9-4- Gunlock 6 Well Specification 11-6-2025.pdf

PDF 327 KB Posted

Attached to
IFB - GUNLOCK WELL #6 REDRILL
Solicitation number
25-238
Issued by
Washington County, Utah

About this file

This is a bid schedule and technical specifications document for the City of St. George, Utah, for the Gunlock Well #6 Redrill project (Inquiry No. 25-238). The project involves drilling a replacement 24-inch minimum diameter well at the Gunlock Well Field located west of the city near Gunlock Reservoir, with work including well construction, casing installation, development, test pumping, and disinfection. The scope consists of 16 line items covering mobilization, drilling operations (36-inch and 24-inch holes to specified depths), casing installation in two wall thicknesses, surface well sealing, well alignment testing, air surge equipment installation and operation, blasting operations, sandstone removal and disposal, well development via pumping, test pump installation and operation, well disinfection, and wellhead construction. The contractor is allowed 180 calendar days on site to complete all work, with liquidated damages of $250 per day assessed for each day beyond the contract deadline. All materials contacting drinking water must meet NSF Standard 61 certification requirements. The well is expected to encounter silty fine alluvial sand deposits and Jurassic-age Navajo sandstone to the full drilling depth.

Bidders must submit unit or lump sum prices for each line item as specified in the bid schedule, with final payment based on actual quantities rather than estimated amounts. A 5% bid bond is required, naming the City of St. George as obligee, and a 100% performance bond covering labor and materials will be required upon award. The contractor is responsible for arranging all power and water needs for drilling operations and must obtain all required permits, licenses, and certificates at their own expense. The contractor bears responsibility for site restoration, waste removal, proper water disposal, and protection of water quality throughout construction. The city reserves the right to reject any or all proposals, waive technicalities, and adjust quantities or eliminate items as deemed necessary. Well development is estimated at 96 hours, with test pumping required for continuous operation at specified discharge rates, and all detailed well logs, geological samples, alignment survey data, and video survey access must be provided to the owner upon completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Project: Gunlock Well #6 Redrill Inquiry No.: 25-238

BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following unit or lump sum prices. If an alternate is asked for, the contractor may elect to BID either or both BID schedules, however only one schedule will be awarded.

BIDDER will complete the work in accordance with the Contract Documents for the following unit prices. Quantities indicated are not guaranteed; they are solely for comparing BIDS and establishing the initial Contract Price. Final payment will be based on actual quantities.

NOTE: The Engineer shall check all BIDS for mathematical errors. If errors have been made in the extension of the figures, the unit prices will be the binding amount and the total amounts will be revised to reflect the corrections.

BID SCHEDULE

ITEM

NO.

ITEM

DESCRIPTION

QUANTITY

UNITS

UNIT

COST

TOTAL

1 Mobilization 1 L.S.

2 Drill 36” Hole 500 L.F.

3 30” Casing (0.375 wall) 302 L.F.

4 30” Casing (0.500 wall) 200 L.F.

5 Surface Well Seal (500’) 1 L.S.

6 Drill 24” Hole 200 L.F.

7 Well Alignment Test 1 L.S.

Install/remove Air Surge Equipment

4 Each

9 Air Surge 10 Hour

10 Blasting 1500 LBS

11 Sand Stone Removal 1500 Yard

12 Sand Stone Disposal 1500 Yard

13 Well Development (pump) 96 Hour

Test Pump (including installation and removal)

1 L.S.

15 Disinfect Well 1 L.S.

Well Head Construction including 30” Flange, Blind Flange, 6” Air Release Line

1 L.S.

TOTAL OF BID SCHEDULE

BIDDER certifies that BIDDER has read the Request for BIDS and fully understands its intent.

BIDDER certifies that BIDDER has adequate personnel and resources to fulfill the proposal requirements. BIDDER further understands that BIDDER’S ability to meet the criteria and provide the required services shall be judged solely by the City. BIDDER further certifies that, since the receipt of the Request for BIDS, no contact, discussion, or negotiation has been made nor will be made regarding this proposal for construction services with any City employee other than the contact people listed in the Request for BIDS. BIDDER understands that any such contact could disqualify this proposal. BIDDER further certifies that BIDDER is properly licensed to conduct business within the scope of this BID as required by the State of Utah. BIDDER certifies that all schedules and addenda contained herein shall be considered part of the entire Request for BIDS response and that the complete document submitted shall be considered a legally binding document.

The undersigned swears and deposes that the information provided herein is true, accurate, and complete so as not to be misleading.

Dated this ____________________________ day of ___________________________ 20__.

Respectfully Submitted:

Business Name: Seal (if BID is by Corporation)

Business Address:

Representative Name:

Signature:

Title:

Date:

Attest Signature:

Attest Name:

END OF SECTION

PART B

TECHNICAL SPECIFICATIONS

SECTION 1

GENERAL

REQUIREMENTS

1-1 SUMMARY OF WORK

The proposed work consists of drilling a 24 inch Minimum diameter replacement well to a depth specified in the attached drawings and developing the well in compliance with rules and regulations R309 and R655 of the Utah Administrative Code. The work and requirements to be accomplished by the Contractor shall include furnishing all labor, materials, equipment, tools, supplies and all other appurtenances necessary to complete the construction as specified. The completion of this contract shall include the installation of casing, development test pumping, and completing a well capable of receiving permanent pumping facilities.

In addition all materials which may contact drinking water, including pipes, gaskets, lubricants, and O-Rings, shall be ANSI-certified as meeting the requirements of National Sanitation Foundation (NSF) Standard 61, Drinking Water System Components – Health Effects. To permit field-verification of this certification, all such components shall be appropriately stamped with the NSF logo. Also, pipe, joints, fittings, and valves shall conform to NSF Standard 61 or Standard 14.

1-2 SITE EXAMINATION

The well is located west of the City near Gunlock Reservoir as shown in the drawings. It is anticipated that the drilling will encounter silty and fine alluvial sand deposits and Jurassic age Navajo sandstone to the full depth of the well.

This information is provided only to assist the Contractor in preparing his bid. However, the Contractor shall satisfy himself regarding all local conditions affecting the work. The reliability of the information herein contained shall not in any way affect the terms and requirements of the contract.

1-3 ACCESS AND BOUNDARIES OF WORK

The proposed well site will be accessed from the surrounding local roads. The Owner will provide an access road from the frontage road to the well site including suitable provision for ingress and egress necessary for the completion of the work specified in the Contract. The Contractor shall insure that all vehicles will remain on the roadways provided and shall not disturb property outside the access road and well site provided. Water produced by the well development may need to be channeled from the site and will need to be completed in cooperation with city. The existing site is 100’ in diameter, all work will need to take place within the site.

1-4 POWER AND WATER

The Contractor will make all arrangements for power if it is required in drilling operations. The cost of power will be included in the unit price bid for the respective items for which the power is used.

The Contractor shall be responsible for transporting any water from source locations to the job site. There will be water available at Well 1, 3, or 4 depending on which wells are operating at the time.

1-5 PROTECTION OF SITE

The Contractor shall conduct his operations in a manner that the present conditions of the sites and surrounding areas will not unnecessarily be altered. All unused materials as well as discarded and waste materials shall be removed from the site. The Contractor, upon completion of the work, shall restore the site as nearly as possible to its original condition. Water pumped from the wells shall be conducted to the nearest drainage where it will be possible to dispose of it without causing damage to property or creating a nuisance.

1-6 COMPLIANCE WITH THE LAWS OF THE STATE OF UTAH

In performing the work under these specifications the Contractor shall, at his own expense, procure all permits, certificates and licenses required by law for the execution of the work. The Contractor shall comply with all Federal, State or local laws, ordinances or rules and regulations relating to the performance of the work. The Owner shall obtain permission from the State Engineer and any other pertinent State Agencies to drill the well.

1-7 QUANTITIES AND PAYMENT

The amount of work to be completed, or materials, or services to be furnished under this contract are estimates and are not to be taken as an expressed or implied statements that the actual amount of work or materials will correspond to the estimate.

The right is reserved to increase or decrease or to entirely eliminate certain items from the work if found desirable or expedient. The Contractor is cautioned against unbalancing the bid by prorating his overhead into one or two items. The overhead and direct charges shall be prorated on all items in the bid schedule.

The Contractor will not be allowed claims for anticipated profits, loss of profits or for damages due to any difference between the estimated and the actual amount of work done or materials furnished or used in the completed project.

Other items of work defined in the specifications but not listed in the bid schedule shall be considered incidental to one or more of the items listed in the bid schedule and shall be paid for under the bid item listed to which it is related.

1-8 LENGTH OF CONTRACT

The Contractor will be allowed 180 calendar days on site to complete the work. Liquidated damages of $250.00 per day may be assessed to the Contractor for each calendar day beyond the contract time period until the work is complete.

SECTION 2

WELL CONSTRUCTION AND DEVELOPMENT

2-1 GENERAL

All materials, equipment and procedures that will be used to construct the replacement well shall conform to the requirements as set forth in these drawings and specifications.

2-2 DRILLING EQUIPMENT

The well shall be drilled by using either percussion or rotary type drilling equipment as determined by the Contractor. No drilling method that requires circulation of drilling mud or other liquids, except liquid soap, under pressure will be permitted below static water level. Furthermore, if air circulating rotary-type drilling equipment is used and the circulation of air is lost during the operation of rotary equipment, the use of drilling mud or other lost circulation agents will not be permitted. It would be required in such cases that the rotary equipment be replaced immediately with percussion type drilling equipment.

2-3 DRILLING PROCEDURES

A carrier casing with a minimum diameter of 30 inches shall be installed to a depth of 500 feet and grouted in place. The 24 inch diameter boring shall be drilled to a depth as specified on the drawings. The Owner or their representative, during the drilling operation, shall stipulate the exact depth. The Contractor shall complete the drilling to the depth so stipulated. Thereafter, the well shall be developed in compliance with Section 2-11 of these specifications.

At the completion of the drilling to the specified depth, the contractor shall construct well cavity by blasting, air-surging, reverse circulation, and bailing. The contractors equipment shall allow for any sequence of the processes to be used in any order. The Contractor shall then install the pump test equipment as specified and shall pump test the well in compliance with Section 2- 12 of these specifications. At the completion of this contract, the well shall be open and clear of any obstruction, disinfected, and ready to receive permanent pumping facilities.

A. Blasting

1. If blasting operations are used, the CONTRACTOR shall not overload any charge which would permanently damage formations above or below the water bearing formation which is being enlarged. The blasting procedure which the CONTRACTOR proposes must be approved by ENGINEER.

2. Obtain all permits and follow all regulations regarding the handling, transportation and use of explosives.

3. Initial blasting of the formation will commence from the bottom in ten foot (10’) increments to below casing.

4. Number and quantity of charges shall be approved by the ENGINEER prior to start.

5. Any damage to the well casing caused by use of explosives by the CONTRACTOR shall be repaired by the CONTRACTOR at his expense.

B. Air Surging

1. Air surging may be necessary to develop the well, in order to clear the aquifer of sand carried into the well by the water entering the well when pumping at the design rate.

2. In conjunction with blasting and bailing, CONTRACTOR shall furnish and install air compressing equipment, flange Adaptor, blind flange, and air release valve for air surging development. Seal well and pressurize with air until water level is depressed just above the bottom of the casing. Open the valve quickly to release air and create an instantaneous surge of water into the well. Remove by bailing or pumping loosened rock after several surging cycles. CONTRACTOR shall continue procedure as long as substantial quantities of rock accumulate. ꞏ

3. CONTRACTOR shall request and receive ENGINEER'S approval of CONTRACTOR'S air surging plan prior to commencement of air surging activities.

4. The CONTRACTOR shall provide all labor, equipment, piping, appurtenances and power, including all instrumentation to conduct air surging. The compressor shall have a minimum size of 750 cfm at 250 psi.

A minimum six inch (6") quick opening valve shall be installed to rapidly release the compressed air which is used to depress the water level in the open hole. The water level in the casing will be depressed to within twenty feet (20') from the end of the casing.

5. CONTRACTOR shall be responsible for providing equipment of adequate size, capacity, and repair to carryout air surging activities in a safe and efficient manner.

6. CONTRACTOR shall provide and furnish to ENGINEER an accurate daily log showing accumulative hours of surging and bailing activities.

D. Sandstone Removal

1. CONTRACTOR may conduct initial bailing utilizing a bailer. However, for the sake of efficiency, CONTRACTOR'S sandstone removal after the initial phase shall be by air lifting.

2. CONTRACTOR shall utilize an educator pipe efficiently sized for the conditions encountered, with outside air line designed to facilitate dynamiting and air surging.

3. CONTRACTOR shall be responsible for providing equipment of adequate and efficient size, capacity and repair to carryout bailing activities in a safe and efficient manner.

4. Periodic sandstone removal may be required. Sandstone in the pit will be measured, trucks for removing sandstone will be counted, and the amount of sandstone disposed of agreed to between ENGINEER and CONTRACTOR.

2-4 ALIGNMENT

ALIGNMENT DEVIATION SURVEY. After the hole has been drilled, the Contractor shall test the plumbness of the borehole by means of an alignment deviation survey. This survey shall provide data that represents the position of the borehole in three-dimensional space. The survey shall provide borehole directional data which measures drift, azimuth, and inclination of the borehole with the vertical. The survey shall be performed using magnetometer probe equipment or gyroscopic equipment. The Contractor shall submit to the Owner for approval the details of the proposed survey method. The testing company shall provide a written report that provides information concerning the drift of the hole. The allowable plumbness tolerance is 0.00667 times the inside diameter of the casing or screen being used per foot, or for the specified 30-inch casing the standard is no more than 0.016675 feet per vertical foot, or 1.6675 feet per 100 feet. All data, result, graphs and a written report must be provided to the Owner in electronic format, in addition to a hard copy. Should the alignment fail to meet this test, the Contractor shall drill a new well at a state approved offset location determined by the Owner and at no additional cost to the Owner.

VIDEO SURVEY. The Owner may conduct a video survey of the well after drilling to ensure that the entire well is in good condition and to observe the characteristics of the geologic formation and/or the well and screen installation. The video camera and recording equipment will be furnished and operated by the Owner. The contractor shall provide access to the well so that the camera can be installed and operated. The video survey will require placement of a flocculant in the well and then a minimum of two days of no well disturbances prior to the work.

2-5 ABANDONMENT OF WELL

If, in the opinion of the Owner or their representative, it is necessary to discontinue work on the well when partially complete by reason of the well being out of line more than the amount specified or on account of jammed tools, caving ground, or by reason of negligence on the part of the Contractor, the Contractor shall immediately start drilling another well at a nearby location designated by the Owner or their representative. The Contractor will not be entitled to any payment for work done on or materials furnished for such abandoned well. Well abandonment shall be completed in accordance with State of Utah, Source Development Rules R309-204-6 (9).

2-6 LOG AND RECORD OF WELL

The Contractor shall keep a complete well log showing the depth at which every important change in formation is encountered. The log shall show thickness, type, color, and drilling characteristics of rocks and soil formation penetrated and particularly the location and quantity of any water obtained.

Formations shall be checked and results entered in the log at intervals not to exceed ten

(10) feet even though no change in formation is apparent. This log shall be kept up to date with the progress of well drilling and shall be available for examination by the Owner or their representative at any time during drilling operation. At the conclusion of drilling, three copies of this log shall be furnished to the Owner. The cost of all labor and materials required for the work described in this paragraph shall be borne by the Contractor and shall be included in the prices bid in the schedule or other items of work.

On a form furnished by the Contractor, the Contractor shall provide a record of data not fully covered in the well log. This record will include: (a) depth, thickness, and yield of all water- bearing zones; (b) the depths at which the hole diameter changes; (c) depth or location of any lost drilling fluid, drilling materials, or tools; (d) static water level, yield and drawdown of the completed well; (e) type, diameter, length and depth interval of all casing installed; and (f) type, size, spacing, and depth interval of all perforations and gravel pack.

2-7 SAMPLES

A cuttings sample shall be taken at each apparent change in the character of the materials penetrated or at intervals not to exceed ten (10) feet in event of no apparent change. Samples shall be obtained from material at the bottom of the well. Samples shall be collected in a 5-gallon bucket and allow to settle before the sample is taken. Washing of the sample is prohibited. Each sample shall be kept separate from other materials and placed in a geologic bag. Each bag shall weigh a minimum of ½ pound and be labeled in permanent ink with the name of the well, number of sample, depth interval sampled, and date obtained. Samples shall be furnished to the Owner with the detailed well log.

2-8 WELL CASING

The materials described in this section will be furnished and installed by the contractor. Casing to be used in this construction shall meet ASTM Standard A53/A53M-04a; ASTM Standard A 589-96 (2001), Types I, II and Ill; or API Standard 5L-04.

Dimensions and nominal weights shall conform to the following minimum requirements:

Depth Size Outside Diameter Wall Thickness Weight (ft.) (in.) (in.) (in.) (lbs./ft.)

0-300 300-500

0.375 0.500

118.65 157.53

2-9 DEVELOPMENT

The Contractor shall develop the well by methods of pumping or other methods satisfactory to the Owner or their representative. The development shall be completed after the installation of well casing and removal of sand. The hours needed will be determined by the Owner or their representative.

2-11.1 DEVELOPMENT BY PUMPING AND SURGING

The Contractor shall develop the well by an engine-driven pump with bowls set at 5 0 0 ’ depth as directed below the surface of the ground for developing 1500 gallons per minute and having a capacity of at least 1600 gallons per minute from said depth. The pumping unit shall be complete with ample power, controls, and appurtenances and shall be capable of continuous duty operation under the specified operating conditions. Periodic surging by lifting of the water column to the surface and letting the water column fill back into the well shall be performed.

Development shall be considered complete when the water is clear and reasonably free from sand. After development is considered completed by the Owner or their representative, all silt, sand and gravel shall be cleaned from the well. Payment for developing the well will be made at the contract unit price bid per hour for the item "Develop Well", as provided in the bid schedule. This price shall be full payment for all equipment, power, labor, and materials necessary to complete the well development work. No payment will be made for time spent installing, removing or repairing developing equipment.

2.12 YIELD AND DRAWDOWN TESTING

2.12.1 GENERAL

After the well has been completely constructed and cleaned out and the depth of the well accurately measured, the Contractor shall notify the Owner or their representative to that effect and shall make the necessary arrangements for conducting a final pumping test. Besides this final test, the Owner or their representative may order the Contractor to make such additional pumping tests during and after construction as he deems necessary. All tests shall be run with similar equipment in a like manner to that hereinafter described.

2.12.2 TEST PUMPING EQUIPMENT

The Contractor shall furnish and install necessary pumping equipment capable of pumping to the required point of discharge a maximum of 1600 gpm with the pumping level 500 feet below ground but with satisfactory throttling devices, so that the discharge may be reduced to 400 gpm.

The pumping unit shall be complete with an engine of ample power, controls and appurtenances and shall be capable of being operated without interruption for the time listed in the bid schedule. The Contractor will furnish and install all discharge pipe necessary to transmit water from the pumping unit an adequate distance to the nearest wash. The Contractor shall furnish, install and maintain equipment of approved size and type of measuring the flow of water; such equipment to be weir box, orifice or water meter. To measure the elevation of the water level in the well, an air line complete with gauge, hand pump, and check valve or water level transducer shall be provided.

2.12.3 PROCEDURE

Unless otherwise approved by the Owner or their representative, the pump test shall begin at a relatively low flow rate (approximately 500 gpm). As the water clears, the flow rate shall be gradually increased to the maximum flow rate previously specified.

2.12.4 DURATION OF TEST

Except as otherwise provided, the Contractor shall furnish all labor, motive power, lubricating oil and other necessary materials, equipment, labor and supplies required and shall operate the pumping unit at such rates of discharge and for such periods of time as directed. The Contractor shall be prepared to continuously pump for a period of 96 hours. The exact length of the pump test shall be stipulated by the Owner during pumping. Accidental interruptions may, if so agreed correspondingly, extend the time of the completion of the test run. After the completion of the final test, the Contractor shall remove by bailing, sand pumping, or other methods any sand, stones, or other foreign material that may have been deposited in the well. Time stated for the duration of the pump test is an estimate only, and the Owner or their representative reserves the right to require the Contractor to shorten or extend such period of test, or to make additional tests.

After recovery from the step test is complete, a "constant-rate" test shall be conducted in accordance with State Rule R309-204-6(10)(b). The well discharge should be 1.5 times the design rate or at the maximum yield. The test shall be run continuously for at least 24 hours or until stabilized drawdown has continued for at least six hours. During pumping, water levels in the well should be measured to provide at least 10 observation drawdowns within each log cycle of time. A recommended scheduling measurement is as follows:

0 to 10 minutes: 1, 1.5, 2, 2.5, 3.25, 4, 5, 6.5, 8, and 10 minutes.

10 to 100 minutes: 10, 15, 20, 25, 30, 40, 50, 65, 80, and 100 minutes. 100 minutes to completion: 1 to 2-hour intervals.

Along with drawdowns readings, the following should also be recorded:

1. Record the time since starting test (in minutes)

2. Record the actual pumping rate

3. Record the pumping water level (in feet to the nearest tenth, as measured from the same datum used for the static water level), Immediately after termination of the constant-rate test, a recovery test shall be completed for a period of time until there are no changes in depth to water level measurements for at least six hours. Record the following at time intervals similar to those used during the constant-rate pump test:

1. Time since stopping pump test (in minutes)

2. Depth to water level (in feet to the nearest tenth, as measured from the same datum used for the pumping water level).

Water measurement recording forms and constant-rate test procedures can be provided by the Owner or their representative upon request.

2.13 GROUTING AND SEALING

After the carrier casing has been set, the well shall be grouted in compliance with the following paragraphs:

Grout for the annular space between the drilled hole and the well casing shall be mixed to the following proportions: 1 sack Portland Cement, an equal volume of dry sand, and 5 to 6 gallons of clean water.

Prior to placement of the grout, the Contractor shall secure the approval of the Owner or their representative for the method he proposes to use. The following method is suggested.

The grout shall be placed by the use of a conductor pipe or tremie 2 inches or larger in diameter. The grout shall be transported to the bottom of the 500 foot drilled hole through the tremie which shall extend to within 20 feet of the bottom of the space to be grouted. When the grout has reached to bottom of the tremie, the tremie shall be raised 20 feet and the placement operations shall resume. This process shall continue until the entire length has been grouted. It is further required that the grouting be done continuously and in such a manner as will insure the entire filling of space in one operation. No drilling operations or other work in the well will be permitted within 72 hours after the grouting of casings. If quick-setting cement is used, this period may be reduced to 24 hours.

As indicated in the Utah Division of Drinking Water R309-515-6(5)(b)(i), the following individuals are authorized to witness the well sealing procedure for a public drinking water well:

(I) An engineer or a geologist from the Division of Drinking Water (II) A district engineer of the Department of Environmental Quality (III) An authorized representative of the Division of Water Rights, or (IV) An individual having written authorization from the Executive Secretary

At least 48 hours before the anticipated well grouting the well driller shall arrange for an authorized witness listed above to witness the procedure.

2-14 PROTECTION OF WATER QUALITY

The Contractor shall take such precautions as are necessary or as may be required to permanently prevent contaminated water or water having undesirable physical or chemical characteristics from entering, through the opening made by the Contractor in drilling the well or the stratum from which the well is to draw its supply. He shall also take all necessary precautions during the construction period to prevent contaminated water, gasoline, etc., from entering the well either through the opening or by seepage through the ground surface.

In the event that the well becomes contaminated or that water having undesirable physical or chemical characteristics does enter the well due to the neglect of the Contractor, he shall, at his own expense, perform such work or supply such casing, seals, sterilizing agents or other material as may be necessary to eliminate the contamination or shut off the undesirable water.

2.15 DISINFECTION

After the well has been completely constructed, it shall be thoroughly cleaned of all foreign substances including tools, timbers, rope, debris of any kind, cement, oil, grease, joint dope and scum.

The casing pipe shall be thoroughly swabbed, using alkalis if necessary to remove oil, grease or joint dope. The well shall then be disinfected with a chlorine solution.

The chlorine solution used for disinfecting the well shall be at least 50 parts per million (PPM) free chlorine and shall be applied over the entire length of the casing and pump column. This solution shall be retained for a period of not less than 24 hours.

An alternative method for the disinfection of the well provides that a sufficient amount of chlorine be added so that a concentration of 300 PPM is obtained. This should be computed on a volume somewhat larger than that of the pipe. The solution should be retained in the well and pump column for at least three hours but should not exceed five to six hours to avoid possible damage by corrosion.

2-16 MEASUREMENT AND PAYMENT

The finished well will be measured for payment from the original ground surface to the bottom of the drilled hole or at the depth of drilling directed by the Owner or their representative, whichever is the lesser depth. The length of casing placed in the well from 2.5 feet above the ground surface to the total depth of the hole will be measured for payment without allowance for lap at joints.

Payment for furnishing and installing well casing, blasting, air surging, 36” drilling, gravel pack, telemetry tube well development, testing, pumping, grouting and disinfection of the new well will be made at the lump sum and unit prices as contained in the bid schedule.

Measurement for payment shall be by actual quantities in place of each bid item.

Item #1 Mobilization

This item shall include but not be limited to, all labor, materials, and equipment necessary to mobilize the drill rig and ancillary equipment to the site and remove from the site when completed. This item shall also include preparation of the site for drilling and prepping for discharge of water, if necessary. This item shall also include any incidental project costs for permitting, insurance, bonding etc.

This item shall be paid on a Lump Sum Basis.

Item #2 Drill 36” Hole

This item shall include all labor, equipment, and materials necessary to drill a 36” Diameter hole to the depth specified in the bid schedule and drawings. The measurement of cuttings for this item and costs for removing them from the hole shall be included in this item. Any cuttings removed during this process in excess of the neat line of the hole will be quantified and paid under item #11.

This item shall be paid on a Lineal foot price basis.

Item #3 30” Casing (0.375 wall)

This item shall include furnishing and installing 30” casing in the 36” hole and shall include all labor, equipment, and materials to install and the pipe including but not limited to welding, trucking, hauling, placing.

This item shall be paid on a Lineal Foot price basis.

Item #4 30” Casing (0.500 wall)

This item shall include furnishing and installing 30” casing in the 36” hole and shall include all labor, equipment, and materials to install and the pipe including but not limited to welding, trucking, hauling, placing.

This item shall be paid on a Lineal Foot price basis.

Item #5 Surface Well Seal

This item shall include furnishing grout and installing in the hole to seal the 30” casing from the ground surface to the bottom of the casing at 500’. This item shall also include any costs associated with witnessing of the surface seal by a representative of the state.

This item shall be paid on a Lump Sum price basis.

Item #6 Drill 24” Hole

This item shall include all labor, equipment, and materials necessary to drill a 24” Diameter hole to the depth specified in the bid schedule and drawings. The measurement of cuttings for this item and costs for removing them from the hole shall be included in this item. Any cuttings removed during this process in excess of the neat line of the hole will be quantified and paid under item #11.

This item shall be paid on a lineal foot price basis.

Item #7 Well Alignment Test

This item shall include all labor, equipment, and materials necessary to perform a well alignment test on the well casing to a depth of 500’.

This item shall be paid on a Lump Sum price basis.

Item #8 Install/Remove Air Surge Equipment

This item shall include all labor, equipment, and materials necessary to install and remove the air surge equipment including blind flange, hoses, discharge valve, compressor and any other materials necessary to surge the well with air and release it through a quarter turn 6” or larger butterfly valve.

This item shall be paid on a per each basis.

Item #9 Air Surge

This item shall include all labor, equipment, and materials necessary to surge the well including pumping the well full of air to remove the water to the bottom of the casing and then release it surging the water back into the well.

This item shall be paid on a hourly basis.

Item #10 Blasting

This item shall include all labor, equipment, and materials necessary to enlarge the hole below the casing with the use of explosives until the desired amount of sandstone has been removed from the well.

This item shall be paid on a per pound basis of explosives actually used.

Item #11 Sand Stone Removal

This item shall include all labor, equipment and materials necessary to remove the loose or blasted material from the well. The material shall be measured using a method approved by the engineer.

This item shall be paid on a per yard basis of materials removed from the hole.

Item #12 Sand Stone Disposal

This item includes removing the sandstone material from the site and disposing of it and included but it not limited to trucking, hauling, and disposing of the materials.

This item shall be paid on a per yard basis and include materials hauled offsite.

Item #13 Well Development

This item shall include all labor, materials, and equipment necessary to run a pump provided under item #14 for the specified hours including but not limited to fuel, oil, piping and any other items necessary to test pump the well in a continuous manner as specified.

This item shall be paid on an hourly basis.

Item #14 Test Pump

This item shall include all labor, materials, and equipment necessary to install and remove test pump for the well including but not limited to pump, head, drive unit, column, tube, shaft, motor, piping, orifice plate and installing owner provided meter. Operation of the pump shall be covered in Item 13 above.

This item shall be paid on a lump sum basis.

Item #15 Disinfect Well

This item shall include all labor, materials, and equipment necessary to disinfect the well as specified.

This item shall be paid on a lump sum basis.

Item #16 Well Head Construction including 30” Flange, 30” Blind Flange, 6” Air release line

This item shall include all labor, materials, and equipment necessary to install a 30” flange on the casing and a 6” welded saddle connection to the casing with valve and piping and includes, but is not limited to welding, fabricating, installing and testing the parts. This item also includes providing a 30” Blind Flange to seal off the well when complete and for air surging.

This item shall be paid on a lump sum basis.