9-ATTACHMENT A-1 CONTROL PANELS.pdf
PDF 2 MB Posted
- Solicitation number
- OPN2131152B1
- Issued by
- Broward County, Florida
About this file
This is a cover sheet and drawing index for lift station control panel fabrication and refurbishment work for Broward County, Florida's wastewater infrastructure. The document outlines specifications for FEMA-compliant fabrication and refurbishment of water and wastewater control panels, establishing an open-end contract to serve Broward County Water and Wastewater Services and other county agencies. The project encompasses multiple control panel configurations, including duplex and triplex control panel systems, with and without standby generator capabilities. The drawing index includes 14 detailed electrical drawings covering lift station notes, control panels, electrical service and transfer switches, control circuits, connection panels, control transformers, automatic transfer switches, and electrical details. Contractors must comply with Florida Chapter 556 (Underground Facility Damage Prevention and Safety Act) and follow designs reviewed and approved by a Florida-licensed professional engineer in accordance with applicable codes and standards.
The specifications detail concrete surface repair and restoration requirements for lift station structures, including active leak mitigation using chemical grouting and hydraulic cement, crack and void filling with water-resistant fast-setting cement, and concrete surface rebuilding using one-component, microsilica-enhanced, fiber-reinforced mortar designed for corrosive environments. The reinforced mortar must meet strict performance standards including minimum flexural strength of 1,000 PSI, compressive strength of 9,000 PSI at 28 days, and slant shear bond strength of 2,250 PSI, all verified through ASTM testing protocols. The contract requires vendor submission through the electronic BPRO portal by specified closing dates, with vendors responsible for obtaining County and State licenses, FEMA compliance certification, FDOT certification, and bonding as required by the solicitation documents.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TURNPIKE EXTENSION
F L O
R I D
A S
T U
R N
P I K E
RD
EXWY
SAWGRASS
MIRAMAR PKWY
HALLANDALE BCH
RD
D R
RD
R D
SAMPLE RD
BLVD
SUNRISE
A
I
A
A
I
A
P O
W E R L I N
E
COPANS
B
L
V
D
A
T
L
A
N
T
I C
BLVD
COMMERCIAL
BLVD
OAKLAND PARK
U N
I V E R S I T Y
BROWARD BLVD
STIRLING
GRIFFIN
BLVD
BLVD
HOLLYWOOD
A
T
L
A
N
T
I
C
O
C
E
A
N
GENERAL LOCATION MAP
ATTACHMENT A-1
LIFT STATIONS CONTROL PANELS
DESCRIPTION
DRAWING INDEX
SHEET
DESIGNATION
THE SIZE OF THESE PLANS MAY HAVE BEEN ALTERED BY REPRODUCTION.
THIS MUST BE CONSIDERED WHEN OBTAINING DATA.
N
S
W E
CONTRACTOR TO COMPLY WITH FS CHAPTER 556
(UNDERGROUND FACILITY DAMAGE PREVENTION
AND SAFETY ACT).
BROWARD COUNTY, FL
G-1COVER SHEET
G-2LIFT STATION NOTES
E-1DUPLEX CONTROL PANEL
E-2DUPLEX ELECTRICAL SERVICE AND TRANSFER SWITCH
E-3DUPLEX CONTROLS CIRCUIT
E-4DUPLEX CONNECTION PANEL & CONTROL TRANSFORMER
E-5TRIPLEX CONTROL PANEL
E-6TRIPLEX ELECTRICAL SERVICE AND TRANSFER SWITCH
E-7TRIPLEX CONTROLS CIRCUIT
E-8TRIPLEX CONNECTION PANEL & CONTROL TRANSFORMER
E-9TRIPLEX CONTROL PANEL FOR LIFT STA. W/ STANDBY GEN.
E-10
TRIPLEX SCHEMATIC FOR LIFT STA. W/ STANDBY GEN.
E-11
TRIPLEX SCHEMATIC FOR LIFT STA. W/ STANDBY GEN.
E-12AUTOMATIC TRANSFER SWITCH FOR STANDBY GEN.
E-13LIFT STATION ELECTRICAL DETAILS
E-14LIFT STATION ELECTRICAL DETAILS
AS SHOWN
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
G-1
COVER SHEET
FOR EMERGENCIES CALL... (954)831-0850
FOR PUMP OUT CALL... (954)831-0850
FOR MAINTENANCE CALL... (954)831-0850
TO REPORT POLLUTION, CALL EPGMD
SIGN DETAIL
NTS
2"
18"
12"
D. ALL ACTIVE LEAKS IN THE STRUCTURE SHALL BE STOPPED USING CHEMICAL GROUTING AND HYDRAULIC
CEMENT.
E. ALL CRACKS, VOIDS AND REMOVED STEP HOLES SHALL BE FILLED USING A WATER RESISTANT
FAST-SETTING CEMENT PATCH.
2. REBUILDING CONCRETE SURFACES
A. THE CONCRETE SHALL BE RETURNED TO ITS ORIGINAL WALL THICKNESS USING A ONE COMPONENT
MORTAR, MINIMUM INSTALLED THICKNESS SHALL BE 1/2".
B. ONE COMPONENT REINFORCED WET MORTAR: THE ONE COMPONENT MORTAR SHALL BE MICROSILICA
ENHANCED, FIBER REINFORCED AND BE DESIGNED FOR CORROSIVE ENVIRONMENTS WITH A pH=2.0 OR
HIGHER. REINFORCED MORTAR SHALL HAVE THE FOLLOWING MINIMUM PHYSICAL PROPERTIES:
1. FLEXURAL STRENGTH 1000 PSI @ 28 DAYS ASTM C78-84
2. COMPRESSIVE STRENGTH 9000 PSI @ 28 DAYS ASTM C109-92
3. DENSITY (WET): 130 LB/CU. FT. ASTM C138-92
4. SPLITTING TENSILE STRENGTH: 700 PSI @ 28 DAYS ASTM C496-90
5. SLANT SHEAR BOND STRENGTH: 2250PSI @ 28 DAYS ASTM C882-91
6. SULFATE RESISTANCE WEIGHTLOSS pH 1.0 <.97% ASTM C-267
84 DAY IMMERSION pH 2.0 <.30% pH 3.0 <.18%
C. MATERIAL SHALL BE BASF SP15, OR APPROVED EQUAL.
PAINTING & COATINGS:
1. WETWELL & VALVE VAULT EXTERIOR: THE EXTERIOR OF WET WELL & VALVE VAULTS SHALL BE COATED
WITH TWO (2), 10 MILS (DFT) EACH COAT OF A BITUMASTIC COATING (20 MILS TOTAL DFT). BITUMASTIC
COATING SHALL BE CARBOLINE (KOPPERS) 300M, OR APPROVED EQUAL.
2. WETWELL INTERIOR, OPTION A: THE INTERIOR OF A NEW OR REHABILITATED WET WELL, WHERE
DIRECTED BY WWS, SHALL BE COATED WITH TWO (2) COATS, 15 MILS (DFT) EACH, OF A BITUMASTIC
COATING (30 MILS DFT, TOTAL). BITUMASTIC COATING SHALL BE CARBOLINE (KOPPERS) 300M, OR
APPROVED EQUAL.
3. WETWELL INTERIOR, OPTION B: THE INTERIOR OF A NEW OR REHABILITATED WET WELL, WHERE DIRECTED
BY WWS, SHALL BE COATED WITH A SPRAYABLE, HIGH BUILD, MOISTURE TOLERANT, CHEMICAL RESISTANT
EPOXY COATING DESIGNED TO BE APPLIED ON DRY OR DAMP CONCRETE SURFACES AND YIELDING A HARD
DURABLE CHEMICAL RESISTANT FINISH TO A pH OF 1.0, EPOXY COATING SHALL BE BASF SEWER GUARD
HBS 100, OR OTHER APPROVED MATERIAL ON THE WWS PRODUCT SPECIFICATION SHEETS. APPLY
MATERIAL USING A 30:O OR 45:1 AIRLESS SPRAYER TO A MINIMUM DRY THICKNESS OF 60 MILS IN TWO 30
MILS COATS.
4. VALVE VAULT CONCRETE INTERIOR SURFACES: THE INTERIOR CONCRETE SURFACES OF VALVE VAULTS
SHALL BE COATED WITH A 100% SOLIDS POLYAMINE EPOXY SPECIFICALLY DESIGNED FOR WASTEWATER
IMMERSION AND LOW PERMEATION TO H2S GAS. MATERIAL SHALL BE IN CONFORM WITH THE PRODUCT
SPECIFICATION SHEETS, OR APPROVED EQUAL, APPLIED IN TWO (2) COATS, 15.0 MILS (DFT) EACH,(30.0
MILS DFT, TOTAL). FINAL COLOR TO BE BEIGE. SURFACE PREPARATION, PRIMING AND APPLICATION SHALL
BE IN ACCORDANCE WITH THE MORE STRINGENT OF THE MANUFACTURERS RECOMMENDATIONS OR LISTED
IN THE PRODUCT SPECIFICATION SHEETS.
5. DUCTILE IRON PIPE AND FITTINGS: DIP EXTERIOR SURFACES SHALL BE COATED WITH A 100% POLYAMINE
EPOXY SPECIFICALLY DESIGN FOR WASTEWATER IMMERSION AND LOW PERMEATION TO H2S GAS.
MATERIAL SHALL BE IN CONFORM WITH THE PRODUCT SPECIFICATION SHEETS, OR APPROVED EQUAL, APPLIED IN TWO (2) COATS 20 MILS (DFT) EACH (40.0 MIL DFT, TOTAL). DIP INTERIOR SURFACES SHALL BE
COATED WITH 40 MILS (DFT) OF PROTECTO 401.
6. VALVES SHALL RECEIVE ONLY THE FINAL 20 MIL (DFT) COAT. FINAL COLOR TO BE BEIGE. SURFACE
PREPARATION, PRIMING AND APPLICATION SHALL BE IN ACCORDANCE WITH THE MORE STRINGENT OF THE
MANUFACTURER'S RECOMMENDATIONS OR THE WWS SPECIFICATIONS. SURFACE PREPARATION AND
APPLICATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION. CERTIFICATION
OF MANUFACTURER SHALL BE PROVIDED.
ELECTRICAL NOTES:
1. CONTROL PANEL ELECTRICAL SYSTEM SHALL BE COMPLETELY AND EFFECTIVELY GROUNDED AS REQUIRED
BY NEC.
2. ALL ELECTRICAL INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE NEC AND SHALL COMPLY WITH ALL
NATIONAL AND LOCAL RULES, ORDINANCES, AND CODES AT TIME OF INSTALLATION.
3. ALL SERVICE CONDUCTORS SHALL BE STRANDED COPPER TYPE THWN.
4. ALL ENCLOSURES SHALL BE 316 STAINLESS STEEL NEMA 3R RIGHT SIDE OPENING. ALL MOUNTING
HARDWARE MUST BE 316 SST.
5. USE T & B CORROSION RESISTANT-LIQUIDTIGHT-STRAIN RELIEF THERMO-PLASTIC FLEXIBLE CORD & CABLE
CONNECTOR ON THE INSIDE OF THE TOP CONNECTION PANEL TO FIT APPROPRIATE CABLE SIZE. TRANSFER
SWITCH MAY BE MOUNTED ON EITHER END BUT GENERATOR RECEPTACLE MUST BE ON OUTSIDE. (STATE
LEFT OR RIGHT SIDE GEN. RECPT. WHEN ORDERING.)
6. ALL PUMP MOTORS SHALL BE 3 PHASE. WHEN THE LOCAL POWER COMPANY CANNOT PROVIDE 3 PHASE
POWER TO THE STATION, A "ROTOPHASE" PHASE CONVERTER SHALL BE SUPPLIED TO PROVIDE 3 PHASE
POWER TO THE STATION.
7. ALL CONTROL CIRCUIT WIRES SHALL BE TERMINATED WITH FORK TYPE CRIMP-ON CONNECTORS AND SHALL
HAVE AN ADJACENT HEAT SHRINK NUMBER, CORRESPONDING EACH CONNECTOR WITH NUMBERS AS
INDICATED ON THE SCHEMATIC. NO CONCEALED WIRING SHALL BE PERMITTED BEHIND THE SUB PANEL.
8. EACH DEVICE IN THE CONTROL CIRCUIT SHALL BE IDENTIFIED WITH THE PROPER CONTROL CIRCUIT
ABBREVIATION AS SHOWN IN THE TABLE AND ON THE SCHEMATIC.
9. FROM THE REAR SIDE OF THE DEAD FRONT HINGED PANEL, ALL WIRES SHALL BE NEATLY LACED TOGETHER
INTO A HARNESS AND TERMINATED INTO A TERMINAL STRIP.
10. DRIVEN GROUND ROD WHICH DOES NOT HAVE A RESISTANCE TO GROUND OF 10 OHMS OR LESS SHALL BE
AUGMENTED UNTIL THE RESISTANCE TO GROUND IS 10 OHMS OR LESS. LIGHTENING ARRESTER LEADS TO
BE ATTACHED TO THE MCB AS PER MOST RECENT NEC ARTICLE # 280.
11. ALL BRANCH CIRCUITS SHALL HAVE PROPER SIZE WIRING.
12. WHEN CONNECTIONS ARE COMPLETE IN THE CONNECTION BOX, COAT THE TERMINAL BLOCKS AND WIRE
ENDS WITH PROTECTIVE COMPOUND, NO-OXIDE OR EQUAL, TO PREVENT CORROSION.
13. SCHEMATIC DRAWINGS SHALL BE PLACED IN STATION ARE TO BE ENCASED BETWEEN TWO PIECES OF 3/16"
PLEXIGLASS.
14. ELECTRICAL SERVICE SHALL BE A MINIMUM OF 100 AMPS OF # 1 THWN STRANDED COPPER WIRE IN RIGID
ALUMINUM CONDUIT-MINIMUM SIZE = 2". INTERMEDIATE METAL CONDUIT UNACCEPTABLE.
15. UNDERGROUND SERVICE PULL BOXES ARE TO BE INSTALLED AT EACH 250 FEET OF SERVICE PULL. VOLTAGE
DROP TO BE LIMITED TO A MAXIMUM OF 3 PERCENT DROP.
16. BUBBLER TUBING SHALL BE CLEAR, 1/4" TYGON (OR APPROVED EQUAL). BACK-UP SENSOR TUBING TO BE
RED.
GENERAL
1. ALL CONSTRUCTION AND MATERIALS SHALL COMPLY WITH BROWARD COUNTY WATER AND WASTEWATER
SERVICES (WWS) "MINIMUM DESIGN AND CONSTRUCTION STANDARDS" AND APPLICABLE LOCAL AND
NATIONAL CODES.
2. MINIMUM REQUIREMENTS FOR PRODUCTS USED IN BROWARD COUNTY DISTRIBUTION AND COLLECTION
SYSTEMS ARE DEFINED IN "PRODUCT SPECIFICATION SHEETS".
3. FOR ALL WATER & WASTEWATER "MINIMUM DESIGN AND CONSTRUCTION STANDARDS" AND "PRODUCT
SPECIFICATION SHEETS" REFER TO:
WWW.BROWARD.ORG/WATERSERVICES/PAGES/MINIMUMDESIGNANDCONSTRUCTIONSTANDARDS.ASPX
4. WHENEVER A MATERIAL, ARTICLE OR PIECE OF EQUIPMENT IS IDENTIFIED IN THE PROJECT MANUAL
INCLUDING DRAWINGS (PLANS) AND SPECIFICATIONS BY REFERENCE TO MANUFACTURER'S OR VENDOR'S
NAME, TRADE NAMES, CATALOG NUMBERS, OR OTHERWISE, IT IS INTENDED MERELY TO ESTABLISH A
STANDARD, AND UNLESS IT IS FOLLOWED BY WORDS INDICATING THAT NO SUBSTITUTION IS PERMITTED, ANY MATERIAL, ARTICLE, OR EQUIPMENT OF OTHER MANUFACTURERS AND VENDORS WHICH WILL PERFORM
OR SERVE THE REQUIREMENTS OF THE GENERAL DESIGN WILL BE CONSIDERED EQUALLY ACCEPTABLE, PROVIDED THE MATERIAL, ARTICLE OR EQUIPMENT SO PROPOSED IS, IN THE OPINION OF THE WWS, EQUAL
IN SUBSTANCE, QUALITY, AND FUNCTION. REFER TO PRODUCT SPECIFICATION SHEETS AT
WWW.BROWARD.ORG/WATERSERVICES/PAGES/MINIMUMDESIGNANDCONSTRUCTIONSTANDARDS.ASPX
5. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE WORK AS SPECIFIED.
6. IF APPLICABLE THE CONTRACTOR SHALL SUPPLY ALL LABOR AND EQUIPMENT NECESSARY TO BY-PASS THE
LIFT STATION DURING CONSTRUCTION AND MAINTAIN SAID BYPASS FOR THE DURATION OF ITS USE.
7. COMPLIANCE TO "TRENCH SAFETY ACT" IS REQUIRED FOR ALL EXCAVATIONS IN EXCESS OF 5 FEET DEEP.
CONTRACTOR SHALL COMPLY WITH THE U.S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATIONS STANDARDS OSHA 29 CFR 1910.146, 'PERMIT-REQUIRED CONFINED SPACES' AND OSHA
29 CFR 1926, 'SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION.'
8. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL NOTIFY:
SUNSHINE STATE 1 CALL
BCWWS NETWORK ...................................... (954)-831- 0838
BCWWS INSPECTOR..................................... (954)-831- 0901
9. THE CONTRACTOR SHALL ATTACH PUMP GUIDE RAILS AS PER MANUFACTURER'S RECOMMENDATIONS.
10. ALL VALVES ARE TO BE TAGGED, STATING TYPE OF VALVE AND NUMBER OF TURNS TO OPERATE. IF THE
VALVE IS BURIED, A BRASS PLATE WILL BE CAST IN THE CONCRETE APRON AROUND THE VALVE COVER. IF
THE VALVE IS LOCATED IN A PIT, THE TAG SHALL BE HUNG FROM THE VALVE WITH A PLASTIC STRAP.
11. ALL VALVE BOXES SHALL HAVE LOCKING LIDS.
12. DUCTILE IRON PIPE AND FITTINGS SHALL CONFORM TO BCWWS PRODUCT SPECIFICATION SHEETS.
13. ALL JOINTS SHALL BE RESTRAINED IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND IN
COMPLIANCE WITH AWWA STANDARDS.
14. COMPLETE "AS-BUILT" INFORMATION RELATIVE TO VALVES, FITTINGS, LENGTH OF PIPE AND THE LIKE, SHALL BE ACCURATELY RECORDED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER PRIOR TO
FINAL ACCEPTANCE OF THE WORK. ALL ELEVATIONS SHALL BE TAKEN BY AN INDEPENDENT REGISTERED
LAND SURVEYOR OR PROFESSIONAL SURVEYOR AND MAPPER AND INCLUDED IN THE "AS-BUILT"
INFORMATION FURNISHED BY THE CONTRACTOR. FINAL APPROVAL OF THE PROJECT IS SUBJECT TO THE
FINAL REVIEW AND APPROVAL OF THE "AS-BUILT" INFORMATION FURNISHED TO THE REGULATORY
AGENCIES AND WWS.
15. ALL ELEVATIONS SHOWN ON THE CONSTRUCTION DRAWINGS ARE BASED ON THE NORTH AMERICAN
VERTICAL DATUM OF 1988, (N.A.V.D. 88), HORIZONTAL DATUM NAD83 (HARN) FLORIDA EAST (0901) - US
FOOT, UNLESS OTHERWISE NOTED.
16. CONTRACTOR SHALL PROVIDE A IDENTIFICATION SIGN AS SHOWN.
SIGN SHALL BE FABRICATED OF
"ALUMINUM WITH WHITE REFLECTIVE BACKGROUND AND RED LETTERS.
LARGE LETTERS SHALL BE 1" HIGH
SMALL LETTERS SHALL BE 1/2" HIGH
BORDER SHALL BE
" THICK,
OFFSET
" FROM EDGE OF SIGN
SIGN SHALL BE PERMANENTLY ATTACHED TO THE FENCE, IF AVAILABLE, OR CONTROL PANEL WHERE
VISIBLE FROM THE STREET
XXX= WWS LIFT STATION COMMON NAME
17. ENGINEER SHALL PROVIDE FLOATATION CALCULATIONS FOR EACH STRUCTURE TO BE
CONSTRUCTED.
PUMPS AND CONTROL PANEL
1. PUMPS AND ALL APPURTENANCES REQUIRED TO MAKE A COMPLETE AND OPERATING SYSTEM SHALL BE
FURNISHED AND INSTALLED BY THE CONTRACTOR. PUMPS WILL TO BE SUPPLIED WITH 60 FT CABLES, REFER
TO WWS "LIFT STATION STANDARD PUMPS".
2. CONTROL PANEL, CONNECTION PANEL AND TRANSFER SWITCH WITH LOUVERED ENCLOSURE ARE TO BE
PROVIDED BY THE CONTRACTOR AND MANUFACTURED BY CHAMPION CONTROLS INC. TO WWS
SPECIFICATIONS (NO SUBSTITUTION).
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH FLORIDA BUILDING CODE (FBC), AMERICAN
CONCRETE INSTITUTE (ACI) 318 AND THE CONTRACT SPECIFICATIONS.
2. COMPLETE ENGINEERING AND PRODUCT DATA SHALL BE SUBMITTED TO THE ENGINEER ON ALL
ADMIXTURES, CURING COMPOUNDS, HARDENERS, SEALERS, REINFORCING STEEL AND WATER STOPS IN
ACCORDANCE WITH THE SPECIFICATIONS.
3. REINFORCEMENT STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM A-615.
4. CONCRETE COVER FOR STEEL REINFORCEMENT SHALL BE AS SPECIFIED ON ACI 318.
5. PIPES, INSERTS, AND OTHER METAL OBJECTS SHOWN SHALL BE BUILT INTO, SET IN, OR ATTACHED TO THE
CONCRETE. ALL REQUIRED HOLES SHALL BE CAST AT TIME OF CONSTRUCTION.
6. ALL CAST-IN-PLACE CONCRETE SHALL BE ACCURATELY FORMED AND PROPERLY PLACED AND FINISHED AS
SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN.
7. CONCRETE SHALL BE EITHER CLASS A OR CLASS B, AS INDICATED ON THE DRAWINGS OR SPECIFIED IN
THESE SPECIFICATIONS. IN GENERAL CLASS A CONCRETE SHALL BE USED FOR REINFORCED CONCRETE
CAST-IN-PLACE IN FORMS FOR SLABS, FOOTINGS, FOUNDATIONS, MAINTENANCE ACCESS STRUCTURES
AND SIMILAR REINFORCED CONCRETE STRUCTURES COMING UNDER THE SCOPE OF ACI 318. CLASS B
CONCRETE SHALL BE PLAIN CONCRETE AND SHALL BE USED FOR PIPE CRADLES, PIPE AND CONDUIT
ENCASEMENT, BEDDING, GRADE CORRECTION, ANCHORS, COLLARS, THRUST BLOCKS, MASSIVE SECTIONS
AND OTHER NON-REINFORCED CONCRETE.
8. CONCRETE INGREDIENTS SHALL BE SELECTED, PROPORTIONED, AND MIXED IN SUCH A MANNER AS
WILL PRODUCE A WATERTIGHT DURABLE CONCRETE THAT WILL DEVELOP THE FOLLOWING MINIMUM
COMPRESSIVE STRENGTHS AT AN AGE OF 28 DAYS WHEN SAMPLED, CURED AND TESTED IN ACCORDANCE
WITH THE PROCEDURES SPECIFIED IN ASTM C 31 AND C 39:
CLASS OF AVERAGE OF THREE MINIMUM ANY
CONCRETE AGE CONSECUTIVE SPECIMENS ONE SPECIMEN
A 28 DAYS 4,000 PSI 3,500 PSI
B 28 DAYS 3,000 PSI 2,500 PSI
FINISHING UNFORMED SURFACES
1. NO SURFACE TREATMENT WILL BE REQUIRED FOR BURIED CONCRETE NOT FORMING AN INTEGRAL PART OF
STRUCTURE EXCEPT THAT REQUIRED TO OBTAIN THE SURFACE ELEVATIONS OR CONTOURS AND
SURFACES FREE OF LAITANCE. THE UNFORMED SURFACES OF ALL OTHER CONCRETE SHALL BE
SCREEDED AND GIVEN AN INITIAL FLOAT FINISH FOLLOWED BY ADDITIONAL FLOATING FOLLOWED BY
TROWELING WHERE REQUIRED. CARE SHALL BE TAKEN THAT NO EXCESS WATER IS PRESENT WHEN THE
FINISH IS MADE. NO SPECIAL CONCRETE OR CEMENT MORTAR TOPPING COURSE SHALL BE USED
UNLESS SO SHOWN ON THE DRAWING.
2. SCREEDING: SCREEDING SHALL PROVIDE A CONCRETE SURFACE CONFORMING TO THE PROPER
ELEVATION AND CONTOUR WITH ALL AGGREGATES COMPLETELY EMBEDDED IN MORTAR. ALL
SCREEDED SURFACES SHALL BE FREE OF SURFACE IRREGULARITIES WITH A HEIGHT OR DEPTH IN EXCESS
OF 1/4 INCH AS MEASURED FROM A 10-FOOT STRAIGHT EDGE.
3. FLOATING: SCREEDED SURFACES SHALL BE GIVEN AN INITIAL FLOAT FINISH AS SOON AS THE
CONCRETE HAS STIFFENED SUFFICIENTLY FOR PROPER WORKING. INITIAL FLOATING SHALL BE
FOLLOWED BY A SECOND FLOATING AT THE TIME OF INITIAL SET. THE SECOND FLOATING SHALL
PRODUCE A FINISH OF UNIFORM TEXTURE AND COLOR. UNLESS ADDITIONAL FINISHING IS
SPECIFICALLY REQUIRED, THE COMPLETED FINISH FOR UNFORMED SURFACES SHALL BE THE FLOAT FINISH
PRODUCED BY THE SECOND FLOATING.
4. BROOMING: SURFACES OF EQUIPMENT BASES AND SLABS ON GRADE SHALL BE GIVEN A LIGHT BROOM
FINISH PROVIDING A NONSLIP SURFACE. BROOMING SHALL BE DONE AFTER THE SECOND FLOATING
AND FOR TRAFFIC AREAS SHALL BE AT RIGHT ANGLES TO THE NORMAL TRAFFIC DIRECTION.
5. EDGING: ALL PERMANENTLY EXPOSED EDGES OF UNFORMED SURFACES SHALL BE CHAMFERED WITH A 3/4
INCH APPROVED EDGING TOOL UNLESS OTHER EDGE TREATMENT IS INDICATED ON THE DRAWINGS.
6. CURING: ALL CONCRETE SHALL BE PROTECTED FROM LOSS OF MOISTURE BY CURING FOR AT LEAST 14
DAYS FOLLOWING PLACEMENT. CURING OPERATIONS SHALL TAKE PLACE IMMEDIATELY AFTER CONCRETE
FINISHING IS COMPLETE OR FORMS ARE REMOVED. BREAKING OF FORM TIES OR OTHERWISE
BREAKING THE SEAL BETWEEN THE CONCRETE SURFACE AND THE FORM SHALL BE CONSIDERED FORM
REMOVAL.
PRE-CAST CONCRETE
1. WALL AND SLAB THICKNESSES SHOWN ON THESE STANDARDS ARE MINIMUMS. MANUFACTURER IS SOLELY
RESPONSIBLE FOR STRUCTURAL DESIGN.
2. PRE-CAST UNITS SHALL CONFORM TO THE REQUIREMENTS OF ASTM C-478
3. LIFTING HOLES THROUGH THE STRUCTURE ARE NOT PERMITTED
4. THE BOTTOM SLAB SHALL BE CAST MONOLITHICALLY WITH THE LOWER WALL SECTION
5. ALL STRUCTURES SHALL BE DESIGNED TO SUPPORT AN H-20 WHEEL LOADING
6. COMPLETE ENGINEERING AND PRODUCT DATA, SHALL BE SUBMITTED TO THE ENGINEER.
ACCESS HATCH
1. EACH HATCH SHALL BE DESIGNED ACCORDING TO THE OPENINGS SHOWN ON THE DRAWINGS. THE
ALUMINUM ACCESS FRAMES SHALL BE MANUFACTURED FROM 1/4-INCH THICK, EXTRUDED 6063-T5
ALUMINUM.
2. THE FRAME SHALL BE DRAINABLE WITH A 1 1/2-INCH THREADED DRAIN COUPLING LOCATED ON CORNER
FRAME.
3. THE DOOR PANELS SHALL CLOSE FLUSH AND SHALL BE 1/4-INCH THICK 5086-H34 ALUMINUM DIAMOND
(CHECKER) PLATE REINFORCED FOR AASHTO H-20-44 WHEEL LOADS.
4. REMOVABLE ALUMINUM CROSS-BEAMS SHALL BE PROVIDED BY THE HATCH SUPPLIER AS REQUIRED TO
ACCOMPLISH THE STATED LOADING.
5. THE DOORS SHALL HAVE HEAVY DUTY STAINLESS STEEL BUTT HINGES WITH TAMPER-PROOF FASTENERS.
6. ALL HARDWARE SHALL BE MADE OF TYPE 316 STAINLESS STEEL.
7. EACH DOOR SHALL HAVE SPRING OPERATORS, SUCH THAT THE MAXIMUM LIFTING EFFORT IS LESS THAN 25
POUNDS.
8. THE HATCH SUPPLIER SHALL PROVIDE THE NUMBER OF SPRING OPERATORS AS REQUIRED TO ACCOMPLISH
THE MAXIMUM LIFTING REQUIREMENT.
9. EACH DOOR SHALL OPEN TO 90 DEGREE AND LOCK AUTOMATICALLY WITH A STAINLESS STEEL, POSITIVE
LOCKING ARM AND A STAINLESS STEEL RELEASE HANDLE.
10. EACH DOOR SHALL HAVE A RECESSED STAINLESS STEEL LIFTING HANDLE AND RECESSED OVERSIZED
PADLOCK BOX.
11. THE HATCH SHALL BE PROVIDED WITH A TYPE 316 STAINLESS STEEL SLAM-LOCK WITH A REMOVABLE
HANDLE.
12. ALL ACCESS DOORS SHALL BE DESIGNED WITH A NEOPRENE GASKET ON THE INSIDE LIP OF THE FRAME
PERIMETER, TO FORM AN ESSENTIALLY AIR-TIGHT SEAL.
13. ALL ACCESS DOORS SHALL BE EQUIPPED WITH A MINIMUM OF FOUR (4) STAINLESS STEEL CARRIAGE BOLTS
WITH WELDED NUTS TO SECURE THE DOORS IN THE DOWN POSITION. BOLTS SHALL BE PER THE
MANUFACTURERS RECOMMENDATION.
WETWELL REHABILITATION
1. SURFACE PREPARATION
A. ANY LOOSE, UNSOUND, OR CRACKED BRICK OR CONCRETE SHALL BE CHISELED OR HAMMERED OUT.
B. ALL SURFACES TO RECEIVE EITHER THE ONE COMPONENT REINFORCED MORTAR OR EPOXY LINING SHALL
BE STRUCTURALLY SOUND AND SHALL BE CLEANED TO REMOVE LAITANCE, GREASE. LOOSE MORTAR, PAINT OR OTHER SURFACE CONTAMINANTS USING SAND BLASTING, HYDRO-GRIT BLASTING AT 3,500 PSI
MINIMUM OR OTHER MECHANICAL SCARIFICATION TECHNIQUES APPROVED BY THE ENGINEER.
C. SURFACE SHALL BE TESTED BY THE CONTRACTOR, IN THE PRESENCE OF THE ENGINEER,USING A SURFACE pH TESTER EQUAL TO INSTA-CHECK SURFACE pH PENCIL AS MANUFACTURED BY PHYDRION. SURFACE
SHALL INDICATE A pH=7.0 OR GREATER.
17. TUBBING FITTINGS SHALL BE SWAGELOK BRASS FITTINGS (OR APPROVED EQUAL).
18. COLOR CODING:
A. SINGLE PHASE 120/240V-BLACK, WHITE, AND RED.
B. THREE PHASE 120/240V 4 WIRE-HI LEG CENTER AND ORANGE, WHENEVER NEUTRAL IS PRESENT. IN
THE ABSENCE OF NEUTRAL, THEY WILL BE MARKED BLACK, RED, AND BLUE AND/OR A-B-C. WILL
CONSTITUTE CLOCKWISE ROTATION OF ALL 3-PHASE MOTORS. THIS IS TO ASSURE PHASE RELATION
THROUGHOUT THE SYSTEM.
C. 120/208V, 4 WIRE, THREE PHASE SHALL BE BLACK, WHITE, RED, AND BLUE WHERE THE NEUTRAL IS
PRESENT. IF THE NEUTRAL IS ABSENT, BLACK, RED, AND BLUE AND/OR A-B-C WILL CONSTITUTE
CLOCKWISE ROTATION OF ALL THREE PHASE MOTORS, THIS IS TO ASSURE PHASE RELATION
THROUGHOUT THE SYSTEM.
D. 277/480V, 4-WIRE-BROWN, ORANGE, YELLOW AND WHITE WHEN THE NEUTRAL IS PRESENT. IF THE
NEUTRAL IS ABSENT, A-B-C WILL CONSTITUTE CLOCKWISE ROTATION OF ALL THREE PHASE MOTORS.
THIS IS TO ASSURE PHASE RELATION THROUGHOUT THE SYSTEM.
19. FABRICATE ANTENNA MAST FROM A 21 FOOT LENGTH OF 2
" DIAMETER SCHEDULE 40 ALUMINUM PIPE.
PAINT LOWER THREE (3) FEET WITH ASPHALTUM PAINT, CAP THE TOP OF PIPE.
20. RUN 3/4 INCH RIGID ALUMINUM CONDUIT UP THE MAST FOR THE ANTENNA CABLE TO WITHIN 16 INCHES
OF THE TOP. RUN SECOND 3/4 INCH CONDUIT UP THE MAST FOR ALARM AND FLOOD LIGHTS AS
SHOWN. USE STAINLESS STEEL UNISTRUT AND CLAMPS TO HOLD CONDUITS TO THE MAST.
21. MOUNT FLOOD LIGHT AND FLASHING RED LIGHT ON THE ANTENNA MAST AT TEN (10) FEET AND EIGHT
(8) FEET ABOVE GRADE.
22. TEST PUMPS AS FOLLOWS:
A. TECHNICIAN MUST BE PRESENT TO CONDUCT TESTS.
B. MEGGER MOTORS, MOTORS SHALL BE 20 MEGOHMS OR MORE TO GROUND, DO NOT MEGGER
LOW VOLTAGE CONTROLS.
C. CHECK VOLTAGE, CHECK PUMP ROTATION, RECORD VOLTAGE AND AMPS UNDER LOAD.
D. DEMONSTRATE PROPER OPERATION OF ALL CONTROLS.
E. CONDUCT DRAWDOWN TESTS AS REQUIRED.
F. CHECK OPERATION WITH OWNER'S PORTABLE GENERATOR AND CHANGE WIRE CONNECTIONS IN
THE PANEL TO GIVE CORRECT ROTATION.
23. THE CONTRACTOR SHALL FURNISH AN ARC FLASH HAZARD ANALYSIS STUDY PER 2015 NFPA 70E -
STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE, REFERENCE ARTICLE 130.5 (C)(1) AND ANNEX
D. PROVIDE PROPER ARC FLASH SAFETY LABELS ON THE FRONT COVER OF TRANSFER SWITCH PANEL, CONTROL PANEL AND CONNECTION PANEL. THE LABELS SHALL BE LAMINATED DURABLE VINYL AND UV
RESISTANT, MINIMUM SIZE OF 5" X 3.5".
IF EMERGENCY LIGHT FLASHES CALL...
BROWARD COUNTY
WATER & WASTEWATER SERVICES
STATION XXX
(954) 831-0850
WHERE CONFLICTS EXIST BETWEEN THESE NOTES AND WWS
"MINIMUM DESIGN AND CONSTRUCTION STANDARDS", THE
MINIMUM STANDARDS WILL GOVERN.
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
G-2
LIFT STATION NOTES
OUTPUT
INPUT
1 2 3 4 5
1 2 3 4 5
TFS001-02
FLUORESCENT TROUBLE LIGHT
PHASE
MONITOR
12V
BATT
A/C RECEPT.
G F I
R E C E P T
S H
U T
O F F
V A L V E
W/DEAD FRONT
W/OUT DEAD FRONT
PHASE MONITOR 1A FUSES
DATAFLOW 47K RESISTOR TERMINALS
DATAFLOW TFS
BELL-EDWARDS ADAPTABELL HEAVY DUTY
BELL, 4", CAT NO. 340-4N5 120V 60 Hz, UL
APPROVED OR APPROVED EQUAL
SCREENED LOUVERS
BOTH SIDES 3 AREAS
DUPLEX CONTROL PANEL LAYOUT
ELAPSED
TIME
METERS
ENCLOSURE SIZE : 66" x 36" x 10"
RATING: NEMA 3R
MATERIAL: 316 STAINLESS STEEL
F8F7F6F5F4F3F2F1
PUMP 1
PUMP 2
SEAL
FAIL
TEMP
FAIL
AIR COMP
RESET
FAIL
SEAL
FAIL
TEMP
FAIL
POWER BLOCK
GND
NEMA RATED STARTERS
ON ON
HOA HOA
LEVEL GAUGE
HORN
TROUBLE
PURGE VALVE
G F I
R E C E P T
S H
U T
O F F
V A L V E
POWER BLOCK
GND
CIRCUIT BREAKERS
SURGE SUPPRESSOR
NEMA RATED STARTERS
H O
R N
TIMERS
RELAY
RELAY
RELAY
RELAY
T E R M
I N
A L S
T E R M
I N
A L S
T E R M
I N
A L S
AIR COMPRESSOR
LEVEL TRANS
PRESSURE SW
FR1
FR2
43 43 44106
IN PUMP 1
30 7141412668N 74 41 75
IN PUMP 2
70 41 212S 213 216 213 218
OFF
LEVEL
ON
LEVEL
SEAL
SENSOR
PUMP
T-STAT
SEAL
SENSOR
PUMP
T-STAT
FM
PRESS.
XDUCER
RAIN
GAUGE
(IF USED)
HATCH
COVER
LIMIT
SWITCH
120V
FROM
F6
ELECTRICAL INPUT CONNECTION BLOCK
69N
120V
EXT.
AUX
CIRCUIT BREAKERS
SURGE SUPPRESSOR
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-1
DUPLEX CONTROL PANEL
1A
1A
1A
F13
F14
F15
B
PHASE MONITOR
POWER PRESENT
LIGHT
N
3 KVA
XFORMER USE
WITH 480V
LIGHTNING ARRESTER
CIRCUIT BREAKERS
GROUND
NOTES:
ENCLOSURE SIZE : 30" x 20" x 8"
NEMA 3R, 316 STAINLESS STEEL
FUSE
HOLDER
PHASE
MONITOR
POWER PRESENT LIGHT
CIRCUIT BREAKER
INTERLOCK
CIRCUIT BREAKER HANDLES
THROUGH INNER DOOR
POWER
SUBFEEDER
TERM BLK
NOTE:
MCB AND ECB ARE TO BE SUITABLE TO
USE AS SERVICE EQUIPMENT, TO BE
PERMANENTLY IDENTIFIED AS SERVICE
DISCONNECTS, TO BE CAPABLE OF
BEING OPERATED WITHOUT EXPOSING
OPERATOR TO CONTACT WITH LIVE PARTS.
GROUND FAULT PROTECTION-25000 IC
AT 240 V, 30000 IC AT 480 V.
A
120V
B
POWER METER
NOTE :
1. THE ABOVE TABLE COMPILED PER CURRENT NATIONAL ELECTRIC CODE SECTION 430 TABLE 430.250
2. GROUNDING ELECTRODE SIZED PER NATIONAL ELECTRICAL CODE
3. *GENERATOR PLUGS ARE SIZED TO MATCH THE GENERATOR'S CORD, NOT THE ELECTRICAL SERVICE.
4. CONDUCTOR B IS A SERVICE FEEDER, SIZED FOR 2 PUMPS AT 125% 0F FLA PLUS A 20 AMP GENERAL LOAD.
5. DESIGNER TO VERIFY DATA IN THESE TABLES
6. SERVICE RACEWAY TO BE OVERSIZED AS SHOWN TO ACCOMMODATE FUTURE EXPANSION.
480 VOLT
HP
MOTOR AMP (I)
STARTER SIZE
CONDUCTOR
(A)
PUMP CB
MAIN/EMER CB CONDUCTOR (B)
GENERATOR
PLUG*
SERVICE
RACEWAY (MIN)
5 1 12 15 100
1 (32.5A)
200 2"
8 1 12 15 100
1 (40A)
200 2"
7.5 11 1 12 20 100
1 (47.5A)
2"
10 14 2 12 30 100
1 (55A)
2"
15 21 2 10 50 125
1 (72.5A)
2"
20 27 2 10 60 125
1 (87.5A)
2"
25 34 2 8 90 150
1/0 (105A)
2"
30 40 3 6 100 150
1/0 (120A)
2"
40 52 3 4 150 225
4/0 (150A)
3"
50 65 4 4 175 250
250 KCM(182.5A)
200 3"
60 77 4 3 200 300
350 KCM(212.5A)
200 3"
75 96 4 1 250 300
350 KCM(260A)
200 3"
240 VOLT
HP
MOTOR AMP (I)
STARTER SIZE
CONDUCTOR
(A)
PUMP CB
MAIN/EMER CB CONDUCTOR (B)
GENERATOR
PLUG*
SERVICE
RACEWAY (MIN)
3 9.6 1 12 20 100
1 (44A)
100 2"
5 15.2 1 10 40 100
1 (58A)
100 2"
7.5 22 2 10 50 125
1 (75A)
100 2"
10 28 2 8 70 125
1 (90A)
100 2"
15 42 3 6 100 175
2/0 (125A)
100 2"
20 54 3 4 150 225
4/0 (155A)
100 3"
B
PUMP 1
PUMP 2
L3
L2
L1
TO CONTROL CIRCUIT
A
120V
B
L1
L2
L3
NO
C
1A
1A
1A
F13
F14
F15
B
PHASE MONITOR
POWER PRESENT
LIGHT
N
B
PUMP 1
PUMP 2
L3
L2
L1
TO CONTROL CIRCUITS
TRANSFER SWITCH MUST BE RATED AS
SERVICE ENTRANCE EQUIPMENT
TRANSFER SWITCH CONTROL PANEL
LIGHTNING ARRESTER
A
POWER METER
LIGHTNING
ARRESTOR
GROUND BUSS
IN TRANSFER
PANEL
GENERATOR
RECEPTACLE
NO 6 BC MIN
TO SERVICE
GROUND
GROUND BUSS IN
CONTROL PANEL
NEUTRAL BUSS
IN CONTROL
PANEL
POWER METER
LIGHTNING
ARRESTER
GROUND BUSS
IN TRANSFER
PANEL
GENERATOR
RECEPTACLE
NO 6 BC MIN
TO SERVICE
GROUND
NEUTRAL BUSS
IN TRANSFER
PANEL
NEUTRAL BUSS
IN TRANSFER
PANEL
240V MAIN POWER CIRCUIT
480V MAIN POWER CIRCUIT
EMERGENCY CONNECTION/TRANSFER SWITCH
NTS
L1
L2
L3
NO
C
POWER PRESENT LIGHT
TRANSFER SWITCH CONTROL PANEL
100 124 4 2/0
250 350
500 KCM(330A)
200 4"
GENERATOR
RECEPTACLE
GENERATOR
RECEPTACLE
1.
2.
GROUND BUSS IN
CONTROL PANEL
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-2
DUPLEX ELECTRICAL SERVICE
AND TRANSFER SWITCH
MOTOR 2 RUN23 MOTOR 1 STARTER
STARTER POWER24 MOTOR 1 RUN
AUX OUTLET
MOTOR 2 STARTER
MOTOR 3 STARTER
AUX POWER
TELEMETRY TXD
ALARM POWER
ALARM LIGHT OUT
ALARM HORN OUT
TELEMETRY RTS
TELEMETRY RXD
TELEMETRY CTS
TELEMETRY PWR
TELEMETRY GRD
LOW LEVEL
AIR COMP FAIL
INPUT COM 1
EXTERNAL P.M.
MOTOR 3 RUN
PNL ENTERED
ALARM SILENCE
ISO GND
HIGH LEVEL
AUX INPUT
LAG 2 LEVEL
LAG 1 LEVEL
INPUT COM 2
A
PHASE C
PHASE A
PHASE B
P1
AC POWER
BATTERY -
BATTERY +
EARTH GROUND
AC NEUTRAL
SPARE (NC)
ANALOG 1+
ISO +24VDC
CABLE SHIELD
RS-232 TXD
RS-232 RXD
RS-232 GND
ANALOG 2+
ANALOG -
SHUNT
P2
F12
F11
F10
2L1
2L2
2L3
RTU 10A
C/B
3L3
3L2
3L1
1 2 3 4
UNPROTECTED INPUT
DATAFLOW TFS
PROTECTED OUTPUT
DFS TCU PUMP CONTROLLER
LEVEL
TRANSDUCER
FORCE MAIN
PRESSURE
TRANSDUCER
TO
BUBBLER
SYSTEM
TROUBLE
LIGHT
TROUBLE
SWITCH
AIR COMP.
FAILURE
AIR COMP. RECEPT.
NORMAL
12V
BACKUP
TO/FROM
TAC II
TELEMETRY
ALARM
LIGHT
CR 11
SITE
LIGHT
FROM MAIN
POWER
CIRCUIT
120VAC
FROM
MAIN POWER
CIRCUIT
OOX
OOX
XOO
RAIN GAUGE
BOTTOM DOOR
TOP DOOR
HATCH
AIR LOSS
PRESS. SW.
4L3
4L2
4L1
CONTROL
30A C/B
ET
1 2 3 4
N2
SILENCE
OX
HORN
F3
1A
F4
1A
R
66A
CR11
1 3
F1
20A
LIGHTING
F2
2A
AIR
COMPRESSORS
PUMP 1
CONTROL
F6
2A
PUMP 2
CONTROL
BACKUP CONTROL
POWER
R3
3 1
F8
1A
T3
3 1
H
O
A
PUMP 2
H
O
A
OOX
OOX
XOO
PUMP 1
R2
1 3
2M
2M
O/L
R7
81A
R6
R22
ET
N
PUMP 2
F7
1A
R1
1 3
1M
O/L
R5
6 7
2 R1 7
R4
80B
PM
9 8
N
N
N
N
N
N
A
CR
AC
64B
A/C
RESET
64A
64A
64D
1M
PS1
CRAC
CRAC
1 4
80A
EMERGENCY
N
N
N
N
GFI
RECEPT.
2M
1M
MCP2
MCP1
R6
11 9
R4
11 9
R7
9 11
R5
9 11
N
N
CRAC
PM
218B 218A
R3
OFF
ON
SIL
OXX
S
N
F5
R3
FR1
FR2
PUMP 1
MOISTURE
PUMP 1 T'STAT
PUMP 2 MOISTURE
PUMP 2 T'STAT
PUMP 1 SEAL. FAIL
PUMP 1 THERMO. FAIL
PUMP 2 SEAL. FAIL
PUMP 2 THERMO. FAIL
PUMP 2
DELAY ON
TIMER
FLOAT
BACK-UP
BACKUP CONTROL
POWER
24VAC XFORMER
OFF
FR1
BACKUP FLOATS
ON
FR2
R4
4 1
R5
R6
4 1
R7
4 1
N
N
N
N
R5
R4
N
N
R3
T3
N
R6
R7
N
PUMP 1
EXT. AUX
15A C/B
ELECTRICAL CONTROLS CIRCUIT (DUPLEX)
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-3
DUPLEX CONTROLS CIRCUIT
30"
66"
36"
A/C#2
A/C#1
(A)
(D)
(A) (A)
(B)
TO WETWELL
(A) (E)
BY OTHERS
(C)
(D)
PS1
LG-1
BUBBLER PIPING
CONTROL TRANSFORMER FOR 480V POWER
DUPLEX CONNECTION PANEL
CONTROL PANEL CONNECTION PANEL
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-4
DUPLEX CONNECTION PANEL
& CONTROL TRANSFORMER
SUPPRESSOR
SURGE
H O
R N
S H
U T
O
F F
V A L V E
CIRCUIT BREAKERS
NEMA RATED STARTERS
SUPPRESSOR
SURGE
G F I
R E C E P T
POWER BLOCK
GROUND
TRANSFORMER
RESISTOR TERMINALS
DATAFLOW TFS
1A FUSES
PHASE MONITOR
DATAFLOW 100K
FLUORESCENT TROUBLE LIGHT
OUTPUT
54321
TFS001-02
INPUT
54321
T E R M
I N
A L S
TRANS.
LEVEL
T E R M
I N
A L S
AIR COMP.
RELAY
TIMERS
T E R M
I N
A L S
AIR COMPRESSORS
RECEPT.
MONITOR
PHASE
NEMA RATED STARTERS
TRANSFORMER
GROUND
POWER BLOCK
F9F8F7F5 F6F3F1 F2
ELAPSE TIME METERS
F4
PUMP 3PUMP 2
ON
HOA
ON
HOA
FLOAT SEQ.
PUMP 1
ON
HOA
HORN
TROUBLE
SWITCH
LIGHT
PURGE VALVE
LEVEL GAUGE
R E C E P T
G F I
V A L V E
S H
U T
O
F F
A/C
BACK-UP
H O
R N
G
G
218216 213
COVER
RAIN
GAUGE
212S
PRESS.
SYSTEM
HATCH
797875 41 4141 74
4141 70 71
151 150 152
FR2
FR1
LEVEL
ON
1504030 35
LEVEL
OFF
10 2568 5N
120V
FIELD DEVICE TERMINAL BLOCK 1 (FDTB1)
FIELD DEVICE TERMINAL BLOCK 2 (FDTB2)
PUMP
SEAL
PUMP
IN PUMP 3
SEAL
IN PUMP 1
SEAL
PUMP
IN PUMP 2
LEVER
ARM 3
LEVER
ARM 1F5
LEVER
ARM 2
FIELD DEVICE TERMINAL BLOCK 3 (FDTB3) SCADA
FROM
XDUCER
150 153
FR3
LEVEL
HIGH
RELAY
RELAY
113110 112 121117115114 116 119118 120 122 125126 128127 129111 123 124
PUMP 1
FAIL
F5
FAIL
PUMP 2
FAIL
PUMP 3 PUMP 1
RUNNING RUNNING
PUMP 2
RUNNING
PUMP 3
ALARM
PUMP 1
READY
PUMP 2
READY
PUMP 3
READY
CIRCUIT BREAKERS
SURGE
SUPPRESSOR
SUPPRESSOR
FIELD DEVICE TERMINAL BLOCK 4 (FDTB4)
AUX
EXT.
60A
TRANSFORMER
120/24VAC
TX1
12V
(FS1)
FLOW SWITCH
TRIPLEX ELECTRICAL INPUT CONNECTION BLOCK
TRIPLEX CONTROL PANEL LAYOUT
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-5
TRIPLEX CONTROL PANEL
ENCLOSURE SIZE: 30" X 20" X 10"
FUSEBLOCKS
MODULAR
POWER
NEMA 3R, 316 STAINLESS STEEL
NOTE :
1. THE ABOVE TABLE COMPILED PER CURRENT NATIONAL ELECTRIC CODE SECTION 430 TABLE 430.250
2. GROUNDING ELECTRODE SIZED PER NATIONAL ELECTRICAL CODE
3. *GENERATOR PLUGS ARE SIZED TO MATCH THE GENERATOR'S CORD, NOT THE ELECTRICAL SERVICE.
4. CONDUCTOR B IS A SERVICE FEEDER, SIZED FOR 3 PUMPS AT 125% 0F FLA PLUS A 20 AMP GENERAL LOAD.
5. DESIGNER TO VERIFY DATA IN THESE TABLES
6. SERVICE RACEWAY TO BE OVERSIZED AS SHOWN TO ACCOMMODATE FUTURE EXPANSION.
480 VOLT
HP
MOTOR AMP (I)
STARTER SIZE
CONDUCTOR
(A)
PUMP MCP
MAIN/EMER CB CONDUCTOR (B)
GENERATOR
PLUG*
SERVICE
RACEWAY (MIN)
50 65 4 4 175 300
350 KCM(263.8A)
200 3"
60 77 4 3 200 350
500 KCM(308.8A)
200 4"
75 96 4 1 250 400
500 KCM(380A)
200 4"
100 124 4
2/0
250 500 2 SETS OF 250
KCM (485A)
200 2 SETS OF 3"
ECB
MCP
3-60-480V,3W
NO
L3
L1
L2
1A
1A
1A
L1
L2
C
B
INTERLOCK
MECH.
L3
G2
G1
G3
2T3
2T1
2T2
PUMP 2
MCP
O/L 2M
1T1
O/L
1M
1T2
1T3
PUMP 2
PUMP 1
PUMP 1
3T1
PUMP 3
MCP
O/L
3T2
3T3
3M
PUMP 3
1L2
1L1
1L3
POWER METER
TO CONTROL
B
A
B
MCB
TRIPLEX CONTROL PANEL
LIGHTNING ARRESTER LIGHTNING ARRESTER
POWER PRESENT LIGHT POWER PRESENT LIGHT
EMERGENCY CONNECTION/TRANSFER SWITCH
NTS
NOTE:
MCB AND ECB ARE TO BE SUITABLE TO
USE AS SERVICE EQUIPMENT, TO BE
PERMANENTLY IDENTIFIED AS SERVICE
DISCONNECTS, TO BE CAPABLE OF
BEING OPERATED WITHOUT EXPOSING
OPERATOR TO CONTACT WITH LIVE PARTS.
GROUND FAULT PROTECTION,
30000 IC AT 480 V.
480V MAIN POWER CIRCUIT
TRANSFER SWITCH MUST BE RATED AS
SERVICE ENTRANCE EQUIPMENT
TRANSFORMER
N
G
NO 1/0 BC MIN
TO SERVICE
GROUND
NOTES:
TRANSFER SWITCH MUST BE RATED
AS SERVICE ENTRANCE EQUIPMENT
1.
2.
G
GROUND BUSS
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-6
TRIPLEX ELECTRICAL SERVICE
AND TRANSFER SWITCH
MCP
INTERNAL DIVICE TERMINALS (IDTB)
FIELD DEVICE TERMINALS (FDTB)
OR PUMP CURRENT TRANSFORMER VIA PLC
INTERLOCK SIGNAL FROM LEVER ARM
20A
F6
2A
F2
2A
3.
2.
1.
NOTE:
GFI RECEPT.
62 N
N
3-60-480V,3W
SHUNT
ANALOG -
ANALOG 2+
RS-232 GND
RS-232 RXD
RS-232 TXD
CABLE SHIELD
ISO +24VDC
ANALOG 1+
INPUT COM 2
LAG 1 LEVEL
LAG 2 LEVEL
AUX INPUT
HIGH LEVEL
ISO GND
ALARM SILENCE
PNL ENTERED
MOTOR 3 RUN
EXTERNAL P.M.
INPUT COM 1
AIR COMP FAIL
LOW LEVEL
MOTOR 1 RUN
MOTOR 2 RUN
TELEMETRY CTS
TO/FROM
F1
66A
LIGHT
R
ALARM
R
7 2
R11
O X X
1A
F4
MOTOR 2 STARTER
STARTER POWER
MOTOR 1 STARTER
TELEMETRY RXD
TELEMETRY RTS
ALARM HORN OUT
ALARM LIGHT OUT
ALARM POWER
TELEMETRY TXD
AUX POWER
MOTOR 3 STARTER
AUX OUTLET
TELEMETRY
TAC II
TFS
PROTECTED OUTPUT
UNPROTECTED INPUT
HORN
ON
OFF SIL
1A
F3
BACKUP
12V
F5
A
1 2 3
3 PHASE A
SPARE (NC)
AC NEUTRAL
EARTH GROUND
BATTERY +
BATTERY -
AC POWER
TELEMETRY GRD
TELEMETRY PWR
N2
PHASE B
PHASE C
4 5
PUMP CONTROLLER
P1 P2
217 213
TROUBLE
MCP2
MCP1
2M
1M
232231
FLORESCENT
TROUBLE
LIGHT
R7
R5
R8
R6
218B
CRAC
PM
8 6
12 11
218A
N
N
OOX
OFF SIL
ON
S
R4
TRANSDUCER
TO BUBBLER
SYSTEM
BY OTHERS
TRANSDUCER
SYSTEM PRESS.
(IF USED)
SUPPLIED
TRANSFORMER PANEL
30A C/B
CONTROL
10A C/B
RTU
RESISTORS
DATAFLOW 100K
F18
30A
MONITOR
PHASE
F16
10A
NO
C/B
L3
L1
L2
1A
1A
1A
L1
L2
MAIN
C
B
INTERLOCK
MECH.
L3
G2
G1
G3
2T3
2T1
2T2
PUMP 2
MCP
O/L
2M
1T1
O/L
1M
1T2
1T3
LEVEL
3KVA
120VAC
480VAC
F17
10A
PUMP 2
PUMP 1
H A
F8
1A
R2
O
1 3
T2
SEE NOTE 1
R2
T2
R8
2M
O/L
2M
ET
R7
91A
G
1A
F7
A H
R1
O
R6
T1
SEE NOTE 1
1M 6
O/L
R1
T1
R5
90A
90B
1M
G
ET
FAIL TIMER
FAIL TIMER
PUMP 2
N
PUMP 2
N
PUMP 1
N
PM
N
PUMP 1
N
GENERATOR
N/G
C/B
PUMP 1
3T1
PUMP 3
MCP
O/L
3T2
3T3
3M
PUMP 3
MCP3
R9
3M
9 11
R10
PUMP 3
FAIL TIMER
PUMP 3
R10
ET
R9
G
6 6
92A
O/L
R3
3M
35 37
T3
H A
O
1 3
XOO
3M
F9
T3
OOX
OOX
SEE NOTE 1
1A 1 4
R3
N
N
1-3
2-3
1-2
FLOAT SEQ
BACK-UP
OOX
XOO
XXO
T4
OXX
R4
3 1
1L2
1L1
1L3
OOX
OOX
XOO
OOX
OOX
XOO
EXT. AUX
15A C/B
EXT. AUX
60 60A
1 3
FLR3
FAILURE
AIR COMP.
FAILURE
AIR COMP.
AIR LOSS
CRAC
64D
CRAC
PS3
64A
64C
64B
NORMAL
RECEPT.
AIR COMPRESSOR
EMERGENCY
RECEPT.
AIR COMPRESSOR
CR
AC
A/C RESET
R
N
N
N
N
CRAC
SNUBBER
T'STAT
24N
24N
24N
PUMP 2
T'STAT
MOISTURE
PUMP 2
R7
R8
R6
24N
24N
24N
24N
PUMP 1
MOISTURE
PUMP 1
FR2
FR3
HIGH
150 153
120VAC
75VA
24VAC
FR1
OFF
ON
F19
5A
TX1
R5
R2
FL
R3
2 7
FL
FL
R1
2 7
N
24N
24N
PUMP 3
T'STAT
MOISTURE
PUMP 3
R9
R10
FLR2FLR1
R8
R7
R6
R5
R
THERMO. FAIL
PUMP 2
SEAL. FAIL
R
PUMP 2
R
PUMP 1
THERMO. FAIL
R
R4
PUMP 1
SEAL. FAIL
R4
T4
TIMER
N
N
N
N
BACK-UP
N
FLOAT
DELAY ON
N
PUMP 2
R10
R9
R
THERMO. FAIL
PUMP 3
SEAL. FAIL
R
PUMP 3
N
N
CONTROL PANEL
SECTION 2 OF 3
SECTION 3 OF 3
SECTION 1 OF 3
TERMINALS TO 18-20 IN-LBS.
TORQUE ALL FIELD WIRING
COPPER, 75°C MINIMUM WIRE
FIELD WIRING TERMINALS USE
TRIPLEX CONTROLS CIRCUIT
G
N
N
G
GROUND BUSS
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
E-7
TRIPLEX CONTROLS CIRCUIT
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
A/C#2
A/C#1
(A)
(D)
(A)
(B)
TO WETWELL
(A) (E)
BY OTHERS
(C)
(D)
LG-1
FS1
SNUBBER
FLOW SWITCH
30"
66"
36"
BUBBLER PIPING
CONTROL TRANSFORMER FOR 480V POWER
TRIPLEX CONNECTION PANEL
CONTROL PANEL CONNECTION PANEL
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-8
TRIPLEX CONNECTION PANEL
& CONTROL TRANSFORMER
OUTPUT
TFS001-02
INPUT
T E R M
I N
A L S
T E R M
I N
A L S
AIR COMPRESSOR
RELAYS
RELAYS
T E R M
I N
A L S
AIR COMPRESSOR
RECEPT.
MONITOR
PHASE
DOOR SWITCH DOOR SWITCH
DFS RIO-032
T1 T2 T3 T4
R1 R2 R3 R4 R5 R6 R7
TIMERS
RELAYS
LIGHT
SWITCH
TROUBLE
HOA
ON
PUMP 1
LEVEL GAUGE
HORN
PURGE VALVE
PUMP 3
HOA HOA
PUMP 2
ON ON
BACK-UP
FLOAT SEQ.
F2F1
A/C
F8
ELAPSE TIME METERS
F5F4F3 F6 F7 F9
RAIL I/O - 32 INPUT/OUTPUT TERMINALS
RIO032
BATTERYPOWER SUPPLY
BATT 1PS BATT 2
FAULT
SOFTSTART
LEVEL
TRANS.
(FS1)
FLOW SWITCH
R9
R8
R10 R11
120/24VAC
TRANSFORMER
TX1
AIR INTAKE
FAN & VENT
AIR EXHAUST
FAN & VENT
S H
U T
O
F F
V A L V E
R E C E P T
G F I
H O
R N
H O
R N
WITH 12" X 72" X 16" BASE
ENCLOSURE SHALL BE NEMA 3R 316 STAINLESS STEEL 60" H X 72" W X 12" D
NOTE:
SURGE
SURGE
FIELD DEVICE TERMINAL BLOCK 1 (FDTB1)
N 68 5
LEVEL
FR2
LEVEL
FR1
OFF ON
403025 35 151150 150
IN PUMP 1
SEAL
PUMP
41G 70 7141
FIELD DEVICE TERMINAL BLOCK 2 (FDTB2)
PUMPPUMP
IN PUMP 2
SEAL
IN PUMP 3
SEAL
41 4174 4175 4178
FR3
HIGH
LEVEL
XDUCER
SYSTEM
PRESS.
15379 G 150 S 212
HATCH
GAUGE
RAIN
COVER
213216 218
FIELD DEVICE TERMINAL BLOCK 3 (FDTB3)
FAN & VENT
AIR EXHAUST
FAN & VENT
AIR INTAKE
211 260 261 260 262 260 263 260 267 260 268
PUMP 3PUMP 1 PUMP 2
TRIPLEX CONTROL PANEL LAYOUT
FOR LIFT STATION WITH STANDBY GENERATOR
FIELD DEVICE TERMINAL BLOCK 4 (FDTB4)
AUX
EXT.
60A
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-9
TRIPLEX CONTROL PANEL FOR
LIFT STA. W/ STANDBY GEN.
MCP
INTERNAL DIVICE TERMINALS (IDTB)
FIELD DEVICE TERMINALS (FDTB)
MOISTURE
PUMP 1
PUMP 2
MOISTURE
OR PUMP CURRENT TRANSFORMER VIA PLC
INTERLOCK SIGNAL FROM LEVER ARM
20A
F6
20A
F2
2A
AIR LOSS
1 3
CRAC
64D
CRAC
FS3
64A
64A
3.
2.
1.
NOTE:
64B
NORMAL
RECEPT.
AIR COMPRESSOR
EMERGENCY
RECEPT.
AIR COMPRESSOR
CR
AC
GFI RECEPT.
A/C RESET
FAILURE
R
AIR COMP.
N
N
N
N
N
N
SHUNT
ANALOG -
ANALOG 2+
RS-232 GND
RS-232 RXD
RS-232 TXD
CABLE SHIELD
ISO +24VDC
ANALOG 1+
INPUT COM 2
LAG 1 LEVEL
LAG 2 LEVEL
AUX INPUT
HIGH LEVEL
ISO GND
ALARM SILENCE
PNL ENTERED
MOTOR 3 RUN
EXTERNAL P.M.
INPUT COM 1
AIR COMP FAIL
LOW LEVEL
MOTOR 1 RUN
MOTOR 2 RUN
TELEMETRY CTS
TO/FROM
F1
66A
LIGHT
R
ALARM
R
7 2
R11
O X X
1A
F4
MOTOR 2 STARTER
STARTER POWER
MOTOR 1 STARTER
TELEMETRY RXD
TELEMETRY RTS
ALARM HORN OUT
ALARM LIGHT OUT
ALARM POWER
TELEMETRY TXD
AUX POWER
MOTOR 3 STARTER
AUX OUTLET
TELEMETRY
TAC II
TFS
PROTECTED OUTPUT
UNPROTECTED INPUT
HORN
ON
OFF SIL
1A
F3
BACKUP
12V
F5
A
3 PHASE A
SPARE (NC)
AC NEUTRAL
EARTH GROUND
BATTERY +
BATTERY -
AC POWER
TELEMETRY GRD
TELEMETRY PWR
N2
PHASE B
PHASE C
4 5
PUMP CONTROLLER
P1 P2
217 213
TROUBLE
MCP2
MCP1
SC2
SC3
232231
FLORESCENT
TROUBLE
LIGHT
R7
R5
R8
R6
218B
CRAC
PM
8 6
12 11
218A
N
N
R8
R7
T'STAT
PUMP 2
OOX
OFF SIL
ON
S
R4
TRANSDUCER
TO BUBBLER
SYSTEM
BY OTHERS
TRANSDUCER
SYSTEM PRESS.
(IF USED)
SUPPLIED
R6
R5
T'STAT
PUMP 1
TRANSFORMER PANEL
30A C/B
CONTROL
10A C/B
RTU
RESISTORS
DATAFLOW 100K
F18
30A
MONITOR
PHASE
F16
10A
1L2
1L3
1L1
PUMP 2
MCP
LEVEL
3KVA
120VAC
480VAC
F17
10A
PUMP 1
R
R
PUMP 2
THERMO. FAIL
SEAL. FAIL
R
PUMP 2
R8 10
R7
R4
SEAL. FAIL
THERMO. FAIL
PUMP 1
R
R6
PUMP 1
R5
R4
T4
N
N
N
N
N
N
N
FLOAT
BACK-UP
TIMER
PUMP 2
DELAY ON
N
N
N
H A
F8
1A
R2
O
1 3
T2
SEE NOTE 1
R2
T2
R8
SC2
ET
R7
91A
G
1A
F7
AH
R1
O
R6
T1
SEE NOTE 1
R1
T1
R5
90A
90B
SC1
G
ET
FAIL TIMER
FAIL TIMER
PUMP 2
N
PUMP 2
N
PUMP 1
N
PM
N
PUMP 1
N
PUMP 1
PUMP 3
MCP
MCP3
R9
SC1
9 11
R10
PUMP 3
FAIL TIMER
PUMP 3
R10
ET
R9
G
6 6
92A
R3
SC3
35 37
T3
H A
O
1 3
XOO
32 92
F9
T3
OOX
OOX
SEE NOTE 1
1A R3
N
N
1-3
2-3
1-2
FLOAT SEQ
BACK-UP
OOX
XOO
XXO
T4
OXX
R4
3 1
R9
PUMP 3
R10
R
PUMP 3
THERMO. FAIL
R
SEAL. FAIL
MOISTURE
T'STAT
PUMP 3
R9
R10
N
N
N
N
PUMP 3
OOX
OOX
XOO
OOX
OOX
XOO
CR
CRF1
CRF2
CRF3
N
C/B
MAIN
L3
L2
L1
3-60-480V,3W
SS1
PUMP 2
SS2
SC3
3T3
PUMP 3
SS3
3T1
3T2
SC2
2T3
2T2
2T1
SC1
1T3
1T2
1T1
1 4
1 4
3 1
FLR3
M1
CR
M2
CR
M3
BATT-1
FLR2
FLR1
TO GENERATOR
BATT CHARGER
TRIPLEX SCHEMATIC FOR LIFT STATION WITH STANDBY GENERATOR
EXT. AUX
15A C/B
EXT. AUX
60 60A
N
G G
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
E-10
TRIPLEX SCHEMATIC FOR
LIFT STA. W/ STANDBY GEN.
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
DI2
DI1
DI3
DI4
DI5
DI6
DI7
DI8
DIGITAL GND
ANALOG GND
AI8
AI4
AI5
AI6
AI7
AI1
AI2
AI3
ANALOG GND
AO7
AO6
AO8
AO2
AO3
AO5
AO4
AO1
DO1
DIGITAL GND
DO5
DO4
DO3
DO2
DO8
DO7
DO6
+5V OUT
GND
B
GND IN
A
+V IN
RIO 32 I/O
CRM1
SS1
PUMP 1
SHORTING RELAY
CR
B1
TRST1
1 3
P1
CR
F1
CRB1
SC1
SHORTING
PUMP 1 SOFT START
PUMP 1
SHUNT TRIP CB
CONTACTOR 1
FAILURE RELAY
ST
TO PUMP 1 CB
R2
CL
R1
1 3
1 3
R3
SHUNT TRIP PUMP 1
TIMER
ST1
CRF1
TR
CRF2
CRM2
SS2
CRB2
1 3
TO PUMP 2 CB
SHUNT TRIP CB
PUMP 2
SHORTING RELAY
PUMP 2
TIMER
SHUNT TRIP PUMP 2
ST2
TR
TRST2
B2
CR
ST
P2
SHORTING
CONTACTOR 2
SC2
8 5
CRF3
1 3
CRM3
SS3
CRB3
SHUNT TRIP PUMP 3
TIMER
PUMP 3
SHORTING RELAY
TR
2 7
ST3
7 2
CR
B3
PUMP 3
CONTACTOR 3
SHORTING
SHUNT TRIP CB
TRST3
1 3
P3
ST
TO PUMP 3 CB
SC3
8 7
POWER SUPPLY
1 2
12VDC
BATTERY
12VDC
N
252 253
PUMP CTRLLER
B
A
CL
R2
CL
FR3
HIGH
150 153
75VA
24VAC
FR2
FR1
ON
150 152
F19
5A
OFF
150 151
TX1
FL
R3
24N
FL
R2
R1
24N
FL
24N
120VAC
N
BATT-2
FAN
COOLING FAN
INTAKE
THERMOSTAT
FAN
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
R
PUMP 1 SOFT START
FAILURE PILOT LIGHT
N
R3
R1
R
CR
2 7
F2
N
PUMP 2 SOFT START
FAILURE PILOT LIGHT
PUMP 2 SOFT START
N
FAILURE RELAY
R2
R3
R1
R
CR
2 7
F3
N
PUMP 3 SOFT START
FAILURE PILOT LIGHT
PUMP 3 SOFT START
N
FAILURE RELAY
FAN
N
EXHAUST
COOLING FAN
TRIPLEX SCHEMATIC FOR LIFT STATION WITH STANDBY GENERATOR
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-11
TRIPLEX SCHEMATIC FOR
LIFT STA. W/ STANDBY GEN.
ENCLOSURE SIZE: 54" X 24" X 16"
NOTE:
INNER DOOR LAYOUT
BACK-PANEL LAYOUT
54"
24"
S2
CLOSE
S1
CLOSE
CONTACTOR
ATC-300
OUTPUTS
S2
OPEN
S1
OPEN
- NORMAL TRANSFORMER
- EMERGENCY TRANSFORMER
- NORMAL AUXILIARY RELAY
- EMERGENCY AUXILIARY RELAY
- NORMAL AUXILIARY SWITCH
- EMERGENCY AUXILIARY SWITCH
- NORMAL PHASE ROTATION RELAY
- EMERGENCY PHASE ROTATION RELAY
- CUSTOMER NORMAL CONNECTION
- CUSTOMER EMERGENCY CONNECTION
- CUSTOMER LOAD CONNECTION
- FEMALE CONNECTOR
- MALE CONNECTOR
- VOTING RELAY
- FUSE HOLDER
- TRANSFORMER
NT1
ET1
NRA
ERA
NSx
ESx
NPRR
EPRR
Nx
Ex
Tx
Px
Sx
KV
FSx
TXx
SOURCE AVAILABLE
TB CUSTOMER
CONTACTS
SHOWN DE-ENGERGIZED
CONNECTED TO
NORMAL
[260] [261] [262] [260]
TO CONTROL
PANEL
AUTOMATIC TRANSFER SWITCH
NEMA 3R, 316 STAINLESS STEEL
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
E-12
AUTOMATIC TRANSFER
SWITCH FOR STANDBY GEN.
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
DUPLEX CONNECTION PANEL DETAIL
NTS
} TO CONTROL PANEL}TO WET WELL
AND VALVE PIT
NON METALLIC
CORD GRIP
SIZED FOR PUMP
POWER CORD,
FLOAT SWITCHES AND
PRESSURE TRANSMITTER
TERMINAL BLOCK
2- 1 1/2" ALUMINUM CONDUIT FOR POWER
1 1/2" ALUMINUM CONDUIT FOR FLOAT
1" ALUMINUM CONDUIT FOR PRESSURE TRANSMITTER
BETWEEN CONNECTION PANEL AND CONTROL PANEL
SST BLOCKHEAD
UNION COMPRESSION
FITTING MOUNTED
TO BRACKET
TYGON AIR LINE
LOUVERED ENCLOSURE
UNDER CONNECTION PANEL
SPLIT SEALOFFS AND
CONDUIT SEAL
CROUSE - HINDS TYPE EYSR
OR APPROVED EQUAL (TYP)
USE HEAT SHRINK TYPE WIRE
MARKERS (TYP)
10" MIN
NTS
DUPLEX LIFT STATION
PLAN VIEW
M
I N
ADD 1 EXTRA 2" ALUMINUM CONDUIT FOR SPARE
2" ALUMINUM CONDUIT FOR
FLOAT WIRES
3/4" ALUMINUM CONDUIT FOR AIR BUBBLER PIPE
UGND ELECTRICAL FEED
FROM HAND HOLE
CONNECTION PANEL NEMA 3R-SST
LOCKABLE W/BACK PANEL
PROVIDE MIN 8" CLEARANCE
BETWEEN ANY PANELS
PROVIDE ALUMINUM POST AND SST PANEL
ANCHOR BOLTS
ELECTRIC METER (DIGITAL)
MOUNT TO BE VISIBLE FROM
OUTSIDE OF FENCE ON SEPARATE
POST AS REQUIRED.
2-1/2" SCHED 40 ALUMINUM ANTENNA POLE
W/316 SST MOUNTING CLAMPS
CONCRETE SLAB FOR PANELS TO BE 8" THICK SIZED
ACCORDING TO PANEL CONFIGURATION, PROVIDE 6" MIN OF
SLAB BEYOND POSTS ON BACK AND SIDE OF PANELS
2-1" SCHED 40 PVC CONDUIT
3/4" PVC CONDUIT FOR GROUND CONDUCTOR
PROVIDE 4' MIN CLEARANCE IN FRONT
OF ELECTRIC PANEL
3" ALUMINUM CONDUIT
FOR PUMP POWER CABLES
SEWER
1" ALUMINUM CONDUIT FOR BUBBLER
BETWEEN CONNECTION PANEL AND
CONTROL PANEL
SEE DUPLEX LIFT STATION
PLAN VIEW ON THIS SHEET
FOR CONDUIT SIZES
M
I N
ADD 1 EXTRA 2" ALUMINUM CONDUIT FOR SPARE
2" ALUMINUM CONDUIT FOR
FLOAT WIRES
3/4" ALUMINUM CONDUIT FOR AIR BUBBLER PIPE
UGND ELECTRICAL FEED
FROM HAND HOLE
CONNECTION PANEL NEMA 3R-SST
LOCKABLE W/BACK PANEL
PROVIDE MIN 8" CLEARANCE
BETWEEN ANY PANELS
PROVIDE ALUMINUM POST AND SST PANEL
ANCHOR BOLTS
ELECTRIC METER (DIGITAL)
MOUNT TO BE VISIBLE FROM
OUTSIDE OF FENCE ON SEPARATE
POST AS REQUIRED.
2-1/2" SCHED 40 ALUMINUM ANTENNA POLE
W/316 SST MOUNTING CLAMPS
CONCRETE SLAB FOR PANELS TO BE 8" THICK SIZED
ACCORDING TO PANEL CONFIGURATION, PROVIDE 6" MIN OF
SLAB BEYOND POSTS ON BACK AND SIDE OF PANELS
2-1" SCHED 40 PVC CONDUIT
3/4" PVC CONDUIT FOR GROUND CONDUCTOR
PROVIDE 4' MIN CLEARANCE IN FRONT
OF ELECTRIC PANEL
3" ALUMINUM CONDUIT
FOR PUMP POWER CABLES
SEWER
TRIPLEX CONNECTION PANEL DETAIL
NTS
}}TO WET WELL
AND VALVE PIT
NON METALLIC
CORD GRIP
SIZED FOR PUMP
POWER CORD,
FLOAT SWITCHES AND
PRESSURE TRANSMITTER
TERMINAL BLOCK
3- 1 1/2" ALUMINUM CONDUIT FOR POWER
1 1/2" ALUMINUM CONDUIT FOR FLOAT
1" ALUMINUM CONDUIT FOR PRESSURE TRANSMITTER
BETWEEN CONNECTION PANEL AND CONTROL PANEL
SST BLOCKHEAD
UNION COMPRESSION
FITTING MOUNTED
TO BRACKET
TYGON AIR LINE
LOUVERED ENCLOSURE
UNDER CONNECTION PANEL
SPLIT SEALOFFS AND
CONDUIT SEAL
CROUSE - HINDS TYPE EYSR
OR APPROVED EQUAL (TYP)
USE HEAT SHRINK TYPE WIRE
MARKERS (TYP)
10" MIN
1" ALUMINUM CONDUIT FOR BUBBLER
BETWEEN CONNECTION PANEL AND
CONTROL PANEL
SEE TRIPLEX LIFT STATION
PLAN VIEW ON THIS SHEET
FOR CONDUIT SIZES
NTS
TRIPLEX LIFT STATION
PLAN VIEW
TO CONTROL PANEL
4" THICK CONCRETE AROUND
CONDUITS
4" THICK CONCRETE AROUND
CONDUITS
NOTES:
1. AREAS INSIDE WETWELL AND VALVE BOX ARE CONSIDERED A CLASS 1,
DIVISION 2 AREA IN ACCORDANCE WITH THE NATIONAL ELECTRICAL
CODE
2. ALL OTHER AREAS ARE NOT CLASSIFIED
3. NO PENETRATIONS SHALL BE PERMITTED IN THE TOP OF ANY PANEL BOX
4. APPLY TWO COATS OF BITUMASTIC PAINT TO ALL ALUMINUM CONDUIT
AND SUPPORT IN CONTACT WITH CONCRETE FLOOR SLABS TO A POINT 4
INCHES ABOVE CONCRETE SURFACE.
5. PROVIDE DUCT SEAL IN ALL CONDUITS.
BITUMASTIC PAINT WHERE
CONDUIT CONTACTS WITH
CONCRETE (TYP)
BITUMASTIC PAINT WHERE
CONDUIT CONTACTS WITH
CONCRETE (TYP)
AS SHOWN
LAST SAVED: 05/04/18 - 11:05AM
DATE:
REVISION DESCRIPTION:
P R O
J E C T
N
O
P R O
J E C T
N
A M
E
F A B R I C A T E
A N
D
R E F U
R B I S H
L I F T
S T A T I O
N
C O
N T R O
L
P A N
E L S
SEAL
X X X X
N O
T
F O
R
C
O N
S T R
U C
T I O
N
DESIGNATION:
DWG NO:
DRAWING NAME:
DESIGN:
DRAWN: CHECK:
SCALE:
FLORIDA LICENSED PROFESSIONAL ENGINEER TO REVIEW AND
MODIFY ELECTRICAL DESIGN AS REQUIRED TO ACCOMPLISH
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS.
E-13
LIFT STATION ELECTRICAL
DETAILS
ANCHOR BOLTS TO BE
" x 8"
316 SST (TYP)
CONTROL PANEL
TRANSFER SW PANEL
CONNECTION PANEL
66"
2' MIN.
8" MIN (TYP)
6" MIN.
6" MIN.
ANTENNA MAST FOR RADIO MONITORING
18' ABOVE TOP OF SLAB MINIMUM
(TO BE WIRED TO GROUND ROD)
MICRO STROBE LIGHT BY TOMAR
ELECTRONICS PART No. 495-120 RED/POT, MALE PIPE THREAD MOUNT ( OR APPROVED EQUAL)
POWER PRESENT LIGHT - 120V LED
W/BLUE LENS LEDTRONICS
S100-1PB-120A (OR EQUAL)
MOUNT AS REQUIRED TO BE
VISIBLE FROM STREET
CROUSE HINDS-ANGLE ADAPTER-45 DEG
100 AMP-RUSSEL-STOHL JAAB 10-30
OR 200 AMP-AJI OR APPROVED EQUAL
FEMALE REVERSE-CROUSE HINDS
100 AMP AREA- 1042-S22-M72
OR 200 AMP AREA- 2042-S22-81
OR APPROVED EQUAL
USE SEALING LOCKNUTS ON
ALL PANEL PENETRATIONS.
MYERS HUBS OR APPROVED EQUAL
14 GAUGE 316 SST NEMA 3R ENCLOSURE
LIGHTNING ARRESTER GENERAL
ELECTRIC TRANQUELL ARRESTER
MODEL 9L15E CC001 520V AC 3 POLE,
OR APPROVED EQUAL
SCREENED LOUVERS
IN CONTROL PANEL AND
LOWER ENCLOSURE
LOWER PORTION OF POST
NOT SHOWN FOR CLARITY
2- 1/ 2" ALUMINUM PIPE-POLE
FOR ANTENNA TYPE 6061-T6
STANDARD (20' LENGTH)
3 KVA, 480:120 VOLT CONTROL
TRANSFORMER TO BE MOUNTED
IN VENTED SST NEMA 3R ENCLOSURE
IN POSITION ON RACK (IF REQUIRED)
# 6 (MIN) BARE COPPER WIRE
INSIDE 3/4" PVC CONDUIT AND
CLAMP FOR GROUND WIRE
4" x 4" ALUMINUM POST WITH CAP.
PAINT BELOW GRADE WITH BITUMASTIC
4" ABOVE FINISH GRADE (TYP)
5/8" DIA x 20' COPPER CLAD
STEEL GROUND ROD-10 OHMS
OR LESS TO GROUND. 2 REQUIRED,
6 FEET (MIN) SEPARATION
USE ADDITIONAL RODS TO
REDUCE RESISTANCE.
ALL GROUND RODS TO BE
CONNECTED USING # 6 (MIN)
BARE COPPER WIRE
3" ID PIPE CUP
1 1/2"
SST UNIT
STRUT
(TYP)
CONTROL PANEL
W/LOUVERED
ENCLOSURE BELOW
316 SST ALL THREAD
ROD SET IN EPOXY
TO MOUNT PANEL
NOTES:
1. AREAS INSIDE WETWELL AND VALVE BOX ARE CONSIDERED A CLASS 1,
DIVISION 2 AREA IN ACCORDANCE WITH THE NATIONAL ELECTRICAL
CODE
2. ALL OTHER AREAS ARE NOT CLASSIFIED
3. NO PENETRATIONS SHALL BE PERMITTED IN THE TOP OF ANY PANEL BOX
4. APPLY TWO COATS OF BITUMASTIC PAINT TO ALL ALUMINUM CONDUIT
AND SUPPORT IN CONTACT WITH CONCRETE FLOOR SLABS TO A POINT 4
INCHES ABOVE CONCRETE SURFACE.
5. PROVIDE DUCT SEAL IN ALL CONDUITS.
NO PENETRATIONS ARE
ALLOWED IN THE TOP OF
ANY PANEL BOX
TRANSFER SWITCH PANEL
MAY BE MOUNTED ON
EITHER END BUT GENERATOR
RECEPTACLE MUST BE ON OUTSIDE.
(STATE LEFT OR RIGHT SIDE
GEN. RECPT. WHEN ORDERING.)
CONCRETE SLAB DOWEL INTO TOP SLAB
OF WETWELL #5 @ 12"OC
TIPPING BUCKET STYLE RAIN GAUGE, 6"
DIAMETER,8"HEIGHT,TEXAS
ELECTRONICS, TR-525I, OR APPROVED
EQUAL. INSTALL BY MANUFACTURER
RECOMMENDATIONS
NTS
PANEL SIDE VIEW
NTS
PANEL REAR VIEW
8" MIN (TYP)
3/4" SCHED 80 PVC AIR BUBBLER PIPE WITH
TYPE 316 SST PIPE SUPPORTS AND
FASTENERS MAX. 3' BETWEEN SUPPORTS
NTS
ELEVATION
BELL-EDWARDS ADAPTABELL
HEAVY DUTY BELL 4" CAT
No 340-4N5 120V 60 Hz
OR APPROVED EQUAL
CONNECT TO GROUND GRID
#6 BARE GROUND WIRE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .