This is a Justification for Qualification Requirements document (FAR 9.202(a) and DoD 4120.24M) for the UWARS Battery Replacement Kit, identified by NSN 1377-01-571-5244 and 1377-01-652-5022, with part numbers 1914-031-02 and 01-0-012-000-0RE. The item is used in multiple aircraft platforms and performs a critical safety function. The U.S. Air Force requires source qualification before contract award due to the item's critical nature and the technical and schedule risks associated with its manufacture, testing, and assembly. Only United States and Canadian suppliers are eligible.

Prospective offerors must complete a comprehensive qualification process estimated at $5,000 to $50,000 in testing and evaluation costs. Requirements include: notification of intent to qualify to AFLCMC/EBHJ CAD/PAD IPT; certification of required manufacturing, inspection, and testing facilities; submission of qualification test procedures and reports per DI-QCIC-81890; documented process verification including material sourcing, special test procedures, and compliance with Unique Identification (UID) requirements per DFARS 211.274; government inspection access upon ten days' written notice; and production and testing of qualification articles in accordance with BRK SOO for Second Source - 20140715 (dated June 25, 2014), including an inert demonstration unit for fit verification. The design control activity estimates 360 days for qualification completion. Once qualified, offerors will be listed as approved sources; currently approved sources include Cobham Mission Systems/Eaton (Cage Code 99251) and Stratus Systems Inc. (Cage Code 3AX04). Offerors with previous production experience may request waivers of qualification requirements. Full qualification must be completed before the contract award date; the government reserves the right to award to a qualified source even if others remain in qualification.

View the file

Other files

File Type Posted
Section L CADPAD 26 May 2026.pdf PDF
FA821326R3008_______0001.pdf PDF
Section M CADPAD 26 May 2026.pdf PDF
12_CDRLS_25-50019_and_25-50020.pdf PDF
5_PHST_SOW _HILL_2023.pdf PDF
7_ES7034_Rework_Repair_Clause_Jan_2012.pdf PDF
1_AIR_SPEC_FD2020-25-50019_and_50020.docx DOCX document
FA821326R3008.pdf PDF
4_CADPAD_Item_Marking_Instruction_Ver_1.6.pdf PDF
2_REPSHIP.pdf PDF
10_ID-015715244.pdf PDF
10_ID-016525022.pdf PDF
3_ADC_SOW_Jan_2018.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) and DoD 4120.24M

Section A: Item Identification

1. Stock Number (NSN): 1377-01-571-5244 1377-01-652-5022

2. Part Number (P/N): 1914-031-02

01-0-012-000-0RE

3. Noun: UWARS Battery Replacement Kit

4. Application: UWARS, used in multiple aircraft platforms

Section B: Justification for Establishing a Qualification Requirement and Reason Why Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.

1. Characteristics associated with the manufacture of the UWARS Battery Replacement Kit, if not correct, would result in product functional degradations. This item performs a critical function on the aircraft and special equipment is required for its manufacture and testing.

Special care and attention is required but not limited to finish, processing, assembly, performance, and part interchangeability of this item.

2. The prospective bidder’s ability to interpret engineering drawings and specifications and the execution of the qualification requirements specified herein are necessary to verify the structural and functional integrity and/or form, fit, and function of the item being procured.

3. Failure to procure this item from a fully qualified source could result in failure of the part, degradation of aircraft mission capability, or loss of aircraft and crew.

4. Completion of the specified pre-contract award qualification requirements, will ensure the government that the prospective offeror is technically capable of producing the item in compliance with the applicable technical specifications and associated drawings and within the schedule and economic constraints of our contracts. To protect the interests of the Air Force, only United States and Canada suppliers will be considered. There are sufficient technical and schedule risks, which can only be minimized by completion of the requirements prior to contract award.

Section C: Qualification Requirements That Must be Satisfied to Become a Qualified Source and Qualification Waiver Requirements.

1. Prequalification Notice. The offeror shall notify AFLCMC/EBHJ CAD/PAD IPT or, if responding to a solicitation, the contracting officer in AFLCMC/EBHKB of intent to qualify as a source for this item.

2. Facilities. The offeror must certify to the design control activity (AFLCMC/EBHJ CAD/PAD IPT) that he has the required facilities and equipment to manufacture, inspect, test, and package the item. The offeror shall make his facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

3. Data Verification. A qualification test procedure per DI-QCIC-81890 and a qualification test report per DI-QCIC-81890 shall be provided through the AFLCMC/EBHKB contracting office to the AFLCMC/EBHJ CAD/PAD IPT. Qualification testing must be accomplished IAW BRK SOO for Second Source - 20140715 (Dated June 25, 2014).

4. Process Verification. The offeror shall identify sources for materials and standards for internally used processes. The offeror shall further define/provide written procedures for the utilization of any special test or inspection facilities and/or equipment. This documentation shall also include a diagnostic procedure showing the process the items being produced would undergo. The production process shall show how the offeror shall test, inspect, diagnose, produce and perform a final functional checkout. Development of special test procedures not available from the government is required. The offeror shall develop those procedures for review and approval by the design control activity identified in paragraph (2) above. The contractor must be capable of locating alternative components to minimize any diminishing manufacturing sources (DMS) problems. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed in the CAD/PAD Marking Instruction version 1.1. Given this item is a safety critical item the offeror must provide evidence in their management process that they will manage the CSI and all of the critical characteristics.

5. Test and Evaluation or Verification. The offeror shall submit to the design control activity an explanation of how they will certify that the test methods and production procedures meet the specifications for the item. The government retains the option to inspect the offeror’s production and testing facilities. To allow accomplishing this, the offeror’s facilities shall be made available to government inspection during the qualification effort upon ten days written notice of intent to inspect.

6. Qualification Article. Upon satisfactory compliance with the provisions of paragraphs 1 to 5 above, the offeror shall build and test the item IAW BRK SOO for Second Source - 20140715 (Dated June 25, 2014) to demonstrate production capability, form and function and also provide an inert UWARS Battery Replacement Kit to demonstrate proper fit. This production and testing shall be done at the offeror’s expense.

Estimated likely costs for government-unique testing and evaluation which will be incurred by the potential offeror to become qualified: $5,000 to $50,000 +.

7. Sensitive Military Technology. Not applicable.

8. Testing and Production Evaluation. The offeror shall be required to submit a complete test report for the production capability demonstration verifying compliance with all performance, environmental, mechanical, and quality assurance requirements, including top level drawing and all related item and source control drawings. In addition the test report shall contain detailed documentation describing the testing procedures during production. This data shall describe in detail the point(s) in the production process that testing occurred, and if failures were noted, the corrective action taken and the results of the retest. The government retains the option to inspect the production and testing process, including on-site witnessing of any or all production and testing activities. The offeror is responsible and liable for ensuring compliance with all applicable system and item requirements. The offeror will provide notification to the government of testing and evaluation 30 days in advance so that the government can witness, if desired, as well as coordinate needed activities, support, etc.

9. Time Completion Estimate. It is the estimate of the design control activity that completion of this qualification effort should require 360 days. This is based on complexity and hazards associated with the item and other factors. This is not a deadline but a notification to a potential offeror of the time we believe will be required. Events that occur during the qualification process may cause this time requirement to increase or perhaps decrease, depending on individual circumstances.

10. Time Limitation. An offeror may not be denied the opportunity to submit and have considered, an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer and cognizant engineering activity that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract.

The award will not be delayed to provide the contractor with an opportunity to demonstrate its ability to meet the standard specified in this source qualification statement.

11. Evaluation of Proposals Not Previously Qualified. The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in this Justification for Qualification Requirements before the date specified for award of the contract. The government reserves the right to award a contract at the time specified for award, to a qualified source even though other sources may not have finished qualifying.

12. Waiver. Any offeror who has had previous experience in the production of the UWARS Battery Replacement Kit or other similar items may apply to the design control activity identified in paragraph (2) for a waiver of all or part of the above requirements. A waiver will be granted only if the design control activity can establish the qualification of the offeror from previous knowledge/interface or from written inputs from the offeror.

13. Approval. Once the qualification requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

Approved Sources: Cage Code Vendor P/N Cobham Mission Systems/Eaton 99251 1914-031-02 Stratus Systems Inc. 3AX04 01-0-12-000-0RE

Section D: Signatures.

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
Section A: Item Identification
2025-04-24T11:50:03-0600
WEBER.ALYSON.KIM.1158367560
2025-04-24T12:10:29-0600
THOM.TRAVIS.R.1369702315

File details come from the government source that posted it. Updated .