on the envelope) with the time the bid was received and will not be considered. Such Bids will be returned to the Bidder or destroyed at the OWNER’S discretion.
2.9 BIDS SUBJECT TO ACCEPTANCE FOR 45 DAYS
A. All bids remain subject to acceptance for 45 days after the day of the Bid opening.
OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date.
00 20 00 - 17
PART 3 EVALUATION AND AWARD
3.1 SUBMITTALS REQUIRED FOR EVALUATION
A. After Bid opening, the Bidder, whose Bid is under consideration, must submit the following at the times specified:
1. Bidder Status Report: Document 00 45 20. One completed form shall be submitted after Bidder receives Notice of Intent to Award.
2. Status Verification System Affidavit: Document 00 45 40. One completed form shall be submitted after Bidder receives Notice of Intent to Award. (Not required when a current document is on file when submitted as part of a prior Prequalification process.)
3. Subcontractor and Supplier Report: Document 00 45 30. The Bidder shall submit this report form within 24 hours of ENGINEER's request.
3.2 EVALUATION OF BIDDER'S QUALIFICATIONS
A. Within seven (7) calendar days of ENGINEER's request, a Bidder, whose Bid is under consideration for award shall submit to the ENGINEER the following information for the Bidder. ENGINEER may request like information on Bidder's Subcontractors, Bidder's Suppliers or any other information the ENGINEER may require.
1. A current financial statement for the Work (as provided to bonding company);
2. A chronological list of "in progress" and "completed" construction work done by
Bidder during the last 3 years; including project name, address, owner, contract name, and current telephone number;
3. Present construction commitments other than items listed in paragraph 2 above;
4. Proposed organizational structure such as firm ownership, project manager, progress scheduler, and superintendent for the Work of this Project;
5. Owned and rented equipment which is to be used to do the Work;
6. Investigations, arbitration, litigation or claims which are pending, threatened, settled or otherwise disposed of within the last three (3) years;
7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified. As a minimum, identify specific experience on projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project manager and superintendent designated to construct this project are different than that of the company, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project;
00 20 00 - 18
8. All matters consistent with federal, state and local Laws and Regulations; and
9. Such other data as may be called for by the ENGINEER.
B. If Bidder believes any information should be held confidential for business reasons, Bidder must submit a written claim of business confidentiality for that particular information and include a specific statement of the reasons supporting the claim pursuant to Utah Code Ann. ß 63-2-308.
C. Untimely response or failure to provide the requested information by Bidder will release
OWNER of any obligation to further consider the Bidder's Bid.
3.3 EVALUATION OF BIDS
A. OWNER reserves the right: to reject any and all Bids or any part thereof; to waive any informalities in the Bid Schedule and elsewhere; to negotiate and agree to contract terms with the successful Bidder; to disregard non-conforming, non-responsive, unbalanced or conditional Bids; and to withhold the award for any reason deemed in the best interests of the OWNER.
B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or the OWNER. Without limitation, such rejection may be because the Bid is not responsive, or the Bidder is unqualified or of doubtful ability or the Bid or Bidder fails to meet any other pertinent standard or criteria established by OWNER.
C. If the OWNER intends to make an award to a Bidder, a Notice of Intent to Award will be issued.
D. OWNER may consider all information which OWNER believes is relevant when evaluating a Bid, including, without limitation:
1. The qualifications and experience of the Bidder and of the Subcontractors, Suppliers, and other persons and organizations proposed (whether or not the Bid otherwise complies with the prescribed requirements).
2. Such alternates, unit prices and other data, as may be requested in the Bid Form, Bid
Schedule, or written requests issued prior to OWNER's Notice of Intent to Award the Construction Contract.
3. Operating costs, maintenance requirements, performance data, and guarantees of ability to provide the required materials and equipment.
4. Corporate organization and capacity for any party.
5. Ability to perform and complete the Work in the manner and within the time specified.
6. Pending litigation.
00 20 00 - 19
7. The amount of the Bid.
8. Proper licensing to do the Work in compliance with licensing laws of the State of Utah for contractors and subcontractors.
9. All other relevant matters, consistent with OWNER's procurement code and administrative rules, OWNER's ordinances and program policies.
F. To establish qualifications of Bidder, OWNER may request such data indicated in the Bid
Documents, conduct such investigations as OWNER deems appropriate, and consider any other information (whether obtained from the Bid, the Bidder, or any other source).
G. If the Construction Contract is to be awarded, it will be awarded to the most responsive qualified and responsible Bidder as determined by the OWNER. Alternates may be accepted depending upon availability of OWNER's funds and as determined by the OWNER. Accepted alternates will be considered in determining the most responsive, qualified, and responsible Bidder.
H. Bid Schedules will be evaluated as follows:
1. Discrepancies in the multiplication of quantities of Work items and unit prices will be resolved in favor of the unit prices. OWNER may correct Bid Schedule calculation errors accordingly.
2. Prices written out in words shall govern over prices written out in numbers.
3. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
4. Bids shall not contain any recapitulations of or changes in the work to be done.
I. The OWNER, in the OWNER’s sole discretion, shall make determinations as to disqualification of Bidders or rejection of Bids. Such matters may include, without limitation, submission of more than one Bid by the Bidder (whether under the same or different names); evidence of collusion among Bidders; other commitments of Bidder which, in the OWNER’s sole judgment, might hinder the Work; previous defaults, Bid irregularities when not waived in the best interests of the OWNER, delays or poor performance by Bidder on any project; official action against Bidder; and any other cause which, in the OWNER’s sole discretion and judgment, is sufficient to justify disqualification of a Bidder or rejection of a Bid.
3.4 ADJUSTMENTS TO THE COST OF THE WORK AFTER OPENING OF BIDS
A. The Contract Price identified in the Agreement represents the cost of the work which is to be paid by the OWNER to the CONTRACTOR.
B. Adjustments to the Contract Price which are agreed to between the OWNER and the successful Bidder shall be effected by signing an Agreement Supplement.
00 20 00 - 20
3.5 SUBSTITUTIONS
A. The Construction Contract, if awarded, will be on the basis of materials and equipment described in the Drawings, Specifications and any Addenda.
B. After the Effective Date of the Construction Contract, the procedure for submitting an application for substitution is set forth in Article 6.4 of the General Conditions.
3.6 SUBMITTALS REQUIRED FOR AWARD OF CONTRACT
A. Performance and Payment Bonds: The OWNER's requirements as to performance and payment Bonds are as set forth in the Modifications to General Conditions (Document 00 81 00). Specific requirements are set forth in the Performance Bond (Document 00 61 00) and the Payment Bond (Document 00 62 00).
1. The form of the Bonds should be carefully examined by the Bidder.
2. When the successful Bidder delivers the executed Construction Contract to OWNER, it must be accompanied by the required Performance and Payment Bonds.
B. Other Information: When a determination has been made to award the Construction
Contract, Bidder is required, prior to the award or after the award, or both, to furnish such other information as the ENGINEER requests.
3.7 SIGNING OF AGREEMENT
A. Within 10 days after OWNER gives Notice of Intent to Award the Construction Contract to the successful Bidder, the Bidder shall pick up, sign and return to Bountiful City, the required number of copies of the Construction Contract, bonds and insurance. A minimum of three (3) originals will be signed with one (1) returned to the Bountiful City. The remaining executed originals shall be for the Bidder and his Bonding Company.
B. All of Bidder’s executions and submittals must be delivered to the OWNER before
OWNER will execute the Construction Contract. The Construction Contract will not be deemed awarded and shall not be binding on the OWNER until it has been approved and executed by the OWNER, and a fully executed copy is formally delivered to the CONTRACTOR. The OWNER reserves the right to rescind its Notice of Intent to Award without liability, except for the return of Bidder’s Bid Security, at any time before the Construction Contract has been fully executed by all parties and delivered to the CONTRACTOR.
C. Transfers, delegations or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from the OWNER.
D. At the time of Bidding, and the signing of the Agreement, and at all times during the Work, Bidder shall be properly licensed to do the Work and shall be in compliance with the license laws of the State of Utah, Davis County and Bountiful City. The Bidder shall also require all Subcontractors to do the same.
00 20 00 - 21
E. If a Bidder fails to fully and properly execute the Construction Contract and provide all submittals required therewith within ten (10) days after the date of the Notice of Intent to Award, the OWNER may elect to rescind the Notice of Intent to Award, and the OWNER shall be entitled to the full amount of Bidder’s Bid Security, not as a penalty, but in liquidation of and compensation for damages sustained. In the OWNER’s sole discretion, a Notice of Intent to Award may then be provided to another bidder whose Bid is most advantageous to the OWNER, price and other factors considered.
00 20 00 - 22
Modifications to Instructions to Bidders 00 22 00 - 23
DOCUMENT 00 22 00
MODIFICATIONS TO INSTRUCTIONS TO BIDDERS
This document changes provisions in the Instructions to Bidders. All other provisions of the Instructions to Bidders document remain in full force and effect.
Add the following paragraph to article 1.1
1.1 DEFINED TERMS
B. General Conditions: as published in Document 00 70 00 in the Manual of Standard
Specifications by the Utah Chapter of the American Public Works Association, 2017 Edition.
Add the following paragraphs to article 1.2
1.2 COPIES OF BID DOCUMENTS
D. All provisions of the 2025 Edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association that are applicable to the Work are hereby made a part of the Contract Documents by reference.
Modifications to Instructions to Bidders 00 22 00 - 24
Bid
00 40 00 - 25
DOCUMENT 00 40 00
BID
1.1 BID PROPOSAL
A. After having personally and carefully examined all conditions surrounding the Work and the Contract Documents, the undersigned proposes to furnish all labor, equipment, tools and machinery and to furnish and deliver all materials not specifically mentioned as being furnished by the OWNER, which is required in and about the construction of the Construction Contract known as:
B. The undersigned proposes to complete the Work for the price or prices listed in the Bid Schedule (Document 00 41 00) and understands that quantities for Unit Price Work are not guaranteed.
C. The undersigned proposes to furnish bonds with the Contract, signed by a surety company satisfactory to the OWNER, in an amount equal to the Contract amount conditioned to insure compliance with all requirements of the Contract Documents.
D. The undersigned encloses a certified check, cashier's check, cash, or a Bid Bond for
________________________________________________ Dollars ($ ____________) which is (five (5) percent of the Bid amount) payable to the OWNER, as a guarantee of good faith, and which it is agreed will be forfeited to the OWNER as liquidated damages in the event of the failure of the undersigned to enter into a contract and furnish satisfactory bonds to the OWNER.
E. The undersigned proposes to execute the attached contract within ten (10) days after the
Notice of Intention to Award, and to begin work within six (6) days after being notified to do so by the OWNER.
F. If OWNER finds it necessary to further define the Work, Contract Price, Contract Time or some other portion of the Construction Contract, after Bid opening, the Bidder promises to execute an Agreement Supplement prior to or concurrent with the execution of the Agreement, if the Agreement Supplement is acceptable to the Bidder.
00 40 00 - 26
G. It is understood that the OWNER has the right to reject this proposal or to accept it at the prices listed in the Bid Schedule.
PART 2 EXECUTION
2.1 BIDDER
A. The Bidder is as follows
Name:
Address:
Telephone number:
Facsimile number:
Email Address:
Tax identification number:
B. Bidder holds license number _______________________________________, issued on the _____ day of ________________________, ________, by the Utah State Department of Commerce, Division of Occupational and Professional Licensing. Bidder is licensed to practice as a ___________________________ Contractor. License renewal date is the ___________ day of ________________, ________ .
C. The undersigned hereby acknowledges receipt of the following Addenda.
(list Addenda numbers here)
2.2 BIDDER'S SUBSCRIPTION
A. Date: _________________________
B. Bidder's Signature:
C. Please print Bidder's name here:
D. Title:
00 40 00 - 27
Bid Schedule 00 41 00 - 28
DOCUMENT 00 41 00
BID SCHEDULE
1.1 DOCUMENT INCLUDES
A. Price schedules.
B. Measurement and payment provisions.
1.2 CONSTRUCTION CONTRACT
A. The Construction Contract is known as
1.3 REFERENCES
A. APWA 01 29 00: Payment Procedures.
B. Document 00 50 00: Agreement.
1.4 SCHEDULE TO BE ADDED TO THE AGREEMENT
A. This document will be added to the Agreement by reference.
PART 2 PRICE SCHEDULE
2.1 BASE BID
A. The Base Bid includes:
1. Contractor’s yearly price modifier (to be applied to each Item in the Bid Schedule) for yearly contract extension: %. (See Section 00 50 00 2.5(B) ).
2. The following schedule of values:
00 41 00 - 29
Schedule 1:
Item No.
Classification of Unit Price Work
Quantity Unit
Unit Price Amount
Remove Curb and Gutter 2,000
Linear Feet
Remove Sidewalk and Concrete Slabs 15,000
Square Feet
Remove Storm Drain Inlet or Outlet 10
Each
Remove Waterway 1,000
Square Feet
Remove Asphalt Pavement 6,000
Square Feet
Curb and Gutter APWA Type E (24") (< 50 Linear Feet in a Block)
1,000 Linear Feet
Curb and Gutter APWA Type E (24") (< 100 Linear Feet in a Block)
Linear Feet
Curb and Gutter APWA Type E (24") (> 100 Linear Feet in a Block)
Curb and Gutter APWA Type A (30")
Side Walk, 4" thick (< 50 Linear Feet in a Block)
4,000 Square Feet
(< 100 Linear Feet in a Block)
1,000
(> 100 Linear Feet in a Block)
1,000
Side Walk, 6" thick 4,000
Bountiful Standard Drive Approach, Type A
Drive Approach, Type B
Drive Approach, Type C
Drive Approach, Type D
Drive Approach, Type E
Linear Feet
Saw Cut Asphalt 4,000
00 41 00 - 30
Unit
Unit Price Amount
Saw Cut Concrete 1,000
Install Dowels In Concrete 100
Each
Concrete Roadway Slab Replacement APWA Plan 256
65,000 Sq. Ft. * inch
Sprinkler Valves, Repair or Replace 20
Sprinkler Heads, Repair or Replace 100
Sprinkler Pipe, Repair or Replace 500
Turf Sod 1,500
Common Fill 100
Ton
Storm Drain Inlet Box APWA Type A Plan 315
Storm Drain Inlet Box - Double APWA Type B Plan 315
Storm Drain Inlet Box with Side Box APWA Plan 316
Outlet Gutter Transition (Dipstone Outlet)
Waterway, 9" thick APWA Plan 211
2,000
Waterway Transition Structure APWA Plan 213
Concrete Pipe, 12" Reinforced (CL III RCP) 100
Linear feet
Concrete Pipe, 15" Reinforced (CL III RCP) 100
Concrete Pipe, 18" Reinforced (CL III RCP) 100
HDPE Pipe 12" 100
Unit
Unit Price Amount
HDPE Pipe 15" 100
Bountiful Standard 30" Storm Drain Manhole
00 41 00 - 31
Storm Drain Manhole, 48" 2
6" Monolithic Curb Wall on New Sidewalk 150
Bountiful Standard 20" Concrete Retaining Wall
Bountiful Standard 36" Concrete Retaining Wall
Flowable Fill 20
Cubic Yard
Furnish & Install Cast Iron 2' x 4' Detectable Warning Device(s)
Tree Removal, 12" Diameter 5
Total, Schedule 1 = $_________________________________
2.2 GRAND TOTAL
A. The following summarizes the totals of all schedules.
TOTAL, SCHEDULE 1 = $________________________________
PART 3 MEASUREMENT AND PAYMENT
3.0 GENERAL
A. Units of measurement are listed above in the price schedule(s).
B. Measurement and payment procedures follow APWA Section 01 29 00.
C. ENGINEER will take all measurements and compute all quantities.
D. CONTRACTOR will verify measurement and quantities.
E. CONTRACTOR will provide all equipment, workers, and survey crews to assist ENGINEER in making measurements.
NOTE: The following items (generally) follow the order in the bid schedule above, however similar items may be grouped together.
3.1 MEASUREMENT AND PAYMENT
3.1.1 REMOVE CURB AND GUTTER, Bid Item 1
A. Measurement: Linear Feet, as measured along the back of the curb prior to removal
B. Payment covers the cost of removing all concrete and transporting to proper disposal
00 41 00 - 32 location. Segregation and Disposal options see section 1.6 item C Summary of Work (01 11 00 -121).
C. Saw cuts paid as separate item.
D. Payment covers excavation and disposal of 6" deep foundation soil materials.
3.1.2 REMOVE SIDEWALK AND CONCRETE SLABS, Bid Item 2
A. Measurement: Square Feet, as measured in place prior to removal.
B. Payment covers the cost of removing all concrete and transporting to proper disposal location. Segregation and Disposal options see section 1.6 item C Summary of Work (01 11 00 -121).
C. Saw cuts paid as separate item.
D. Payment covers excavation and disposal of 6" deep foundation soil materials.
3.1.3 REMOVE STORM DRAIN INLET OR OUTLET, Bid Item 3
A. Measurement: Each.
B. Payment covers the cost of removing all concrete and transporting to proper disposal location. Segregation and Disposal options see section 1.6 item C Summary of Work (01 11 00 -121).
C. Saw cuts paid as separate item.
3.1.4 REMOVE WATERWAY, Bid Item 4
A. Measurement: Square Feet, as measured in place prior to removal.
B. Payment covers the cost of removing all concrete and transporting to proper disposal location. Segregation and Disposal options see section 1.6 item C Summary of Work (01 11 00 -121).
C. Saw cuts paid as separate item.
D. Payment covers excavation and disposal of 6" deep foundation soil materials.
3.1.5 REMOVE ASPHALT PAVEMENT, Bid Item 5
A. Measurement: Square Feet, measured in place prior to removal.
B. Payment covers the cost of removing all asphalt and transporting to proper disposal location. Segregation and Disposal options see section 1.6 item C Summary of Work (01 11 00 -121).
C. Saw cuts paid as separate item.
3.1.6 CURB AND GUTTER, Bid Items 6,7,8,9
A. Measurement: Linear Feet, as measured along top back of curb, exclusive of catch basins.
B. Payment covers the cost of the type of curb and gutter indicated, with installation per APWA Plan No. 205 and form strip filler work shown in APWA Plan No. 242.
C. Payment covers the cost of supplying and installing 6" inch thickness of untreated base course as foundation and leveling material.
3.1.7 SIDEWALK 4" THICK, LESS THAN 50' IN A BLOCK, Bid Item 10
A. Measurement: Square Feet, for amounts of walk installed which are part of a total less than
00 41 00 - 33
50 feet long in a one block area along both sides of a street.
B. Payment covers the cost of the thickness indicated, with installation per APWA Plan No.
231 and form strip filler work per APWA Plan No. 242.
C. Payment covers the cost of supplying and installing 6" of select fill used for backfilling and leveling.
3.1.8 SIDEWALK 4" THICK, LESS THAN 100 LF IN A BLOCK, Bid Item 11
A. Measurement: Square Feet, for amounts of walk installed which are part of a total less than 100 feet long in a one block area along both sides of a street.
B. Payment covers the cost of the thickness indicated, with installation per APWA Plan No.
231 and form strip filler work per APWA Plan No. 242.
C. Payment covers the cost of supplying and installing 6" of select fill used for backfilling and leveling.
3.1.9 SIDEWALK 4" THICK, MORE THAN 100 LF IN A BLOCK, Bid Item 12
A Measurement: Square Feet, for amounts of walk installed which are part of a total more than 100 feet long in a one block area along both sides of a street.
B. Payment covers the cost of the thickness indicated, with installation per APWA Plan No.
231 and form strip filler work per APWA Plan No. 242.
C. Payment covers the cost of supplying and installing 6" of select fill used for backfilling and leveling.
3.1.10 SIDEWALK 6" THICK, Bid Item 13
A. Measurement: Square Feet, regardless of the amount installed in any one block area.
B. Payment covers the cost of the thickness indicated, with installation per APWA Plan No.
231 and form strip filler work per APWA Plan No. 242.
C. Payment covers the cost of supplying and installing 6" of select fill used for backfilling and leveling.
3.1.11 DRIVE APPROACH TYPE A, Bid Item 14
A. Measurement: Linear Feet, measured at sidewalk, including curb, gutter, apron and flared surfaces. Sidewalk measured separately.
B. Payment covers the cost of work shown in Bountiful City Standard Drawing.
C. Payment covers the cost of supplying and installing select fill as foundation and leveling material.
3.1.12 DRIVE APPROACH TYPE B, Bid Item 15
A. Measurement: Linear Feet, measured at sidewalk, including, curb, gutter, apron and flared surfaces. Sidewalk measured separately.
B. Payment covers the cost of work shown in Bountiful City Standard Drawing.
C. Payment covers the cost of supplying and installing select fill as foundation and leveling material.
3.1.13 DRIVE APPROACH TYPE C, Bid Item 16
00 41 00 - 34
A. Measurement: Linear Feet, measured at sidewalk, including curb, gutter, apron and flared surfaces. Sidewalk measured separately.
B. Payment covers the cost of work shown in Bountiful City Standard Drawing.
C. Payment covers the cost of supplying and installing select fill as foundation and leveling material.
D. Payment covers the cost of saw-cutting the existing curb and gutter.
3.1.14 DRIVE APPROACH TYPE D, Bid Item 17
A. Measurement: Linear Feet, including plate, curb, gutter, apron and flared surfaces.
Sidewalk measured separately. The apron measured for payment will include apron slab measured back from curb 4'-0".
B. Payment covers the cost of work shown in Bountiful Standard Drawing.
C. Payment covers the cost of supplying and installing select fill as foundation and…
This is the start of the file's text. The full file is on GovTribe.