10-Type E Drive Approach 8-2017.pdf

PDF 122 KB Posted

Attached to
2026 Storm Drain Projects State and local contract opportunity
Solicitation number
Not on record
Issued by
Utah

About this file

This is a technical standard specification document for Type E Drive Approach construction prepared by Bountiful City, Utah, detailing the design and construction requirements for mountable curb-type driveway approaches. The specification outlines the physical dimensions and structural requirements for drive approaches, including a minimum 4-foot-wide concrete walkway, a 1½-inch raise at the flow line, 6-inch road base minimum, and continuous #4 rebar reinforcement. The concrete must be Class 4000 per APWA specifications with a minimum 6-inch thickness throughout the walkway through the driveway. Drive approach lengths must measure between 12 and 30 feet for payment purposes, with a minimum 4½-foot length measured from the curb transition. The specification requires expansion joints when driveway width exceeds 14 feet, contraction joints as required, and a minimum 3-foot-6-inch saw cut of asphalt removal in front of drive approaches with straight lines to full depth.

The specification mandates epoxy-coated rebar, Class 4000 concrete cured per APWA Section 03390 using curing compound application, and compact existing subgrade to 95 percent minimum using modified Proctor testing. All concrete and asphalt removal must be saw cut to full depth with straight lines, and straight metal forms are required for all tangent sections or where curb radius is not less than 150 feet. The specification was revised in August 2017 and applies to the City of Bountiful's 2026 replacement and new construction project for sidewalk, curb and gutter, and storm drain facilities at random locations throughout the city.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Storm Drain Projects, newest first.
File Type Posted
4-2026 Storm Drain Projects Bid Set.pdf PDF
2-2026 Storm Drain Projects Bid Package.pdf PDF
1-NOTICE TO CONTRACTORS 2026 SD Projects.pdf PDF
3-Bountiful Landfill Retention Pond Sheet Set.pdf PDF
4-PRV 2017.pdf PDF
6-2020 Fire Hydrant Installation.pdf PDF
9-NOTICE TO CONTRACTORS 2026 WL Projects.pdf PDF
5-2020 Water Standard Trench Detail.pdf PDF
8-2026 Water Line Projects Bid Set.pdf PDF
3-2009 NEW water service.pdf PDF
2-2009 2 IN water service.pdf PDF
7-2009 TRANSFER water service.pdf PDF
1-2026 Water Line Projects Bid Package.pdf PDF
4-4 Bountiful Trail MasterPlan Map large Mar2025 With Trail Names.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Big Rock Hiking.pdf PDF
6-6 USFS Trail Design Parameters Hiking.pdf PDF
5-5 2026 Holbrook USFS Trail Design Parameters.pdf PDF
3-3 2026 Holbrook Trails Project Plans.pdf PDF
6-6 2026 Holbrook Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
4-4 Bountiful Trail Design 210830v1.1 NEPA LR.pdf PDF
3-3 Big Rock Hiking Trail Plans.pdf PDF
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf PDF
2-2 2026 Big Rock Hiking Trail Project Bid Document.pdf PDF
1-1 NOTICE TO CONTRACTORS - 2026 Holbrook Trails Construction Project.pdf PDF
8-Holbrook Trails flagged.txt TXT text file
7-Reference A Bountiful Trails NEPA Botanical Survey CCF 2025.pdf PDF
2-2 2026 Holbrook Trails Construction Project Bid Doc.pdf PDF
7-7 Forest Service Standard Trail Plans, annotated for Davis County.pdf PDF
8-Reference A Weed Management Plan 06.15.22.pdf PDF
9-Big Rock Trail flagged.txt TXT text file
7-Type A Drive Approach 8-2017.pdf PDF
1-2026 Misc. Concrete Bid Documents.pdf PDF
9-Type C Drive Approach 8-2017.pdf PDF
6-Type D Drive Approach 8-2017.pdf PDF
5-Type B Drive Approach 8-2017.pdf PDF
4-retaining wall 20 inch.pdf PDF
2-Dipstone outlet gutter transition.pdf PDF
3-NOTICE TO CONTRACTORS - 2026 Misc Concrete.pdf PDF
8-retaining wall 36 inch.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4' WALKVARIESC & G

6" MAXIMUM

1 1/2" RAISE

AT FLOW LINE

6" MINIMUM

THROUGHOUT

6" ROAD BASE

MINIMUM

2 #4 BARS

CONTINUOUS

4' WALK

C & G

CURB

TRANSITION

4 1/2' MINIMUM

LENGTH TO BE MEASURED FOR

DRIVE APPROACH PAYMENT

12' MINIMUM / 30' MAXIMUM

MINIMUM 6" THICK CONCRETE WALK

THROUGH DRIVEWAY

BOUNTIFUL STANDARD

TYPE E DRIVE APPROACH

MOUNTABLE CURB TYPE APPROACH

SECTION A-A

PLAN VIEW

NOTES

A

A

CONTINUOUS

2 #4 BARS

1 1/2" RAISE

AT FLOW LINE

CONTRACTION

JOINT REQUIRED

WHEN DRIVEWAY

WIDTH EXCEEDS

14'

1/2" EXPANSION

JOINT MATERIAL

3'-6" (min)

SAW CUT

ASPHALT

6"

(TYP. 4')

PARK

STRIP

VARIES

6"

12" 18"

1. CONCRETE: CLASS 4000 PER APWA SECTION 03304. PLACE PER APWA SECTION 02770. CURE PER APWA SECTION 03390

2. COMPACT EXISTING SUBGRADE 95% MINIMUM (MODIFIED PROCTOR).

3. CURING BY APPLICATION OF CURING COMPOUND PER CURRENT APWA SPECIFICATIONS.

4. WHERE CONCRETE, OR ASPHALT IS TO BE REMOVED, THE MATERIAL MUST BE SAWCUT TO FULL DEPTH WITH STRAIGHT LINES.

MINIMUM WIDTH OF ASPHALT REMOVAL IN FRONT OF A DRIVE APPROACH IS 3 FT-6 INCHES.

5. 6" ROAD BASE MINIMUM UNDER ALL NEW CONCRETE.

6. EPOXY COATED REBAR REQUIRED.

7. STRAIGHT METAL FORMS REQUIRED FOR ALL TANGENT SECTIONS OR WHERE THE CURB RADIUS IS NOT LESS THAN 150 FT.

REVISED 8/2017

6"

SAW CUT

REQUIRED

'-6

(m in