9-12.0-PART A- Standard-Technical-Specifications-CTS.pdf

PDF 314 KB Posted

Attached to
Beckett Bridge Watermain and Force Main Relocation
Solicitation number
260141-B-JL
Issued by
Pinellas County, Florida

About this file

This is a Standard Technical Specifications document published by the City of Tarpon Springs, Florida Development Services Department in February 2011, establishing construction standards and measurement protocols for municipal infrastructure projects. The specifications cover a comprehensive range of construction operations including survey and layout work, earthwork and grading, pavement construction, drainage structures, and incidental construction items such as curbing, sidewalks, and signage. The document establishes lump-sum and unit-price payment methodologies for various work categories, with mobilization payments structured on a graduated schedule based on the percentage of original contract amount earned, ranging from 25 percent payment at 5 percent contract completion to 100 percent payment at 50 percent contract completion. All work must be performed to the satisfaction of the Engineer, with detailed technical requirements referencing FDOT Specifications, AASHTO standards, and Pinellas County specifications for materials such as asphaltic concrete, limerock base, and stabilization materials. The specifications mandate the employment of Florida-registered Professional Land Surveyors for survey and layout tasks and require contractors to submit erosion control plans and project-specific construction phasing plans prior to commencing work.

The specifications establish rigorous testing, inspection, and quality assurance requirements throughout construction, with costs for de-watering, erosion control, and traffic maintenance generally included in applicable pay items unless separately itemized. Contractors bear responsibility for providing and maintaining temporary facilities, equipment, and safety measures, with specific performance standards including maintaining turbidity levels under state-allowed thresholds and correcting deficiencies within 24 hours or incurring daily penalties. Payment for materials is determined through various methods including batch weights, truck scale weights, field measurements, and volume calculations, with delivery tickets required for asphalt and aggregate materials. The document specifies that suitable excavated material remains City property until earthwork completion, surplus material becomes contractor property for disposal, and all borrow sources must comply with Pinellas County and FDOT standards with appropriate soil testing documentation prior to use.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF TARPON SPRINGS, FLORIDA

STANDARD TECHNICAL SPECIFICATIONS

FEBRUARY 2011

PUBLISHED BY:

DEVELOPMENT SERVICES DEPARTMENT

CITY OF TARPON SPRINGS – STANDARD TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

GENERAL CONSTRUCTION OPERATIONS

ACRONYMS & ABBREVIATIONS

SURVEY & LAYOUT BY CONTRACTOR

QUANTITY MEASUREMENTS SURVEY BY CONTRACTOR

PERMITTING AS-BUILT SURVEY REQUIREMENTS BY CONTRACTOR

AS-BUILT SURVEY REQUIREMENTS (UTILITY) BY CONTRACTOR

MOBILIZATION

MAINTENANCE OF TRAFFIC

MAINTENANCE OF TRAFFIC (ITEMIZED)

WATER FOR DUST CONTROL

PREVENTION, CONTROL & ABATEMENT OF EROSION & WATER POLLUTION

DRAIN PIPE WITH SOCK (FOR SEDIMENTATION CONTROL)

CLEARING & GRUBBING

ROOT CONTROL BARRIER

EARTHWORK & RELATED OPERATIONS

GRADING

DREDGING

FLOWABLE CONCRETE FILL

BEDDING MATERIAL

STABILIZATION

FINISH SOIL LAYER (ORGANIC TOPSOIL)

BASE COURSES

ROADWAY BASE (RECYCLED CRUSHED CONCRETE/GRADED AGGREGATE)

SUPERPAVE ASPHALT BASE

OPTIONAL BASE COURSE

BITUMINOUS TREATMENTS SURFACE COURSES & CONCRETE PAVEMENT

MILLING & RESURFACING OF EXISTING ASPHALTIC CONCRETE PAVEMENT & ROADWAY BASE... 36

ASPHALTIC CONCRETE FRICTION COURSE

PAVEMENT

DRIVEWAY RESTORATION

BRICK PAVEMENT REMOVAL

BRICK PAVEMENT INSTALLATION

STRUCTURES

BOX CULVERT SECTION

REINFORCING STEEL

INLETS, MANHOLES & JUNCTION BOXES

RELOCATION / ADJUSTMENT OF EXISTING UTILITIES

SKIMMER FOR OUTFALL DRAINAGE STRUCTURE

PIPE CULVERTS & STORM SEWERS

JACK & BORE

U-TYPE ENDWALLS & FLARED OR MITERED END SECTIONS

UNDERDRAIN

INCIDENTAL CONSTRUCTION

CURB & GUTTER

REMOVE & RESET GRANITE CURB

SIDEWALK

RIPRAP

GUARDRAIL

FENCING

DIRECTIONAL BORE

SODDING

HIGHWAY SIGNING

STREET LIGHTING CONDUIT SYSTEM

SHEETING & BRACING

BARRICADES

GENERAL CONSTRUCTION OPERATIONS

Measurement and Payment The items of work and the pay item numbers specified in the Schedule of Values contained in the Proposal are identified specifically with the corresponding primary Section numbers of the Technical Specifications, and are hereby incorporated by reference as extensions of the corresponding Technical Specifications.

The pay item descriptions shown in the Specifications, as, for example, Asphaltic Concrete or Concrete, Class II, shall be deemed to include all additional descriptive wording shown on the Plans or in the Schedule of Prices for the respective pay items.

The contract price shown for the various pay items in the Schedule of Values contained in the Proposal upon which award of the Contract is based shall constitute full compensation for all work and materials described and specified in the Specifications for the respective pay items.

Any pay items which appear on the Bid Submittal Sheets (Schedule of Values) and for which there is no technical or special provisions contained in Division I, the pay item shall be provided, measured, and paid as per the provisions of the FDOT Specifications, latest edition. Technical provisions have been included which may not have pay items listed on the Bid Submittal Sheets (Schedule of Values). These technical provisions are included as incidental to other items covered under other technical provisions which are included herein.

De-Watering Testing Requirements If there is no separate pay item for de-watering, then the cost for de-watering shall be included in the pay items where de-watering is required. The Contractor will monitor the de-watering discharge to ensure that turbidity levels remain under the State allowed level of 29 Nephelometric Turbidity Units (units used to measure turbidity) above background. If turbidity levels exceed these State standards, activities will cease and corrective measures will be implemented until the discharge is in compliance. The Contractor shall make every effort to contain the discharge within City owned drainage.

Should the Contractor choose to de-water to waters of the State, the Contractor must meet the testing requirements of 62-621.300(2) or 62-621.300(1), including water quality testing. For all pay items where de-watering is required, said pay items shall include the testing, reporting, and notification requirements described in the "State of Florida - Department of Environmental Protection - Generic Permit for Discharge of Produced Ground Water From Any Non-contaminated Site Activity" [62-621.300(2)] or "State of Florida - Department of Environmental Protection - Generic Permit for Discharges from Petroleum Contaminated Sites" [62-621.300(1)].

ACRONYMS & ABBREVIATIONS

AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute ASTM American Society of Testing and Materials CITY or CTS City of Tarpon Springs FDOT Florida Department of Transportation ID Inside Diameter PCED Pinellas County Public Works Engineering Department SCHEDULE OF VALUES The Schedule of Values contained in the Proposal (Division W) TON A weight of two thousand (2000) pounds FDOT SPECIFICATIONS FDOT Standard Specifications for Road and Bridge Construction

(current edition unless otherwise stated including latest FDOT approved interim specifications)

FDOT DESIGN STANDARDS FDOT Design Standards for Design, Construction, Maintenance and Utility Operations on the State Highway System (current edition unless otherwise stated) (including latest FDOT approved interim details)

SURVEY & LAYOUT BY CONTRACTOR

The work specified under this Section consists of all materials and labor necessary to complete the survey and layout by the Contractor, in accordance with the section “SURVEY AND LAYOUT” in Division B of these specifications, to completely construct the project, to the satisfaction of the Engineer.

This work shall include providing all lines, grades, boundaries and required survey and/or layout necessary to construct and inspect the project. All right-of-way and easement boundaries and centerline control points shall be established and maintained through the contract period by the Contractor.

The Contractor shall employ or retain the services of a Florida registered Professional Land Surveyor to satisfy all the requirements specified in section “SURVEY AND LAYOUT” of Division B of these specifications.

The Contractor shall be responsible to perform all layouts in acceptable standard methods.

The Contractor shall thoroughly familiarize themselves with the plans, specifications and on-site field conditions to submit a lump sum bid that will include all means and methods necessary to satisfy the survey and layout requirements of this project. All field books and calculations, related to layout, shall be available to the engineer upon request, for a period of one year after construction completion.

Basis of Payment:

The pay quantity shall consist of all materials and labor necessary to complete the survey and layout by the Contractor in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one Lump Sum quantity.

QUANTITY MEASUREMENTS SURVEY BY CONTRACTOR

The work specified under this Section consists of all materials and labor necessary to complete all quantity measurements by the Contractor, to the satisfaction of the Engineer.

The Contractor shall employ or retain the services of a Florida registered Professional Land Surveyor to satisfy all the requirements related to quantity measurements and shall be responsible to perform all measurements in acceptable standard methods.

The Contractor shall thoroughly familiarize themselves with the plans, specifications and on-site field conditions to submit a lump sum bid that will include all means and methods necessary to satisfy the measurement requirements of this project.

The Contractor shall provide summaries to the City, signed and sealed by a Florida registered Professional Land Surveyor, listing all items measured, measurement quantities and dates of measurements, within 5 days after receiving written request from the City.

The items that require measurements include, but are not limited to:

• Roadway items (surface course, base, stabilization, curb, sidewalks, etc.)

• Drainage items (inlets, pipes, box culverts, etc.)

• Other items (Handrails, guardrail, fencing, gates, landscaping, sod, fill, excavation, etc.)

In the case of dispute in quantity measurements, the City reserves the right to have CTS Development Services Department – Engineering Division, verify all measurements and calculations. Contractor’s Surveyor shall make all field books and calculations available for review by the engineer or his designee.

Basis of Payment:

The pay quantity shall consist of all materials and labor necessary to complete the quantity measurements by the Contractor in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one Lump Sum quantity.

PERMITTING AS-BUILT SURVEY REQUIREMENTS BY CONTRACTOR

required permitting as-built requirements, to the satisfaction of the Engineer.

The Contractor shall employ or retain the services of a Florida registered Professional Land Surveyor to satisfy all the requirements related to this as-built survey and shall be responsible to perform all survey operations in acceptable standard methods.

The Contractor shall thoroughly familiarize themselves with the plans, specifications and on-site field conditions to submit a lump sum bid that will include all means and methods necessary to satisfy the permitting as-built requirements of this project.

The Contractor shall provide the as-built survey to the City, signed and sealed by a Florida registered Professional Land Surveyor, within 25 days after receiving written request from the City. Contractor’s Surveyor shall make all field books and calculations available for review by the engineer or his designee.

The items that require as-built surveying shall include:

• Control structures - weir and grate elevations and dimensions

• Ponds - top of bank, toe of slope, etc.

• Sanitary Sewer Structures – Rim and Invert elevations

• Other items (if specified in Technical Special Provisions)

Basis of Payment:

The pay quantity shall consist of all materials and labor necessary to complete the permitting as-built survey requirements by the Contractor in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one Lump

AS-BUILT SURVEY REQUIREMENTS (UTILITY) BY CONTRACTOR

required as-built survey requirements for City of Tarpon Springs Utility Lines or other Utility Lines specifically listed in these specifications, to the satisfaction of the Engineer.

The Contractor shall employ or retain the services of a Florida registered Professional Land Surveyor to satisfy all the requirements related to this as-built survey and shall be responsible to perform all survey operations in acceptable standard methods.

The Contractor shall thoroughly familiarize themselves with the plans, specifications and on-site field conditions to submit a lump sum bid that will include all means and methods necessary to satisfy the utility as-built requirements of this project.

The Contractor shall provide the utility as-built survey to the City, signed and sealed by a Florida registered Professional Land Surveyor, prior to final project approval and release of monies retained by the City. The contractor’s Surveyor shall make all field books and calculations available for review by the engineer or his designee.

The items that require as-built surveying shall include:

• CTS Sewer Line

• CTS Water Line

• CTS Storm Sewer

• Other Utility Lines (if specified in Special Technical Provisions)

Basis of Payment:

The pay quantity shall consist of all materials and labor necessary to complete the utility as-built survey requirements by the Contractor in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one Lump

MOBILIZATION

The work specified under this Section consists of the preparatory work and operations in mobilizing to begin work on the project, including but not limited to those operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site(s), and for the establishment of temporary offices, buildings, safety equipment and first aid supplies, sanitary and other facilities as required by these specifications, special provisions, and state and local laws and regulations.

The Contractor shall furnish, install, and maintain station boards (every 100 ft) on one side of the project for the duration of the project. The station boards shall be 48 inch long, 1” x 4” lumber, painted white with 3 inch black stenciled numbers. Station boards shall be removed by the Contractor upon written notice of the Engineer.

The Contractor and all sub-contactors shall enter into an agreement with the property owner for the acquisition and use of all staging areas or privately owned property, and a copy of such agreement/s will be furnished to the City prior to the use of such property. The agreement will hold the City of Tarpon Springs harmless and absolve the City of any and all liability or responsibility for the duration of the agreement.

The cost of bonds and any required insurance, consideration for indemnification to the City and the Engineer, and any other preconstruction expenses necessary for the start of the work, excluding the cost of construction materials, shall also be included in this Section.

Pay item for Mobilization shall include taking pictures and a video of the project by the Contractor, prior to construction beginning, for the purpose of documenting existing conditions. The pictures and video shall be provided to the City prior to beginning construction.

Pay item for Mobilization shall also include the furnishing and placement of door hangers on all properties immediately affected by the project, prior to commencing construction, informing said properties of construction time frame, road closures or as directed by the Engineer.

Basis of Payment The work and incidental costs specified as being covered under this Section shall be paid for at the contract lump sum price, for Mobilization, in accordance with the following schedule:

Percent of Original Contract Amount Earned

Allowable Percent of the Lump Sum Price for Mobilization

5 25 10 50 25 75 50 100

Partial payments shall be limited to ten percent (10%) of the original contract amount for the project. Any remaining amount will be paid upon completion of all work on the project.

When more than one project (separate Project Fund Number) is included in the Contract, the above percentages shall apply separately to each of the projects, where separate pay items for Mobilization apply.

MAINTENANCE OF TRAFFIC

The work specified under this Section consists of the maintaining of vehicular and pedestrian traffic within the limits of the project for the duration of the construction period, in accordance with the requirements of Section 102 of the FDOT Specifications, as amended herein and in accordance with the Plans.

The road shall be kept open to two-way traffic for the duration of the construction period, except that, DURING NON-PEAK TRAFFIC PERIODS, one lane of traffic will be permitted provided that flagmen are used and prior approval is obtained from the City. The Contractor will not be permitted to isolate residences or places of business. Access shall be provided to all residences and all places of business whenever construction interferes with the existing means of access.

The Contractor shall furnish, erect and maintain all necessary traffic control and safety devices, in accordance with the Plans and FDOT Design Standards, applicable edition, and the State of Florida Roadway and Traffic Design Standards for Design, Construction, Maintenance and Utility Operations for Streets and Highways on the State Maintained Systems, applicable edition, and shall take all necessary precautions for the protection of the work and the safety of the public for the duration of the construction period. The work specified under this Section shall include removal of pavement markings, installation of pavement striping, markings and reflective markers, and all materials and construction necessary to create temporary connections for street, driveways and pedestrian traffic. The applicable edition of the documents referenced herein shall be the current edition or that edition of the respective documents specified in the Plans.

Temporary Curb (Asphaltic or Concrete) shall not be used, with the following exception: Portable Temporary Low Profile Barrier for Roadside Safety, in accordance with FDOT Index 412, can be used in lieu of barrier walls for design speeds of 45 mph or less, where a low profile is desired to maintain sight distance at intersections and driveways. Portable Temporary Low Profile Barrier for Roadside Safety shall be paid for under the contract unit value for Barrier Wall (Temporary) Low Profile Concrete (Linear Foot), and will be full compensation for furnishing, installing, maintaining, relocating and removing the barrier wall. The contractor shall not receive additional compensation for relocating the barrier wall (i.e., from one construction phase to another). The approved "Portable Temporary Low Profile Barrier for Roadside Safety" is a proprietary design by the University of Florida. Only those barrier units cast by producers licensed by the University of Florida will be allowed for installation. Availability of this device may be limited as a result of demand; this should be considered in establishing project schedules calling for this device.

Basis of Payment The work specified under this Section shall be paid for at the contract lump sum price for Maintenance of Traffic. The lump sum MOT shall be paid on a pro-rated monthly amount based on the contract time. Unless specified for under a separate pay item, the lump sum item shall include all costs for Maintenance of Traffic shown in the Plans, including, but not limited to, the following temporary items:

• Temporary Traffic Barricades

• Temporary Pavement for Maintenance of Vehicular Traffic (Install and Remove)

• Temporary Pavement for Maintenance of Pedestrian Traffic (Install and Remove)

• Temporary Pavement Markings, Pavement Striping and Reflective Markers

• Temporary Traffic Control Signals

• Temporary Curb (Includes Paint & Delineators)

• Panels Arrow Advance

• Temporary Vehicle Impact Attenuators

• Temporary Variable Message Signs

• Flagmen

• Off Duty Law Enforcement Officer

• Temporary Drainage

• Commercial Materials for Driveway Maintenance

• Temporary Concrete Barrier Wall (Including Mounted Lights-Type C Steady Burn)

MAINTENANCE OF TRAFFIC (ITEMIZED)

The work specified under this Section consists of the maintaining of vehicular and pedestrian traffic within the limits of the project for the duration of the construction period, in accordance with the requirements of Section 102 of the FDOT Specifications, as amended herein. The road shall be kept open to two-way traffic for the duration of the construction period, except that, during non-peak traffic periods, one lane of traffic will be permitted provided that flagmen are used and prior approval is obtained from the City. The Contractor will not be permitted to isolate residences or places of business. Access shall be provided to all residences and all places of business whenever construction interferes with the existing means of access.

The Contractor shall furnish, erect and maintain all necessary traffic control and safety devices, in accordance with the Plans and FDOT Design Standards, applicable edition, and the State of Florida Roadway and Traffic Design Standards for Design, Construction, Maintenance and Utility Operations for Streets and Highways on the State Maintained Systems, applicable edition, and shall take all necessary precautions for the protection of the work and the safety of the public for the duration of the construction period.

The work specified under this Section shall include all work shown in the Plans including, but not limited to, removal of existing pavement markings, installation and removal of pavement striping, markings and reflective markers, and all materials and construction necessary to create temporary connections for street, driveways and pedestrian traffic. The pay item for “Maintenance of Traffic – Lump Sum” shall include all work necessary for maintenance of vehicular traffic and pedestrian traffic, unless otherwise specified to be paid for under other items of work. Payment for pavement markings to be used during maintenance of traffic shall be paid for under Sections 706-710 of these specifications.

Temporary Curb (Asphaltic or Concrete) shall not be used, with the following exception: Portable Temporary Low Profile Barrier for Roadside Safety, in accordance with FDOT Index 412, can be used in lieu of barrier walls for design speeds of 45 mph or less, where a low profile is desired to maintain sight distance at intersections and driveways. Portable Temporary Low Profile Barrier for Roadside Safety shall be paid for under the contract unit value for Barrier Wall (Temporary) Low Profile Concrete (Linear Foot), and will be full compensation for furnishing, installing, maintaining, relocating and removing the barrier wall. The contractor shall not receive additional compensation for relocating the barrier wall (i.e., from one construction phase to another). The approved "Portable Temporary Low Profile Barrier for Roadside Safety" is a proprietary design by the University of Florida. Only those barrier units cast by producers licensed by the University of Florida will be allowed for installation. Availability of this device may be limited as a result of demand; this should be considered in establishing project schedules calling for this device. The applicable edition of the documents referenced herein shall be that edition of the respective documents specified in the Plans.

Basis of Payment The work specified under this Section shall be paid for in accordance with the following individual pay items:

• Maintenance of Traffic (lump sum)

• Temporary Traffic Barricades

• Temporary Pavement for Maintenance of Vehicular Traffic (Install & Remove)

• Temporary Pavement for Maintenance of Pedestrian Traffic (Install & Remove)

• Temporary Pavement Markings, Pavement Striping and Reflective Markers

• Temporary Traffic Control Signals

• Temporary Curb (Includes Paint & Delineators)

• Panels Arrow Advance

• Temporary Vehicle Impact Attenuators

• Temporary Variable Message Signs

• Flagmen

• Off Duty Law Enforcement Officer

• Temporary Drainage

• Commercial Materials for Driveway Maintenance

• Temporary Concrete Barrier Wall (Including Mounted Lights-Type C Steady Burn)

Note: If a pay item for one of the items above is not provided in the “Schedule of Values”, then the cost for said item/work shall be included in the “Maintenance of Traffic” (Lump Sum) pay item.

WATER FOR DUST CONTROL

The work specified under this Section consists of the furnishing and application of Water on the construction area including but not limited to sub-grade, un-surfaced base, or other un-surfaced traveled ways, in order to control dust resulting from construction operations. The locations and frequency of application shall be as directed by the Engineer. The Contractor must comply with Item 23 of Part ‘B’ of the City’s “General Conditions for Construction” as it relates to water used for construction and testing purposes.

Basis of Payment The work specified under this Section shall be paid for at the contract unit price per thousand gallons of Water for Dust Control.

PREVENTION, CONTROL & ABATEMENT OF EROSION & WATER POLLUTION

The work specified under this Section shall consist of the furnishing and application of measures required to control erosion on the project and in areas where work is accomplished in conjunction with the project, so as to prevent pollution of water, detrimental effects of public or private property adjacent to the project right of way and damage to work on the project. These measures will consist of construction and maintenance of temporary erosion control features including baled hay or straw, silt fences, floating turbidity barriers, staked turbidity barriers, rock bags, or as otherwise shown on the Plans or Stormwater Pollution Prevention Plan (SWPP). The furnishing and application of these measures shall be in accordance with Section 104 of the FDOT Specifications, as amended herein, and, where specified herein or on the Plans, applicable standard drawings of the FDOT Design Standards.

The work shall consist of the construction of baled hay or straw dams across water flow paths, and the placement of baled hay or straw barriers around drainage structures during the construction thereof, to protect against downstream or lateral accumulations of silt and debris. The dams shall be placed so as to effectively control silt and debris dispersion under the conditions present on the project, or any conditions created during construction activities, which might tend to produce erosion or the accumulation of silt and debris. Silt fences and turbidity barriers shall be constructed in accordance with the details shown in the Plans, or as may be directed by the Engineer, in a manner such as to insure the adequate performance of their intended function.

The Contractor shall inspect on a daily basis and re-establish, at no additional expense to the City, all baled hay or straw dams, silt fences, turbidity barriers, rock bags or sections thereof, which may become damaged, destroyed or otherwise rendered unsuitable for their intended function during the construction of the project. The work specified under this Section shall include the installation and inspection, re-establishment and maintenance of all required baled hay or straw dams, silt fences, turbidity barriers and rock bags, and all other work required to control effectively the downstream or lateral accumulation of silt and debris, control erosion, reduce suspended solids in downstream waters, and the removal of all such temporary erosion control facilities upon completion of the project. The work specified under this Section shall include the removal and proper disposal of debris, sediment, etc, which accumulates against erosion control or turbidity barriers. It will also include the removal of the erosion control barriers after construction is deemed complete.

The re-establishment and maintenance described above; shall be performed within twenty-four (24) hours after receiving notice by the Engineer. For each day following the twenty-four (24) hour period the deficiency is not corrected, the Contractor shall be assessed an amount of Five Hundred ($500.00) dollars per day. Payment to the City of said sums may become payable under the provisions of this article and shall be made by identifying said sums as a credit item on the Contractor's monthly pay estimate.

The Contractor shall be required to submit to the City (for review and approval) a project-specific plan for erosion and sedimentation control and construction phasing, prior to commencing construction activities. The plan will demonstrate the methodology for minimizing the amount of area disturbed and soil exposed at any one time and the corresponding erosion control measures. The plan must be approved and accepted by the City prior to commencing construction work. A deficient plan submittal by the contractor, and the subsequent need to re-submit a revised plan to the City for review, shall not constitute a basis for claiming a delay by the Contractor.

There is no separate pay item for costs associated with the plan. All costs associated with the plan shall be included in the pay items for which erosion control will be needed.

Basis of Payment

The pay quantities for the work specified under this Section shall be each of Bales of Hay or Straw, linear feet of Silt Fences, linear feet of Floating Turbidity Barriers or Staked Turbidity Barriers, each of Rock Bags, each of Soil Tracking Prevention Devices, actually constructed, placed and accepted, as authorized by the Engineer, and maintained to the satisfaction of the Engineer for the duration of the construction period.

DRAIN PIPE WITH SOCK (FOR SEDIMENTATION CONTROL)

The work specified under this Section consists of the temporary installation of Drain Pipe with Sock type products for the specific purpose of preventing and controlling soil erosion runoff and intrusion into stormwater drainage systems.

Drain sock products, such as “ADS Sock” or approved equal, shall be installed to conform to the requirements set forth by the manufacturer and guidelines regulated by the Pinellas County Environmental Management Department for erosion control measures. Perforated PVC pipe, in lieu of ADS pipe, or approved equal, may also be used.

The SOCK material shall be an ultra-porous filter (synthetic wrap material) that provides water entry and sediment protection and fits (in a snug manner) over the pipe. It shall be 100% knitted polyester (or approved equal), with an equivalent opening size of 30 to 40, burst strength of 100-135 (ASTM D 3786), fiber size of 100-200 denier per filament, 2.5 to 3.5 ounces per square yard (ASTM D 3776). It shall be free of folds and tears and will be replaced immediately, by the contractor and at the contractor’s expense, should such folds and tears occur.

The Contractor shall provide the Engineer a manufacturer’s certificate stating the manufacturer’s name, product name, style number and other pertinent information fully describing the product, to obtain approval prior to use.

The work specified under this Section shall include all preparation, installation and maintenance of the product per the manufacturer’s specifications. It shall also include removal of product from inlets at the end of the construction phase.

Basis of Payment

The pay quantity for the work specified under this Section shall be the number each of Drain Pipe with Sock (pipe + synthetic wrap material) required to span the opening of the inlet, satisfactorily installed, accepted and removed at the end of construction. The pay quantity of each shall include varying lengths, ranging from the minimum to maximum inlet throat openings shown in plans

CLEARING & GRUBBING

The work specified under this Section consists of the clearing and preparation of sites for proposed construction, in accordance with the requirements of Section 110 of the FDOT Specifications, as amended herein.

The work specified under this Section shall include the removal and off-site disposal of all trees indicated on the Plans to be removed, the removal and off-site disposal of all brush, stumps, roots, rubbish and debris, and all obstructions resting on or protruding through the surface of the existing ground and the surface of excavated areas, the removal and off-site disposal of all existing facilities, structures and pavement indicated on the Plans to be removed, plugging of water wells, and the removal and off-site disposal of all buildings, structures, appurtenances, and other facilities necessary to prepare the area for the proposed construction.

All buildings, structures, utilities and other obstructions indicated on the Plans to remain shall be carefully protected against displacement or damage.

Except as otherwise provided for in these Specifications, the work to be performed under this Section shall also include the clearing and grubbing necessary for the excavation of detention ponds, borrow pits, and the like, and the clearing and grubbing necessary for the construction of designated haul routes.

Included under this Section shall be the removal and off-site disposal of all product and debris except that which is to be salvaged or which is required to complete the construction of the project. Whenever it is necessary to cut for removal large roots of trees to be preserved, the roots to be cut shall be cleaned prior to cutting and cut with a saw. Cut shall be smooth without jagged edges.

The Contractor shall make his own inspection to determine the character, density and extent of trees, vegetation and other items subject to removal and disposal under these provisions. The attention of the Contractor is directed to the fact that the burning of debris resulting from clearing and grubbing operations shall not be permitted within City-owned lands or rights-of-way.

Nothing in these provisions shall be construed to authorize the removal or disturbance of any tree or other form of vegetation, or any marine, land or air creature natural habitat, which may be subject to the jurisdiction of regulatory agencies.

This section shall also include the cost for trimming of trees by an arborist and disposal of the trimmings, as shown on the plans and/or required for construction of project.

This section shall also include the temporary relocation of mailboxes during construction and permanent relocation after construction has been completed.

Basis of Payment The pay quantity shall consist of all clearing and grubbing required in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one lump sum quantity, unless otherwise specified in the schedule of values.

ROOT CONTROL BARRIER

The work specified under this Section consists of the installation of Root Control Barrier in trenches, alongside hardscape structures such as sidewalks, curbing, pavements concrete and building foundations to prevent structural damage due to root penetration, in accordance with these specifications, at locations as directed by the Engineer.

Root control barrier, such as “Biobarrier” or approved equal, shall be installed to conform to the requirements as set forth by the manufacturer, to a minimal depth of 18” below finish grade of adjacent sidewalk or curbing. Root Barrier shall be free of folds and tears to produce an effective barrier between concrete construction and trees. Installation shall be perpendicular to finish grade and all edges shall be below finish grade once restoration of the adjacent disturbed area has been completed.

Product labels shall clearly show the manufacturer or supplier name, style number, and roll number and shall include a compliance statement certifying that all ingredients and inspection standards for this product have been met.

The Contractor shall provide to the Engineer a manufacturer’s certificate stating the manufacturer’s name, product name, style number, chemical composition and other pertinent information to fully describe the product. The Contractor shall affix an applicable MSDS (Material Safety Data Sheet) to the outside of each shipping container for the product.

The work specified under this Section shall include all preparation of sub-grade and the furnishing of all necessary incidental items for proper installation per the manufacturer’s specifications.

Basis of Payment The work specified under this Section shall be paid for in Linear Feet, of root control barrier, of widths specified by the applicable pay items, actually constructed and accepted.

EARTHWORK & RELATED OPERATIONS

Excavation and Embankment The work specified under this Section consists of the excavation and embankment required for completion of the project. All work specified under this Section shall conform to the requirements of Section 120 of the FDOT Specifications, except as amended herein.

Excavation specified under this Section shall include the excavation and removal of all existing materials, debris, obstructions, structures and utilities encountered during excavation, except where designated in the Plans or Specifications to remain, between the original ground or top of existing pavement and the surface of the completed earthwork, within the limits shown in the Plans. Fill material, borrow material, and embankment shall consist of suitable earthen material acceptable to the Engineer. Ownership of all suitable excavated material shall remain with the City until all earthwork requirements for the project have been fulfilled. Except as otherwise provided for in the Plans and Specifications, all surplus material and other items not claimed by the City shall become the property of the Contractor and shall be disposed of by the Contractor in areas provided by the Contractor. The Contractor shall not over-excavate a construction site below the elevations shown in the Plans and Permits, unless specifically pre-approved by the City.

All fill and embankment material shall be A-1 or A-3 soil material, per AASHTO M-145 classifications. If A- 3 material is used, it shall have a minimum average lab permeability of 5x10-5 cm/sec (0.14 ft./day) as per FM I-T215. Sites such as stormwater management areas or mitigation sites located within the project corridor identified by the Contractor for possible use as Embankment must be presented to the Engineer for approval prior to use. Any borrow source is required to have the appropriate soil and materials testing required per Pinellas County and FDOT standards and specifications to qualify as Embankment. In addition, borrow sources shall not be in conflict with any specific stormwater or environmental permit and/or contract requirements. The Engineer of Record and the City do not guarantee or qualify any materials, identified in the plans as Regular Excavation, as being suitable borrow or a suitable borrow source.

EXCAVATION OF UNSUITABLE MATERIAL specified under this Section consists of the removal of muck, clay, rock and all other types of unsuitable material and shall include the supply, placement and compaction of fill material as replacement for unsuitable material.

The location and quantity of unsuitable material is estimated, and is approximate only. The removal of unsuitable material may be required at additional locations to be determined in the field by the Engineer, after unsuitability is confirmed by testing laboratory. For roadway construction in general, unsuitable material shall be removed to a minimum depth of four (4) feet below proposed centerline grade, or as directed by the Engineer in the field. In areas adjacent to existing structures, the Contractor shall remove unsuitable material to a minimum depth of four (4) feet below proposed grade, or as directed by the Engineer, and backfilled immediately with suitable material. Testing shall be performed in compliance with Item 44 of the City’s “General Conditions for Construction”.

EXCAVATION OF DETENTION POND AND/OR MITIGATION AREA specified under this Section shall include all excavation required for the construction of detention ponds, mitigation areas, reservoirs and other facilities of a similar nature and also shall include all grading, the preparation of side slopes, compacting as required, final dressing and all incidental work required for the construction of detention ponds.

Unless otherwise provided for in these Specifications, the work to be performed under this Section shall include the hauling, to designated sites, of all material which may remain the property of the City, and the stockpiling, compaction, and shaping of such material to the template lines shown in the Plans or as directed by the Engineer. Except as otherwise provided for in the Plans and Specifications, all surplus material and other items not claimed by the City shall become the property of the Contractor and shall be disposed of by the Contractor in areas provided by the Contractor. Pay item for excavation of detention pond shall include the excavation of unsuitable materials.

FILL MATERIAL Work specified under this Section consists of the placement and compaction of fill material for such purposes as filling of ditches and channels, and the filling of substantial voids and depressions. The fill material used to replace excavated unsuitable material shall be paid under “excavation of unsuitable material.”

The work specified under this Section shall include the shaping, compaction and dressing of material to the condition required for the placement of embankment, bedding, pavement or other material, and where required, to the slopes and tolerances normally associated with final grading operations, such as required for seeding and the placement of sod. The work specified under this Section shall include the furnishing of all required borrow material. Borrow material shall be furnished from areas provided by the Contractor, and shall be approved by the Engineer prior to placement.

For limits of payment, where no other material, such as embankment, pavement, bedding or other select material, is to be constructed over fill material, the limits of payment for Fill Material shall extend from the line of contact between Fill Material and original ground or completed excavation to the finished earthwork lines for Fill Material shown in the Plans. Where embankment is to be constructed directly over Fill Material, the limits of payment for Fill Material shall extend from the line of contact between Fill Material and original ground or completed excavation to the straight line connecting the highest points of original ground to which Fill Material is to be placed. Where bedding or other select material is to be constructed directly over Fill Material, the limits of payment for Fill Material shall extend from the line of contact between Fill Material and original ground or completed excavation to the bottom line of bedding or select material, whichever is encountered first. Where pavement is to be constructed directly over Fill Material, the limits of payment for Fill Material shall extend from the line of contact between Fill Material and original ground or completed excavation to the bottom line of Stabilization, Base material or pavement, whichever is first encountered. The limits of payment defined above shall be adjusted as necessary by the Engineer to exclude payment for such quantities of suitable fill material, measured in cubic yards after placement and compaction, as may be available as surplus material on the project site.

Testing shall be performed in compliance with Item 44 of the City’s “General Conditions for Construction”.

EMBANKMENT work specified under this Section consists of the furnishing and placement of material where such work involves the construction of embankment, side slopes, and the shaping and dressing of material to neat lines conforming to definite geometric configurations, such as required in the construction of berms, road-beds and other embankments, and the reshaping of ditches, stream channels and pond bottoms, fill and backfill, and miscellaneous grading required for the completion of the project. Material shall be furnished from areas provided by the Contractor, and shall be approved by the Engineer prior to placement.

Where grading operations outside the limits shown in the Plans require the placement, compaction, shaping and dressing of fill material for the completion of the project, and where no separate pay items for such work are provided in the Schedule of Values, such work, including the furnishing of borrow material, shall be included under this Section. Borrow material shall be furnished from areas provided by the Contractor, and shall be approved by the Engineer prior to placement. The limits of payment for Embankment shall extend from the line of contact with original ground or Fill Material to the finished earthwork lines shown in the Plans. Where pavement is to be constructed over Embankment the upper limit of payment for Embankment shall be the bottom line of Stabilization, Base material or pavement, whichever is first encountered.

Basis of Payment When the quantity for a pay item under this Section is shown in the Schedule of Values as a lump sum quantity, the pay quantity shall consist of all work described and specified herein which may be required in connection with the construction of the project, performed to the satisfaction of the Engineer. Unless specified to be paid for at the lump sum price, the work specified under this Section shall be paid for at the contract price per cubic yard. If the contractor has a claim that actual volumes are greater than what is depicted in the contract, then the contractor shall be responsible for providing signed and sealed surveys (pre & post), with volume calculations, to substantiate any contractor claim/request for additional compensation.

For FILL MATERIAL, payment shall be made only for the furnishing and placement of such quantities of fill material as may be required in excess of suitable material available on the project site as surplus material.

For FILL MATERIAL AND BORROW MATERIAL, the pay quantity for work specified herein shall be the number of cubic yards of material actually furnished, as determined by field measurement of the compacted in-place material, and accepted by the Engineer.

FOR BORROW MATERIAL, at the discretion of the Engineer, the material furnished under this Section may be measured in its loose state and the volume thereof converted to the equivalent volume of compacted in-place material. In such case a shrinkage factor of 35% shall be assumed, and the equivalent volume of compacted in-place material shall be taken as the volume of the material in its loose state multiplied by the factor 0.74074.

For EMBANKMENT, the work specified herein shall be paid for under the pay items shown in the Schedule of Values for Embankment. All quantities shown in the Plans or the Schedule of Values shall be the theoretical quantities calculated, with no factor applied for shrinkage, losses due to clearing and grubbing, or any other consideration. It shall be the responsibility of the Contractor to address the various factors affecting the cost of the completed work, and to include in the unit bid price the costs associated with such factors.

If the schedule of values does not provide a specific pay item for the aforementioned work, then the work shall be included in the pay item for grading (lump sum).

GRADING

All work specified under this Section shall conform to the requirements of Sections 110 and 120 of the FDOT Specifications, except as amended herein.

Except for that work excluded under other provisions of this Section, and except as provided for under other Sections of these Specifications, the work to be performed under this Section shall consist of all excavation, the supply, placement and compaction of all embankment and fill material, all grading of roadway shoulders and ditches, the construction or re-channelization of all ditches and swales, all graded road connections, the shaping or reshaping of slopes, all final dressing, and all other earthwork operations required for the completion of the project. The Contractor shall not over-excavate a construction site below the elevations shown in the Plans and permits, unless specifically pre-approved by the City.

Unless otherwise provided for, all borrow material required for the completion of work performed under this Section shall be furnished by the Contractor from areas provided by the Contractor.

When the project includes the construction of Road Base, the work performed under this Section shall include also the furnishing, placement and compaction of all embankment material required between existing ground and the bottom of the Road Base.

The work to be performed under this Section shall not include the excavation of unsuitable material, or the furnishing or placement of borrow material as replacement for unsuitable material, or other items of work for which separate payment is to be made, but shall include the placement and compaction of suitable fill material as replacement for unsuitable material where suitable fill material is available as surplus material from the project site.

Ownership of all suitable material shall remain with the City until all earthwork requirements for the project have been fulfilled. Except as otherwise provided for in the Plans and Specifications, all surplus material and other items not claimed by the City shall become the property of the Contractor and shall be disposed of by the Contractor in areas provided by the Contractor.

Basis of Payment The pay quantity for work specified under this Section shall be one lump sum quantity which shall include all work described and specified herein.

DREDGING

The work specified under this Section consists of the dredging of submerged channels and areas by the use of drag lines or by methods of hydraulic dredging.

Dredging by the use of drag lines or other non-hydraulic methods shall be classified as regular dredging.

Dredging by hydraulic methods shall be classified as hydraulic dredging.

All dredging operations shall conform to the applicable requirements of Section 120 of the FDOT Specifications, as amended herein, and shall be performed in accordance with all provisions and conditions of all permits issued for dredging operations on this project.

Dredging shall include all labor, equipment and materials necessary for cleaning, deepening and widening an area, canal, creek or area by the use of a dredge, or any other type of machinery or equipment used to clean, deepen, or widen and also pumping (and/or otherwise transporting) of the dredged material to the spoil site. It shall also include all work associated with spoils site area, stockpile management, disposition of dredged materials, discharge/containment of settling ponds, geo-tubes (if applicable), etc.

All dredged material shall become the property of the contractor and the contractor shall be responsible for transportation of dredged material to a suitable off site disposal area (unless specified otherwise).

Basis of Payment The quantity to be paid for under this Section shall be one lump sum of cubic yards quantity which shall include all items of work described and specified for:

• Dredging, Regular

• Dredging, Hydraulic

FLOWABLE CONCRETE FILL

All work specified under this Section shall conform to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .