9 Master Trail Pricing Sheets Amended 20230420.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Northern Wyoming Trail Maintenance IDIQ
Solicitation number
1282B123R0011
Issued by

View the file

Other files

File Type Posted
Amendment 3 RFIs.pdf PDF
1442_Amendment_3.pdf PDF
1442_Amendment_2.pdf PDF
20230410 Wyoming Trail IDIQ Plan Set_FINAL Amend 2.pdf PDF
1442_Amendment_1.pdf PDF
Amendment_1 Doc.pdf PDF
4 Future Project List.pdf PDF
7 Fishhawk Trail Reconstruction Videos.docx DOCX document
8 PPQ template.docx DOCX document
6 Fishhawk Trail 757 Work Item Photos.pdf PDF
1 IDIQ Plans.pdf PDF
11 16001 Expanded Food Storage Order.pdf PDF
9 Master Trail Pricing Sheets.xlsx XLSX spreadsheet
2 Trail Specifications.pdf PDF
10 Wage Determination.pdf PDF
3 SOW ShoshoneTrail IDIQ.pdf PDF
5 Fishhawk Maps.pdf PDF
RFP 1282B123R0011.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Master IDIQ_Schedule of Items

Shoshone National Forest Trail IDIQ
- Master Schedule of Items -
Item No.DescriptionEstimated QuantityUnitZonesUnit Price
ZONES: Bidders shall enter the Zone(s) bidding. North = North Zone of Forest South = South Zone of Forest Both = Forest wideBaseOption
YearNotesYear 2
901(01)Survey and Design1Mile
907(01)Mobilization1LSPer Task OrderPer Task Order
911(02)Excavation and Embankment, New Trail Construction, Full Bench
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(05)Excavation for Trail Structures1LSPer Task OrderPer Task OrderPer Task Order
911(06)Existing Trail Restoration
Trail Class 11Mile
Trail Class 21Mile
Trail Class 31Mile
911(09)Slide and Washout Maintenance1LSPer Task OrderPer Task OrderPer Task Order
911(16)Trail Obliteration, Scarification and Slash Placement.
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(17)Trail Obliteration, Recontour and Slash Placement.
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
912(01)Clearing and Grubbing, New Construction
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
912(04)Light Existing Trailway Clearing and Logging out.
Non-Wilderness1Mile
Wilderness1Mile
912(05)Heavy Existing Trailway Clearing and Logging out.
Non-Wilderness1Mile
Wilderness1Mile
912(17)Hazard Tree Removal
Non-Wilderness1EA
Wilderness1EA
914(02)Climbing Turn, New Construction
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
914(03)Climbing Turn, Maintenance of Existing
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
917(01)Stream Ford, Type Log or Rock, New Construction
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
917(02)Stream Ford, Maintain Existing
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
918(01)Geosynthetic Foundation1LSPer Task OrderPer Task OrderPer Task Order
921(01)Culvert, Type 12" Dia HDPE Corrugated Plastic Pipe1LF
921(05)Culvert, Type Rock, New Construction1LF
922(01)Water Bar, Type Rock or Native Log, New Construction1EA
922(02)Water Bar, Maintain Existing1LF
927(01)Drain Dip, New Construction1LF
927(02)Drain Dip, Maintain Existing1LF
928(01)Check Dam, Type Rock or Log, New Construction1LF
928(02)Check Dam, Maintain Existing1LF
931(02)Switchback, Type 1 or 2, New Construction
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
931(03)Switchback, Type 1 or 2, Maintain Existing
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
932(01)Turnpike, New Construction1SF
933(01)Side Barrier, Type Rock, New Construction1SF
934(02)Puncheon1LSPer Task OrderPer Task OrderPer Task Order
935(01)Retaining Wall, Type Log or Rock, New Construction1SF
935(02)Retaining Wall, Maintain Existing1SF
955(01)Rock Cairn, New Construction
Type T -Simple Rock Cairn1EA
Type U - Rock Cairn1EA
961(01)Trail Bridge1LSPer Task OrderPer Task OrderPer Task Order
981(01)Seeding1ACREPer Task OrderPer Task OrderPer Task Order
983(05)Individual Removal and Disposal1LSPer Task OrderPer Task OrderPer Task Order
Schedule of Items Notes:

All Pay Items: The use of livestock to transport tools and materials to and from a project site is permitted. However, daily travel to the project site and between work sections shall be done on foot. Exceptions to this requirement may be granted by the CO.

Trail Classes are defined in Plans but primarily are tread width and finish (24", 36", and 48" respectively)
901(01) – Survey and Design. Includes personnel traversing an undisturbed landscape and establishing survey locations in the form of wooden stakes, pin flags, or flagging. Stationing will be established on the ground and terrain features located on the ground. Terrain features include, but not limited to, grade dips, water bars, stream crossings, switchbacks, retaining walls and other items shown in the Schedule of Items. Additionally, stationing and terrain features will be documented in a Description of Work for use by the Government.

911(02) – EXCAVATION AND EMBANKMENT, NEW TRAIL CONSTRUCTION, FULL BENCH. This work consists of constructing new trail prisms to the specified dimensions shown in the DRAWINGS. This work also includes construction of native material features such as ditches, and drain dips. Trail structures such as culverts, rock or log waterbars, stream fords, check dams, switchbacks, turnpikes, and retaining walls will be paid for separately. Clearing and Grubbing will be paid for seperately.

911(06) – EXISTING TRAIL RESTORATION. This work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring existing drainage and other trail structures, reconstructing check dams, and removing protruding rocks, roots, stumps, slough, and berms. This pay item is primarily focused on earthwork to bring the trail back to its original template.

912 (01) - Clearing and Grubbing, New Construction, Non-Wilderness. Use heavy trail clearing and logout cost&production plus estimate grubbing at 500 ft/day
Assume 1 miniexcavator can do 1 mile in five days for Class 2/3.
912(04) & 912(05) – EXISTING TRAILWAY CLEARING AND LOGGING OUT. Includes cutting and removing vegetation from inside the clearing limits and scattering outside of the clearing limits. Also includes removal of loose rock larger than 4” in diameter from the trailway. Roots larger than 3” in diameter shall be cut and disposed of outside the clearing limits. This pay item is primarily focused on the cutting and removal of vegetation and the removal of loose rocks; however, this pay item also includes cleaning drainage features such as drain dips and waterbars to ensure water drains off the trailway.

912(04) & 912(05) - EXISTING TRAILWAY CLEARING AND LOGGING OUT. The requirements for light & heavy trailway clearing and logging out are identical. The difference between the two pay items is the estimated amount of time and effort needed to clear the trail. Heavy clearing is estimated to need a two person crew and a production rate of 1 mile per day. Light clearing is estimated to need a two person crew and a production rate of 5 miles per day.

Master IDIQ SOI

Shoshone National Forest Trail IDIQ
- Schedule of Items -
Item No.DescriptionEstimated QuantityUnitZonesUnit Price
ZONES: Bidders shall enter the Zone(s) bidding. North = North Zone of Forest South = South Zone of Forest Both = Forest wide ; BH = BighornsBaseOption
YearYear 1
901(01)Survey1Mile
907(01)Mobilization1LSPer Task OrderPer Task Order
911(02)Excavation & Embankment, New Trail Construction, Full Bench, Non-Wilderness
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(02)Excavation & Embankment, New Trail Construction, Full Bench, Wilderness
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(02)Excavation & Embankment, Widen Existing Tread, Non-Wilderness
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(02)Excavation & Embankment, Widen Existing Tread, Wilderness
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(03)Excavation, Non- Wilderness1LSPer Task OrderPer Task Order
911(03)Excavation, Wilderness1LSPer Task OrderPer Task Order
911(05)Excavation for Trail Structures1LSPer Task OrderPer Task Order
911(06)Existing Trail Restoration, Light, Non-Widerness
Trail Class 11Mile
Trail Class 21Mile
Trail Class 31Mile
911(06)Existing Trail Restoration, Light, Widerness
Trail Class 11MIle
Trail Class 21Mile
Trail Class 31Mile
911(07)Existing Trail Restoration, Heavy, Non-Wilderness
Trail Class 11Mile
Trail Class 21Mile
Trail Class 31Mile
911(07)Existing Trail Restoration, Heavy, Wilderness
Trail Class 11Mile
Trail Class 21Mile
Trail Class 31Mile
911(09)Slide and Washout Maintenance1LSPer Task OrderPer Task Order
911(16)Trail Obliteration, Scarification and Slash Placement.
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(17)Trail Obliteration, Recontour and Slash Placement.
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
911(23)Typical Single Native Log Retainer, R2a
Non-Wilderness1LF
Wilderness1LF
911(24)Typical Single Native Log Retainer, R2d
Non-Wilderness1LF
Wilderness1LF
912(01)Clearing and Grubbing, New Construction, Wilderness
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
912(02)Clearing and Grubbing, New Construction, Non-Wilderness
Trail Class 11LF
Trail Class 21LF
Trail Class 31LF
912(04)Light Existing Trailway Clearing and Logging out.
Non-Wilderness1Mile
Wilderness1Mile
912(05)Heavy Existing Trailway Clearing and Logging out.
Non-Wilderness1Mile
Wilderness1Mile
912(14)Logging Out >4" Diameter
Non-Wilderness1EA
Wilderness1EA
912(17)Hazard Tree Removal
Non-Wilderness1EA
Wilderness1EA
914(02)Climbing Turn, New Construction
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
914(03)Climbing Turn, Maintenance of Existing
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
917(01)Stream Ford, Type Log or Rock, New Construction
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
917(02)Stream Ford, Maintain Existing
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
918(01)Geosynthetic Foundation1LSPer Task OrderPer Task Order
921(01)Culvert, Type 12" Dia HDPE Corrugated Plastic Pipe1LF
921(05)Culvert, Type Rock, New Construction1LF
922(01)Water Bar, Type Rock or Native Log, New Construction1EA
922(02)Water Bar, Maintain Existing1EA
927(01)Drain Dip, New Construction1LF
927(02)Drain Dip, Maintain Existing1LF
928(01)Check Dam, Type Rock or Log, New Construction1LF
928(02)Check Dam, Maintain Existing1LF
931(02)Switchback, Type 1 or 2, New Construction
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
931(03)Switchback, Type 1 or 2, Maintain Existing
Trail Class 11EA
Trail Class 21EA
Trail Class 31EA
932(01)Turnpike, New Construction1SF
933(01)Side Barrier, Type Rock, New Construction1SF
934(02)Puncheon1LSPer Task OrderPer Task Order
935(01)Retaining Wall, Type Log or Rock, New Construction1SF
935(02)Retaining Wall, Maintain Existing1SF
955(01)Rock Cairn, New Construction
Type T -Simple Rock Cairn1EA
Type U - Rock Cairn1EA
961(01)Trail Bridge1LSPer Task OrderPer Task Order
981(01)Seeding1ACREPer Task OrderPer Task Order
983(05)Individual Removal and Disposal1LSPer Task OrderPer Task Order

Schedule of Items Notes:

All Pay Items: The use of livestock to transport tools and materials to and from a project site is permitted. However, daily travel to the project site and between work sections shall be done on foot. Exceptions to this requirement may be granted by the CO.

901(01) – Survey and Design. Includes personnel traversing an undisturbed landscape and establishing survey locations in the form of wooden stakes, pin flags, or flagging. Stationing will be established on the ground and terrain features located on the ground. Terrain features include, but not limited to, grade dips, water bars, stream crossings, switchbacks, retaining walls and other items shown in the Schedule of Items. Additionally, stationing and terrain features will be documented in a Description of Work for use by the Government.

911(02) – EXCAVATION AND EMBANKMENT, NEW TRAIL CONSTRUCTION, FULL BENCH. This work consists of constructing new trail prisms to the specified dimensions shown in the DRAWINGS. This work also includes construction of native material features such as ditches, and drain dips. Trail structures such as culverts, rock or log waterbars, stream fords, check dams, switchbacks, turnpikes, and retaining walls will be paid for separately. Clearing and Grubbing will be paid for seperately.

911(06) – EXISTING TRAIL RESTORATION. This work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring existing drainage and other trail structures, reconstructing check dams, and removing protruding rocks, roots, stumps, slough, and berms. This pay item is primarily focused on earthwork to bring the trail back to its original template.

912(04) & 912(05) – EXISTING TRAILWAY CLEARING AND LOGGING OUT. Includes cutting and removing vegetation from inside the clearing limits and scattering outside of the clearing limits. Also includes removal of loose rock larger than 4” in diameter from the trailway. Roots larger than 3” in diameter shall be cut and disposed of outside the clearing limits. This pay item is primarily focused on the cutting and removal of vegetation and the removal of loose rocks; however, this pay item also includes cleaning drainage features such as drain dips and waterbars to ensure water drains off the trailway.

912(04) & 912(05) - EXISTING TRAILWAY CLEARING AND LOGGING OUT. The requirements for light & heavy trailway clearing and logging out are identical. The difference between the two pay items is the estimated amount of time and effort needed to clear the trail. Heavy clearing is estimated to need a two person crew and a production rate of 1 mile per day. Light clearing is estimated to need a two person crew and a production rate of 5 miles per day.

Fishhawk_Task Order Price form

DESCRIPTION OF WORK - FISHHAWK TRAIL 757 - Trail Class 2 Pricing Form
MilepostWork DescriptionPay ItemQuantityUnitMeth. of MeasureUnit CostTotal Costtwo person crew
Trail 757 was Cleared/Logged Out In August 2022. Two known down trees across in October 2022
0Mobilization907(01)1LSLSQ0hr
0.74Camp And Water
1Logging Out, >4" Diameter912(14)1EAAQ
1.45Water
1.75Excavation & Embankment; Reconstruction of Existing Trail; Widen existing trail tread from (12"-16") to 36". (510 Linear Feet). Use excavated material to raise grade to fill entrenched trail.911(02)510LFDQ0hr
Begin Track 1
1.8Construct Offset Double Log Retainer, R2d (prior to excavation)911(23)24LFDQ0hr
1.83Construct Offset Double Log Retainer, R2d (prior to excavation)911(23)16LFDQ0hr
1.85Install New Log Water Bar with Log Anchors922(01)1EAAQ0hr
1.88End Restoration of Existing Trail
2Place To Camp With Horses
2Logging Out, >4" Diameter912(14)1EAAQ
2.1Water And Camp
2.37Slide and Washout Maintenance, Site 2911(09)1LSLSQ0hr
Re-Establish Tread to 36" Width for 25 Linear Feet
2.44Slide and Washout Maintenance, Site 3911(09)1LSLSQ0hr
Re-Establish Tread to 36" Width for 100 Linear Feet. Estimate 1-2 CY of soil removal
2.47Slide and Washout Maintenance, Site 4911(09)1LSLSQ0hr
Re-establish Tread to 36" Width for 60 Linear Feet. Build Tread Over Slide Material. Only Remove Rocks Greater Than 4 Inches. No Excavation
2.57Water
2.78Camp And Water, Could Keep Horses
3Logging Out, >4" Diameter912(14)1EAAQ
3.33Water
3.34Slide and Washout Maintenance, Site 5911(09)1LSLSQ0hr
Re-establish Tread each side of creek crossing to 36" width for 50 Linear Feet
3.93Water
4Logging Out, >4" Diameter912(14)1EAAQ
4.81Water
4.5Logging Out, >4" Diameter912(14)1EAAQ
4.88Hazard Tree Removal, Wilderness912(17)1EAAQ
5Logging Out, >4" Diameter912(14)1EAAQ
5.15Small Camp Site In Green Trees
5.5Small Camp Site
6Logging Out, >4" Diameter912(14)1EAAQ
6.22Slide and Washout Maintenance, Site 6911(09)1LSLSQ0hrs
Reestablish Tread For 50 Lf,
6.5Logging Out, >4" Diameter912(14)1EAAQ
6.98Begin Track 7 - Reroute (Track length 0.14)
Begin Clearing & Grubbing, New Construction, TC2 - Grub according to Standard Specification 912.10.05& any other applicable specification - SEE VIDEO912(01)750LFDQ0hrs
Excavation & Embankment, New Trail Construction - Reference Standard Specification 911.10.04 & any other applicable specification911(02)750LFDQ0hs
Trail Obliteration, Pull Rocks/Soil from edge of trail into entrenched trail existing trail. Cover with available slash911(16)528LFDQ0hrs
Construct 5 Log Check Dams before washout on trail segment to be abandoned and 3 log check dams after washout. Scatter slash. Field Fit. Tread is not 36" wide. Not all 20 LF will likely be needed. Varies between flat & entrenched. Minimize Excavation.928(01)20LFAQ0hrs
7.01Excavation. Pull soil from top of stream bank to bottom (backfill double log retainer) to flatten grade. Approx 1 CY, 25-30LF - SEE VIDEO911(03)1LSLSQ0hrs
7.02Construct Offset Double Log Retainer, R2d. At base of stream bank & stream channel.911(23)8LFDQ0hrs
7.12End Track 7 - Reroute
7.4Install New Log Water Bar at Spring with Log Anchors, Drain Left - SEE VIDEO922(01)1EAAQ0
Excavation. Construct Outlet Ditch To Drain Spring Water from Trail, est 60 LF from trail to outlet - SEE VIDEO911(03)1LSLSQ0hr
7.48Hazard Tree Removal, Wilderness912(17)1EAAQ
8Logging Out, >4" Diameter912(14)1EAAQ
8.07Stream Ford, Maintain Existing Ruth Creek, Trail Class 2917(01)1EAAQ0hr
Remove 4-6 down trees, remove approx 30 rocks larger than 8", reshape remaining gravels/sands by flattening high spots. Ruth Creek
9Logging Out, >4" Diameter912(14)1EAAQ
9.7Outfitter Camp, Has Bear Boxes
10.06Public Camp Spot At End of Meadow, with 1 Food Pole
0hrs0days for two people
ERROR:#DIV/0!cost/day for crew of two

File details come from the government source that posted it. Updated .