Beckett Bridge Watermain and Force Main Relocation
Solicitation number
260141-B-JL
Issued by
Pinellas County, Florida

About this file

This is a Perpetual Utility Easement document related to the Beckett Bridge Watermain and Force Main Relocation project in Tarpon Springs, Florida. The easement grants rights to the City of Tarpon Springs (or relevant water utility authority) to install, operate, maintain, and access underground water and wastewater infrastructure on private property owned by Robert N. Faison and Lisa M. Faison. The easement is recorded in the public records and establishes a permanent right-of-way for the approximately 1,150 feet each of new 8-inch potable water main and 12-inch wastewater force main that will be installed subaqueuously in the vicinity of Beckett Bridge via horizontal directional drilling.

The perpetual nature of this easement means it extends indefinitely and does not expire, ensuring the utility's long-term access and operational rights to the infrastructure on the property owners' land. This easement document represents a critical real property acquisition component for the project, with an estimated construction cost between $2,000,000 and $4,000,000. The easement likely includes standard provisions regarding utility access, maintenance rights, and compensation or consideration provided to the property owners for the permanent encumbrance on their property.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .