9-Attachment C - Boulder Canyon Trail Repair Bid Tab.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Boulder Canyon Trail Repair Project
Solicitation number
BID-326-26
Issued by
Boulder County, Colorado

About this file

This is a bid worksheet for the Boulder Canyon Trail Repair Project solicited by Boulder County Parks and Open Space Department (BCPOS) in Colorado. The project involves repair and reconstruction of a damaged segment of the Boulder Canyon Trail and its creekside slope protection wall located downstream of the intersection of Highway 119 and Fourmile Canyon Drive. The bid worksheet itemizes 25 base bid items and 2 alternate bid items across six work categories: General (6 items), Erosion & Sediment Control (6 items), Remove, Relocate, & Abandon (2 items), Earthwork & Subgrade Preparation (2 items), Geotextile (2 items), Rockwork (2 items), and Landscaping (5 items). Base bid items include clearing and grubbing (0.02 acres), traffic control, water control, mobilization, construction and as-built surveying, erosion control maintenance, sediment control logs (2,200 linear feet), stabilized staging area (2,340 square yards), stream crossing with temporary ford, removal of structures and obstructions, tree removal, crusher fines and topsoil excavation/replacement (10 cubic yards each), geotextile installation (30 square yards combined), boulder wall removal and reset (195 square feet), riprap placement (20 cubic yards), and landscaping items including erosion control blanket, hydromulch, seeding, and soil amendments. Alternate bids include courtesy shuttle services for 40 days each (Alternate #1 and #2).

The bid worksheet presents all unit prices and total costs as blank or zero values, indicating this is a template for bidders to complete with their pricing. No pricing information, set-asides, incumbent contractor details, funding sources, or contract terms are disclosed in this bid worksheet document. Bidders are required to populate unit prices for each line item and calculate totals for the base bid, base bid plus Alternate #1, and base bid plus Alternates #1 and #2 configurations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Worksheet Table

Bid Worksheet Table
Boulder Canyon Repair Design
BID ITEM NO.MHFD BID ITEM CODERelated SpecDESCRIPTION OF BID ITEMPAY UNITQTYUNIT PRICETOTAL COST
General
1GN-01-00131 11 00Clearing and GrubbingAC0.02$ - 0
2GN-05-00101 55 26Traffic ControlLS1$ - 0
3GN-06-00131 23 19Water ControlLS1$ - 0
4GN-02-00101 71 13MobilizationLS1$ - 0
5GN-04-00101 71 23Surveying - ConstructionLS1$ - 0
6GN-04-00201 71 23Surveying - As BuiltLS1$ - 0
Erosion & Sediment Control
7ESC-01-00101 57 19General BMP MaintenanceHR20$ - 0
8ESC-05-00501 57 19Concrete Washout AreaEA1$ - 0
9ESC-13-00101 57 19Sediment Control LogLF2,200$ - 0
10ESC-17-00201 57 19Stabilized Staging AreaSY2,340$ - 0
11ESC-19-00201 57 19Stream Crossing, Temporary, with FordEA1$ - 0
12ESC-20-00201 57 19Vehicle Tracking Control with Construction MatEA2$ - 0
Remove, Relocate, & Abandon
13RR-06-00102 41 13Remove Structures and ObstructionsEA1$ - 0
14RR-06-01931 11 00Remove Tree, 6-Inch to 12-Inch in DiameterEA1$ - 0
Earthwork & Subgrade Preparation
15ESP-06-00531 23 00Crusher Fines, Excavate, Stockpile, and ReplaceCY10$ - 0
16ESP-07-00131 14 13Topsoil Excavate, Stockpile, and ReplaceCY10$ - 0
Geotextile
17GG-02-00131 05 19Geotextile, Non-Woven, Class ISY10$ - 0
18GG-02-00331 05 19Geotextile, Non-Woven, Class IIISY20$ - 0
Rockwork
19RW-15-00731 37 00
31 37 19Remove, Stockpile, Reset, and Grout Boulder WallSFF195$ - 0
20RW-10-00431 37 00Riprap, Conventional, Type HCY20$ - 0
Landscaping
21LS-02-00432 92 19Erosion Control Blanket, Straw / Coconut MixSY50$ - 0
22LS-08-00132 92 19Mulch, HydromulchAC0.02$ - 0
23LS-10-00132 92 19Seeding, Upland, BroadcastAC0.02$ - 0
24LS-17-00132 92 19Soil Amendment, FertilizerAC0.02$ - 0
25LS-17-00232 92 19Soil Amendment, CompostAC0.02$ - 0
BASE BID TOTAL =$ - 0
Alternate #1 - Curtesy Shuttle
Alt #1GN-05-00201 55 26Courtesy ShuttleDAY40$ - 0
BASE BID + Alternate #1 TOTAL =$ - 0$
Alternate #2 - Additional Curtesy Shuttle
Alt #2GN-05-00201 55 26Courtesy ShuttleDAY40$0
BASE BID + Alt #1 & Alt #2 TOTAL =$ - 0$

image1.png