9-Attachment C - Boulder Canyon Trail Repair Bid Tab.xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- Boulder Canyon Trail Repair Project
- Solicitation number
- BID-326-26
- Issued by
- Boulder County, Colorado
About this file
This is a bid worksheet for the Boulder Canyon Trail Repair Project solicited by Boulder County Parks and Open Space Department (BCPOS) in Colorado. The project involves repair and reconstruction of a damaged segment of the Boulder Canyon Trail and its creekside slope protection wall located downstream of the intersection of Highway 119 and Fourmile Canyon Drive. The bid worksheet itemizes 25 base bid items and 2 alternate bid items across six work categories: General (6 items), Erosion & Sediment Control (6 items), Remove, Relocate, & Abandon (2 items), Earthwork & Subgrade Preparation (2 items), Geotextile (2 items), Rockwork (2 items), and Landscaping (5 items). Base bid items include clearing and grubbing (0.02 acres), traffic control, water control, mobilization, construction and as-built surveying, erosion control maintenance, sediment control logs (2,200 linear feet), stabilized staging area (2,340 square yards), stream crossing with temporary ford, removal of structures and obstructions, tree removal, crusher fines and topsoil excavation/replacement (10 cubic yards each), geotextile installation (30 square yards combined), boulder wall removal and reset (195 square feet), riprap placement (20 cubic yards), and landscaping items including erosion control blanket, hydromulch, seeding, and soil amendments. Alternate bids include courtesy shuttle services for 40 days each (Alternate #1 and #2).
The bid worksheet presents all unit prices and total costs as blank or zero values, indicating this is a template for bidders to complete with their pricing. No pricing information, set-asides, incumbent contractor details, funding sources, or contract terms are disclosed in this bid worksheet document. Bidders are required to populate unit prices for each line item and calculate totals for the base bid, base bid plus Alternate #1, and base bid plus Alternates #1 and #2 configurations.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Worksheet Table
| Bid Worksheet Table |
| Boulder Canyon Repair Design |
| BID ITEM NO. | MHFD BID ITEM CODE | Related Spec | DESCRIPTION OF BID ITEM | PAY UNIT | QTY | UNIT PRICE | TOTAL COST | |
| General | ||||||||
| 1 | GN-01-001 | 31 11 00 | Clearing and Grubbing | AC | 0.02 | $ - 0 | ||
| 2 | GN-05-001 | 01 55 26 | Traffic Control | LS | 1 | $ - 0 | ||
| 3 | GN-06-001 | 31 23 19 | Water Control | LS | 1 | $ - 0 | ||
| 4 | GN-02-001 | 01 71 13 | Mobilization | LS | 1 | $ - 0 | ||
| 5 | GN-04-001 | 01 71 23 | Surveying - Construction | LS | 1 | $ - 0 | ||
| 6 | GN-04-002 | 01 71 23 | Surveying - As Built | LS | 1 | $ - 0 | ||
| Erosion & Sediment Control | ||||||||
| 7 | ESC-01-001 | 01 57 19 | General BMP Maintenance | HR | 20 | $ - 0 | ||
| 8 | ESC-05-005 | 01 57 19 | Concrete Washout Area | EA | 1 | $ - 0 | ||
| 9 | ESC-13-001 | 01 57 19 | Sediment Control Log | LF | 2,200 | $ - 0 | ||
| 10 | ESC-17-002 | 01 57 19 | Stabilized Staging Area | SY | 2,340 | $ - 0 | ||
| 11 | ESC-19-002 | 01 57 19 | Stream Crossing, Temporary, with Ford | EA | 1 | $ - 0 | ||
| 12 | ESC-20-002 | 01 57 19 | Vehicle Tracking Control with Construction Mat | EA | 2 | $ - 0 | ||
| Remove, Relocate, & Abandon | ||||||||
| 13 | RR-06-001 | 02 41 13 | Remove Structures and Obstructions | EA | 1 | $ - 0 | ||
| 14 | RR-06-019 | 31 11 00 | Remove Tree, 6-Inch to 12-Inch in Diameter | EA | 1 | $ - 0 | ||
| Earthwork & Subgrade Preparation | ||||||||
| 15 | ESP-06-005 | 31 23 00 | Crusher Fines, Excavate, Stockpile, and Replace | CY | 10 | $ - 0 | ||
| 16 | ESP-07-001 | 31 14 13 | Topsoil Excavate, Stockpile, and Replace | CY | 10 | $ - 0 | ||
| Geotextile | ||||||||
| 17 | GG-02-001 | 31 05 19 | Geotextile, Non-Woven, Class I | SY | 10 | $ - 0 | ||
| 18 | GG-02-003 | 31 05 19 | Geotextile, Non-Woven, Class III | SY | 20 | $ - 0 | ||
| Rockwork | ||||||||
| 19 | RW-15-007 | 31 37 00 | ||||||
| 31 37 19 | Remove, Stockpile, Reset, and Grout Boulder Wall | SFF | 195 | $ - 0 | ||||
| 20 | RW-10-004 | 31 37 00 | Riprap, Conventional, Type H | CY | 20 | $ - 0 | ||
| Landscaping | ||||||||
| 21 | LS-02-004 | 32 92 19 | Erosion Control Blanket, Straw / Coconut Mix | SY | 50 | $ - 0 | ||
| 22 | LS-08-001 | 32 92 19 | Mulch, Hydromulch | AC | 0.02 | $ - 0 | ||
| 23 | LS-10-001 | 32 92 19 | Seeding, Upland, Broadcast | AC | 0.02 | $ - 0 | ||
| 24 | LS-17-001 | 32 92 19 | Soil Amendment, Fertilizer | AC | 0.02 | $ - 0 | ||
| 25 | LS-17-002 | 32 92 19 | Soil Amendment, Compost | AC | 0.02 | $ - 0 | ||
| BASE BID TOTAL = | $ - 0 |
| Alternate #1 - Curtesy Shuttle | ||||||||
| Alt #1 | GN-05-002 | 01 55 26 | Courtesy Shuttle | DAY | 40 | $ - 0 | ||
| BASE BID + Alternate #1 TOTAL = | $ - 0 | $ |
| Alternate #2 - Additional Curtesy Shuttle | ||||||||
| Alt #2 | GN-05-002 | 01 55 26 | Courtesy Shuttle | DAY | 40 | $0 | ||
| BASE BID + Alt #1 & Alt #2 TOTAL = | $ - 0 | $ |