4 Future Project List.pdf
PDF 242 KB Posted
- Attached to
- Northern Wyoming Trail Maintenance IDIQ
- Solicitation number
- 1282B123R0011
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9 Master Trail Pricing Sheets Amended 20230420.xlsx | XLSX spreadsheet | |
| Amendment 3 RFIs.pdf | ||
| 1442_Amendment_3.pdf | ||
| 1442_Amendment_2.pdf | ||
| 20230410 Wyoming Trail IDIQ Plan Set_FINAL Amend 2.pdf | ||
| 1442_Amendment_1.pdf | ||
| Amendment_1 Doc.pdf | ||
| 7 Fishhawk Trail Reconstruction Videos.docx | DOCX document | |
| 8 PPQ template.docx | DOCX document | |
| 6 Fishhawk Trail 757 Work Item Photos.pdf | ||
| 1 IDIQ Plans.pdf | ||
| 11 16001 Expanded Food Storage Order.pdf | ||
| 9 Master Trail Pricing Sheets.xlsx | XLSX spreadsheet | |
| 2 Trail Specifications.pdf | ||
| 10 Wage Determination.pdf | ||
| 3 SOW ShoshoneTrail IDIQ.pdf | ||
| 5 Fishhawk Maps.pdf | ||
| RFP 1282B123R0011.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Task Task Subtype Trail BMP EMP Description
Shoshone Maintain to Standard Deferred Maintenance Fishhawk Trail 0 10.07 Re-establish and rehab trail tread along the entire length of the Fishhawk trail due to damage incurred from the 2019 Fishhawk Fire. The trail is currently closed for safety.
Shoshone Maintain to Standard Deferred Maintenance Eagle Creek Trail 0 15.82
Replace retaining logs and turnpikes. Complete drainage work along the entire trail. Eagle Creek creating cutting and impassible sections of the trail. Popular trail for O&Gs, public, Yellowstone NP employee access, important O&G transfer site.
Shoshone Miles Improved Alteration Willow Creek Ski Trails 0 10 Remove rock obstacles and create full bench trail across side slopes to bring winter x-country ski and fat bike trails up to standards
Shoshone Miles Improved Alteration, new construction Middle Fork Trail 2 6
Installing 2 large inside drains/french drains, 34 checks/rock water bars, 3 turnpikes, and 1 minor trail realignment over a 1.2 mile section of heavily eroded trail. Popular trail located by of Lander, WY identified as a gateway community.
Shoshone Maintain to Standard Deferred Maintenance North Fork Trail 4 7
Logout and re-establish trail corridor specs along main arterial trail accessing the popular Cirque of the Towers climbing venue. This trail is one of only a few popular portals accessing the internationally acclaimed Cirque of the Towers.
Shoshone Miles Improved Alteration, new construction Piney Creek Trail 0 4 Re-route existing trail away from unsafe boggy area.Sheep and other O&Gs to access high country -safety aspect and very popular O&G activities.
Shoshone Miles Improved Alteration, new construction Pinnacles Trail Rebuild section of trail destroyed by rock slide Shoshone Miles Improved New construction Ink Wells Cut-Off Trail 0 1.337 Logout and re-establish burned over trail linking outfitter base camp operating areas Shoshone Miles Improved Alteration, new construction Ink Wells Trail 0 8.2 Reconstruction of tread through slabby incline and Improved drainage Shoshone Maintain to Standard Deferred Maintenance Elk Creek Trail Cut Across 0 0.87 improve existing trail to increase safety for users
Shoshone Maintain to Standard Deferred Maintenance Crandall Trail Rock Removal (Timber Creek), remove large rock that entirely obstructs trail with no route around (blasting required)
Shoshone Maintain to Standard Deferred Maintenance Deer Creek Trail 2.1 2.11 Crossing Improvement, improve second creek crossing on Deer Creek by removing large rock (blasting required).
Shoshone Maintain to Standard Deferred Maintenance Ishawooa Trail Repair several washouts along trail Shoshone Maintain to Standard Deferred Maintenance Jack Creek Trail Slide, gravel and tread work needed to reestablish trail tread Shoshone Miles Improved New construction Venus Basin Trail Re-route existing trail around slide
Shoshone Miles Improved Alteration, new construction Yellowstone Trail Footbridge 0.3095 0.317 Install 30 foot footbridge, remove old bridge, rehab impacted water crossing, build trail to connect new bridge
Shoshone Miles Improved Alteration, new construction Downs Fork Bridge 14.3 15 Remove unserviceable 30 foot footbridge and pack hardware out of Wilderness. build trail to connect new bridge
Shoshone Maintain to Standard Deferred Maintenance Bears Ears Trail improve 6 miles of trail by slab rock removal, large boulder removal, tread work, tread widening, and installation of drainage structures
Bighorn Miles Improved Alteration, new construction Bighorn NF Trail bridge Repairs – Driveway, Cedar Ck, & Shell Ck Trail Bridges
Bridge Safety Improvements - Trail bridge Infrastructure. High - priority on Forest Trail Strategy - Safety and Access Concerns. Trail Reconstruction on 3 (qty.) trail bridges. High utilized recreation, cattle permittees, and access to wilderness. Request is for design dollars in FY21.
Bighorn Miles Improved Alteration, new construction North High Park Trail Improvements Protect a wetland and restore trail. Replace a 250' puncheon. The trail is a portal to the Cloud Peak Wilderness for hikers, & stock users, and is utilized by mountain bikers & motorcyclists.
Bighorn Miles Improved Alteration, new construction Stockwell Trail 0 606
Repair 6.6 miles of wet/damaged trail and relocate away from streams/riparian areas. Work will include, but is not limited to, construction of drainage structures, realignment, turnpikes, stream crossings, trail reconditioning, and bank stabiliation.
Bighorn Miles Improved Alteration, new construction Dutch Creek Trail
Replace Dutch Creek trail bridge which was destroyed by 416 Fire, repair and relocate trail out of riparian areas and address safety needs. Construction, reconditioning, construction of drainage, improving stream crossings, and trail surface repair.