9 Master Trail Pricing Sheets.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Northern Wyoming Trail Maintenance IDIQ
- Solicitation number
- 1282B123R0011
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9 Master Trail Pricing Sheets Amended 20230420.xlsx | XLSX spreadsheet | |
| Amendment 3 RFIs.pdf | ||
| 1442_Amendment_3.pdf | ||
| 1442_Amendment_2.pdf | ||
| 20230410 Wyoming Trail IDIQ Plan Set_FINAL Amend 2.pdf | ||
| 1442_Amendment_1.pdf | ||
| Amendment_1 Doc.pdf | ||
| 4 Future Project List.pdf | ||
| 7 Fishhawk Trail Reconstruction Videos.docx | DOCX document | |
| 8 PPQ template.docx | DOCX document | |
| 6 Fishhawk Trail 757 Work Item Photos.pdf | ||
| 1 IDIQ Plans.pdf | ||
| 11 16001 Expanded Food Storage Order.pdf | ||
| 2 Trail Specifications.pdf | ||
| 10 Wage Determination.pdf | ||
| 3 SOW ShoshoneTrail IDIQ.pdf | ||
| 5 Fishhawk Maps.pdf | ||
| RFP 1282B123R0011.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Master IDIQ_Schedule of Items
| Shoshone National Forest Trail IDIQ | |||||||
| - Master Schedule of Items - | |||||||
| Item No. | Description | Estimated Quantity | Unit | Zones | Unit Price | ||
| ZONES: Bidders shall enter the Zone(s) bidding. North = North Zone of Forest South = South Zone of Forest Both = Forest wide | Base | Option | |||||
| Year | Notes | Year 2 | |||||
| 901(01) | Survey and Design | 1 | Mile | ||||
| 907(01) | Mobilization | 1 | LS | Per Task Order | Per Task Order | ||
| 911(02) | Excavation and Embankment, New Trail Construction, Full Bench | ||||||
| Trail Class 1 | 1 | LF | |||||
| Trail Class 2 | 1 | LF | |||||
| Trail Class 3 | 1 | LF | |||||
| 911(05) | Excavation for Trail Structures | 1 | LS | Per Task Order | Per Task Order | Per Task Order | |
| 911(06) | Existing Trail Restoration | ||||||
| Trail Class 1 | 1 | Mile | |||||
| Trail Class 2 | 1 | Mile | |||||
| Trail Class 3 | 1 | Mile | |||||
| 911(09) | Slide and Washout Maintenance | 1 | LS | Per Task Order | Per Task Order | Per Task Order | |
| 911(16) | Trail Obliteration, Scarification and Slash Placement. | ||||||
| Trail Class 1 | 1 | LF | |||||
| Trail Class 2 | 1 | LF | |||||
| Trail Class 3 | 1 | LF | |||||
| 911(17) | Trail Obliteration, Recontour and Slash Placement. | ||||||
| Trail Class 1 | 1 | LF | |||||
| Trail Class 2 | 1 | LF | |||||
| Trail Class 3 | 1 | LF | |||||
| 912(01) | Clearing and Grubbing, New Construction | ||||||
| Trail Class 1 | 1 | LF | |||||
| Trail Class 2 | 1 | LF | |||||
| Trail Class 3 | 1 | LF | |||||
| 912(04) | Light Existing Trailway Clearing and Logging out. | ||||||
| Non-Wilderness | 1 | Mile | |||||
| Wilderness | 1 | Mile | |||||
| 912(05) | Heavy Existing Trailway Clearing and Logging out. | ||||||
| Non-Wilderness | 1 | Mile | |||||
| Wilderness | 1 | Mile | |||||
| 912(17) | Hazard Tree Removal | ||||||
| Non-Wilderness | 1 | EA | |||||
| Wilderness | 1 | EA | |||||
| 914(02) | Climbing Turn, New Construction | ||||||
| Trail Class 1 | 1 | EA | |||||
| Trail Class 2 | 1 | EA | |||||
| Trail Class 3 | 1 | EA | |||||
| 914(03) | Climbing Turn, Maintenance of Existing | ||||||
| Trail Class 1 | 1 | EA | |||||
| Trail Class 2 | 1 | EA | |||||
| Trail Class 3 | 1 | EA | |||||
| 917(01) | Stream Ford, Type Log or Rock, New Construction | ||||||
| Trail Class 1 | 1 | EA | |||||
| Trail Class 2 | 1 | EA | |||||
| Trail Class 3 | 1 | EA | |||||
| 917(02) | Stream Ford, Maintain Existing | ||||||
| Trail Class 1 | 1 | EA | |||||
| Trail Class 2 | 1 | EA | |||||
| Trail Class 3 | 1 | EA | |||||
| 918(01) | Geosynthetic Foundation | 1 | LS | Per Task Order | Per Task Order | Per Task Order | |
| 921(01) | Culvert, Type 12" Dia HDPE Corrugated Plastic Pipe | 1 | LF | ||||
| 921(05) | Culvert, Type Rock, New Construction | 1 | LF | ||||
| 922(01) | Water Bar, Type Rock or Native Log, New Construction | 1 | EA | ||||
| 922(02) | Water Bar, Maintain Existing | 1 | LF | ||||
| 927(01) | Drain Dip, New Construction | 1 | LF | ||||
| 927(02) | Drain Dip, Maintain Existing | 1 | LF | ||||
| 928(01) | Check Dam, Type Rock or Log, New Construction | 1 | LF | ||||
| 928(02) | Check Dam, Maintain Existing | 1 | LF | ||||
| 931(02) | Switchback, Type 1 or 2, New Construction | ||||||
| Trail Class 1 | 1 | EA | |||||
| Trail Class 2 | 1 | EA | |||||
| Trail Class 3 | 1 | EA | |||||
| 931(03) | Switchback, Type 1 or 2, Maintain Existing | ||||||
| Trail Class 1 | 1 | EA | |||||
| Trail Class 2 | 1 | EA | |||||
| Trail Class 3 | 1 | EA | |||||
| 932(01) | Turnpike, New Construction | 1 | SF | ||||
| 933(01) | Side Barrier, Type Rock, New Construction | 1 | SF | ||||
| 934(02) | Puncheon | 1 | LS | Per Task Order | Per Task Order | Per Task Order | |
| 935(01) | Retaining Wall, Type Log or Rock, New Construction | 1 | SF | ||||
| 935(02) | Retaining Wall, Maintain Existing | 1 | SF | ||||
| 955(01) | Rock Cairn, New Construction | ||||||
| Type T -Simple Rock Cairn | 1 | EA | |||||
| Type U - Rock Cairn | 1 | EA | |||||
| 961(01) | Trail Bridge | 1 | LS | Per Task Order | Per Task Order | Per Task Order | |
| 981(01) | Seeding | 1 | ACRE | Per Task Order | Per Task Order | Per Task Order | |
| 983(05) | Individual Removal and Disposal | 1 | LS | Per Task Order | Per Task Order | Per Task Order | |
| Schedule of Items Notes: |
All Pay Items: The use of livestock to transport tools and materials to and from a project site is permitted. However, daily travel to the project site and between work sections shall be done on foot. Exceptions to this requirement may be granted by the CO.
| Trail Classes are defined in Plans but primarily are tread width and finish (24", 36", and 48" respectively) |
| 901(01) – Survey and Design. Includes personnel traversing an undisturbed landscape and establishing survey locations in the form of wooden stakes, pin flags, or flagging. Stationing will be established on the ground and terrain features located on the ground. Terrain features include, but not limited to, grade dips, water bars, stream crossings, switchbacks, retaining walls and other items shown in the Schedule of Items. Additionally, stationing and terrain features will be documented in a Description of Work for use by the Government. |
911(02) – EXCAVATION AND EMBANKMENT, NEW TRAIL CONSTRUCTION, FULL BENCH. This work consists of constructing new trail prisms to the specified dimensions shown in the DRAWINGS. This work also includes construction of native material features such as ditches, and drain dips. Trail structures such as culverts, rock or log waterbars, stream fords, check dams, switchbacks, turnpikes, and retaining walls will be paid for separately. Clearing and Grubbing will be paid for seperately.
911(06) – EXISTING TRAIL RESTORATION. This work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring existing drainage and other trail structures, reconstructing check dams, and removing protruding rocks, roots, stumps, slough, and berms. This pay item is primarily focused on earthwork to bring the trail back to its original template.
| 912 (01) - Clearing and Grubbing, New Construction, Non-Wilderness. Use heavy trail clearing and logout cost&production plus estimate grubbing at 500 ft/day |
| Assume 1 miniexcavator can do 1 mile in five days for Class 2/3. |
| 912(04) & 912(05) – EXISTING TRAILWAY CLEARING AND LOGGING OUT. Includes cutting and removing vegetation from inside the clearing limits and scattering outside of the clearing limits. Also includes removal of loose rock larger than 4” in diameter from the trailway. Roots larger than 3” in diameter shall be cut and disposed of outside the clearing limits. This pay item is primarily focused on the cutting and removal of vegetation and the removal of loose rocks; however, this pay item also includes cleaning drainage features such as drain dips and waterbars to ensure water drains off the trailway. |
912(04) & 912(05) - EXISTING TRAILWAY CLEARING AND LOGGING OUT. The requirements for light & heavy trailway clearing and logging out are identical. The difference between the two pay items is the estimated amount of time and effort needed to clear the trail. Heavy clearing is estimated to need a two person crew and a production rate of 1 mile per day. Light clearing is estimated to need a two person crew and a production rate of 5 miles per day.
Master IDIQ SOI
| Shoshone National Forest Trail IDIQ | ||||||
| - Schedule of Items - | ||||||
| Item No. | Description | Estimated Quantity | Unit | Zones | Unit Price | |
| ZONES: Bidders shall enter the Zone(s) bidding. North = North Zone of Forest South = South Zone of Forest Both = Forest wide ; BH = Bighorns | Base | Option | ||||
| Year | Year 1 | |||||
| 901(01) | Survey | 1 | Mile | |||
| 907(01) | Mobilization | 1 | LS | Per Task Order | Per Task Order | |
| 911(02) | Excavation and Embankment, New Trail Construction, Full Bench | |||||
| Trail Class 1 | 1 | LF | ||||
| Trail Class 2 | 1 | LF | ||||
| Trail Class 3 | 1 | LF | ||||
| 911(05) | Excavation for Trail Structures | 1 | LS | Per Task Order | Per Task Order | |
| 911(06) | Existing Trail Restoration | |||||
| Trail Class 1 | 1 | Mile | ||||
| Trail Class 2 | 1 | Mile | ||||
| Trail Class 3 | 1 | Mile | ||||
| 911(09) | Slide and Washout Maintenance | 1 | LS | Per Task Order | Per Task Order | |
| 911(16) | Trail Obliteration, Scarification and Slash Placement. | |||||
| Trail Class 1 | 1 | LF | ||||
| Trail Class 2 | 1 | LF | ||||
| Trail Class 3 | 1 | LF | ||||
| 911(17) | Trail Obliteration, Recontour and Slash Placement. | |||||
| Trail Class 1 | 1 | LF | ||||
| Trail Class 2 | 1 | LF | ||||
| Trail Class 3 | 1 | LF | ||||
| 912(01) | Clearing and Grubbing, New Construction | |||||
| Trail Class 1 | 1 | LF | ||||
| Trail Class 2 | 1 | LF | ||||
| Trail Class 3 | 1 | LF | ||||
| 912(04) | Light Existing Trailway Clearing and Logging out. | |||||
| Non-Wilderness | 1 | Mile | ||||
| Wilderness | 1 | Mile | ||||
| 912(05) | Heavy Existing Trailway Clearing and Logging out. | |||||
| Non-Wilderness | 1 | Mile | ||||
| Wilderness | 1 | Mile | ||||
| 912(17) | Hazard Tree Removal | |||||
| Non-Wilderness | 1 | EA | ||||
| Wilderness | 1 | EA | ||||
| 914(02) | Climbing Turn, New Construction | |||||
| Trail Class 1 | 1 | EA | ||||
| Trail Class 2 | 1 | EA | ||||
| Trail Class 3 | 1 | EA | ||||
| 914(03) | Climbing Turn, Maintenance of Existing | |||||
| Trail Class 1 | 1 | EA | ||||
| Trail Class 2 | 1 | EA | ||||
| Trail Class 3 | 1 | EA | ||||
| 917(01) | Stream Ford, Type Log or Rock, New Construction | |||||
| Trail Class 1 | 1 | EA | ||||
| Trail Class 2 | 1 | EA | ||||
| Trail Class 3 | 1 | EA | ||||
| 917(02) | Stream Ford, Maintain Existing | |||||
| Trail Class 1 | 1 | EA | ||||
| Trail Class 2 | 1 | EA | ||||
| Trail Class 3 | 1 | EA | ||||
| 918(01) | Geosynthetic Foundation | 1 | LS | Per Task Order | Per Task Order | |
| 921(01) | Culvert, Type 12" Dia HDPE Corrugated Plastic Pipe | 1 | LF | |||
| 921(05) | Culvert, Type Rock, New Construction | 1 | LF | |||
| 922(01) | Water Bar, Type Rock or Native Log, New Construction | 1 | EA | |||
| 922(02) | Water Bar, Maintain Existing | 1 | LF | |||
| 927(01) | Drain Dip, New Construction | 1 | LF | |||
| 927(02) | Drain Dip, Maintain Existing | 1 | LF | |||
| 928(01) | Check Dam, Type Rock or Log, New Construction | 1 | LF | |||
| 928(02) | Check Dam, Maintain Existing | 1 | LF | |||
| 931(02) | Switchback, Type 1 or 2, New Construction | |||||
| Trail Class 1 | 1 | EA | ||||
| Trail Class 2 | 1 | EA | ||||
| Trail Class 3 | 1 | EA | ||||
| 931(03) | Switchback, Type 1 or 2, Maintain Existing | |||||
| Trail Class 1 | 1 | EA | ||||
| Trail Class 2 | 1 | EA | ||||
| Trail Class 3 | 1 | EA | ||||
| 932(01) | Turnpike, New Construction | 1 | SF | |||
| 933(01) | Side Barrier, Type Rock, New Construction | 1 | SF | |||
| 934(02) | Puncheon | 1 | LS | Per Task Order | Per Task Order | |
| 935(01) | Retaining Wall, Type Log or Rock, New Construction | 1 | SF | |||
| 935(02) | Retaining Wall, Maintain Existing | 1 | SF | |||
| 955(01) | Rock Cairn, New Construction | |||||
| Type T -Simple Rock Cairn | 1 | EA | ||||
| Type U - Rock Cairn | 1 | EA | ||||
| 961(01) | Trail Bridge | 1 | LS | Per Task Order | Per Task Order | |
| 981(01) | Seeding | 1 | ACRE | Per Task Order | Per Task Order | |
| 983(05) | Individual Removal and Disposal | 1 | LS | Per Task Order | Per Task Order |
Schedule of Items Notes:
All Pay Items: The use of livestock to transport tools and materials to and from a project site is permitted. However, daily travel to the project site and between work sections shall be done on foot. Exceptions to this requirement may be granted by the CO.
901(01) – Survey and Design. Includes personnel traversing an undisturbed landscape and establishing survey locations in the form of wooden stakes, pin flags, or flagging. Stationing will be established on the ground and terrain features located on the ground. Terrain features include, but not limited to, grade dips, water bars, stream crossings, switchbacks, retaining walls and other items shown in the Schedule of Items. Additionally, stationing and terrain features will be documented in a Description of Work for use by the Government.
911(02) – EXCAVATION AND EMBANKMENT, NEW TRAIL CONSTRUCTION, FULL BENCH. This work consists of constructing new trail prisms to the specified dimensions shown in the DRAWINGS. This work also includes construction of native material features such as ditches, and drain dips. Trail structures such as culverts, rock or log waterbars, stream fords, check dams, switchbacks, turnpikes, and retaining walls will be paid for separately. Clearing and Grubbing will be paid for seperately.
911(06) – EXISTING TRAIL RESTORATION. This work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring existing drainage and other trail structures, reconstructing check dams, and removing protruding rocks, roots, stumps, slough, and berms. This pay item is primarily focused on earthwork to bring the trail back to its original template.
912(04) & 912(05) – EXISTING TRAILWAY CLEARING AND LOGGING OUT. Includes cutting and removing vegetation from inside the clearing limits and scattering outside of the clearing limits. Also includes removal of loose rock larger than 4” in diameter from the trailway. Roots larger than 3” in diameter shall be cut and disposed of outside the clearing limits. This pay item is primarily focused on the cutting and removal of vegetation and the removal of loose rocks; however, this pay item also includes cleaning drainage features such as drain dips and waterbars to ensure water drains off the trailway.
912(04) & 912(05) - EXISTING TRAILWAY CLEARING AND LOGGING OUT. The requirements for light & heavy trailway clearing and logging out are identical. The difference between the two pay items is the estimated amount of time and effort needed to clear the trail. Heavy clearing is estimated to need a two person crew and a production rate of 1 mile per day. Light clearing is estimated to need a two person crew and a production rate of 5 miles per day.
Fishhawk_Task Order Price form
| DESCRIPTION OF WORK - FISHHAWK TRAIL 757 - Trail Class 2 Pricing Form | |||||||||||
| Milepost | Work Description | Pay Item | Quantity | Unit | Meth. of Measure | Unit Cost | Total Cost | two person crew | |||
| Trail 757 was Cleared/Logged Out In August 2022. Two known down trees across in October 2022 | |||||||||||
| 0 | Mobilization | 907(01) | 1 | LS | LSQ | 0 | hr | ||||
| 0.74 | Camp And Water | ||||||||||
| 1 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 1.45 | Water | ||||||||||
| 1.75 | Excavation & Embankment; Reconstruction of Existing Trail; Widen existing trail tread from (12"-16") to 36". (510 Linear Feet). Use excavated material to raise grade to fill entrenched trail. | 911(02) | 510 | LF | DQ | 0 | hr | ||||
| Begin Track 1 | |||||||||||
| 1.8 | Construct Offset Double Log Retainer, R2d (prior to excavation) | 911(23) | 24 | LF | DQ | 0 | hr | ||||
| 1.83 | Construct Offset Double Log Retainer, R2d (prior to excavation) | 911(23) | 16 | LF | DQ | 0 | hr | ||||
| 1.85 | Install New Log Water Bar with Log Anchors | 922(01) | 1 | EA | AQ | 0 | hr | ||||
| 1.88 | End Restoration of Existing Trail | ||||||||||
| 2 | Place To Camp With Horses | ||||||||||
| 2 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 2.1 | Water And Camp | ||||||||||
| 2.37 | Slide and Washout Maintenance, Site 2 | 911(09) | 1 | LS | LSQ | 0 | hr | ||||
| Re-Establish Tread to 36" Width for 25 Linear Feet | |||||||||||
| 2.44 | Slide and Washout Maintenance, Site 3 | 911(09) | 1 | LS | LSQ | 0 | hr | ||||
| Re-Establish Tread to 36" Width for 100 Linear Feet. Estimate 1-2 CY of soil removal | |||||||||||
| 2.47 | Slide and Washout Maintenance, Site 4 | 911(09) | 1 | LS | LSQ | 0 | hr | ||||
| Re-establish Tread to 36" Width for 60 Linear Feet. Build Tread Over Slide Material. Only Remove Rocks Greater Than 4 Inches. No Excavation | |||||||||||
| 2.57 | Water | ||||||||||
| 2.78 | Camp And Water, Could Keep Horses | ||||||||||
| 3 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 3.33 | Water | ||||||||||
| 3.34 | Slide and Washout Maintenance, Site 5 | 911(09) | 1 | LS | LSQ | 0 | hr | ||||
| Re-establish Tread each side of creek crossing to 36" width for 50 Linear Feet | |||||||||||
| 3.93 | Water | ||||||||||
| 4 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 4.81 | Water | ||||||||||
| 4.5 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 4.88 | Hazard Tree Removal, Wilderness | 912(17) | 1 | EA | AQ | ||||||
| 5 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 5.15 | Small Camp Site In Green Trees | ||||||||||
| 5.5 | Small Camp Site | ||||||||||
| 6 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 6.22 | Slide and Washout Maintenance, Site 6 | 911(09) | 1 | LS | LSQ | 0 | hrs | ||||
| Reestablish Tread For 50 Lf, | |||||||||||
| 6.5 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 6.98 | Begin Track 7 - Reroute (Track length 0.14) | ||||||||||
| Begin Clearing & Grubbing, New Construction, TC2 - Grub according to Standard Specification 912.10.05& any other applicable specification - SEE VIDEO | 912(01) | 750 | LF | DQ | 0 | hrs | |||||
| Excavation & Embankment, New Trail Construction - Reference Standard Specification 911.10.04 & any other applicable specification | 911(02) | 750 | LF | DQ | 0 | hs | |||||
| Trail Obliteration, Pull Rocks/Soil from edge of trail into entrenched trail existing trail. Cover with available slash | 911(16) | 528 | LF | DQ | 0 | hrs | |||||
| Construct 5 Log Check Dams before washout on trail segment to be abandoned and 3 log check dams after washout. Scatter slash. Field Fit. Tread is not 36" wide. Not all 20 LF will likely be needed. Varies between flat & entrenched. Minimize Excavation. | 928(01) | 20 | LF | AQ | 0 | hrs | |||||
| 7.01 | Excavation. Pull soil from top of stream bank to bottom (backfill double log retainer) to flatten grade. Approx 1 CY, 25-30LF - SEE VIDEO | 911(03) | 1 | LS | LSQ | 0 | hrs | ||||
| 7.02 | Construct Offset Double Log Retainer, R2d. At base of stream bank & stream channel. | 911(23) | 8 | LF | DQ | 0 | hrs | ||||
| 7.12 | End Track 7 - Reroute | ||||||||||
| 7.4 | Install New Log Water Bar at Spring with Log Anchors, Drain Left - SEE VIDEO | 922(01) | 1 | EA | AQ | 0 | |||||
| Excavation. Construct Outlet Ditch To Drain Spring Water from Trail, est 60 LF from trail to outlet - SEE VIDEO | 911(03) | 1 | LS | LSQ | 0 | hr | |||||
| 7.48 | Hazard Tree Removal, Wilderness | 912(17) | 1 | EA | AQ | ||||||
| 8 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 8.07 | Stream Ford, Maintain Existing Ruth Creek, Trail Class 2 | 917(01) | 1 | EA | AQ | 0 | hr | ||||
| Remove 4-6 down trees, remove approx 30 rocks larger than 8", reshape remaining gravels/sands by flattening high spots. Ruth Creek | |||||||||||
| 9 | Logging Out, >4" Diameter | 912(14) | 1 | EA | AQ | ||||||
| 9.7 | Outfitter Camp, Has Bear Boxes | ||||||||||
| 10.06 | Public Camp Spot At End of Meadow, with 1 Food Pole | ||||||||||
| 0 | hrs | 0 | days for two people | ||||||||
| ERROR:#DIV/0! | cost/day for crew of two |
File details come from the government source that posted it. Updated .